﻿_id	Owner - Item 21 + 22/B.CL.01 + 02	Region - Item 2/B.L.04	Structure Number - Item 8/B.ID.01	Structure Name	Facility Carried - Item 7/B.F.03	Feature Intersected - Item 6/B.F.03	Location - Item 9/B.L.06	Service Type On - Item 42A/B.F.01+2	Service Type Under - Item 42B/B.F.01+2	Year Built - Item 27/B.W.01	Year Reconstructed - Item 106/B.W.02	Year Overlaid - B.W.02	Year Painted - B.W.02	Total Spans - Item 45+Item 46/B.SP.02	Length - Item 49/B.G.02	Bridge Width Out-to-Out - Item 52/B.G.05	Main Span Count - Item 45/B.SP.02	Main Span Material Type - Item 43A/B.SP.04	Main Span Design Type - Item 43B/B.SP.06	Approach Span Count - Item 46/B.SP.02	Approach Span Material Type - Item 44A/B.SP.04	Approach Span Design Type - Item 44B/B.SP.06	Wearing Surface - Item 108A/B.SP.10	Design Load - Item 31/B.LR.01	Lanes on Structure - Item 28A/B.BH.08	Lanes under Structure - Item 28B/B.BH.08	Latitude - Item 16/B.L.05	Longitude - Item 17/B.L.06	Report Date	Geo Reference	Transporation Service Center	NBI Indicator	NHS Indicator Item 104/B.H.03	Bridge Deck Area - B.G.16	Bridge Width Curb-to-Curb - Item 51/B.G.06	LRS Route ID Item 13/B.H.06	LRS Mile Point Item 11/B.H.07	Inspection Date Item 90/B.IE.02	Inspection Frequency Item 91/B.IE.05	Posting Status Item 41/B.IE.02	Deck Condition Rating Item 58/B.C.01	Superstructure Condition Rating Item 59/B.C.02	Substructure Condition Rating Item 60/B.C.03	Culvert Condition Rating Item 62/B.C.04
1	Macomb County	Metro	6344	""	FAIRCHILD RD	DEER CREEK	0.1 MI SOUTH OF 25 MILE	1 Highway	5 Waterway	2002				1	28.2	39.4	1	1 Concrete	19 Culvert	0	""	""	6 Bituminous	5 MS 18 (HS 20)	2		42.7	-82.86399	2025-08-18T00:00:00	POINT (-82.86399 42.7)	Macomb	NBI	Non-NHS	1111.08	43.6	817902	5.28	2025-05-20T00:00:00	24	A	N	N	N	7
2	Troy	Metro	7986	""	ROCHESTER RD	RENSHAW COUNTY DRAIN	2.7 MI N OF BIG BEAVER RD	1 Highway	5 Waterway	1979				2	23	65.9	2	1 Concrete	19 Culvert	0	""	""	N N/A (no deck (NBI))	5 MS 18 (HS 20)	6		42.6	-83.12941389	2025-08-18T00:00:00	POINT (-83.12941389 42.6)	Oakland	NBI	NHS	1515.7	0	4413538	3.06	2025-04-01T00:00:00	24	A	N	N	N	6
3	Wayne County	Metro	12172	""	BEECH-DALY ROAD	MIDDLE ROUGE RIVER	DBN HTS          N/WARREN	5 Highway-pedestrian	5 Waterway	1953	2021	1997		3	90.9	62.3	3	2 Concrete Continuous	01 Slab	0	""	""	2 Integral Concrete	5 MS 18 (HS 20)	4		42.34	-83.2929	2025-08-18T00:00:00	POINT (-83.2929 42.34)	Taylor	NBI	Non-NHS	5663.07	47.9	1596409	2.18	2023-10-23T00:00:00	24	A	7	9	8	N
4	Wayne County	Metro	12266	""	LILLEY ROAD	LOWER ROUGE RIVER	CANTON         N/MICHIGAN	5 Highway-pedestrian	5 Waterway	2019				1	110	47.08	1	5 Prestressed Concrete	32 Multi Str Comp	0	1 Concrete	""	2 Integral Concrete	A HL 93	2		42.28	-83.4565	2025-08-18T00:00:00	POINT (-83.4565 42.28)	Taylor	NBI	Non-NHS	5178.8	30	4710390	0.15	2023-11-07T00:00:00	24	A	9	9	9	N
5	Wayne County	Metro	12293	""	ARKONA ROAD	BRADSHAW DRAIN	SUMPTER            W/KARR	1 Highway	5 Waterway	1981				3	31.8	27.9	3	3 Steel	19 Culvert	0	""	""	N N/A (no deck (NBI))	0 Unknown	2		42.1	-83.51137	2025-08-18T00:00:00	POINT (-83.51137 42.1)	Taylor	NBI	Non-NHS	887.22	0	1670405	1.45	2024-08-15T00:00:00	24	A	N	N	N	6
6	MDOT	Metro	11107	82022-R01	I-94 EB	CSX RR & SHOOK RD	4.0 MI W OF TAYLOR	1 Highway	4 Highway-railroad	2003				4	285	78.5	4	5 Prestressed Concrete	05 Box Bm/Gird- Multiple	0	""	""	1 Monolithic Concrete	9 MS22.5(HS25)or greater	4	2	42.23	-83.39542	2025-08-18T00:00:00	POINT (-83.39542 42.23)	Taylor	NBI	NHS	22372.5	75.3	1576405	7.63	2023-08-16T00:00:00	24	A	6	6	7	N
7	Oakland County	Metro	13810	""	PONTIAC LAKE ROAD	CLINTON RIVER	WATERFORD TWP SEC 21	1 Highway	5 Waterway	2024				1	42	32.5	1	1 Concrete	19 Culvert	0	""	""	6 Bituminous	B Greater than HL 93	2		42.65	-83.3975	2025-08-18T00:00:00	POINT (-83.3975 42.65)	Oakland	NBI	Non-NHS	1365	37.5	703707	6.71	2025-02-24T00:00:00	17	A	N	N	N	9
8	MDOT	Metro	11501	82122-S15	BREAKFAST U-TRN LN	I-96	IN REDFORD TWP	5 Highway-pedestrian	1 Highway	2014				2	200.3	52.4	2	5 Prestressed Concrete	06 Box Bms- Single/Sprd	0	""	""	1 Monolithic Concrete	B Greater than HL 93	2	11	42.38	-83.307365	2025-08-18T00:00:00	POINT (-83.307365 42.38)	Taylor	NBI	Non-NHS	10495.72	40	4706055	0.02	2024-09-16T00:00:00	24	A	7	8	8	N
9	Novi	Metro	8246	""	MEADOWBROOK RD	COURTER DITCH	0.4 MI N OF NINE MILE RD	5 Highway-pedestrian	5 Waterway	1976	2005			1	62	44.7	1	5 Prestressed Concrete	05 Box Bm/Gird- Multiple	0	""	""	5 Epoxy Overlay	5 MS 18 (HS 20)	2		42.47	-83.45532	2025-08-18T00:00:00	POINT (-83.45532 42.47)	Oakland	NBI	Non-NHS	2771.4	28.1	656706	2.32	2024-09-27T00:00:00	24	A	8	7	7	N
10	MDOT	Metro	11209	82024-S02	CASS AVE	I-94	IN DETROIT	5 Highway-pedestrian	1 Highway	2022				2	190.3	82.8	2	4 Steel Continuous	82 Pl Girder Comp	0	""	00 Other	1 Monolithic Concrete	B Greater than HL 93	4	6	42.36	-83.07049	2025-08-18T00:00:00	POINT (-83.07049 42.36)	Detroit	NBI	Non-NHS	15756.84	24	1577605	2.6	2024-08-14T00:00:00	15	A	9	9	9	N
11	Warren	Metro	6435	""	RYAN ROAD	RED RUN DRAIN	0.37 MI S OF 14 MI RD	5 Highway-pedestrian	5 Waterway	1991				3	126	72.2	3	5 Prestressed Concrete	05 Box Bm/Gird- Multiple	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	5		42.53	-83.06827	2025-08-18T00:00:00	POINT (-83.06827 42.53)	Macomb	NBI	Non-NHS	9097.2	59.1	799302	5.67	2023-10-26T00:00:00	24	A	8	7	6	N
12	MDOT	Metro	6158	50111-S15	12 MI RD	I-94	W LTS OF ST CLAIR SHORES	5 Highway-pedestrian	1 Highway	1967	2002		1997	4	197	62.3	4	3 Steel	32 Multi Str Comp	0	""	""	3 Latex Concrete/Similar	4 M 18 (H 20)	4	6	42.51	-82.91822	2025-08-18T00:00:00	POINT (-82.91822 42.51)	Macomb	NBI	NHS	12273.1	47.9	803401	8.54	2025-06-25T00:00:00	24	A	7	6	6	N
13	MDOT	Metro	11563	82123-S15	GR RIV LT TRN(M-5)	I-96 (JEFFRIES FRWY)	IN DETROIT	5 Highway-pedestrian	1 Highway	1971	2005		2005	4	283.5	35.9	4	3 Steel	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	2	12	42.38	-83.17678	2025-08-18T00:00:00	POINT (-83.17678 42.38)	Detroit	NBI	NHS	10177.65	28.5	4710079	0.04	2025-08-14T00:00:00	24	A	7	7	7	N
14	MDOT	Metro	6123	50062-S11	I-696 RAMP N TO W	I-94	IN ST CLAIR SHORES	1 Highway	1 Highway	1972		2010	1997	4	296.3	46.4	4	3 Steel	82 Pl Girder Comp	0	""	""	5 Epoxy Overlay	5 MS 18 (HS 20)	2	6	42.49	-82.916855	2025-08-18T00:00:00	POINT (-82.916855 42.49)	Macomb	NBI	NHS	13748.32	27.7	1740604	0.1	2024-06-27T00:00:00	24	A	6	7	5	N
15	MDOT	Metro	11312	82062-S01-4	US-12 WB	US-24	IN DEARBORN OVER US-24	5 Highway-pedestrian	1 Highway	1937	1983		1983	2	95.2	63	2	3 Steel	02 Multi Str Non Comp	0	""	""	5 Epoxy Overlay	4 M 18 (H 20)	4	4	42.3	-83.271645	2025-08-18T00:00:00	POINT (-83.271645 42.3)	Taylor	NBI	NHS	5997.6	54.2	4705565	14.68	2024-12-30T00:00:00	12	A	4	7	7	N
16	MDOT	Metro	12667	82103-S04	WOODWARD AVE UTURN	M-8, DAVISON FWY	CITY OF HIGHLAND PARK	1 Highway	1 Highway	1996				2	202.5	37.1	2	5 Prestressed Concrete	02 Multi Str Non Comp	0	""	""	5 Epoxy Overlay	5 MS 18 (HS 20)	2	10	42.4	-83.093636	2025-08-18T00:00:00	POINT (-83.093636 42.4)	Detroit	NBI	Non-NHS	7512.75	34	4700006	0.01	2023-11-28T00:00:00	24	A	7	5	8	N
17	MDOT	Metro	8038	63173-S08	LAHRING RD	I-75	2.2 MI SE OF GENESEE COL	1 Highway	1 Highway	1962				4	214	30.9	4	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	5 Epoxy Overlay	2 M 13.5 (H 15)	2	6	42.84	-83.58485	2025-08-18T00:00:00	POINT (-83.58485 42.84)	Oakland	NBI	Non-NHS	6612.6	27.5	651303	2.35	2024-12-16T00:00:00	24	A	6	7	7	N
18	Wayne County	Metro	11986	""	MARLEY DRIVE	CANAL (WEST)	BROWNSTOWN   E/MILLEVILLE	5 Highway-pedestrian	5 Waterway	2002		2002		1	45	29.9	1	1 Concrete	19 Culvert	0	""	""	2 Integral Concrete	6 MS18(HS20)+mod	2		42.05	-83.19208	2025-08-18T00:00:00	POINT (-83.19208 42.05)	Taylor	NBI	Non-NHS	1345.5	25.7	1709809	0.07	2024-09-19T00:00:00	24	A	N	N	N	7
19	MDOT	Metro	11817	82251-S16	WARREN AVE	I-75	IN DETROIT	5 Highway-pedestrian	1 Highway	1962	2007		2007	4	205.2	173.1	4	3 Steel	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	6 MS18(HS20)+mod	12	8	42.36	-83.05424	2025-08-18T00:00:00	POINT (-83.05424 42.36)	Detroit	NBI	NHS	35520.12	136.7	1628604	7.49	2025-07-17T00:00:00	24	A	6	7	7	N
20	Wayne County	Metro	12119	""	NORTHVILLE ROAD	MIDDLE ROUGE RIVER	PLYMOUTH T S/E N HINES DR	5 Highway-pedestrian	5 Waterway	1921	1953			2	67.9	62.7	2	4 Steel Continuous	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	4		42.38	-83.46261	2025-08-18T00:00:00	POINT (-83.46261 42.38)	Taylor	NBI	Non-NHS	4257.33	47.9	1679402	0.02	2025-05-27T00:00:00	24	A	5	5	6	N
21	MDOT	Metro	6182	50112-S01	M-3 & M-29	I-94	@ M-3 & M-29	1 Highway	1 Highway	1963		2002	2002	4	347.8	75.4	4	3 Steel	82 Pl Girder Comp	0	""	""	2 Integral Concrete	5 MS 18 (HS 20)	4	6	42.67	-82.82037	2025-08-18T00:00:00	POINT (-82.82037 42.67)	Macomb	NBI	NHS	26224.12	64	807106	14.09	2025-06-10T00:00:00	12	A	6	4	6	N
22	Oakland County	Metro	12685	""	NEWMAN ROAD	PAINT CREEK	BET STANTON AND INDIANWD	1 Highway	5 Waterway	1994				1	22	27.9	1	1 Concrete	19 Culvert	0	""	""	8 Gravel	5 MS 18 (HS 20)	2		42.8	-83.29147	2025-08-18T00:00:00	POINT (-83.29147 42.8)	Oakland	NBI	Non-NHS	613.8	32.8	669910	0.57	2024-07-11T00:00:00	24	A	N	N	N	6
23	MDOT	Metro	7878	63081-S07	9 MI RD	M-10 RAMP	IN SOUTHFIELD (RAMP E)	1 Highway	1 Highway	1964	1998		1996	3	117.3	64	3	3 Steel	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	5	2	42.46	-83.222275	2025-08-18T00:00:00	POINT (-83.222275 42.46)	Oakland	NBI	Non-NHS	7507.2	56.1	684404	4.87	2023-10-30T00:00:00	24	A	7	7	6	N
24	Macomb County	Metro	6309	""	RAAP ROAD	FISHER LAKE OUTLET	0.1 MI E OF FISHER ROAD	1 Highway	5 Waterway	1982				3	21	29.5	3	3 Steel	19 Culvert	0	""	""	N N/A (no deck (NBI))	4 M 18 (H 20)	2		42.82	-83.07185	2025-08-18T00:00:00	POINT (-83.07185 42.82)	Macomb	NBI	Non-NHS	619.5	0	4200376	0.11	2024-08-07T00:00:00	12	P	N	N	N	4
25	Macomb County	Metro	6393	""	WEBER ROAD	BELLE RIVER	1.3 MILES EAST OF M-19	1 Highway	5 Waterway	2002				2	120	47.2	2	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	2		42.88	-82.74145	2025-08-18T00:00:00	POINT (-82.74145 42.88)	Macomb	NBI	Non-NHS	5664	40	829610	4.1	2025-06-25T00:00:00	24	A	7	7	7	N
26	MDOT	Metro	11812	82251-S11	I-375 N W TURN RD	I-75 & RAMP	IN DETROIT	1 Highway	1 Highway	1963	1998		1989	8	511.3	31.1	2	3 Steel	82 Pl Girder Comp	6	3 Steel	32 Multi Str Comp	1 Monolithic Concrete	6 MS18(HS20)+mod	1	9	42.34	-83.04398	2025-08-18T00:00:00	POINT (-83.04398 42.34)	Detroit	NBI	NHS	15901.43	27.9	1585605	0.18	2024-10-21T00:00:00	24	A	7	5	6	N
27	MDOT	Metro	7892	63082-S02	M-10 WB	US-24	IN SOUTHFIELD	1 Highway	1 Highway	1964	2006		1999	3	188.1	96.3	3	3 Steel	82 Pl Girder Comp	0	""	""	1 Monolithic Concrete	6 MS18(HS20)+mod	6	6	42.49	-83.284706	2025-08-18T00:00:00	POINT (-83.284706 42.49)	Oakland	NBI	NHS	18114.03	93	710102	4.66	2025-05-09T00:00:00	24	A	6	5	5	N
28	MDOT	Metro	8098	63174-S30	10.5 MI ROAD	I-75	@ CITY OF ROYAL OAK	5 Highway-pedestrian	1 Highway	2022				2	222.3	66.7	2	5 Prestressed Concrete	32 Multi Str Comp	0	5 Prestressed Concrete	32 Multi Str Comp	1 Monolithic Concrete	B Greater than HL 93	2	11	42.48	-83.11354	2025-08-18T00:00:00	POINT (-83.11354 42.48)	Oakland	NBI	Non-NHS	14827.41	52	651908	3.42	2025-04-17T00:00:00	24	A	8	8	8	N
29	Taylor	Metro	11635	""	HURON STREET	FRANK & POET DRAIN	S OF EUREKA	1 Highway	5 Waterway	1965				2	34.8	36.1	2	3 Steel	19 Culvert	0	""	""	N N/A (no deck (NBI))	5 MS 18 (HS 20)	2		42.2	-83.23508333	2025-08-18T00:00:00	POINT (-83.23508333 42.2)	Taylor	NBI	Non-NHS	1256.28	0	1654817	0.07	2024-12-02T00:00:00	24	A	N	N	N	7
30	MDOT	Metro	11170	82023-S02	ADDISON RD	I-94	IN DETROIT	5 Highway-pedestrian	1 Highway	1949	1996		1949	2	124	57.4	2	3 Steel	02 Multi Str Non Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	4	6	42.33	-83.15094	2025-08-18T00:00:00	POINT (-83.15094 42.33)	Detroit	NBI	Non-NHS	7117.6	44	1577109	0.04	2023-09-25T00:00:00	24	A	7	6	6	N
31	MDOT	Metro	13002	63101-C03	I-696	PEBBLE CREEK	E OF INKSTER RD	1 Highway	5 Waterway	2023				1	32.1	123.7	1	1 Concrete	19 Culvert	0	""	""	N N/A (no deck (NBI))	B Greater than HL 93	8		42.49	-83.31692	2025-08-18T00:00:00	POINT (-83.31692 42.49)	Oakland	NBI	NHS	3970.77	150.04	710701	6.8	2024-10-15T00:00:00	24	A	N	N	N	9
32	MDOT	Metro	8016	63172-S12-1	I-75 NB	CLINTONVILLE RD	4.1MI SE OF M-15	1 Highway	1 Highway	1962	1988	1983	1988	3	162	62	3	3 Steel	02 Multi Str Non Comp	0	""	""	5 Epoxy Overlay	5 MS 18 (HS 20)	3	2	42.72	-83.34931	2025-08-18T00:00:00	POINT (-83.34931 42.72)	Oakland	NBI	NHS	10044	58.9	647308	27.91	2025-03-14T00:00:00	24	A	6	6	6	N
33	MDOT	Metro	11953	82292-S15	I-275 NB	M-153 (FORD RD)	5 MI W OF GARDEN CITY	1 Highway	1 Highway	1972			1995	2	180	64.5	2	3 Steel	02 Multi Str Non Comp	0	""	""	5 Epoxy Overlay	6 MS18(HS20)+mod	4	6	42.32	-83.44305	2025-08-18T00:00:00	POINT (-83.44305 42.32)	Taylor	NBI	NHS	11610	61.2	1607208	17.33	2024-09-09T00:00:00	24	A	6	7	7	N
34	Wayne County	Metro	12050	""	GREENFIELD ROAD	ROTUNDA DRIVE	DEARBORN           N/I-94	5 Highway-pedestrian	1 Highway	1961		1985	1996	2	108.9	149	2	4 Steel Continuous	32 Multi Str Comp	0	0 Other	00 Other	6 Bituminous	6 MS18(HS20)+mod	10	4	42.31	-83.18687	2025-08-18T00:00:00	POINT (-83.18687 42.31)	Taylor	NBI	NHS	16226.1	89.9	1651002	2.57	2024-10-15T00:00:00	24	A	5	7	6	N
35	Macomb County	Metro	6384	""	KUNSTMAN RD	CAMP BROOK DRAIN	0.3 MI NORTH OF 28 MILE	1 Highway	5 Waterway	1972				2	25.9	19.7	2	3 Steel	19 Culvert	0	""	""	N N/A (no deck (NBI))	4 M 18 (H 20)	2		42.75	-82.94055	2025-08-18T00:00:00	POINT (-82.94055 42.75)	Macomb	NBI	Non-NHS	510.23	0	817007	1.24	2025-06-17T00:00:00	24	A	N	N	N	5
36	MDOT	Metro	11590	82123-S42	I96WB TO I94WB RMP	I-96 & RAMP	IN DETROIT	7 3d level interchg	1 Highway	1971	2005		2005	10	757.2	43.2	10	3 Steel	82 Pl Girder Comp	0	""	""	1 Monolithic Concrete	6 MS18(HS20)+mod	2	8	42.35	-83.09828	2025-08-18T00:00:00	POINT (-83.09828 42.35)	Detroit	NBI	NHS	32711.04	40	4705636	0.14	2023-10-24T00:00:00	24	A	7	7	6	N
37	MDOT	Metro	11915	82291-S18	I-275 TO I-94 RAMP	I-275	IN ROMULUS (WEST)	1 Highway	1 Highway	1974		2022	1992	4	363.7	39.7	4	3 Steel	82 Pl Girder Comp	0	""	""	3 Latex Concrete/Similar	9 MS22.5(HS25)or greater	1	7	42.22	-83.411514	2025-08-18T00:00:00	POINT (-83.411514 42.22)	Taylor	NBI	NHS	14438.89	36.5	1576605	0.31	2024-08-30T00:00:00	24	A	6	7	7	N
38	Rochester Hills	Metro	8279	""	ROCHDALE ROAD	SARGENT CREEK	0.4 MILE N OF WALTON BLVD	1 Highway	5 Waterway	1965	2002			1	30	25.9	1	1 Concrete	19 Culvert	0	""	""	N N/A (no deck (NBI))	5 MS 18 (HS 20)	2		42.68	-83.15902	2025-08-18T00:00:00	POINT (-83.15902 42.68)	Oakland	NBI	Non-NHS	777	26.9	678303	0.14	2024-11-06T00:00:00	24	A	N	N	N	7
39	MDOT	Metro	11853	82252-S11	DEQUINDRE AVE	I-75	IN HAMTRAMCK	5 Highway-pedestrian	1 Highway	1969	2007		1998	2	215.8	38.9	2	3 Steel	82 Pl Girder Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	2	8	42.4	-83.06813	2025-08-18T00:00:00	POINT (-83.06813 42.4)	Detroit	NBI	Non-NHS	8394.62	28.1	1805203	0.27	2024-05-23T00:00:00	24	A	7	7	7	N
40	MDOT	Metro	7849	63043-S12	M-59 WB	EAST BOULEVARD	IN PONTIAC	1 Highway	1 Highway	1966			1997	3	161.6	42.3	3	3 Steel	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	2	4	42.64	-83.26939	2025-08-18T00:00:00	POINT (-83.26939 42.64)	Oakland	NBI	NHS	6835.68	40	677208	0.64	2025-05-20T00:00:00	24	A	7	6	7	N
41	Macomb County	Metro	6253	""	SCHOENHERR RD NBD	CLINTON RIVER	0.6 MI NORTH OF UTICA RD	5 Highway-pedestrian	5 Waterway	1992				2	159.8	38.7	2	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	9 MS22.5(HS25)or greater	2		42.59	-82.99256	2025-08-18T00:00:00	POINT (-82.99256 42.59)	Macomb	NBI	NHS	6184.26	30	798810	9.46	2025-05-14T00:00:00	24	A	7	7	7	N
42	Livonia	Metro	12508	""	HUBBARD ROAD	BELL CREEK	HUBBARD RD @ BELL CREEK	5 Highway-pedestrian	5 Waterway	1960	2004			3	90.9	45.9	3	1 Concrete	01 Slab	0	""	""	6 Bituminous	6 MS18(HS20)+mod	2		42.4	-83.3641	2025-08-18T00:00:00	POINT (-83.3641 42.4)	Taylor	NBI	Non-NHS	4172.31	33.1	1606910	1.38	2024-10-16T00:00:00	24	A	6	5	6	N
43	MDOT	Metro	13544	63174-S33	I-696W TO I-75N	I-75N TO 11 MI EXIT RMP	N OF I-696 AND I-75 INTCH	1 Highway	1 Highway	2022			2022	2	370	42.5	2	4 Steel Continuous	82 Pl Girder Comp	0	""	""	1 Monolithic Concrete	B Greater than HL 93	1	1	42.48	-83.1121	2025-08-18T00:00:00	POINT (-83.1121 42.48)	Oakland	NBI	NHS	15725	39	607606	0.4	2025-04-17T00:00:00	24	A	8	8	8	N
44	Birmingham	Metro	8229	""	OAK ST	ROUGE RIVER	0.5 MI W OF WOODWARD AVE	5 Highway-pedestrian	5 Waterway	1961			1996	1	37.7	58.4	1	3 Steel	02 Multi Str Non Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	4		42.55	-83.2268	2025-08-18T00:00:00	POINT (-83.2268 42.55)	Oakland	NBI	Non-NHS	2201.68	44	619905	0.98	2024-10-24T00:00:00	24	A	6	7	6	N
45	MDOT	Metro	7908	63101-S11	M-10 SB NWESTERN	I-696	IN SOUTHFIELD (I-696)	1 Highway	1 Highway	1964	1988		1988	2	296.7	63.3	2	3 Steel	82 Pl Girder Comp	0	""	""	5 Epoxy Overlay	6 MS18(HS20)+mod	3	5	42.49	-83.2953	2025-08-18T00:00:00	POINT (-83.2953 42.49)	Oakland	NBI	NHS	18781.11	60	710010	4.07	2025-05-20T00:00:00	24	A	5	6	7	N
46	MDOT	Metro	11844	82252-S04	CLAY AVE	I-75	IN DETROIT	5 Highway-pedestrian	1 Highway	1969	2007		1998	4	204.4	105	4	3 Steel	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	6	8	42.38	-83.06260556	2025-08-18T00:00:00	POINT (-83.06260556 42.38)	Detroit	NBI	Non-NHS	21462	82.6	1585708	0.21	2024-04-29T00:00:00	24	A	7	6	6	N
47	Wayne County	Metro	12094	""	SEVEN MILE ROAD	MIDDLE ROUGE RIVER	NORTHVILLE W/NORTHVILL RD	5 Highway-pedestrian	5 Waterway	1954				3	65	53.8	3	2 Concrete Continuous	01 Slab	0	""	""	6 Bituminous	5 MS 18 (HS 20)	2		42.43	-83.47789	2025-08-18T00:00:00	POINT (-83.47789 42.43)	Taylor	NBI	Non-NHS	3497	44	1680201	0.13	2025-05-27T00:00:00	24	A	5	5	5	N
48	Pontiac	Metro	8263	""	KENNETT ROAD	CN & GTW RR	1/4 MI SE TELEGR & OAKLND	5 Highway-pedestrian	2 Railroad	2004				1	50	58.4	1	5 Prestressed Concrete	05 Box Bm/Gird- Multiple	0	""	""	5 Epoxy Overlay	5 MS 18 (HS 20)	3		42.67	-83.32144	2025-08-18T00:00:00	POINT (-83.32144 42.67)	Oakland	NBI	Non-NHS	2920	39	673310	0.34	2024-10-17T00:00:00	24	A	7	6	6	N
49	Wayne County	Metro	12143	""	WAYNE ROAD	TONQUISH CREEK	WESTLAND            S/JOY	5 Highway-pedestrian	5 Waterway	1958		1979		3	90.9	62	3	2 Concrete Continuous	01 Slab	0	""	""	6 Bituminous	5 MS 18 (HS 20)	4		42.35	-83.38608	2025-08-18T00:00:00	POINT (-83.38608 42.35)	Taylor	NBI	NHS	5635.8	47.9	4719470	11.34	2025-04-29T00:00:00	12	K	4	4	6	N
50	MDOT	Metro	11507	82122-S19-6	SB SERV RD	I-96	IN DETROIT	6 2d level interchg	1 Highway	1970	2014		2014	2	166	72.5	2	3 Steel	02 Multi Str Non Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	4	8	42.39	-83.27643	2025-08-18T00:00:00	POINT (-83.27643 42.39)	Detroit	NBI	NHS	12035	61.1	4711490	0.26	2024-04-24T00:00:00	24	A	7	8	7	N
51	MDOT	Metro	8072	63174-S10	WATTLES RD	I-75	IN TROY	1 Highway	1 Highway	2019				2	182.3	68.9	2	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	B Greater than HL 93	2	8	42.58	-83.15896	2025-08-18T00:00:00	POINT (-83.15896 42.58)	Oakland	NBI	Non-NHS	12560.47	44	618802	3.33	2023-09-18T00:00:00	24	A	8	8	8	N
52	Wayne County	Metro	12240	""	MILLER ROAD	FORD ROAD	DEARBORN       N/MICHIGAN	5 Highway-pedestrian	1 Highway	1940	1979	1989	1997	2	110.9	53.8	2	4 Steel Continuous	02 Multi Str Non Comp	0	""	""	1 Monolithic Concrete	6 MS18(HS20)+mod	4	6	42.33	-83.16644	2025-08-18T00:00:00	POINT (-83.16644 42.33)	Taylor	NBI	Non-NHS	5966.42	42	1595510	19.46	2025-05-15T00:00:00	24	A	6	6	6	N
53	MDOT	Metro	6050	50022-B04	M-59 WB	GLOEDE DRAIN	3.1 MI EAST OF M-53	1 Highway	5 Waterway	1993				1	37.2	65	1	1 Concrete	19 Culvert	0	""	""	6 Bituminous	9 MS22.5(HS25)or greater	4		42.63	-82.95192	2025-08-18T00:00:00	POINT (-82.95192 42.63)	Macomb	NBI	NHS	2418	0	807801	7.18	2023-12-19T00:00:00	24	A	N	N	N	7
54	MDOT	Metro	7921	63102-S05	EVERGREEN ROAD	I-696	IN SOUTHFIELD	1 Highway	1 Highway	1985				2	130	106.7	2	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	9 MS22.5(HS25)or greater	7	6	42.49	-83.24119	2025-08-18T00:00:00	POINT (-83.24119 42.49)	Oakland	NBI	Non-NHS	13871	88	666003	3	2024-07-19T00:00:00	24	A	6	6	7	N
55	MDOT	Metro	11359	82102-S06	M-14 WB	SHELDON ROAD	1.2 MI W OF PLYMOUTH	1 Highway	1 Highway	1976		2006	2006	4	251.9	71.8	4	3 Steel	82 Pl Girder Comp	0	""	""	3 Latex Concrete/Similar	9 MS22.5(HS25)or greater	4	6	42.38	-83.48067	2025-08-18T00:00:00	POINT (-83.48067 42.38)	Taylor	NBI	NHS	18086.42	69	1606204	3.85	2023-10-10T00:00:00	24	A	7	7	6	N
56	MDOT	Metro	7875	63081-S04	M-10 RAMP H	M-39	IN SOUTHFIELD  RAMP H	1 Highway	1 Highway	1964	2006		2006	3	120.5	35.2	3	3 Steel	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	2	3	42.46	-83.21965	2025-08-18T00:00:00	POINT (-83.21965 42.46)	Oakland	NBI	NHS	4241.6	32	710605	0.14	2025-06-11T00:00:00	24	A	6	7	6	N
57	MDOT	Metro	11225	82024-S18	LUCKY PLACE	I-94	IN DETROIT	1 Highway	1 Highway	1983		1983	1983	2	174.3	48.9	2	4 Steel Continuous	02 Multi Str Non Comp	0	""	""	3 Latex Concrete/Similar	9 MS22.5(HS25)or greater	2	7	42.38	-83.038445	2025-08-18T00:00:00	POINT (-83.038445 42.38)	Detroit	NBI	Non-NHS	8523.27	45.9	4705746	0.01	2024-04-18T00:00:00	24	A	6	5	5	N
58	Oakland County	Metro	13595	""	CEDAR KEY DRIVE	VOORHEIS LAKE	IN SUBDIVSION  SEC 21	1 Highway	5 Waterway	1985				3	40	28	3	3 Steel	19 Culvert	0	""	""	6 Bituminous	5 MS 18 (HS 20)	2		42.75	-83.293335	2025-08-18T00:00:00	POINT (-83.293335 42.75)	Oakland	NBI	Non-NHS	1120	28	1840406	0.78	2025-07-23T00:00:00	12	A	N	N	N	4
59	MDOT	Metro	6005	50011-B02	M-53	RED RUN DRAIN	IN WARREN	1 Highway	5 Waterway	1964	1995			3	108	119	3	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	9 MS22.5(HS25)or greater	7		42.53	-83.02905	2025-08-18T00:00:00	POINT (-83.02905 42.53)	Macomb	NBI	NHS	12852	104	799108	5.34	2024-03-28T00:00:00	24	A	7	6	5	N
60	MDOT	Metro	6173	50111-S28-4	I-94 WB	JOY RD	1.5 MI SW OF M-59	1 Highway	1 Highway	1963	1980	2006		3	131.8	54.9	3	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	5 Epoxy Overlay	6 MS18(HS20)+mod	3	4	42.61	-82.85616	2025-08-18T00:00:00	POINT (-82.85616 42.61)	Macomb	NBI	NHS	7235.82	51.5	798502	12.91	2025-06-17T00:00:00	12	D	5	4	5	N
61	MDOT	Metro	11542	82123-R03	TURN RDWY 4TH LEVL	CSX RR & 3RD LEVL TRN RD	IN DETROIT	8 4th level interchg	4 Highway-railroad	1973		1973	1991	25	1981.8	29.2	25	4 Steel Continuous	82 Pl Girder Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	1	4	42.38	-83.21675	2025-08-18T00:00:00	POINT (-83.21675 42.38)	Detroit	NBI	NHS	57868.56	26.9	1590601	0	2023-08-19T00:00:00	24	A	6	6	7	N
62	Oakland County	Metro	8215	""	NAVARRA CT	WHITE LAKE CANAL	EAST OF LAKE GROVE DR	1 Highway	5 Waterway	2004				1	30	24	1	7 Timber	01 Slab	0	""	""	6 Bituminous	5 MS 18 (HS 20)	2		42.68	-83.558136	2025-08-18T00:00:00	POINT (-83.558136 42.68)	Oakland	NBI	Non-NHS	720	22	704810	0.07	2024-06-12T00:00:00	24	A	7	7	6	N
63	MDOT	Metro	14376	82705-C01	VISTA AVE	CANOE STREAM	BELLE ISLE	1 Highway	5 Waterway	2022				1	26.3	26	1	1 Concrete	19 Culvert	0	""	""	4 Low Slump Concrete	B Greater than HL 93	2		42.34	-82.98	2025-08-18T00:00:00	POINT (-82.98 42.34)	Detroit	NBI	Non-NHS	683.8	26	4710275	0.02	2024-08-08T00:00:00	24	A	N	N	N	9
64	MDOT	Metro	11262	82025-S16-2	MOROSS RD SB	I-94	IN DETROIT	5 Highway-pedestrian	1 Highway	2003				2	163.5	69.7	2	5 Prestressed Concrete	05 Box Bm/Gird- Multiple	0	""	""	5 Epoxy Overlay	9 MS22.5(HS25)or greater	4	6	42.42	-82.92874	2025-08-18T00:00:00	POINT (-82.92874 42.42)	Detroit	NBI	NHS	11395.95	59	4705319	1.12	2024-06-17T00:00:00	24	A	7	7	7	N
65	Other Local Agencies	Metro	13372	""	MIDFIELD RAMP C1	DINGELL RD	1.2 MI N OF EUREKA	1 Highway	1 Highway	2002				2	139.8	35.8	2	4 Steel Continuous	82 Pl Girder Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	2	4	42.21	-83.35353	2025-08-18T00:00:00	POINT (-83.35353 42.21)	Taylor	NBI	Non-NHS	5004.84	32.5	4712002	0.03	2025-05-27T00:00:00	24	A	6	7	6	N
66	MDOT	Metro	11428	82112-S03	PALLISTER AVENUE	M-10	IN DETROIT	5 Highway-pedestrian	1 Highway	1954	2000		2000	2	138.6	65.8	2	4 Steel Continuous	02 Multi Str Non Comp	0	""	""	2 Integral Concrete	5 MS 18 (HS 20)	4	8	42.37	-83.08382	2025-08-18T00:00:00	POINT (-83.08382 42.37)	Detroit	NBI	Non-NHS	9119.88	50.3	4706949	0.51	2024-09-26T00:00:00	24	A	7	7	5	N
67	Taylor	Metro	12978	""	BEECH DALY ROAD	BLAKELY DRAIN	CITY OF TAYLOR	1 Highway	5 Waterway	2004				1	41	60	1	1 Concrete	19 Culvert	0	""	""	1 Monolithic Concrete	9 MS22.5(HS25)or greater	4		42.18	-83.2868	2025-08-18T00:00:00	POINT (-83.2868 42.18)	Taylor	NBI	Non-NHS	2460	0	1692903	1.16	2024-12-03T00:00:00	24	A	N	N	N	7
68	MDOT	Metro	7942	63102-S29	MOHAWK AVENUE	I-696	IN ROYAL OAK	5 Highway-pedestrian	1 Highway	1983				2	180	91.4	2	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	9 MS22.5(HS25)or greater	4	10	42.48	-83.13308	2025-08-18T00:00:00	POINT (-83.13308 42.48)	Oakland	NBI	Non-NHS	16452	83	652405	0.45	2024-07-17T00:00:00	24	A	6	7	7	N
69	Oakland County	Metro	8196	""	KIRKWAY RD	LOWER LONG LAKE	0.2 MI N OF LONG LAKE RD	1 Highway	5 Waterway	2004				1	30.3	26	1	1 Concrete	19 Culvert	0	""	""	6 Bituminous	5 MS 18 (HS 20)	2		42.58	-83.292244	2025-08-18T00:00:00	POINT (-83.292244 42.58)	Oakland	NBI	Non-NHS	787.8	26	617202	0.16	2024-08-23T00:00:00	24	A	N	N	N	7
70	MDOT	Metro	11776	82195-S19	M-5 GRAND RIV AVE	I-75	IN DETROIT	5 Highway-pedestrian	1 Highway	1967	1998		1998	2	180.3	99.7	2	4 Steel Continuous	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	6	8	42.34	-83.05913	2025-08-18T00:00:00	POINT (-83.05913 42.34)	Detroit	NBI	NHS	17975.91	71.9	1577408	11.99	2024-05-28T00:00:00	24	A	7	6	6	N
71	Oakland County	Metro	13600	""	BRIDGEWATER DRIVE	MINNOW POND	250' N OF MINNOW POND	1 Highway	5 Waterway	1995				5	114	30	5	7 Timber	01 Slab	0	""	""	6 Bituminous	5 MS 18 (HS 20)	2		42.54	-83.4322	2025-08-18T00:00:00	POINT (-83.4322 42.54)	Oakland	NBI	Non-NHS	3420	28	4410870	0.03	2024-06-28T00:00:00	24	A	7	7	5	N
72	MDOT	Metro	7931	63102-S16	10 MILE ROAD W-SER	I-696	IN OAK PARK	1 Highway	1 Highway	1985		1985	2009	2	411.9	42.4	2	4 Steel Continuous	82 Pl Girder Comp	0	""	""	3 Latex Concrete/Similar	5 MS 18 (HS 20)	2	10	42.47	-83.18775	2025-08-18T00:00:00	POINT (-83.18775 42.47)	Oakland	NBI	Non-NHS	17464.56	31	644205	0.11	2024-07-24T00:00:00	24	A	7	7	7	N
73	MDOT	Metro	11709	82193-S06	OUTER DRIVE	M-39	IN DETROIT	5 Highway-pedestrian	1 Highway	1963	1991		1963	2	104	134	2	4 Steel Continuous	02 Multi Str Non Comp	0	""	""	5 Epoxy Overlay	5 MS 18 (HS 20)	8	6	42.42	-83.21881	2025-08-18T00:00:00	POINT (-83.21881 42.42)	Detroit	NBI	Non-NHS	13936	96	1584506	0.67	2024-05-28T00:00:00	24	A	5	7	6	N
74	Wayne County	Metro	11991	""	GIBRALTAR ROAD	SILVER CREEK	FLATROCKE/TELEGRAPH	1 Highway	5 Waterway	1928	1974	1983		1	24	47.9	1	1 Concrete	19 Culvert	0	""	""	6 Bituminous	6 MS18(HS20)+mod	4		42.09	-83.2751	2025-08-18T00:00:00	POINT (-83.2751 42.09)	Taylor	NBI	Non-NHS	1149.6	47.9	1692303	0.77	2025-02-26T00:00:00	24	P	N	N	N	5
75	Macomb County	Metro	6187	""	14 MILE RD	BIG BEAVER CREEK	0.3 MI W OF VAN DYKE	5 Highway-pedestrian	5 Waterway	1973	2011			1	44	73.8	1	5 Prestressed Concrete	06 Box Bms- Single/Sprd	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	5		42.54	-83.03568	2025-08-18T00:00:00	POINT (-83.03568 42.54)	Macomb	NBI	NHS	3247.2	59.1	798407	7.84	2025-07-11T00:00:00	24	A	7	8	7	N
76	Macomb County	Metro	6273	""	BRIDGEVIEW	CLINTON R & OLD N R RD	BETWEEN N&S RIVER ROADS	5 Highway-pedestrian	6 Highway-waterway	2009			2009	3	349	48.3	3	4 Steel Continuous	82 Pl Girder Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	2	2	42.6	-82.82598	2025-08-18T00:00:00	POINT (-82.82598 42.6)	Macomb	NBI	Non-NHS	16856.7	29.9	831906	0.37	2023-09-15T00:00:00	24	A	7	8	8	N
77	Macomb County	Metro	6214	""	26 MILE ROAD	PRICE BROOK DRAIN	2.7 MILES EAST OF M-53	1 Highway	5 Waterway	1972				3	44.9	43	3	3 Steel	19 Culvert	0	""	""	N N/A (no deck (NBI))	4 M 18 (H 20)	2		42.72	-82.97827	2025-08-18T00:00:00	POINT (-82.97827 42.72)	Macomb	NBI	Non-NHS	1930.7	0	816702	5.78	2025-05-20T00:00:00	12	P	N	N	N	4
78	Oakland County	Metro	13644	""	NOVI ROAD	TRIB TO INGERSOL CREEK	NOVI TWP SEC 26/27	5 Highway-pedestrian	5 Waterway	1960				2	23.3	60	2	3 Steel	19 Culvert	0	""	""	6 Bituminous	5 MS 18 (HS 20)	5		42.45	-83.47405	2025-08-18T00:00:00	POINT (-83.47405 42.45)	Oakland	NBI	NHS	1398	62	621910	3.97	2024-06-26T00:00:00	24	A	N	N	N	6
79	Southfield	Metro	8305	""	BRIDGE STREET	RIVER ROUGE	N OF 8 MILE RD	5 Highway-pedestrian	5 Waterway	1972	2001			3	207	27.9	3	5 Prestressed Concrete	04 Tee Beam	0	""	""	3 Latex Concrete/Similar	9 MS22.5(HS25)or greater	1		42.44	-83.28519722	2025-08-18T00:00:00	POINT (-83.28519722 42.44)	Oakland	NBI	Non-NHS	5775.3	20	685406	0.03	2023-09-19T00:00:00	24	A	8	8	4	N
80	MDOT	Metro	11141	82022-S35	RAMP TO US-12	I-94	IN DEARBORN	1 Highway	1 Highway	1948		1982	1997	2	116.4	45.6	2	3 Steel	02 Multi Str Non Comp	0	""	""	3 Latex Concrete/Similar	5 MS 18 (HS 20)	2	6	42.33	-83.15941	2025-08-18T00:00:00	POINT (-83.15941 42.33)	Taylor	NBI	NHS	5307.84	44	4706471	0.04	2023-09-26T00:00:00	24	A	5	7	6	N
81	MDOT	Metro	11459	82112-S30	VASSAR DRIVE	M-10	IN DETROIT	5 Highway-pedestrian	1 Highway	1963	2000		2000	2	110.7	68.4	2	3 Steel	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	4	6	42.43	-83.190346	2025-08-18T00:00:00	POINT (-83.190346 42.43)	Detroit	NBI	Non-NHS	7571.88	44	1584503	0	2025-04-18T00:00:00	24	A	6	7	6	N
82	MDOT	Metro	11437	82112-S12	M-8 EB DAVISON	M-10 SB	IN DETROIT OVER M-10 SB	5 Highway-pedestrian	1 Highway	1956	1996		2006	5	219.2	47.6	5	3 Steel	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	9 MS22.5(HS25)or greater	2	4	42.4	-83.1101	2025-08-18T00:00:00	POINT (-83.1101 42.4)	Detroit	NBI	NHS	10433.92	44.3	4702009	2.69	2025-04-29T00:00:00	24	A	6	7	6	N
83	Auburn Hills	Metro	7828	""	OLD M-59(AUBURN R)	CLINTON RIVER	IN AUBURN HTS	5 Highway-pedestrian	5 Waterway	1952	2001		2001	1	44.9	68.6	1	3 Steel	02 Multi Str Non Comp	0	""	""	6 Bituminous	5 MS 18 (HS 20)	3		42.63	-83.22431	2025-08-18T00:00:00	POINT (-83.22431 42.63)	Oakland	NBI	Non-NHS	3080.14	43	625105	3.51	2024-10-16T00:00:00	24	A	7	6	7	N
84	MDOT	Metro	11274	82051-C01	US-24	SMITH CREEK	1.7 MI NE OF FLATROCK	1 Highway	5 Waterway	2011				1	25.7	60	1	1 Concrete	19 Culvert	0	""	""	6 Bituminous	B Greater than HL 93	5		42.12	-83.27975	2025-08-18T00:00:00	POINT (-83.27975 42.12)	Taylor	NBI	NHS	1542	62	4700038	1.79	2024-05-15T00:00:00	24	A	N	N	N	7
85	Wayne County	Metro	12167	""	INKSTER ROAD	LOWER ROUGE RIVER	INKSTER        N/MICHIGAN	5 Highway-pedestrian	5 Waterway	1930	1968	2024		2	88.7	74	2	4 Steel Continuous	32 Multi Str Comp	0	""	""	3 Latex Concrete/Similar	6 MS18(HS20)+mod	5		42.3	-83.31023	2025-08-18T00:00:00	POINT (-83.31023 42.3)	Taylor	NBI	NHS	6563.8	60	1674404	13.1	2025-02-26T00:00:00	24	A	5	7	7	N
86	MDOT	Metro	8077	63174-S14-1	I-75 NB	COOLIDGE RD	IN TROY	1 Highway	1 Highway	2019				1	113.5	73.8	1	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	B Greater than HL 93	4	3	42.6	-83.18883	2025-08-18T00:00:00	POINT (-83.18883 42.6)	Oakland	NBI	NHS	8376.3	70.4	647308	14.29	2025-07-15T00:00:00	24	A	8	8	8	N
87	MDOT	Metro	11735	82194-S07	SPRINGWELLS AVE	I-75	IN DETROIT	5 Highway-pedestrian	1 Highway	2021				2	163.2	96.8	2	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	B Greater than HL 93	4	8	42.3	-83.11933	2025-08-18T00:00:00	POINT (-83.11933 42.3)	Detroit	NBI	Non-NHS	15797.76	51	1589810	0.77	2025-06-24T00:00:00	24	A	8	8	8	N
88	Macomb County	Metro	6349	""	22 MILE ROAD	MIDDLE BR CLINTON RIVER	0.1 MI E OF ROMEO PLANK	5 Highway-pedestrian	5 Waterway	1993				2	160	54.4	2	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	5 Epoxy Overlay	5 MS 18 (HS 20)	3		42.66	-82.93485	2025-08-18T00:00:00	POINT (-82.93485 42.66)	Macomb	NBI	Non-NHS	8704	40	807104	7.16	2024-06-07T00:00:00	24	A	7	6	7	N
89	Oakland County	Metro	8149	""	OPDYKE RD	CLINTON RIVER	BET AUBURN AND M59FREEWAY	1 Highway	5 Waterway	2018				1	62	84.3	1	5 Prestressed Concrete	06 Box Bms- Single/Sprd	0	""	""	1 Monolithic Concrete	9 MS22.5(HS25)or greater	5		42.64	-83.24958	2025-08-18T00:00:00	POINT (-83.24958 42.64)	Oakland	NBI	Non-NHS	5226.6	64	616205	3.41	2024-08-23T00:00:00	24	A	8	8	8	N
90	MDOT	Metro	6100	50061-S33-1	NB MOUND RD	I-696	IN THE CITY OF WARREN	6 2d level interchg	1 Highway	1976			2008	2	174.8	81.2	2	3 Steel	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	9 MS22.5(HS25)or greater	2	8	42.49	-83.045395	2025-08-18T00:00:00	POINT (-83.045395 42.49)	Macomb	NBI	NHS	14193.76	76	799110	2.75	2025-04-09T00:00:00	24	A	6	7	7	N
91	MDOT	Metro	11756	82194-S27	RMP I-96E TO I-75N	I-96 WB	IN DETROIT	1 Highway	1 Highway	1970	2007		2007	3	168.3	43.1	3	3 Steel	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	2	2	42.33	-83.08722	2025-08-18T00:00:00	POINT (-83.08722 42.33)	Detroit	NBI	NHS	7253.73	40	1590406	0.22	2024-06-10T00:00:00	24	A	7	7	6	N
92	MDOT	Metro	6013	50011-S05	M-53 SB	CANAL RD	0.4 MI S OF M-59	1 Highway	1 Highway	1966		2024	1994	3	142	52.2	3	3 Steel	32 Multi Str Comp	0	""	""	3 Latex Concrete/Similar	5 MS 18 (HS 20)	2	3	42.62	-83.012566	2025-08-18T00:00:00	POINT (-83.012566 42.62)	Macomb	NBI	NHS	7412.4	49.1	813706	5.43	2024-09-12T00:00:00	18	A	6	6	7	N
93	MDOT	Metro	13400	82194-S36-4	PLAZA TO I-96 WB	I-75 NB AND VERNOR RAMPS	AMBASSADOR GATEWAY	1 Highway	1 Highway	2007			2007	3	390.9	31.5	3	4 Steel Continuous	82 Pl Girder Comp	0	""	""	2 Integral Concrete	9 MS22.5(HS25)or greater	2		42.32	-83.08235	2025-08-18T00:00:00	POINT (-83.08235 42.32)	Detroit	NBI	NHS	12313.35	28	4718925	0	2024-06-14T00:00:00	24	A	7	8	8	N
94	MDOT	Metro	11469	82112-S36	LIVERNOIS AV UTURN	M-10	IN DETROIT	5 Highway-pedestrian	1 Highway	1987		1987		2	115.7	44	2	5 Prestressed Concrete	05 Box Bm/Gird- Multiple	0	""	""	3 Latex Concrete/Similar	5 MS 18 (HS 20)	2	6	42.4	-83.14183	2025-08-18T00:00:00	POINT (-83.14183 42.4)	Detroit	NBI	Non-NHS	5090.8	29.9	4718289	0.02	2025-04-15T00:00:00	24	A	7	6	7	N
95	Macomb County	Metro	6290	""	IRWIN ROAD	NEWLAND DRAIN	0.1 MI E OF ROMEO PLANK	1 Highway	5 Waterway	1971				3	33.8	19.7	3	3 Steel	19 Culvert	0	""	""	N N/A (no deck (NBI))	4 M 18 (H 20)	2		42.86	-82.96422	2025-08-18T00:00:00	POINT (-82.96422 42.86)	Macomb	NBI	Non-NHS	665.86	0	819907	0.04	2024-07-22T00:00:00	24	A	N	N	N	5
96	MDOT	Metro	11561	82123-S13	FULLERTON AVE	I-96 (JEFFRIES FRWY)	IN DETROIT	5 Highway-pedestrian	1 Highway	1970		1992	1992	4	330.9	61.7	4	3 Steel	32 Multi Str Comp	0	""	""	3 Latex Concrete/Similar	5 MS 18 (HS 20)	4	12	42.38	-83.18851	2025-08-18T00:00:00	POINT (-83.18851 42.38)	Detroit	NBI	Non-NHS	20416.53	49.2	4710521	1.46	2024-08-27T00:00:00	12	A	4	7	5	N
97	MDOT	Metro	7978	63103-S17	I-75 SB TO I-696EB	I-696&RAMPS FROM I-75 SB	@ I-75	7 3d level interchg	1 Highway	1971	2007	2007	2007	4	408	44.4	4	3 Steel	82 Pl Girder Comp	0	""	""	3 Latex Concrete/Similar	6 MS18(HS20)+mod	1	2	42.48	-83.11172	2025-08-18T00:00:00	POINT (-83.11172 42.48)	Oakland	NBI	NHS	18115.2	39.5	1738904	0.11	2025-07-15T00:00:00	24	A	6	7	5	N
98	Wayne County	Metro	13243	""	VANBORN ROAD	ECORSE RIVER	WEST OF INKSTER RD	1 Highway	5 Waterway	2000				1	22	80	1	1 Concrete	19 Culvert	0	""	""	N N/A (no deck (NBI))	9 MS22.5(HS25)or greater	5		42.27	-83.31108	2025-08-18T00:00:00	POINT (-83.31108 42.27)	Taylor	NBI	NHS	1760	59	1670203	5.91	2024-07-30T00:00:00	24	A	N	N	N	7
99	Wayne County	Metro	12135	""	HAGGERTY ROAD	TONQUISH CREEK	CANTON           N/WARREN	1 Highway	5 Waterway	1974				1	34.8	48.2	1	5 Prestressed Concrete	02 Multi Str Non Comp	0	0 Other	00 Other	1 Monolithic Concrete	4 M 18 (H 20)	2		42.34	-83.44469	2025-08-18T00:00:00	POINT (-83.44469 42.34)	Taylor	NBI	Non-NHS	1677.36	44.3	4706524	8.8	2024-06-28T00:00:00	24	A	7	8	7	N
100	Beverly Hills	Metro	8222	""	EVERGREEN RD	ROUGE RIVER	0.7 MI N OF 13 MILE RD	1 Highway	5 Waterway	1970	2001	2012		3	40.4	24	3	1 Concrete	19 Culvert	0	""	""	N N/A (no deck (NBI))	9 MS22.5(HS25)or greater	2		42.53	-83.24504	2025-08-18T00:00:00	POINT (-83.24504 42.53)	Oakland	NBI	Non-NHS	969.6	28.5	666003	5.68	2024-09-26T00:00:00	24	A	N	N	N	5
101	Oakland County	Metro	14030	""	INKSTER ROAD	ROUGE RIVER	0.1 MI N OF 14 MILE ROAD	1 Highway	5 Waterway	1963				2	23.5	25	2	3 Steel	19 Culvert	0	""	""	6 Bituminous	5 MS 18 (HS 20)	2		42.53	-83.3233	2025-08-18T00:00:00	POINT (-83.3233 42.53)	Oakland	NBI	Non-NHS	587.5	25	616805	0.06	2025-07-23T00:00:00	6	A	N	N	N	3
102	Pontiac	Metro	13767	""	AUBURN AVENUE	CLINTON RIVER	BTWN SAGINAW AND WOODWARD	1 Highway	5 Waterway	1963				2	27.7	43	2	1 Concrete	19 Culvert	0	""	""	N N/A (no deck (NBI))	0 Unknown	4		42.63	-83.290436	2025-08-18T00:00:00	POINT (-83.290436 42.63)	Oakland	NBI	Non-NHS	1191.1		625105	0	2024-06-28T00:00:00	24	A	N	N	N	6
103	MDOT	Metro	11393	82111-S04	JEFFERSON AVE	I-375	IN DETROIT	5 Highway-pedestrian	1 Highway	1962		2016	2005	2	136.7	59.5	2	3 Steel	02 Multi Str Non Comp	0	""	""	6 Bituminous	6 MS18(HS20)+mod	4	4	42.33	-83.03589	2025-08-18T00:00:00	POINT (-83.03589 42.33)	Detroit	NBI	NHS	8133.65	40	4705824	0.17	2025-05-23T00:00:00	24	A	4	4	6	N
104	MDOT	Metro	11969	82293-S06	PLYMOUTH RD	I-275	0.3 MI W OF LIVONIA LTS	5 Highway-pedestrian	1 Highway	1971	2012		2012	2	228	68	2	3 Steel	82 Pl Girder Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	4	6	42.37	-83.43629	2025-08-18T00:00:00	POINT (-83.43629 42.37)	Taylor	NBI	Non-NHS	15504	52	1680408	1.24	2024-10-25T00:00:00	24	A	7	7	7	N
105	MDOT	Metro	11879	82271-R01-1	US-24-I-75 CONN NB	CONRAIL	IN TAYLOR	1 Highway	2 Railroad	1963	2001		2001	3	181.9	43.3	3	3 Steel	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	6 MS18(HS20)+mod	2		42.19	-83.25376	2025-08-18T00:00:00	POINT (-83.25376 42.19)	Taylor	NBI	NHS	7876.27	40	1579905	0.7	2024-12-16T00:00:00	24	A	7	6	7	N
106	Macomb County	Metro	6355	""	25 MILE ROAD	MIDDLE BR CLINTON RIVER	0.1 MI E OF ROMEO PLANK	1 Highway	5 Waterway	1988				1	74.8	41	1	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	2		42.7	-82.95185	2025-08-18T00:00:00	POINT (-82.95185 42.7)	Macomb	NBI	Non-NHS	3066.8	39	4211019	7.29	2024-05-01T00:00:00	24	A	7	8	8	N
107	Wayne County	Metro	12126	""	NORTHVILLE ROAD	MIDDLE ROUGE RIVER	NORTHVILE T  S/SEVEN MILE	5 Highway-pedestrian	5 Waterway	1959		1996		3	90.9	60	3	2 Concrete Continuous	01 Slab	0	0 Other	00 Other	6 Bituminous	5 MS 18 (HS 20)	2		42.42	-83.47299	2025-08-18T00:00:00	POINT (-83.47299 42.42)	Taylor	NBI	Non-NHS	5454	48.2	1679402	2.62	2025-03-01T00:00:00	12	P	4	4	5	N
108	Oakland County	Metro	8201	""	MARTINDALE	NOVI-LYON DRAIN	SOUTH OF TRAVIS	1 Highway	5 Waterway	1970				2	28.9	20	2	3 Steel	19 Culvert	0	""	""	N N/A (no deck (NBI))	6 MS18(HS20)+mod	2		42.5	-83.63878	2025-08-18T00:00:00	POINT (-83.63878 42.5)	Oakland	NBI	Non-NHS	578	0	656802	2.34	2024-06-20T00:00:00	24	K	N	N	N	2
109	Warren	Metro	13470	""	CHICAGO ROAD	BEAR CREEK DRAIN	0.27 MI N OF VAN DYKE	5 Highway-pedestrian	5 Waterway	1959				2	33.8	55.1	2	1 Concrete	19 Culvert	0	""	""	N N/A (no deck (NBI))	4 M 18 (H 20)	5		42.52	-83.02357	2025-08-18T00:00:00	POINT (-83.02357 42.52)	Macomb	NBI	Non-NHS	1862.38	55	804109	3.38	2023-10-26T00:00:00	24	A	N	N	N	6
110	Oakland County	Metro	8203	""	DAWSON	HURON RIVER	WEST OF MARTINDALE	1 Highway	5 Waterway	1964		2014		1	40	33	1	5 Prestressed Concrete	05 Box Bm/Gird- Multiple	0	""	""	6 Bituminous	6 MS18(HS20)+mod	2		42.56	-83.62665	2025-08-18T00:00:00	POINT (-83.62665 42.56)	Oakland	NBI	Non-NHS	1320	27	657408	0.57	2025-06-24T00:00:00	12	A	7	6	4	N
111	Detroit	Metro	12467	""	DIVISION	DEQUINDRE CUT PATHWAY	BETW. ORLEANS-ST. AUBIN	5 Highway-pedestrian	3 Pedestrian-bicycle	2014				2	68.5	34	2	1 Concrete	19 Culvert	0	""	""	2 Integral Concrete	B Greater than HL 93	2		42.35	-83.03684444	2025-08-18T00:00:00	POINT (-83.03684444 42.35)	Detroit	NBI	Non-NHS	2329	34	1711403	0.23	2024-11-21T00:00:00	24	A	N	N	N	8
112	Wayne County	Metro	12158	""	MIDDLE BELT ROAD	LOWER ROUGE RIVER	INKSTER        N/MICHIGAN	5 Highway-pedestrian	5 Waterway	1924	1972		1996	3	155.8	74.5	3	4 Steel Continuous	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	6 MS18(HS20)+mod	5		42.29	-83.32942	2025-08-18T00:00:00	POINT (-83.32942 42.29)	Taylor	NBI	NHS	11607.1	60	1674403	12.01	2024-10-17T00:00:00	12	A	4	6	7	N
113	Wayne County	Metro	12283	""	EDENDERRY DRIVE	JOHNSON DRAIN	NORTHVILLE T S/SEVEN MILE	1 Highway	5 Waterway	1965				2	35.8	38.7	2	3 Steel	19 Culvert	0	""	""	N N/A (no deck (NBI))	6 MS18(HS20)+mod	2		42.42	-83.495514	2025-08-18T00:00:00	POINT (-83.495514 42.42)	Taylor	NBI	Non-NHS	1385.46	38.7	1689805	0.3	2023-08-09T00:00:00	24	A	N	N	N	7
114	MDOT	Metro	11901	82291-S05	SIBLEY RD	I-275	0.7 MI E OF NEW BOSTON	5 Highway-pedestrian	1 Highway	1974			2009	2	288	78.4	2	3 Steel	82 Pl Girder Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	5	6	42.17	-83.38752	2025-08-18T00:00:00	POINT (-83.38752 42.17)	Taylor	NBI	NHS	22579.2	64	1607308	0.76	2024-05-29T00:00:00	24	A	6	6	6	N
115	Macomb County	Metro	6219	""	26 MILE ROAD	SALT RIVER	0.5MI EAST OF GRATIOT AVE	1 Highway	5 Waterway	1996				1	67.9	47.2	1	5 Prestressed Concrete	05 Box Bm/Gird- Multiple	0	""	""	1 Monolithic Concrete	9 MS22.5(HS25)or greater	2		42.72	-82.78561	2025-08-18T00:00:00	POINT (-82.78561 42.72)	Macomb	NBI	Non-NHS	3204.88	42.7	816702	15.59	2025-04-18T00:00:00	24	A	6	7	7	N
116	Oakland County	Metro	8181	""	AVON ROAD	CLINTON RIVER	BET LIVERNOIS AND ROCHEST	1 Highway	5 Waterway	2012				1	67.6	88.4	1	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	A HL 93	5		42.67	-83.15287	2025-08-18T00:00:00	POINT (-83.15287 42.67)	Oakland	NBI	NHS	5975.84	64	605102	2.04	2024-09-26T00:00:00	24	A	7	8	8	N
117	Novi	Metro	14275	""	9 MILE ROAD	THORNTON CREEK	0.06 MI E OF NOVI RD	1 Highway	5 Waterway	1990				2	21.5	52	2	3 Steel	19 Culvert	0	""	""	6 Bituminous	5 MS 18 (HS 20)	4		42.45	-83.47292	2025-08-18T00:00:00	POINT (-83.47292 42.45)	Oakland	NBI	Non-NHS	1118	52	633603	0.67	2024-09-30T00:00:00	24	A	N	N	N	7
118	MDOT	Metro	11406	82111-S19	WARREN AV	M-10	IN DETROIT	5 Highway-pedestrian	1 Highway	1950	1996		1996	2	126.5	139.8	2	4 Steel Continuous	02 Multi Str Non Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	10	8	42.35	-83.073395	2025-08-18T00:00:00	POINT (-83.073395 42.35)	Detroit	NBI	NHS	17684.7	109.9	4700429	0.28	2024-08-14T00:00:00	24	A	6	5	5	N
119	Lake Orion	Metro	8240	""	PERRY ST	PAINT CREEK	S OF FLINT ST	1 Highway	5 Waterway	1990				1	27.2	24.9	1	1 Concrete	19 Culvert	0	""	""	6 Bituminous	6 MS18(HS20)+mod	2		42.78	-83.2335	2025-08-18T00:00:00	POINT (-83.2335 42.78)	Oakland	NBI	Non-NHS	677.28	24	655205	0.19	2024-08-16T00:00:00	24	A	N	N	N	7
120	MDOT	Metro	11574	82123-S26	ELMHURST AVE	I-96	IN DETROIT	5 Highway-pedestrian	1 Highway	1972	2009		2009	2	155	59.5	2	3 Steel	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	2	8	42.38	-83.14617	2025-08-18T00:00:00	POINT (-83.14617 42.38)	Detroit	NBI	Non-NHS	9222.5	37	1581710	0.36	2024-03-06T00:00:00	24	A	7	8	7	N
121	Allen Park	Metro	12308	""	REECK ROAD	SEXTON-KILFOIL DRAIN	IN ALLEN PARK	5 Highway-pedestrian	5 Waterway	1960	2024			1	38	46.8	1	3 Steel	06 Box Bms- Single/Sprd	0	""	""	1 Monolithic Concrete	A HL 93	2		42.23	-83.219734	2025-08-18T00:00:00	POINT (-83.219734 42.23)	Taylor	NBI	Non-NHS	1778.4	33.7	1662707	1.59	2024-12-04T00:00:00	24	A	8	8	7	N
122	Macomb County	Metro	6272	""	JEFFERSON AVE	VENTRE DE BEUF	0.5MI S OF METRO. PARKWAY	1 Highway	5 Waterway	1923				1	34.8	27.2	1	1 Concrete	25 Girder- Thru	0	""	""	6 Bituminous	2 M 13.5 (H 15)	2		42.57	-82.8211	2025-08-18T00:00:00	POINT (-82.8211 42.57)	Macomb	NBI	Non-NHS	946.56	23	4718263	9.3	2024-05-07T00:00:00	24	A	5	5	6	N
123	MDOT	Metro	11183	82023-S14	NB W GRAND BLVD	I-94	IN DETROIT	5 Highway-pedestrian	1 Highway	2013				2	189.5	63.4	2	4 Steel Continuous	02 Multi Str Non Comp	0	""	""	1 Monolithic Concrete	B Greater than HL 93	4	6	42.35	-83.109055	2025-08-18T00:00:00	POINT (-83.109055 42.35)	Detroit	NBI	Non-NHS	12014.3	52	1577308	1.03	2024-04-15T00:00:00	24	A	7	8	7	N
124	Macomb County	Metro	6314	""	24 MILE ROAD	SALT RIVER	0.1 MI WEST OF BAKER ROAD	5 Highway-pedestrian	5 Waterway	1996				2	129.9	54.5	2	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	2		42.69	-82.76738	2025-08-18T00:00:00	POINT (-82.76738 42.69)	Macomb	NBI	Non-NHS	7079.55	39.4	819202	1.44	2024-09-17T00:00:00	24	A	7	8	8	N
125	MDOT	Metro	11708	82193-S05	6 MI RD	M-39	IN DETROIT	5 Highway-pedestrian	1 Highway	1962	2010		1996	2	108.5	134.7	2	4 Steel Continuous	02 Multi Str Non Comp	0	""	""	1 Monolithic Concrete	6 MS18(HS20)+mod	8	6	42.42	-83.21871	2025-08-18T00:00:00	POINT (-83.21871 42.42)	Detroit	NBI	NHS	14614.95	114	1680701	16.98	2025-08-12T00:00:00	24	A	7	7	6	N
126	Macomb County	Metro	6285	""	33 MILE ROAD	N B CLINTON RIVER	0.2 MI EAST OF POWELL RD	1 Highway	5 Waterway	1955			1984	1	37.7	29.5	1	3 Steel	02 Multi Str Non Comp	0	""	""	6 Bituminous	2 M 13.5 (H 15)	2		42.82	-82.97641	2025-08-18T00:00:00	POINT (-82.97641 42.82)	Macomb	NBI	Non-NHS	1112.15	21	4210214	1.73	2024-09-27T00:00:00	12	P	5	3	3	N
127	Troy	Metro	13610	""	WATTLES ROAD	ROUGE RIVER	0.4 MI E OF ADAMS ROAD	1 Highway	5 Waterway	1957	2016			2	27.7	36	2	3 Steel	19 Culvert	0	""	""	6 Bituminous	6 MS18(HS20)+mod	2		42.58	-83.2003	2025-08-18T00:00:00	POINT (-83.2003 42.58)	Oakland	NBI	Non-NHS	997.2	36	618802	1.24	2025-04-01T00:00:00	24	A	N	N	N	7
128	MDOT	Metro	11496	82122-S10	WARNER COURT	I-96	IN LIVONIA	5 Highway-pedestrian	1 Highway	1974	2014		2001	2	176	46.8	2	3 Steel	02 Multi Str Non Comp	0	""	""	1 Monolithic Concrete	4 M 18 (H 20)	2	10	42.38	-83.347206	2025-08-18T00:00:00	POINT (-83.347206 42.38)	Taylor	NBI	Non-NHS	8236.8	34	1606308	0.01	2024-09-16T00:00:00	24	A	7	7	7	N
129	Detroit	Metro	12363	""	LAFAYETTE STREET	CONRAIL	LAFAYETTE AT TWELFTH ST	5 Highway-pedestrian	2 Railroad	1984	2016		1984	2	125.3	79	2	3 Steel	02 Multi Str Non Comp	0	""	""	2 Integral Concrete	6 MS18(HS20)+mod	4		42.32	-83.06692	2025-08-18T00:00:00	POINT (-83.06692 42.32)	Detroit	NBI	Non-NHS	9898.7	57	4718963	0.55	2023-12-13T00:00:00	24	A	6	7	7	N
130	MDOT	Metro	7957	63102-S46	I-696 EB	M-1 WOODWARD	AT I-696 & WOODWARD	1 Highway	1 Highway	1986				2	122	76.1	2	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	9 MS22.5(HS25)or greater	4	4	42.48	-83.14527	2025-08-18T00:00:00	POINT (-83.14527 42.48)	Oakland	NBI	NHS	9284.2	71.9	1903903	2.86	2024-07-09T00:00:00	24	A	6	7	7	N
131	New Baltimore	Metro	6416	""	MAIN STREET	CRAPEAU CREEK	EAST OF M-29	5 Highway-pedestrian	5 Waterway	1925	1997			1	39.7	37.7	1	5 Prestressed Concrete	05 Box Bm/Gird- Multiple	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	2		42.68	-82.74287	2025-08-18T00:00:00	POINT (-82.74287 42.68)	Macomb	NBI	Non-NHS	1496.69	34.1	4208331	0.07	2023-11-30T00:00:00	24	A	6	8	6	N
132	MDOT	Metro	11130	82022-S24	I-94 WB	OUTER DR	IN ALLEN PARK	1 Highway	1 Highway	1996		1996		1	112.2	65.6	1	5 Prestressed Concrete	05 Box Bm/Gird- Multiple	0	""	""	1 Monolithic Concrete	9 MS22.5(HS25)or greater	3	6	42.28	-83.20399	2025-08-18T00:00:00	POINT (-83.20399 42.28)	Taylor	NBI	NHS	7360.32	62.3	1588802	18.36	2023-08-21T00:00:00	24	A	6	6	6	N
133	MDOT	Metro	13105	63043-S14-2	SB ADAMS RD	M-59	ROCHESTER HILLS	1 Highway	1 Highway	2004				4	304	59.3	4	5 Prestressed Concrete	05 Box Bm/Gird- Multiple	0	""	""	1 Monolithic Concrete	9 MS22.5(HS25)or greater	3	6	42.65	-83.193375	2025-08-18T00:00:00	POINT (-83.193375 42.65)	Oakland	NBI	NHS	18027.2	56	4415855	0.66	2023-10-27T00:00:00	24	A	7	7	8	N
134	MDOT	Metro	11959	82293-R01	I-275 NB	CSX RR	1 MI W OF LIVONIA	1 Highway	2 Railroad	1972	2012		2012	3	206	61.2	3	3 Steel	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	3		42.34	-83.44089	2025-08-18T00:00:00	POINT (-83.44089 42.34)	Taylor	NBI	NHS	12607.2	58	1607208	18.74	2024-10-31T00:00:00	24	A	8	7	7	N
135	MDOT	Metro	11450	82112-S25	MYERS RD	M-10	IN DETROIT	5 Highway-pedestrian	1 Highway	1963			2006	2	208.5	78.4	2	3 Steel	82 Pl Girder Comp	0	""	""	6 Bituminous	5 MS 18 (HS 20)	4	6	42.41	-83.16998	2025-08-18T00:00:00	POINT (-83.16998 42.41)	Detroit	NBI	Non-NHS	16346.4	54	1583210	3.82	2024-08-13T00:00:00	24	A	5	6	6	N
136	Wayne County	Metro	12020	""	PENNSYLVANIA ROAD	BLAKELY DRAIN	BTWN/TAYLORE/TELEGRAPH	1 Highway	5 Waterway	1967			1967	2	59.7	44	2	3 Steel	19 Culvert	0	""	""	N N/A (no deck (NBI))	5 MS 18 (HS 20)	2		42.18	-83.26451	2025-08-18T00:00:00	POINT (-83.26451 42.18)	Taylor	NBI	Non-NHS	2626.8	0	1674307	7.79	2024-09-13T00:00:00	12	A	N	N	N	4
137	MDOT	Metro	11113	82022-S04-3	I-94 EB	MERRIMAN RD	1.9 MI W OF TAYLOR	1 Highway	1 Highway	1993				2	144.5	121.8	2	5 Prestressed Concrete	05 Box Bm/Gird- Multiple	0	""	""	5 Epoxy Overlay	9 MS22.5(HS25)or greater	6	6	42.24	-83.34148	2025-08-18T00:00:00	POINT (-83.34148 42.24)	Taylor	NBI	NHS	17600.1	115.7	1576405	10.55	2025-08-06T00:00:00	24	A	8	6	8	N
138	MDOT	Metro	7801	63022-S05	WIXOM RD	I-96	IN WIXOM	1 Highway	1 Highway	2008				2	201.7	205.7	2	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	A HL 93	7	6	42.5	-83.536095	2025-08-18T00:00:00	POINT (-83.536095 42.5)	Oakland	NBI	NHS	41489.69	107.4	639101	2.52	2024-11-20T00:00:00	24	A	7	8	8	N
139	MDOT	Metro	8135	63192-S04-5	M-5 NB CD	12 MILE RD	I-96, I-696, M-5 INTRCHG	1 Highway	1 Highway	1993				2	208.8	59.1	2	5 Prestressed Concrete	02 Multi Str Non Comp	0	""	""	1 Monolithic Concrete	9 MS22.5(HS25)or greater	3	8	42.5	-83.44589	2025-08-18T00:00:00	POINT (-83.44589 42.5)	Oakland	NBI	NHS	12340.08	55.8	4410616	0.62	2025-03-07T00:00:00	24	A	7	7	7	N
140	MDOT	Metro	11299	82061-B01	US-12 EB	APPLE RUN DRAIN	2.3 MI E OF WASHTENAW COL	1 Highway	5 Waterway	2003				1	34.5	46	1	1 Concrete	19 Culvert	0	""	""	6 Bituminous	0 Unknown	2		42.27	-83.50274	2025-08-18T00:00:00	POINT (-83.50274 42.27)	Taylor	NBI	NHS	1587	51.8	1600206	2.51	2024-10-28T00:00:00	24	A	N	N	N	7
141	Wayne County	Metro	12203	""	TOLEDO ROAD	SEXTON KILFOIL DRAIN	LINCOLN PARK    S/GODDARD	5 Highway-pedestrian	5 Waterway	1958				2	52.8	120.7	2	2 Concrete Continuous	04 Tee Beam	0	""	""	2 Integral Concrete	5 MS 18 (HS 20)	7		42.22	-83.19429	2025-08-18T00:00:00	POINT (-83.19429 42.22)	Taylor	NBI	NHS	6372.96	87.9	1688707	4.58	2024-11-12T00:00:00	24	A	5	5	7	N
142	MDOT	Metro	7870	63081-B01	M-10 EB	ROUGE RIVER	IN SOUTHFIELD	1 Highway	5 Waterway	1964	2006			3	157.5	85.3	3	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	6 MS18(HS20)+mod	5		42.49	-83.28039	2025-08-18T00:00:00	POINT (-83.28039 42.49)	Oakland	NBI	NHS	13434.75	82	710010	5.04	2025-05-09T00:00:00	24	A	7	6	5	N
143	Wayne County	Metro	12211	""	MERIDIAN ROAD	THOROFARE CH(GROSSE ILE)	GROSSE ILE TWP    S/FERRY	5 Highway-pedestrian	5 Waterway	2024				1	80	59.33	1	3 Steel	32 Multi Str Comp	0	1 Concrete	01 Slab	1 Monolithic Concrete	6 MS18(HS20)+mod	2		42.14	-83.15858	2025-08-18T00:00:00	POINT (-83.15858 42.14)	Taylor	NBI	Non-NHS	4746.4	56	1690909	1.92	2024-08-13T00:00:00	24	A	9	9	9	N
144	MDOT	Metro	6162	50111-S20	I-94	LITTLE MACK AVE	IN ROSEVILLE	1 Highway	1 Highway	2002			2002	3	244.3	147.2	3	3 Steel	82 Pl Girder Comp	0	""	""	1 Monolithic Concrete	9 MS22.5(HS25)or greater	8	5	42.53	-82.909096	2025-08-18T00:00:00	POINT (-82.909096 42.53)	Macomb	NBI	NHS	35960.96	140.7	798501	5.63	2025-06-07T00:00:00	24	A	8	7	7	N
145	Wayne County	Metro	12177	""	EVERGREEN ROAD	ROUGE RIVER	DEARBORN       N/MICHIGAN	5 Highway-pedestrian	5 Waterway	1975		2015		3	335	170.4	3	4 Steel Continuous	82 Pl Girder Comp	0	""	""	3 Latex Concrete/Similar	6 MS18(HS20)+mod	8		42.31	-83.22651	2025-08-18T00:00:00	POINT (-83.22651 42.31)	Taylor	NBI	NHS	57084	100	1596908	0.17	2025-06-30T00:00:00	12	A	4	6	4	N
146	MDOT	Metro	11174	82023-S06	MARTIN STREET	I-94	IN DETROIT	5 Highway-pedestrian	1 Highway	1949	1994		2012	4	174.6	67.8	4	3 Steel	02 Multi Str Non Comp	0	""	""	5 Epoxy Overlay	5 MS 18 (HS 20)	2	6	42.34	-83.1303	2025-08-18T00:00:00	POINT (-83.1303 42.34)	Detroit	NBI	Non-NHS	11837.88	44	1577205	0.92	2025-03-28T00:00:00	24	A	7	6	6	N
147	Warren	Metro	12839	""	DENTON DRIVE	RED RUN DRAIN	0.23 KM N OF CHICAGO RD	1 Highway	5 Waterway	1962				2	116	28	2	5 Prestressed Concrete	05 Box Bm/Gird- Multiple	0	""	""	0 None	5 MS 18 (HS 20)	2		42.53	-83.03637	2025-08-18T00:00:00	POINT (-83.03637 42.53)	Macomb	NBI	Non-NHS	3248	24	4201230	0.13	2023-10-26T00:00:00	24	P	8	6	5	N
148	MDOT	Metro	6065	50023-S09	U TRN E/MOUND RD	M-59	0.5 MI, WEST OF UTICA	1 Highway	1 Highway	1994				2	129.7	43.1	2	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	2	6	42.62	-83.04986	2025-08-18T00:00:00	POINT (-83.04986 42.62)	Macomb	NBI	Non-NHS	5590.07	40	4205541	0.02	2023-11-21T00:00:00	24	A	7	7	7	N
149	MDOT	Metro	11808	82251-S08-1	M-3 NB CONN	I-75 & I-375	IN DETROIT OVER I-375	1 Highway	1 Highway	1964	1998		2007	7	361.6	47.4	7	3 Steel	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	6 MS18(HS20)+mod	2	10	42.34	-83.04353	2025-08-18T00:00:00	POINT (-83.04353 42.34)	Detroit	NBI	NHS	17139.84	44	1592010	24.29	2024-10-21T00:00:00	24	A	7	7	7	N
150	Oakland County	Metro	8169	""	12 MILE RD (WEST)	ROUGE RIVER	BET TELEGRAPH AND LAHSER	1 Highway	5 Waterway	1972				3	115	74.5	3	2 Concrete Continuous	01 Slab	0	""	""	5 Epoxy Overlay	6 MS18(HS20)+mod	5		42.5	-83.278725	2025-08-18T00:00:00	POINT (-83.278725 42.5)	Oakland	NBI	NHS	8567.5	61	4462980	12.14	2024-07-23T00:00:00	24	P	7	7	7	N
151	Sterling Heights	Metro	6431	""	MAPLE LANE RD	RED RUN DRAIN	NORTH OF 14 MILE RD	5 Highway-pedestrian	5 Waterway	1985		2017		2	180	78.2	2	5 Prestressed Concrete	05 Box Bm/Gird- Multiple	0	""	""	3 Latex Concrete/Similar	6 MS18(HS20)+mod	5		42.54	-83.003815	2025-08-18T00:00:00	POINT (-83.003815 42.54)	Macomb	NBI	Non-NHS	14076	63	798910	0.06	2024-09-03T00:00:00	12	A	5	4	5	N
152	MDOT	Metro	11214	82024-S08	CHENE ST	I-94	IN DETROIT	5 Highway-pedestrian	1 Highway	2018				2	179.7	79.8	2	4 Steel Continuous	82 Pl Girder Comp	0	""	""	1 Monolithic Concrete	B Greater than HL 93	5	6	42.37	-83.046364	2025-08-18T00:00:00	POINT (-83.046364 42.37)	Detroit	NBI	Non-NHS	14340.06	57	1587501	3.1	2024-04-17T00:00:00	24	A	8	8	8	N
153	MDOT	Metro	11647	82191-S06-1	I-75 NB	VAN HORN RD	IN WOODHAVEN	1 Highway	1 Highway	2006				1	160	63.3	1	3 Steel	82 Pl Girder Comp	0	""	""	2 Integral Concrete	9 MS22.5(HS25)or greater	3	2	42.12	-83.24119	2025-08-18T00:00:00	POINT (-83.24119 42.12)	Taylor	NBI	NHS	10128	60	1592010	4.05	2024-07-16T00:00:00	24	A	7	8	7	N
154	MDOT	Metro	7842	63043-S05	M-59 EB	EAST BOULEVARD	IN PONTIAC	1 Highway	1 Highway	1967			1997	3	143.9	47.9	3	3 Steel	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	3	4	42.64	-83.26933	2025-08-18T00:00:00	POINT (-83.26933 42.64)	Oakland	NBI	NHS	6892.81	45.6	648906	22.23	2025-05-20T00:00:00	24	A	7	6	7	N
155	MDOT	Metro	11565	82123-S17	MEYERS RD	I-96 (JEFFRIES FRWY)	IN DETROIT	5 Highway-pedestrian	1 Highway	1971		2005	2005	4	305.1	66.4	4	3 Steel	32 Multi Str Comp	0	""	""	5 Epoxy Overlay	5 MS 18 (HS 20)	4	14	42.38	-83.16859	2025-08-18T00:00:00	POINT (-83.16859 42.38)	Detroit	NBI	Non-NHS	20258.64	48	1583210	1.8	2024-01-02T00:00:00	19	A	6	7	7	N
156	MDOT	Metro	11103	82022-B01	I-94 EB	ECORSE CREEK	IN ALLEN PARK	1 Highway	5 Waterway	1943		1943		2	28.9	49.9	2	1 Concrete	19 Culvert	0	""	""	2 Integral Concrete	4 M 18 (H 20)	3		42.27	-83.20742	2025-08-18T00:00:00	POINT (-83.20742 42.27)	Taylor	NBI	NHS	1442.11	47.9	1576405	18.08	2023-08-29T00:00:00	24	A	N	N	N	6
157	Wayne County	Metro	12261	""	LILLEY ROAD	TRUESDELL DRAIN	CANTON      S/CHERRY HILL	1 Highway	5 Waterway	1973				2	22	35.8	2	1 Concrete	19 Culvert	0	""	""	N N/A (no deck (NBI))	0 Unknown	2		42.3	-83.45758	2025-08-18T00:00:00	POINT (-83.45758 42.3)	Taylor	NBI	Non-NHS	787.6	35.8	4710390	1.62	2025-05-12T00:00:00	24	A	N	N	N	6
158	MDOT	Metro	11254	82025-S09-2	OUTER DRIVE SB	I-94	IN DETROIT	5 Highway-pedestrian	1 Highway	1959	2001		2000	4	166.2	62.3	4	3 Steel	02 Multi Str Non Comp	0	""	""	5 Epoxy Overlay	5 MS 18 (HS 20)	4	6	42.4	-82.96024	2025-08-18T00:00:00	POINT (-82.96024 42.4)	Detroit	NBI	Non-NHS	10354.26	47.9	4705402	0.29	2024-06-17T00:00:00	24	A	6	7	7	N
159	Macomb County	Metro	13956	""	DIAMANTE DRIVE	GLOEDE DRAIN	0.2 MI E OF GAVIOTA LANE	5 Highway-pedestrian	5 Waterway	2016				1	20	28	1	1 Concrete	19 Culvert	0	""	""	6 Bituminous	B Greater than HL 93	2		42.66	-82.963165	2025-08-18T00:00:00	POINT (-82.963165 42.66)	Macomb	NBI	Non-NHS	560	28	5499890	0.17	2024-10-04T00:00:00	24	A	N	N	N	8
160	MDOT	Metro	8044	63174-B04-2	I-75 SB	CLINTON RIVER	0.6 MI S OF M-59	1 Highway	5 Waterway	1964	1988			1	44	71.3	1	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	6 MS18(HS20)+mod	4		42.63	-83.2389	2025-08-18T00:00:00	POINT (-83.2389 42.63)	Oakland	NBI	NHS	3137.2	67.2	646106	17.92	2025-07-10T00:00:00	24	A	6	8	7	N
161	Macomb County	Metro	13577	""	GRACECHURCH LANE	SALT SLANG GLOEDE DRAIN	0.5 MI N OF 22 MI RD	5 Highway-pedestrian	5 Waterway	1972				1	21	28.6	1	5 Prestressed Concrete	05 Box Bm/Gird- Multiple	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	2		42.66	-82.96558	2025-08-18T00:00:00	POINT (-82.96558 42.66)	Macomb	NBI	Non-NHS	600.6	26.3	4211416	0.51	2024-08-30T00:00:00	24	A	7	7	6	N
162	Westland	Metro	12522	""	HENRY RUFF RD	LOWER RIVER ROUGE	IN WESTLAND	5 Highway-pedestrian	5 Waterway	1947		2011		3	73.8	40	3	2 Concrete Continuous	01 Slab	0	""	""	6 Bituminous	4 M 18 (H 20)	2		42.29	-83.33915	2025-08-18T00:00:00	POINT (-83.33915 42.29)	Taylor	NBI	Non-NHS	2952	27.9	1664604	3.11	2025-04-14T00:00:00	24	A	5	5	7	N
163	MDOT	Metro	8034	63173-S04	DAVISBURG RD	I-75	3.3 MI NW OF M-10	1 Highway	1 Highway	1962	2023		2023	5	239.3	34.4	5	3 Steel	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	2 M 13.5 (H 15)	2	6	42.76	-83.50635	2025-08-18T00:00:00	POINT (-83.50635 42.76)	Oakland	NBI	Non-NHS	8231.92	32	649404	6.56	2023-08-08T00:00:00	24	A	9	6	7	N
164	MDOT	Metro	12942	63192-S03	I-96 EB, RAMP J	M-5 NB	NOVI TWP SEC 13	1 Highway	1 Highway	2000				3	339	47.2	3	3 Steel	82 Pl Girder Comp	0	""	""	1 Monolithic Concrete	9 MS22.5(HS25)or greater	2	3	42.49	-83.44565	2025-08-18T00:00:00	POINT (-83.44565 42.49)	Oakland	NBI	NHS	16000.8	44	4410616	1.19	2024-11-18T00:00:00	24	A	7	6	7	N
165	Macomb County	Metro	6342	""	CARD ROAD	MCBRIDE DRAIN	0.1 MI SOUTH OF 23 MILE	1 Highway	5 Waterway	1970	2001			2	31.8	39	2	3 Steel	19 Culvert	0	""	""	N N/A (no deck (NBI))	4 M 18 (H 20)	2		42.67	-82.897995	2025-08-18T00:00:00	POINT (-82.897995 42.67)	Macomb	NBI	Non-NHS	1240.2	0	4200010	2.94	2024-06-07T00:00:00	24	A	N	N	N	6
166	MDOT	Metro	11288	82053-B02-1	US-24 NB	MIDDLE ROUGE R	IN DEARBORN HTS	1 Highway	5 Waterway	1959	2006			2	124	66.6	2	5 Prestressed Concrete	06 Box Bms- Single/Sprd	0	""	""	1 Monolithic Concrete	9 MS22.5(HS25)or greater	4		42.34	-83.27331	2025-08-18T00:00:00	POINT (-83.27331 42.34)	Taylor	NBI	NHS	8258.4	56	4700038	17.61	2024-08-12T00:00:00	24	A	7	8	7	N
167	MDOT	Metro	11524	82122-S36	LFT TRN W OF LEVAN	I-96	IN LIVONIA	1 Highway	1 Highway	1974	2014		2014	2	176	26.4	2	3 Steel	02 Multi Str Non Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	2	10	42.38	-83.40484	2025-08-18T00:00:00	POINT (-83.40484 42.38)	Taylor	NBI	Non-NHS	4646.4	24	1804002	0.02	2024-10-08T00:00:00	24	A	7	7	8	N
168	Detroit	Metro	12442	""	TIREMAN AVE	ROUGE RIVER	ROUGE PARK	5 Highway-pedestrian	5 Waterway	1930	1998			2	89.9	69.9	2	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	6 MS18(HS20)+mod	4		42.35	-83.25198333	2025-08-18T00:00:00	POINT (-83.25198333 42.35)	Detroit	NBI	Non-NHS	6284.01	49.9	1625510	0.14	2023-11-30T00:00:00	24	A	7	7	5	N
169	MDOT	Metro	11693	82192-S15	PLYMOUTH ROAD	M-39 (SOUTHFIELD)	IN DETROIT	5 Highway-pedestrian	1 Highway	1961	2010		1996	2	108.5	143.7	2	4 Steel Continuous	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	6 MS18(HS20)+mod	10	6	42.37	-83.21658	2025-08-18T00:00:00	POINT (-83.21658 42.37)	Detroit	NBI	NHS	15591.45	126	1604102	17.29	2023-12-14T00:00:00	24	A	8	7	8	N
170	Wayne County	Metro	12015	""	KING ROAD	BLAKELY DRAIN	RVRVW/TRENTONE/ALLEN	1 Highway	5 Waterway	1933				1	37.7	35.8	1	1 Concrete	04 Tee Beam	0	0 Other	00 Other	6 Bituminous	4 M 18 (H 20)	2		42.16	-83.21673	2025-08-18T00:00:00	POINT (-83.21673 42.16)	Taylor	NBI	Non-NHS	1349.66	29.9	1592206	4.56	2024-11-29T00:00:00	12	A	5	4	4	N
171	MDOT	Metro	8127	63191-S13	I-96 WB	9 MI RD	1 MI W OF FARMINGTON	1 Highway	1 Highway	1972		1998	1999	1	90.9	74.1	1	3 Steel	02 Multi Str Non Comp	0	""	""	5 Epoxy Overlay	6 MS18(HS20)+mod	4	2	42.45	-83.431076	2025-08-18T00:00:00	POINT (-83.431076 42.45)	Oakland	NBI	NHS	6735.69	71.9	639107	3.08	2024-12-19T00:00:00	24	A	5	7	7	N
172	Macomb County	Metro	6380	""	31 MILE ROAD	N BRANCH CLINTON RIVER	0.4 MI E OF ROMEO PLANK	1 Highway	5 Waterway	1972				1	53.8	22.3	1	5 Prestressed Concrete	04 Tee Beam	0	""	""	6 Bituminous	5 MS 18 (HS 20)	2		42.79	-82.953094	2025-08-18T00:00:00	POINT (-82.953094 42.79)	Macomb	NBI	Non-NHS	1199.74	20	4408230	7.75	2024-05-01T00:00:00	24	P	5	5	7	N
173	MDOT	Metro	8020	63172-S15	I-75 SB	CLARKSTON RD	1.1 MI SE OF M-15	1 Highway	1 Highway	1962	1988	1983	1988	3	105	62	3	3 Steel	02 Multi Str Non Comp	0	""	""	5 Epoxy Overlay	6 MS18(HS20)+mod	3	2	42.75	-83.39977	2025-08-18T00:00:00	POINT (-83.39977 42.75)	Oakland	NBI	NHS	6510	58.9	646106	30.99	2025-03-14T00:00:00	24	A	5	6	7	N
174	Macomb County	Metro	6306	""	MCVICAR ROAD	EAST POND CREEK	AT MCVICAR AND 33 MILE RD	1 Highway	5 Waterway	1955		2021		1	23	29.5	1	3 Steel	19 Culvert	0	""	""	N N/A (no deck (NBI))	2 M 13.5 (H 15)	2		42.82	-83.00947	2025-08-18T00:00:00	POINT (-83.00947 42.82)	Macomb	NBI	Non-NHS	678.5	23	4208305	0.54	2024-08-06T00:00:00	12	P	N	N	N	3
175	Macomb County	Metro	6192	""	15 MILE RD	SWEENEY DRAIN	0.3MI EAST OF GARFIELD RD	5 Highway-pedestrian	5 Waterway	2003				1	20	60	1	1 Concrete	19 Culvert	0	""	""	N N/A (no deck (NBI))	4 M 18 (H 20)	5		42.55	-82.944534	2025-08-18T00:00:00	POINT (-82.944534 42.55)	Macomb	NBI	Non-NHS	1200	0	803605	7.34	2024-06-07T00:00:00	24	A	N	N	N	7
176	MDOT	Metro	7859	63051-S01-5	M-1 NB RAMP	M-102 (8 MILE RD)	@ N LTS OF DETROIT	5 Highway-pedestrian	1 Highway	1956	2007		2007	2	119	66	2	3 Steel	32 Multi Str Comp	0	""	""	3 Latex Concrete/Similar	5 MS 18 (HS 20)	3	6	42.45	-83.12466	2025-08-18T00:00:00	POINT (-83.12466 42.45)	Oakland	NBI	NHS	7854	40	1598701	0	2023-09-26T00:00:00	24	A	7	7	7	N
177	MDOT	Metro	11599	82123-S51	EB DAVISON (M-8)	I-96 WYOMING EXIT RAMP	IN DETROIT	5 Highway-pedestrian	1 Highway	1971				1	122.4	35.1	1	3 Steel	82 Pl Girder Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	2	1	42.39	-83.15577	2025-08-18T00:00:00	POINT (-83.15577 42.39)	Detroit	NBI	Non-NHS	4296.24	28.8	4707877	0.16	2024-09-20T00:00:00	24	A	5	6	5	N
178	Wayne County	Metro	12078	""	FIVE MILE ROAD	SMITH DRAIN	REDFORD       W/TELEGRAPH	5 Highway-pedestrian	5 Waterway	1979				2	21	62	2	3 Steel	19 Culvert	0	""	""	N N/A (no deck (NBI))	0 Unknown	5		42.4	-83.2797	2025-08-18T00:00:00	POINT (-83.2797 42.4)	Taylor	NBI	Non-NHS	1302	62	1579605	1.8	2025-06-30T00:00:00	24	A	N	N	N	6
179	Rochester	Metro	8273	""	LUDLOW ST	PAINT CREEK	WEST OF ROCHESTER RD	1 Highway	5 Waterway	1967	2004		1990	1	40	36.4	1	3 Steel	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	6 MS18(HS20)+mod	2		42.69	-83.14276	2025-08-18T00:00:00	POINT (-83.14276 42.69)	Oakland	NBI	Non-NHS	1456	25.9	678903	0.43	2024-09-25T00:00:00	24	A	7	6	7	N
180	MDOT	Metro	11220	82024-S13	M-53(VANDYKE ST)	I-94	IN DETROIT	5 Highway-pedestrian	1 Highway	2013				2	172.3	99.7	2	5 Prestressed Concrete	02 Multi Str Non Comp	0	""	""	1 Monolithic Concrete	B Greater than HL 93	6	6	42.39	-83.02008	2025-08-18T00:00:00	POINT (-83.02008 42.39)	Detroit	NBI	NHS	17178.31	80	1577904	0.57	2023-11-28T00:00:00	24	A	8	8	8	N
181	MDOT	Metro	7998	63172-R01-5	NB JOSLYN TO I-75	GTW RR	5.7 MI NW OF M-59	1 Highway	2 Railroad	1981	2005	2005		3	144	29.9	3	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	3 Latex Concrete/Similar	9 MS22.5(HS25)or greater	1		42.7	-83.28682	2025-08-18T00:00:00	POINT (-83.28682 42.7)	Oakland	NBI	NHS	4305.6	26	1849506	0.1	2025-03-28T00:00:00	24	A	7	7	7	N
182	Macomb County	Metro	6209	""	23 MILE ROAD	N BRANCH CLINTON RIVER	0.2 MI WEST OF NORTH AVE	1 Highway	5 Waterway	2013				3	206	78.6	3	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	B Greater than HL 93	5		42.67	-82.881996	2025-08-18T00:00:00	POINT (-82.881996 42.67)	Macomb	NBI	NHS	16191.6	76.1	807106	10.98	2023-08-16T00:00:00	24	A	7	8	8	N
183	MDOT	Metro	11442	82112-S17	OAKMAN BLVD	M-10	IN DETROIT	5 Highway-pedestrian	1 Highway	1955	2000		2000	2	147.9	122.3	2	4 Steel Continuous	32 Multi Str Comp	0	""	""	2 Integral Concrete	5 MS 18 (HS 20)	4	7	42.4	-83.11554	2025-08-18T00:00:00	POINT (-83.11554 42.4)	Detroit	NBI	Non-NHS	18088.17	60	1581709	3.5	2025-04-29T00:00:00	24	A	7	7	6	N
184	Macomb County	Metro	6207	""	21 MILE ROAD	LEWIS DRAIN	0.5 MI EAST OF HAYES ROAD	1 Highway	5 Waterway	1975				2	23	29.5	2	1 Concrete	19 Culvert	0	""	""	N N/A (no deck (NBI))	4 M 18 (H 20)	3		42.64	-82.965225	2025-08-18T00:00:00	POINT (-82.965225 42.64)	Macomb	NBI	Non-NHS	678.5	0	817708	3.74	2025-07-11T00:00:00	24	A	N	N	N	6
185	MDOT	Metro	7904	63101-S08	MIDDLEBELT RD	I-696	5.7 MI E OF I-96	1 Highway	1 Highway	1961	2002		2002	4	236.4	41.1	4	3 Steel	32 Multi Str Comp	0	""	""	5 Epoxy Overlay	5 MS 18 (HS 20)	2	8	42.49	-83.338776	2025-08-18T00:00:00	POINT (-83.338776 42.49)	Oakland	NBI	Non-NHS	9716.04	32	634610	3.53	2025-05-06T00:00:00	24	A	6	7	7	N
186	MDOT	Metro	8060	63174-S04-1	I-75 NB	13 MILE RD	IN MADISON HTS	1 Highway	1 Highway	2022				1	111.5	73.8	1	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	6 MS18(HS20)+mod	4	5	42.52	-83.115295	2025-08-18T00:00:00	POINT (-83.115295 42.52)	Oakland	NBI	NHS	8228.7	70.4	647308	5.41	2025-04-16T00:00:00	24	A	8	8	8	N
187	MDOT	Metro	6018	50011-S10	M-53 NB	UTICA RD	1.9 MI S OF M-59	1 Highway	1 Highway	1966				3	123.1	42.9	3	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	5 Epoxy Overlay	5 MS 18 (HS 20)	2	2	42.6	-83.02317	2025-08-18T00:00:00	POINT (-83.02317 42.6)	Macomb	NBI	NHS	5280.99	39.5	4210208	3.97	2025-02-13T00:00:00	13	A	6	7	7	N
188	MDOT	Metro	11626	82191-B02	I-75 NB	BLAKELY DRAIN	0.2 MI S OF TAYLOR	1 Highway	5 Waterway	1964	2019		2019	1	40	63.3	1	3 Steel	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	6 MS18(HS20)+mod	3		42.18	-83.24322	2025-08-18T00:00:00	POINT (-83.24322 42.18)	Taylor	NBI	NHS	2532	60	1592010	8.06	2024-07-26T00:00:00	24	A	7	8	7	N
189	Oakland County	Metro	8164	""	10 MILE RD	PEBBLE CREEK	BET INKSTER AND BEECH	1 Highway	5 Waterway	1984				1	44	87.3	1	5 Prestressed Concrete	05 Box Bm/Gird- Multiple	0	""	""	6 Bituminous	6 MS18(HS20)+mod	2		42.47	-83.30389	2025-08-18T00:00:00	POINT (-83.30389 42.47)	Oakland	NBI	Non-NHS	3841.2	40	633409	3.62	2024-07-30T00:00:00	24	A	7	7	7	N
190	Wayne County	Metro	12001	""	VAN HORN ROAD	SILVER CREEK	BROWNSTOWN      E/INKSTER	1 Highway	5 Waterway	2018				1	23.5	50	1	1 Concrete	19 Culvert	0	""	""	4 Low Slump Concrete	B Greater than HL 93	2		42.12	-83.29489	2025-08-18T00:00:00	POINT (-83.29489 42.12)	Taylor	NBI	Non-NHS	1175	30	1674101	2.88	2024-11-13T00:00:00	24	A	N	N	N	8
191	Wayne County	Metro	12230	""	INDUSTRIAL ROAD	DIX ROAD	DEARBORN         N/MILLER	5 Highway-pedestrian	1 Highway	1930			1984	4	149	77.8	2	3 Steel	42 Multi Str Encsd	2	1 Concrete	01 Slab	6 Bituminous	6 MS18(HS20)+mod	4	6	42.3	-83.147644	2025-08-18T00:00:00	POINT (-83.147644 42.3)	Taylor	NBI	Non-NHS	11592.2	47.9	4706467	1.86	2025-05-09T00:00:00	12	A	3	3	4	N
192	Macomb County	Metro	6224	""	29 MILE ROAD	NORTH BRANCH CLINTON RIV	0.5 MI W OF RAY CENTER RD	5 Highway-pedestrian	5 Waterway	1982		2019		2	132.8	60.4	2	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	3 Latex Concrete/Similar	9 MS22.5(HS25)or greater	4		42.76	-82.91414	2025-08-18T00:00:00	POINT (-82.91414 42.76)	Macomb	NBI	Non-NHS	8021.12	49.2	815710	7.29	2025-04-18T00:00:00	24	A	6	7	7	N
193	Oakland County	Metro	8210	""	NAKOMIS	INDIANWOOD LAKE CANAL	1.0 MI N OF INDIANWOOD RD	1 Highway	5 Waterway	1930	2012			1	27.5	26.2	1	7 Timber	01 Slab	0	""	""	6 Bituminous	A HL 93	2		42.8	-83.27299	2025-08-18T00:00:00	POINT (-83.27299 42.8)	Oakland	NBI	Non-NHS	720.5	24.3	669401	0.79	2024-07-11T00:00:00	24	A	7	7	7	N
194	MDOT	Metro	11326	82072-R01	M-3 (GRATIOT AVE)	DEQUINDRE CUT	IN DETROIT	1 Highway	3 Pedestrian-bicycle	1929	1970	1970	1970	2	81.7	119.8	2	3 Steel	42 Multi Str Encsd	0	""	""	2 Integral Concrete	4 M 18 (H 20)	4		42.35	-83.03584	2025-08-18T00:00:00	POINT (-83.03584 42.35)	Detroit	NBI	NHS	9787.66	89.9	4711788	1.51	2024-09-25T00:00:00	12	A	4	5	6	N
195	MDOT	Metro	11529	82122-S41	NEWBURGH DBL U-TRN	I-96	IN LIVONIA	1 Highway	1 Highway	1974	2014	2014	2001	2	176	49.5	2	3 Steel	02 Multi Str Non Comp	0	""	""	3 Latex Concrete/Similar	5 MS 18 (HS 20)	2	8	42.38	-83.413925	2025-08-18T00:00:00	POINT (-83.413925 42.38)	Taylor	NBI	Non-NHS	8712	40.5	1804009	0.01	2024-10-02T00:00:00	24	A	6	7	8	N
196	MDOT	Metro	11267	82025-S20-4	M-102 WB	I-94	IN HARPER WOODS	5 Highway-pedestrian	1 Highway	1959	2002			4	179.7	61.3	4	5 Prestressed Concrete	05 Box Bm/Gird- Multiple	0	""	""	2 Integral Concrete	6 MS18(HS20)+mod	4	6	42.45	-82.91708	2025-08-18T00:00:00	POINT (-82.91708 42.45)	Detroit	NBI	NHS	11015.61	43.9	4702103	0.93	2024-06-27T00:00:00	24	A	7	7	7	N
197	Wolverine Lake	Metro	8314	""	OAK ISLAND DRIVE	WOLVERINE LAKE	SOUTH OF GLENGARY	1 Highway	5 Waterway	1981				7	175.9	25.9	7	7 Timber	01 Slab	0	""	""	6 Bituminous	6 MS18(HS20)+mod	2		42.56	-83.4813	2025-08-18T00:00:00	POINT (-83.4813 42.56)	Oakland	NBI	Non-NHS	4555.81	24.9	706002	0.02	2024-08-13T00:00:00	24	P	7	7	6	N
198	Macomb County	Metro	6238	""	MOUND RD	BEAR CREEK	0.4 MI N OF 11 MILE RD	1 Highway	5 Waterway	2022				1	27.2	106.7	1	1 Concrete	19 Culvert	0	""	""	N N/A (no deck (NBI))	B Greater than HL 93	10		42.5	-83.04602	2025-08-18T00:00:00	POINT (-83.04602 42.5)	Macomb	NBI	NHS	2902.24	0	799110	3.38	2024-06-07T00:00:00	24	A	N	N	N	9
199	MDOT	Metro	8005	63172-S05	WALTON BLVD	I-75	2.5 MI N OF M-59	1 Highway	1 Highway	2008				2	209.2	81.3	2	5 Prestressed Concrete	06 Box Bms- Single/Sprd	0	""	""	1 Monolithic Concrete	6 MS18(HS20)+mod	5	8	42.68	-83.24101	2025-08-18T00:00:00	POINT (-83.24101 42.68)	Oakland	NBI	NHS	17007.96	64	616602	0.48	2024-05-29T00:00:00	24	A	7	8	8	N
200	MDOT	Metro	11663	82191-S21-1	I-75 NB	TOLEDO-DIX HWY & RAMP C&	IN LINCOLN PARK	1 Highway	1 Highway	1966	2001		2001	10	830	63.8	10	4 Steel Continuous	82 Pl Girder Comp	0	""	""	1 Monolithic Concrete	9 MS22.5(HS25)or greater	3	8	42.24	-83.19427	2025-08-18T00:00:00	POINT (-83.19427 42.24)	Taylor	NBI	NHS	52954	60.3	1592010	13.03	2024-10-03T00:00:00	24	A	7	7	7	N
201	MDOT	Metro	11586	82123-S38	MC GRAW AVE	I-96	IN DETROIT	5 Highway-pedestrian	1 Highway	1971		2004	2004	4	332	70.2	4	3 Steel	32 Multi Str Comp	0	""	""	3 Latex Concrete/Similar	5 MS 18 (HS 20)	4	12	42.35	-83.10186389	2025-08-18T00:00:00	POINT (-83.10186389 42.35)	Detroit	NBI	Non-NHS	23306.4	47.9	1581903	3.19	2023-09-19T00:00:00	24	A	6	6	6	N
202	MDOT	Metro	11974	82293-S10-5	I-275 NB COLLECTOR	M-14	0.3 MI W OF LIVONIA	1 Highway	1 Highway	1971		2001	2001	4	455	38.7	4	3 Steel	82 Pl Girder Comp	0	""	""	3 Latex Concrete/Similar	5 MS 18 (HS 20)	2	8	42.39	-83.435844	2025-08-18T00:00:00	POINT (-83.435844 42.39)	Taylor	NBI	NHS	17608.5	34.5	1607504	0.52	2024-08-13T00:00:00	24	A	6	6	6	N
203	MDOT	Metro	11840	82252-R11	DAVISON TO I-75 RP	GTWRR,I-75&DAVISON(M-8)	IN DETROIT	7 3d level interchg	4 Highway-railroad	1971	2021		2003	9	1070.9	30.8	9	4 Steel Continuous	82 Pl Girder Comp	0	""	""	1 Monolithic Concrete	6 MS18(HS20)+mod	1	9	42.41	-83.07975	2025-08-18T00:00:00	POINT (-83.07975 42.41)	Detroit	NBI	NHS	32983.72	27.6	1598504	0.05	2025-04-29T00:00:00	24	A	8	8	7	N
204	MDOT	Metro	11780	82195-S25	M-1 WOODWARD AV	I-75	IN DETROIT	5 Highway-pedestrian	1 Highway	2014			2014	2	160	112.4	2	4 Steel Continuous	82 Pl Girder Comp	0	""	""	1 Monolithic Concrete	B Greater than HL 93	5	9	42.34	-83.05281	2025-08-18T00:00:00	POINT (-83.05281 42.34)	Detroit	NBI	NHS	17984	83	1591001	5.99	2024-03-05T00:00:00	24	A	7	8	8	N
205	MDOT	Metro	11548	82123-S02	WB TO SB TURN RDWY	3RD LEVEL TURN RDWY	IN DETROIT	8 4th level interchg	1 Highway	1972		1991	1991	17	1203.1	39.4	17	4 Steel Continuous	02 Multi Str Non Comp	0	""	""	5 Epoxy Overlay	5 MS 18 (HS 20)	2	3	42.38	-83.21645	2025-08-18T00:00:00	POINT (-83.21645 42.38)	Detroit	NBI	NHS	47402.14	37.4	4710305	0.03	2023-08-25T00:00:00	24	A	6	7	7	N
206	MDOT	Metro	11520	82122-S32	LFT TRN W INKSTER	I-96	@ E LTS OF LIVONIA	1 Highway	1 Highway	1971	2014		2001	2	166.5	22.4	2	3 Steel	02 Multi Str Non Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	1	8	42.38	-83.31514	2025-08-18T00:00:00	POINT (-83.31514 42.38)	Taylor	NBI	Non-NHS	3729.6	20	1803909	0.01	2024-09-27T00:00:00	24	A	7	7	7	N
207	Other Local Agencies	Metro	13376	""	DINGELL RD	FRANK & POET PARALLEL	900 FT N OF EUREKA	1 Highway	5 Waterway	1991				2	21.7	124	2	1 Concrete	19 Culvert	0	""	""	0 None	9 MS22.5(HS25)or greater	4		42.19	-83.36359	2025-08-18T00:00:00	POINT (-83.36359 42.19)	Taylor	NBI	NHS	2690.8	130	4711337	0.18	2025-05-29T00:00:00	24	A	N	N	N	6
208	Novi	Metro	12769	""	WEST PARK DRIVE	CSX RR	CITY OF NOVI	5 Highway-pedestrian	2 Railroad	1999				3	151.2	63.4	3	5 Prestressed Concrete	05 Box Bm/Gird- Multiple	0	""	""	5 Epoxy Overlay	9 MS22.5(HS25)or greater	2		42.51	-83.50736	2025-08-18T00:00:00	POINT (-83.50736 42.51)	Oakland	NBI	Non-NHS	9586.08	36.1	4413388	0.72	2024-09-27T00:00:00	24	A	7	7	7	N
209	MDOT	Metro	7925	63102-S09	SOUTHFIELD U TURN	I-696	IN LATHRUP VILLAGE	1 Highway	1 Highway	1987	2009			2	130	63.7	2	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	9 MS22.5(HS25)or greater	2	6	42.49	-83.220276	2025-08-18T00:00:00	POINT (-83.220276 42.49)	Oakland	NBI	Non-NHS	8281	60	4413528	0.01	2024-07-23T00:00:00	24	A	6	7	7	N
210	MDOT	Metro	11581	82123-S33	JOY RD	I-96	IN DETROIT	5 Highway-pedestrian	1 Highway	1972	2007		2008	2	174.5	70.4	2	3 Steel	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	4	8	42.36	-83.13116	2025-08-18T00:00:00	POINT (-83.13116 42.36)	Detroit	NBI	Non-NHS	12284.8	48	1581806	0.5	2023-09-26T00:00:00	24	A	6	7	6	N
211	Macomb County	Metro	6275	""	JEFFERSON AVE	SALT RIVER	0.3 MI N OF SUGARBUSH RD	1 Highway	5 Waterway	2019				2	100	59	2	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	B Greater than HL 93	2		42.66	-82.77684	2025-08-18T00:00:00	POINT (-82.77684 42.66)	Macomb	NBI	Non-NHS	5900	40	821205	3.11	2023-11-16T00:00:00	24	A	8	8	8	N
212	Macomb County	Metro	6300	""	ROMEO PLANK ROAD	NEWLAND DRAIN	0.2 MI SOUTH OF IRWIN RD	1 Highway	5 Waterway	1971				3	33.8	23	3	3 Steel	19 Culvert	0	""	""	N N/A (no deck (NBI))	4 M 18 (H 20)	2		42.86	-82.96497	2025-08-18T00:00:00	POINT (-82.96497 42.86)	Macomb	NBI	Non-NHS	777.4	0	816509	11.03	2024-08-07T00:00:00	12	P	N	N	N	4
213	MDOT	Metro	11343	82101-B01	M-14 (OLD)	FELLOWS CREEK	0.3 MI E OF WASHTENAW COL	1 Highway	5 Waterway	2003				1	30	48	1	1 Concrete	19 Culvert	0	""	""	6 Bituminous	9 MS22.5(HS25)or greater	2		42.35	-83.54035	2025-08-18T00:00:00	POINT (-83.54035 42.35)	Taylor	NBI	Non-NHS	1440	48	1604102	0.36	2023-10-09T00:00:00	24	A	N	N	N	8
214	Wayne County	Metro	12068	""	E N HINES DRIVE	MIDDLE ROUGE RIVER	PLYMOUTH T S/PLYMOUTH RD	5 Highway-pedestrian	5 Waterway	1932	1977	2013		3	99.7	51.8	3	2 Concrete Continuous	04 Tee Beam	0	""	""	2 Integral Concrete	4 M 18 (H 20)	2		42.37	-83.45315	2025-08-18T00:00:00	POINT (-83.45315 42.37)	Taylor	NBI	NHS	5164.46	35.1	1689409	2.21	2025-07-24T00:00:00	6	D	3	2	7	N
215	MDOT	Metro	11945	82292-S03	ECORSE ROAD	I-275	1 MI SW OF WAYNE	1 Highway	1 Highway	1974		2012	2012	2	288	74	2	3 Steel	82 Pl Girder Comp	0	""	""	3 Latex Concrete/Similar	9 MS22.5(HS25)or greater	5	6	42.25	-83.43977	2025-08-18T00:00:00	POINT (-83.43977 42.25)	Taylor	NBI	Non-NHS	21312	70.9	5495384	1.88	2024-08-28T00:00:00	24	A	7	7	7	N
216	Dearborn Height	Metro	12325	""	BEECH-DALY ROAD	ECORSE CREEK	IN DEARBORN HEIGHTS	5 Highway-pedestrian	5 Waterway	1986				1	42	72.2	1	1 Concrete	05 Box Bm/Gird- Multiple	0	""	""	2 Integral Concrete	6 MS18(HS20)+mod	2		42.27	-83.28955	2025-08-18T00:00:00	POINT (-83.28955 42.27)	Taylor	NBI	Non-NHS	3032.4	60	1692903	7.06	2023-10-17T00:00:00	24	A	5	7	7	N
217	MDOT	Metro	13314	82194-S31	SB I-75 RMP TO VER	I-75 AND WB I-96	AMBASSADOR GATEWAY	1 Highway	1 Highway	2007			2007	4	399.7	31.5	4	4 Steel Continuous	82 Pl Girder Comp	0	""	""	2 Integral Concrete	9 MS22.5(HS25)or greater	1		42.32	-83.08215278	2025-08-18T00:00:00	POINT (-83.08215278 42.32)	Detroit	NBI	NHS	12590.55	28	4718928	0.06	2024-06-27T00:00:00	24	A	8	8	8	N
218	MDOT	Metro	6165	50111-S23	I-94	QUINN RD	0.5 MI N OF ST CLAIR SHRS	1 Highway	1 Highway	2002				3	121.1	123.7	3	3 Steel	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	6 MS18(HS20)+mod	6	2	42.55	-82.87929	2025-08-18T00:00:00	POINT (-82.87929 42.55)	Macomb	NBI	NHS	14980.07	117.1	798501	7.92	2025-06-07T00:00:00	24	A	7	8	7	N
219	Troy	Metro	8309	""	ROCHESTER RD	STURGIS	0.15 MI N/BIG BEAVER RD	5 Highway-pedestrian	5 Waterway	1975	2000	1975		1	30	72.2	1	1 Concrete	19 Culvert	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	5		42.56	-83.128494	2025-08-18T00:00:00	POINT (-83.128494 42.56)	Oakland	NBI	NHS	2166	62	4413538	0.6	2025-04-01T00:00:00	24	A	N	N	N	7
220	MDOT	Metro	11921	82292-B04	I-275 SB	FELLOWS CREEK	2.0 MI NW OF WAYNE	1 Highway	5 Waterway	1974			2012	3	106.1	56.5	3	3 Steel	02 Multi Str Non Comp	0	""	""	5 Epoxy Overlay	9 MS22.5(HS25)or greater	3		42.31	-83.44288	2025-08-18T00:00:00	POINT (-83.44288 42.31)	Taylor	NBI	NHS	5994.65	53.2	1607610	16.16	2024-10-30T00:00:00	24	A	7	8	7	N
221	MDOT	Metro	7982	63111-R02	I-75 BL NB	GTW RR	S LTS OF PONTIAC	1 Highway	2 Railroad	1966	2004		2004	4	235.5	48.6	4	3 Steel	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	9 MS22.5(HS25)or greater	3		42.6	-83.25246	2025-08-18T00:00:00	POINT (-83.25246 42.6)	Oakland	NBI	NHS	11445.3	44.9	625903	1.83	2025-07-15T00:00:00	24	A	7	6	6	N
222	Macomb County	Metro	6243	""	MOUND RD	STERLING RELIEF DRAIN	0.5 MI NORTH OF 15 MILE	1 Highway	5 Waterway	1977				2	25.3	120	2	1 Concrete	19 Culvert	0	""	""	N N/A (no deck (NBI))	4 M 18 (H 20)	10		42.56	-83.04907778	2025-08-18T00:00:00	POINT (-83.04907778 42.56)	Macomb	NBI	NHS	3036	120	812510	5.25	2024-04-10T00:00:00	24	A	N	N	N	5
223	MDOT	Metro	11465	82112-S34-5	M-102 WB SERV RD	M-10	N LTS OF DETROIT	1 Highway	1 Highway	1965	2009		2009	3	213.9	37.6	3	3 Steel	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	2	7	42.44	-83.20326	2025-08-18T00:00:00	POINT (-83.20326 42.44)	Detroit	NBI	NHS	8042.64	30	1879401	0.3	2024-08-01T00:00:00	24	A	7	7	7	N
224	MDOT	Metro	7938	63102-S25	SB WOODWARD SERV	I-696	AT I-696 & WOODWARD	5 Highway-pedestrian	1 Highway	1986				2	185.1	55.6	2	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	9 MS22.5(HS25)or greater	3	8	42.48	-83.14566	2025-08-18T00:00:00	POINT (-83.14566 42.48)	Oakland	NBI	NHS	10291.56	37	1903609	0.48	2024-07-09T00:00:00	24	A	6	7	7	N
225	MDOT	Metro	11137	82022-S31	MILLER RD	I-94	IN DEARBORN	5 Highway-pedestrian	1 Highway	1970	2004	2004	2004	4	253	68.42	4	3 Steel	32 Multi Str Comp	0	""	""	5 Epoxy Overlay	5 MS 18 (HS 20)	6	8	42.32	-83.16502	2025-08-18T00:00:00	POINT (-83.16502 42.32)	Taylor	NBI	Non-NHS	17310.26	60	1589801	2.41	2023-09-15T00:00:00	24	A	6	7	6	N
226	Lincoln Park	Metro	12504	""	LAFAYETTE	N BR ECORSE RIVER	IN LINCOLN PARK	5 Highway-pedestrian	5 Waterway	1948	2005			1	32	41.5	1	5 Prestressed Concrete	05 Box Bm/Gird- Multiple	0	""	""	2 Integral Concrete	6 MS18(HS20)+mod	2		42.26	-83.17221	2025-08-18T00:00:00	POINT (-83.17221 42.26)	Taylor	NBI	Non-NHS	1328	35.1	1594503	2.22	2023-08-29T00:00:00	24	A	7	8	7	N
227	Wayne County	Metro	12279	""	ASH ROAD	SWAN CREEK	HURON             E/WALTZ	1 Highway	5 Waterway	1976				1	34.8	26.9	1	5 Prestressed Concrete	04 Tee Beam	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	2		42.11	-83.397385	2025-08-18T00:00:00	POINT (-83.397385 42.11)	Taylor	NBI	Non-NHS	936.12	24	1670808	1.21	2024-08-28T00:00:00	12	A	6	6	5	N
228	Inkster	Metro	12497	""	JOHN DALY	LOWER ROUGE RIVER	N OF MICHIGAN AVE US12	5 Highway-pedestrian	5 Waterway	2001				1	74.1	41.5	1	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	2		42.3	-83.30054	2025-08-18T00:00:00	POINT (-83.30054 42.3)	Taylor	NBI	Non-NHS	3075.15	29.9	1642902	1.96	2025-03-05T00:00:00	24	A	7	8	7	N
229	MDOT	Metro	11187	82023-S19	14TH ST	I-94	IN DETROIT	5 Highway-pedestrian	1 Highway	1953	1997		2004	4	165.5	81.7	4	3 Steel	02 Multi Str Non Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	2	6	42.35	-83.088974	2025-08-18T00:00:00	POINT (-83.088974 42.35)	Detroit	NBI	Non-NHS	13521.35	53.8	4705601	1.98	2023-11-14T00:00:00	24	A	7	6	7	N
230	MDOT	Metro	6087	50061-S18	VAN DYKE AVE (M53)	I-696	IN WARREN & CENTERLINE	5 Highway-pedestrian	1 Highway	1972	2010		2000	2	207	106.3	2	4 Steel Continuous	82 Pl Girder Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	7	8	42.49	-83.02778	2025-08-18T00:00:00	POINT (-83.02778 42.49)	Macomb	NBI	NHS	22004.1	88	799108	2.99	2023-09-13T00:00:00	24	A	7	6	8	N
231	MDOT	Metro	11883	82271-S03	US-24,I-75 CONN SB	US-24 NB	IN TAYLOR OVER US-24 NB	1 Highway	1 Highway	1964			2001	3	193.1	43.6	3	3 Steel	32 Multi Str Comp	0	""	""	2 Integral Concrete	6 MS18(HS20)+mod	2	2	42.19	-83.26684	2025-08-18T00:00:00	POINT (-83.26684 42.19)	Taylor	NBI	NHS	8419.16	39.4	1578409	1.41	2024-11-06T00:00:00	12	A	4	6	5	N
232	Macomb County	Metro	6359	""	HAYES ROAD	MIDDLE BR CLINTON RIVER	0.4 MI SOUTH OF 26 MILE	1 Highway	5 Waterway	1972			1972	1	73.8	34.1	1	3 Steel	32 Multi Str Comp	0	""	""	5 Epoxy Overlay	5 MS 18 (HS 20)	2		42.71	-82.976654	2025-08-18T00:00:00	POINT (-82.976654 42.71)	Macomb	NBI	Non-NHS	2516.58	29.9	4208921	9.68	2024-06-14T00:00:00	24	A	7	7	7	N
233	Wayne County	Metro	12253	""	HANFORD ROAD	FELLOWS CREEK	CANTON            W/RIDGE	1 Highway	5 Waterway	1944				1	22	31.5	1	1 Concrete	01 Slab	0	""	""	8 Gravel	6 MS18(HS20)+mod	2		42.33	-83.53222	2025-08-18T00:00:00	POINT (-83.53222 42.33)	Taylor	NBI	Non-NHS	693	29.2	1676006	2.73	2025-05-27T00:00:00	12	P	3	3	5	N
234	MDOT	Metro	11570	82123-S23	WB DAV TO EB JEFFR	I-96 (JEFFRIES FRWY)	IN DETROIT	1 Highway	1 Highway	1971	2009		2009	2	243	31.2	2	3 Steel	82 Pl Girder Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	1	8	42.38	-83.148834	2025-08-18T00:00:00	POINT (-83.148834 42.38)	Detroit	NBI	NHS	7581.6	28	1606501	0.23	2023-09-27T00:00:00	24	A	7	7	6	N
235	MDOT	Metro	11492	82122-S06	FARMINGTON RD	I-96	IN LIVONIA	5 Highway-pedestrian	1 Highway	1974	2014	2014	2001	2	178.5	82.4	2	3 Steel	02 Multi Str Non Comp	0	""	""	3 Latex Concrete/Similar	5 MS 18 (HS 20)	5	8	42.38	-83.372925	2025-08-18T00:00:00	POINT (-83.372925 42.38)	Taylor	NBI	NHS	14708.4	64	1690602	2.23	2024-11-11T00:00:00	24	A	5	7	7	N
236	Oakland County	Metro	8159	""	DEQUINDRE ROAD	GIBSON DRAIN	BET WATTLES AND LONG LK R	1 Highway	5 Waterway	2003				1	30.1	64	1	1 Concrete	19 Culvert	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	5		42.59	-83.089676	2025-08-18T00:00:00	POINT (-83.089676 42.59)	Oakland	NBI	NHS	1926.4	64	799402	9.65	2024-08-23T00:00:00	24	A	N	N	N	7
237	MDOT	Metro	11126	82022-S16	I-94 WB	MONROE BLVD	IN TAYLOR OVER MONROE BLV	1 Highway	1 Highway	2004				3	125	91.3	3	5 Prestressed Concrete	06 Box Bms- Single/Sprd	0	""	""	1 Monolithic Concrete	9 MS22.5(HS25)or greater	4	2	42.27	-83.250404	2025-08-18T00:00:00	POINT (-83.250404 42.27)	Taylor	NBI	NHS	11412.5	84	1588802	15.76	2025-08-06T00:00:00	24	A	7	7	7	N
238	Bloomfield Hill	Metro	13612	""	CRANBROOK ROAD	ROUGE RIVER BRANCH	WEST OF WOODWARD	5 Highway-pedestrian	5 Waterway	2011				1	25.7	24	1	1 Concrete	19 Culvert	0	""	""	N N/A (no deck (NBI))	B Greater than HL 93	2		42.57	-83.24211	2025-08-18T00:00:00	POINT (-83.24211 42.57)	Oakland	NBI	Non-NHS	616.8	24	618210	0.02	2024-01-22T00:00:00	24	A	N	N	N	6
239	MDOT	Metro	11821	82251-S20	FERRY AVE	I-75 & TURN RDWY	IN DETROIT	5 Highway-pedestrian	1 Highway	1962	1999	1985	2002	5	240	67.9	5	3 Steel	32 Multi Str Comp	0	""	""	3 Latex Concrete/Similar	6 MS18(HS20)+mod	4	8	42.37	-83.05619	2025-08-18T00:00:00	POINT (-83.05619 42.37)	Detroit	NBI	Non-NHS	16296	44	1585703	0.6	2023-12-13T00:00:00	24	A	6	7	6	N
240	MDOT	Metro	13198	63172-S03	UNIVERSITY DRIVE	I-75	1.6 MI N OF M-59	1 Highway	1 Highway	2015				2	229	84.3	2	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	B Greater than HL 93	4	9	42.67	-83.24119	2025-08-18T00:00:00	POINT (-83.24119 42.67)	Oakland	NBI	NHS	19304.7	64	624301	3.25	2023-12-19T00:00:00	24	A	8	8	8	N
241	MDOT	Metro	7804	63022-S09	HAGGERTY RD	M-5	E LTS OF NOVI	1 Highway	1 Highway	1957	2001		2001	4	214	34.8	4	3 Steel	02 Multi Str Non Comp	0	""	""	1 Monolithic Concrete	2 M 13.5 (H 15)	2	4	42.48	-83.4355	2025-08-18T00:00:00	POINT (-83.4355 42.48)	Oakland	NBI	NHS	7447.2	31.4	639005	2.89	2024-11-22T00:00:00	24	A	6	6	7	N
242	Macomb County	Metro	6318	""	DUNHAM ROAD	MILLER DRAIN	0.1 MI W OF HEYDENREICH	1 Highway	5 Waterway	1964		1986	1964	1	26.9	33.1	1	3 Steel	02 Multi Str Non Comp	0	""	""	1 Monolithic Concrete	4 M 18 (H 20)	2		42.62	-82.91665	2025-08-18T00:00:00	POINT (-82.91665 42.62)	Macomb	NBI	Non-NHS	890.39	29.5	832505	0.19	2024-10-04T00:00:00	12	P	5	4	7	N
243	MDOT	Metro	7966	63103-S05	I-696	I-75 & 4 RAMPS	IN ROYAL OAK	8 4th level interchg	1 Highway	1971			2007	5	670	152.7	3	4 Steel Continuous	02 Multi Str Non Comp	2	3 Steel	02 Multi Str Non Comp	5 Epoxy Overlay	6 MS18(HS20)+mod	8	2	42.48	-83.11139	2025-08-18T00:00:00	POINT (-83.11139 42.48)	Oakland	NBI	NHS	102309	144.2	1903903	4.53	2024-07-01T00:00:00	24	A	6	5	4	N
244	Macomb County	Metro	14330	""	HAVERHILL DR	SALT SLING GLOEDE DRAIN	100 FT W OF GARFIELD RD	1 Highway	5 Waterway	2004				1	24	36	1	1 Concrete	19 Culvert	0	""	""	4 Low Slump Concrete	5 MS 18 (HS 20)	2		42.65	-82.9569	2025-08-18T00:00:00	POINT (-82.9569 42.65)	Macomb	NBI	Non-NHS	864	36	819309	0.9	2023-08-16T00:00:00	24	A	N	N	N	7
245	MDOT	Metro	11490	82122-S04	YALE AVE	I-96	IN LIVONIA	5 Highway-pedestrian	1 Highway	1974			2014	2	176	46.4	2	3 Steel	02 Multi Str Non Comp	0	""	""	5 Epoxy Overlay	5 MS 18 (HS 20)	2	8	42.38	-83.39286	2025-08-18T00:00:00	POINT (-83.39286 42.38)	Taylor	NBI	Non-NHS	8166.4	34	1606210	0.01	2024-10-08T00:00:00	24	A	6	7	7	N
246	Wayne County	Metro	12073	""	E N HINES DRIVE	MIDDLE ROUGE RIVER	DBN HTS            N/FORD	5 Highway-pedestrian	5 Waterway	2023				1	116.25	62.33	1	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	0 None	B Greater than HL 93	2		42.33	-83.24795	2025-08-18T00:00:00	POINT (-83.24795 42.33)	Taylor	NBI	NHS	7245.86	44	1689409	14.79	2023-12-14T00:00:00	24	A	8	8	7	N
247	MDOT	Metro	12653	50022-B05	M-59 WB	MIDDLE BR CLINTON RIVER	4.2 MILES E OF M-53	1 Highway	5 Waterway	1996		2021		3	135	67.8	3	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	5 Epoxy Overlay	9 MS22.5(HS25)or greater	3		42.63	-82.93102	2025-08-18T00:00:00	POINT (-82.93102 42.63)	Macomb	NBI	NHS	9153	59	807801	8.19	2023-12-20T00:00:00	24	A	7	8	8	N
248	Wayne County	Metro	12196	""	JEFFERSON AVENUE	HURON RIVER	BROWNSTOWN    COUNTY LINE	1 Highway	5 Waterway	2023				2	175.5	50.08	2	6 Prestr Conc Contin	05 Box Bm/Gird- Multiple	0	""	""	1 Monolithic Concrete	B Greater than HL 93	2		42.04	-83.21404	2025-08-18T00:00:00	POINT (-83.21404 42.04)	Taylor	NBI	Non-NHS	8789.04	36	4302169	0.05	2024-03-19T00:00:00	24	A	9	9	8	N
249	MDOT	Metro	6045	50021-S02	MERRILL RD	M-59	IN UTICA	5 Highway-pedestrian	1 Highway	1994				2	130	44.4	2	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	2	6	42.62	-83.047134	2025-08-18T00:00:00	POINT (-83.047134 42.62)	Macomb	NBI	Non-NHS	5772	32	813809	1.59	2023-11-21T00:00:00	24	A	7	7	7	N
250	Sterling Heights	Metro	6422	""	15 MILE RD	BIG BEAVER DRAIN	WEST OF RYAN RD	1 Highway	5 Waterway	1984				2	33.8	58.1	2	1 Concrete	19 Culvert	0	""	""	N N/A (no deck (NBI))	6 MS18(HS20)+mod	5		42.55	-83.07746	2025-08-18T00:00:00	POINT (-83.07746 42.55)	Macomb	NBI	Non-NHS	1963.78	0	803605	0.54	2024-09-03T00:00:00	24	A	N	N	N	5
251	Armada	Metro	6410	""	WEST MAIN STREET	E BR COON CREEK	SEC 23 ARMADA TWP	5 Highway-pedestrian	5 Waterway	1990				1	36.1	39.4	1	5 Prestressed Concrete	05 Box Bm/Gird- Multiple	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	2		42.84	-82.88689	2025-08-18T00:00:00	POINT (-82.88689 42.84)	Macomb	NBI	Non-NHS	1422.34	25.9	817602	3.77	2023-10-18T00:00:00	24	A	7	7	7	N
252	MDOT	Metro	8090	63174-S21-2	I-75 SB	MAPLE RD, 15 MILE RD	IN TROY (OVER MAPLE RD)	1 Highway	1 Highway	2020				1	113.5	73.8	1	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	B Greater than HL 93	4	4	42.55	-83.1169	2025-08-18T00:00:00	POINT (-83.1169 42.55)	Oakland	NBI	NHS	8376.3	70.4	646106	7.43	2025-07-02T00:00:00	24	A	8	8	8	N
253	MDOT	Metro	11099	82021-S01	BELLEVILLE RD	I-94	3.0 MI E OF WASHTENAW COL	1 Highway	1 Highway	1974			2011	2	260	105.9	2	4 Steel Continuous	82 Pl Girder Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	6	8	42.22	-83.48516	2025-08-18T00:00:00	POINT (-83.48516 42.22)	Taylor	NBI	NHS	27534	86.5	4705580	0.9	2025-05-20T00:00:00	24	A	6	8	7	N
254	Wayne County	Metro	12229	""	DIX ROAD	ROUGE RIVER	DEARBORN/DETROIT W/MILLER	5 Highway-pedestrian	5 Waterway	1927	1989		1992	6	221.8	73.8	2	3 Steel	16 Movable- Bascule	4	3 Steel	02 Multi Str Non Comp	1 Monolithic Concrete	0 Unknown	4		42.3	-83.15073	2025-08-18T00:00:00	POINT (-83.15073 42.3)	Taylor	NBI	NHS	16368.84	56.1	1627003	1.05	2025-04-25T00:00:00	12	A	5	4	5	N
255	Detroit	Metro	12381	""	LAFAYETTE STREET	DEQUINDRE CUT GREENWAY	W OF ST AUBIN	5 Highway-pedestrian	3 Pedestrian-bicycle	1924	2009			2	66.1	114	2	4 Steel Continuous	02 Multi Str Non Comp	0	""	""	6 Bituminous	6 MS18(HS20)+mod	6		42.34	-83.03027	2025-08-18T00:00:00	POINT (-83.03027 42.34)	Detroit	NBI	Non-NHS	7535.4	65.9	1585507	0.68	2023-11-30T00:00:00	24	A	7	7	6	N
256	MDOT	Metro	11552	82123-S06	I-96 EB MAIN RDWY	M-39 (SOUTHFIELD EXP)	IN DETROIT	6 2d level interchg	1 Highway	1970		2005	1989	4	215	60	4	3 Steel	32 Multi Str Comp	0	""	""	3 Latex Concrete/Similar	5 MS 18 (HS 20)	3	8	42.38	-83.2167	2025-08-18T00:00:00	POINT (-83.2167 42.38)	Detroit	NBI	NHS	12900	57.7	1606201	12.02	2023-08-22T00:00:00	24	A	7	6	7	N
257	MDOT	Metro	13317	82194-S34-6	TRUCK INSP TO I-75	NB I-75 RMP TO VERNOR	AMBASSADOR GATEWAY	1 Highway	1 Highway	2007			2007	1	118.8	35.5	1	3 Steel	82 Pl Girder Comp	0	""	""	2 Integral Concrete	9 MS22.5(HS25)or greater	1	1	42.32	-83.08172	2025-08-18T00:00:00	POINT (-83.08172 42.32)	Detroit	NBI	NHS	4217.4	32	4718920	0.3	2024-06-14T00:00:00	24	A	7	8	7	N
258	MDOT	Metro	11354	82102-S01	HAGGERTY ROAD	M-14	0.6MI W OF W LTS LIVONIA	1 Highway	1 Highway	1977			2006	3	254.9	77.8	3	3 Steel	82 Pl Girder Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	4	8	42.39	-83.4438	2025-08-18T00:00:00	POINT (-83.4438 42.39)	Taylor	NBI	Non-NHS	19831.22	64	1689610	0.83	2023-10-19T00:00:00	24	A	5	7	6	N
259	Novi	Metro	13859	""	WIXOM RD	UNNAMED TRIB	500 FT S OF 11 MILE RD	5 Highway-pedestrian	5 Waterway	2012				2	42.7	28	2	1 Concrete	19 Culvert	0	""	""	6 Bituminous	9 MS22.5(HS25)or greater	2		42.48	-83.53455556	2025-08-18T00:00:00	POINT (-83.53455556 42.48)	Oakland	NBI	Non-NHS	1195.6	28.3	639101	1.14	2024-09-27T00:00:00	24	A	N	N	N	8
260	Oakland County	Metro	8171	""	GRAND RIVER AVE	KENT LAKE	BET DIXBORO AND KENT LK R	1 Highway	5 Waterway	2009				2	131.5	43.2	2	5 Prestressed Concrete	06 Box Bms- Single/Sprd	0	""	""	1 Monolithic Concrete	6 MS18(HS20)+mod	2		42.52	-83.66146	2025-08-18T00:00:00	POINT (-83.66146 42.52)	Oakland	NBI	Non-NHS	5680.8	40	4104142	1.42	2024-06-20T00:00:00	24	A	7	7	7	N
261	Wayne County	Metro	12273	""	FERRY STREET	THOROFARE CANAL	GROSSE ILE     E/MERIDIAN	1 Highway	5 Waterway	1947		1996		4	94.8	35.8	4	2 Concrete Continuous	01 Slab	0	""	""	6 Bituminous	6 MS18(HS20)+mod	2		42.14	-83.15603	2025-08-18T00:00:00	POINT (-83.15603 42.14)	Taylor	NBI	Non-NHS	3393.84	27.9	1691307	0.69	2025-03-31T00:00:00	12	P	3	3	5	N
262	MDOT	Metro	11150	82022-S48	I-94 EB	M-39	IN ALLEN PARK	1 Highway	1 Highway	1984				19	899.4	65.9	7	5 Prestressed Concrete	02 Multi Str Non Comp	12	1 Concrete	01 Slab	5 Epoxy Overlay	9 MS22.5(HS25)or greater	2	9	42.27	-83.222145	2025-08-18T00:00:00	POINT (-83.222145 42.27)	Taylor	NBI	NHS	59270.46	62	1576405	17.1	2024-11-19T00:00:00	24	A	6	6	7	N
263	MDOT	Metro	11336	82081-S04	M-153 EB	HINES DRIVE	IN DEARBORN OVER HINES DR	1 Highway	1 Highway	1971	2022	2005	2005	2	169.6	65.9	2	3 Steel	82 Pl Girder Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	4	5	42.33	-83.2451	2025-08-18T00:00:00	POINT (-83.2451 42.33)	Taylor	NBI	NHS	11176.64	63.5	1689409	15.12	2024-05-14T00:00:00	24	A	8	7	8	N
264	Macomb County	Metro	6365	""	27 MILE ROAD	COON CREEK	0.2 MI WEST OF NORTH AVE	1 Highway	5 Waterway	1990				1	58	43.2	1	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	2		42.73	-82.87783	2025-08-18T00:00:00	POINT (-82.87783 42.73)	Macomb	NBI	Non-NHS	2505.6	40	4208049	1.13	2025-05-13T00:00:00	24	A	7	7	7	N
265	MDOT	Metro	7905	63101-S09-3	I-696 EB	INKSTER RD	IN SOUTHFIELD	1 Highway	1 Highway	1988		1988	1988	1	122.5	72.5	1	3 Steel	82 Pl Girder Comp	0	""	""	5 Epoxy Overlay	9 MS22.5(HS25)or greater	4	2	42.49	-83.31902	2025-08-18T00:00:00	POINT (-83.31902 42.49)	Oakland	NBI	NHS	8881.25	69.42	710701	6.69	2025-07-09T00:00:00	12	A	6	7	7	N
266	MDOT	Metro	11506	82122-S19-5	NB SERV RD	I-96	IN DETROIT	6 2d level interchg	1 Highway	1970	2014		2014	2	166	72.5	2	3 Steel	02 Multi Str Non Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	4	8	42.39	-83.275764	2025-08-18T00:00:00	POINT (-83.275764 42.39)	Detroit	NBI	NHS	12035	61.1	1580109	0.25	2024-04-24T00:00:00	24	A	7	8	7	N
267	Wayne County	Metro	12044	""	ECORSE ROAD	NS RR	TAYLOR        E/TELEGRAPH	5 Highway-pedestrian	2 Railroad	1936	1995	1995	1995	14	421.9	57.4	14	3 Steel	02 Multi Str Non Comp	0	""	""	1 Monolithic Concrete	9 MS22.5(HS25)or greater	4		42.26	-83.26501	2025-08-18T00:00:00	POINT (-83.26501 42.26)	Taylor	NBI	NHS	24217.06	49.2	5495384	10.9	2025-06-26T00:00:00	24	A	7	7	7	N
268	MDOT	Metro	7886	63081-S13	10.5 MI RD	M-10	IN SOUTHFIELD	5 Highway-pedestrian	1 Highway	1989			1989	2	172.4	129.3	2	3 Steel	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	4	6	42.48	-83.25115	2025-08-18T00:00:00	POINT (-83.25115 42.48)	Oakland	NBI	Non-NHS	22291.32	106	684205	1.72	2025-06-27T00:00:00	24	A	7	6	6	N
269	Wayne	Metro	12518	""	NEWBURGH ROAD	LOWER ROUGE RIVER	IN CITY OF WAYNE	5 Highway-pedestrian	5 Waterway	2006				3	92	49.9	3	5 Prestressed Concrete	05 Box Bm/Gird- Multiple	0	""	""	2 Integral Concrete	6 MS18(HS20)+mod	2		42.28	-83.40694	2025-08-18T00:00:00	POINT (-83.40694 42.28)	Taylor	NBI	Non-NHS	4590.8	36.1	4710394	0.18	2024-05-29T00:00:00	24	A	8	8	8	N
270	MDOT	Metro	11748	82194-S19	US-12	I-75 NB	IN DETROIT	5 Highway-pedestrian	1 Highway	1970	1998		1998	3	229	113.2	3	3 Steel	82 Pl Girder Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	8	3	42.33	-83.084564	2025-08-18T00:00:00	POINT (-83.084564 42.33)	Detroit	NBI	NHS	25922.8	93.8	1577103	5.58	2024-05-23T00:00:00	24	A	7	6	5	N
271	MDOT	Metro	7900	63101-S03	HALSTEAD RD	I-696	1.7 MI NE OF I-96	1 Highway	1 Highway	2008				4	301	89.2	4	4 Steel Continuous	82 Pl Girder Comp	0	""	""	1 Monolithic Concrete	A HL 93	5	8	42.49	-83.416885	2025-08-18T00:00:00	POINT (-83.416885 42.49)	Oakland	NBI	Non-NHS	26849.2	64	633802	1.7	2024-12-26T00:00:00	15	A	7	7	8	N
272	Macomb County	Metro	6338	""	OMO ROAD	EAST BRANCH COON CREEK	0.3 MI NORTH OF 31 MILE	1 Highway	5 Waterway	1994				1	87.9	43.3	1	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	2		42.79	-82.85966	2025-08-18T00:00:00	POINT (-82.85966 42.79)	Macomb	NBI	Non-NHS	3806.07	39	4208329	5.43	2025-06-25T00:00:00	24	A	7	7	7	N
273	MDOT	Metro	11528	82122-S40	WAYNE RD	I-96	IN LIVONIA	5 Highway-pedestrian	1 Highway	1974	2014		2001	2	176	48.8	2	3 Steel	02 Multi Str Non Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	2	8	42.38	-83.38827	2025-08-18T00:00:00	POINT (-83.38827 42.38)	Taylor	NBI	Non-NHS	8588.8	36	1606301	0.4	2024-10-08T00:00:00	24	A	7	6	8	N
274	MDOT	Metro	11218	82024-S11	CONCORD AVE	I-94	IN DETROIT	5 Highway-pedestrian	1 Highway	2019				2	210	52.8	2	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	B Greater than HL 93	2	6	42.38	-83.02984	2025-08-18T00:00:00	POINT (-83.02984 42.38)	Detroit	NBI	Non-NHS	11088	30	1577901	2.88	2023-11-13T00:00:00	24	A	8	8	8	N
275	MDOT	Metro	11689	82192-S11	TIREMAN AVE	M-39	IN DETROIT	5 Highway-pedestrian	1 Highway	2005				2	128	56.5	2	5 Prestressed Concrete	06 Box Bms- Single/Sprd	0	""	""	2 Integral Concrete	6 MS18(HS20)+mod	4	6	42.35	-83.21626	2025-08-18T00:00:00	POINT (-83.21626 42.35)	Detroit	NBI	Non-NHS	7232	44	1594805	1.57	2024-05-29T00:00:00	24	A	7	7	7	N
276	MDOT	Metro	11569	82123-S22	I-96 W  TO E M-8	RAMPS TO M-8	IN DETROIT	1 Highway	1 Highway	1974	2009		2009	2	192.9	31.2	2	3 Steel	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	1	6	42.38	-83.14851	2025-08-18T00:00:00	POINT (-83.14851 42.38)	Detroit	NBI	NHS	6018.48	28	1606501	0.11	2023-09-27T00:00:00	24	A	7	7	6	N
277	MDOT	Metro	12449	82704-B02	SUNSET DRIVE	CANOE STREAM	BELLE ISLE	5 Highway-pedestrian	5 Waterway	1947				1	44.9	53.8	1	1 Concrete	07 Frame- Rigid exc Culv	0	""	""	6 Bituminous	6 MS18(HS20)+mod	4		42.34	-82.99683	2025-08-18T00:00:00	POINT (-82.99683 42.34)	Detroit	NBI	Non-NHS	2415.62	39	1633110	0.12	2024-08-07T00:00:00	24	A	6	6	7	N
278	MDOT	Metro	12940	63192-S01	I-96 EB, RAMP J	M-5 SB / I-96 / I-697	NOVI TWP SEC 13	1 Highway	1 Highway	1992				7	943.6	47.2	7	3 Steel	82 Pl Girder Comp	0	""	""	1 Monolithic Concrete	9 MS22.5(HS25)or greater	2		42.48	-83.44811	2025-08-18T00:00:00	POINT (-83.44811 42.48)	Oakland	NBI	NHS	44537.92	44	4410611	0.28	2024-11-18T00:00:00	24	A	7	7	7	N
279	Wayne County	Metro	12272	""	SWAN DRIVE	SWAN CHANNEL	GROSSE ILE  W/S POINTE DR	1 Highway	5 Waterway	1956			1995	2	87.9	25.3	1	3 Steel	10 Truss- Thru and Pony	1	""	""	1 Monolithic Concrete	2 M 13.5 (H 15)	2		42.1	-83.173256	2025-08-18T00:00:00	POINT (-83.173256 42.1)	Taylor	NBI	Non-NHS	2223.87	20	1690901	0.04	2025-03-01T00:00:00	12	P	5	4	4	N
280	MDOT	Metro	11401	82111-S14-2	US-12	M-10 SB	IN DETROIT	5 Highway-pedestrian	1 Highway	1954	1997	1997		1	69.7	122	1	5 Prestressed Concrete	05 Box Bm/Gird- Multiple	0	""	""	2 Integral Concrete	5 MS 18 (HS 20)	9	3	42.33	-83.06188	2025-08-18T00:00:00	POINT (-83.06188 42.33)	Detroit	NBI	NHS	8503.4	89.9	1577103	6.75	2024-05-09T00:00:00	24	A	5	5	6	N
281	MDOT	Metro	11861	82252-S25	I-75N RMP WINCHEST	I-75	IN DETROIT	1 Highway	1 Highway	1967	2003		2003	3	229.5	34.1	3	3 Steel	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	2	7	42.44	-83.09474	2025-08-18T00:00:00	POINT (-83.09474 42.44)	Detroit	NBI	NHS	7825.95	27.9	4700043	0.03	2024-03-28T00:00:00	24	A	7	7	7	N
282	MDOT	Metro	8123	63191-S08	I-96 RAMP	M-5	@ I-96/I-696 INTERCHANGE	1 Highway	1 Highway	1971		1998	1998	4	273.7	52.2	4	3 Steel	02 Multi Str Non Comp	0	""	""	5 Epoxy Overlay	6 MS18(HS20)+mod	3	5	42.48	-83.42734	2025-08-18T00:00:00	POINT (-83.42734 42.48)	Oakland	NBI	NHS	14287.14	49.9	634208	0.96	2024-12-17T00:00:00	24	A	6	7	6	N
283	Farmington Hill	Metro	14703	""	9 MILE RD	CADDELL DRAIN	DRAKE AND 9 MILE	1 Highway	5 Waterway	1973	1988			4	41.33	49.3	4	3 Steel	19 Culvert	0	""	""	N N/A (no deck (NBI))	4 M 18 (H 20)	2		42.45	-83.3952	2025-08-18T00:00:00	POINT (-83.3952 42.45)	Oakland	NBI	Non-NHS	2037.57		633603	1.17	2025-02-25T00:00:00	12	P	N	N	N	3
284	Oakland County	Metro	13934	""	FARR STREET	HURON RIVER	COMMERCE TWP SEC 10	1 Highway	5 Waterway	2024				2	21	22	2	3 Steel	19 Culvert	0	""	""	0 None	B Greater than HL 93	2		42.59	-83.485275	2025-08-18T00:00:00	POINT (-83.485275 42.59)	Oakland	NBI	Non-NHS	462	34	630201	0.29	2025-02-24T00:00:00	16	A	N	N	N	9
285	MDOT	Metro	11104	82022-B02	I-94 WB	ECORSE CREEK	IN ALLEN PARK	1 Highway	5 Waterway	1943		1943		2	28.9	49.9	2	1 Concrete	19 Culvert	0	""	""	2 Integral Concrete	4 M 18 (H 20)	3		42.27	-83.20787	2025-08-18T00:00:00	POINT (-83.20787 42.27)	Taylor	NBI	NHS	1442.11	47.9	1588802	18.04	2023-08-29T00:00:00	24	A	N	N	N	6
286	Macomb County	Metro	6234	""	ARMADA CENTER RD	NEWLAND DRAIN	0.2 MI W OF ROMEO PLANK	1 Highway	5 Waterway	1975				2	28.9	39.4	2	3 Steel	19 Culvert	0	""	""	N N/A (no deck (NBI))	4 M 18 (H 20)	2		42.85	-82.96925	2025-08-18T00:00:00	POINT (-82.96925 42.85)	Macomb	NBI	Non-NHS	1138.66	0	824306	0.95	2023-07-14T00:00:00	24	A	N	N	N	6
287	Oakland County	Metro	8154	""	GALLAGHER RD	PAINT CREEK	BET ORION AND SILVER BELL	1 Highway	5 Waterway	1989				3	62	31.2	1	7 Timber	01 Slab	2	7 Timber	01 Slab	6 Bituminous	6 MS18(HS20)+mod	2		42.73	-83.164055	2025-08-18T00:00:00	POINT (-83.164055 42.73)	Oakland	NBI	Non-NHS	1934.4	30.5	609402	0.83	2024-09-13T00:00:00	24	A	6	6	7	N
288	MDOT	Metro	6095	50061-S29	HAYES RD	I-696	IN WARREN & ROSEVILLE	5 Highway-pedestrian	1 Highway	1973	2005		2000	2	202	121.1	2	4 Steel Continuous	82 Pl Girder Comp	0	""	""	1 Monolithic Concrete	6 MS18(HS20)+mod	7	8	42.49	-82.96775	2025-08-18T00:00:00	POINT (-82.96775 42.49)	Macomb	NBI	Non-NHS	24462.2	98.7	808510	2	2023-09-15T00:00:00	24	A	6	6	6	N
289	Macomb County	Metro	6325	""	WEST ARCHER DRIVE	CHANNEL TO LAKE ST CLAIR	0.2 MI S OF S RIVER RD	1 Highway	5 Waterway	2023				1	45	31.63	1	5 Prestressed Concrete	05 Box Bm/Gird- Multiple	0	""	""	0 None	A HL 93	2		42.59	-82.79069	2025-08-18T00:00:00	POINT (-82.79069 42.59)	Macomb	NBI	Non-NHS	1423.35	28.29	832501	0.17	2023-11-16T00:00:00	24	A	5	9	9	N
290	Dearborn Height	Metro	12612	""	CAMPBELL AVENUE	ECORSE CREEK	IN DEARBORN HEIGHTS	5 Highway-pedestrian	5 Waterway	1993				1	30.1	25.9	1	1 Concrete	19 Culvert	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	2		42.27	-83.24474	2025-08-18T00:00:00	POINT (-83.24474 42.27)	Taylor	NBI	Non-NHS	779.59	26.3	1646601	0.11	2023-10-17T00:00:00	24	A	N	N	N	6
291	MDOT	Metro	13482	82141-B03-4	M-102 WB	PLUM CREEK	0.5 MI E OF US-24	1 Highway	5 Waterway	2013				1	75	61.7	1	5 Prestressed Concrete	06 Box Bms- Single/Sprd	0	""	""	1 Monolithic Concrete	B Greater than HL 93	4		42.44	-83.2698	2025-08-18T00:00:00	POINT (-83.2698 42.44)	Detroit	NBI	NHS	4627.5	52	640807	2.64	2024-09-03T00:00:00	24	A	8	8	8	N
292	MDOT	Metro	7843	63043-S06	CROOKS RD	M-59	3.4 MI E OF I-75	1 Highway	1 Highway	2011				2	216.5	85.4	2	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	B Greater than HL 93	2	6	42.64	-83.17084	2025-08-18T00:00:00	POINT (-83.17084 42.64)	Oakland	NBI	NHS	18489.1	56	659810	10.4	2024-09-12T00:00:00	24	A	7	8	8	N
293	MDOT	Metro	11446	82112-S21	LIVERNOIS AVE	M-10	IN DETROIT	5 Highway-pedestrian	1 Highway	1955	2006		2006	2	122.6	123.2	2	4 Steel Continuous	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	8	6	42.4	-83.140335	2025-08-18T00:00:00	POINT (-83.140335 42.4)	Detroit	NBI	NHS	15104.32	94	5490612	1.21	2024-12-23T00:00:00	24	A	7	7	7	N
294	MDOT	Metro	11680	82192-S02-4	OUTER DRIVE S WB	M-39	IN ALLEN PARK	5 Highway-pedestrian	1 Highway	1964	2001		1997	2	104	78.1	2	4 Steel Continuous	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	5	6	42.28	-83.21708	2025-08-18T00:00:00	POINT (-83.21708 42.28)	Taylor	NBI	NHS	8122.4	67.8	1662401	1.34	2023-11-16T00:00:00	24	A	7	6	5	N
295	Macomb County	Metro	6196	""	WB METRO PARKWAY	RED RUN DRAIN	0.1 MI WEST OF UTICA RD	5 Highway-pedestrian	5 Waterway	1969	2005			4	192.6	57.7	4	5 Prestressed Concrete	05 Box Bm/Gird- Multiple	0	""	""	1 Monolithic Concrete	9 MS22.5(HS25)or greater	3		42.57	-82.97073	2025-08-18T00:00:00	POINT (-82.97073 42.57)	Macomb	NBI	NHS	11113.02	47.9	801202	6	2024-05-07T00:00:00	24	A	7	6	5	N
296	MDOT	Metro	8046	63174-C02	I-75	ROUGE RIVER (SPRAGUE DR)	0.5 MI EAST OF COOLIDGE	1 Highway	5 Waterway	2020				1	30.75	141.3	1	1 Concrete	19 Culvert	0	""	""	4 Low Slump Concrete	B Greater than HL 93	8		42.61	-83.17947	2025-08-18T00:00:00	POINT (-83.17947 42.61)	Oakland	NBI	NHS	4344.98	141.3	647308	13.83	2024-09-05T00:00:00	24	A	N	N	N	8
297	MDOT	Metro	11376	82104-S04	SB OAKLAND AVENUE	M-8, DAVISON FWY	IN HIGHLAND PARK	1 Highway	1 Highway	1971	2015		2015	5	263.8	62.9	5	4 Steel Continuous	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	4	10	42.41	-83.08679	2025-08-18T00:00:00	POINT (-83.08679 42.41)	Detroit	NBI	Non-NHS	16593.02	52.5	4704923	1.03	2023-10-23T00:00:00	24	A	7	8	7	N
298	MDOT	Metro	6172	50111-S28-3	I-94 EB	JOY RD	1.5 MI SW OF M-59	1 Highway	1 Highway	1963	1980	2006		3	131.8	54.9	3	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	5 Epoxy Overlay	6 MS18(HS20)+mod	3	4	42.61	-82.85586	2025-08-18T00:00:00	POINT (-82.85586 42.61)	Macomb	NBI	NHS	7235.82	51.5	798501	12.86	2025-06-17T00:00:00	24	A	6	5	6	N
299	Macomb County	Metro	6206	""	21 MILE ROAD	SALT SLANG GLOEDE DRAIN	418 FT WEST OF GARFIELD	1 Highway	5 Waterway	1968		2020	1968	1	38.7	34.1	1	3 Steel	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	2		42.64	-82.957924	2025-08-18T00:00:00	POINT (-82.957924 42.64)	Macomb	NBI	Non-NHS	1319.67	28	817708	4.12	2025-07-11T00:00:00	12	A	4	5	3	N
300	MDOT	Metro	8099	63174-S31	11 MI RD	I-75	IN ROYAL OAK	5 Highway-pedestrian	1 Highway	2021				2	166.9	90.4	2	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	B Greater than HL 93	6	6	42.49	-83.11611	2025-08-18T00:00:00	POINT (-83.11611 42.49)	Oakland	NBI	Non-NHS	15087.76	76	4400088	8.95	2025-04-16T00:00:00	24	A	8	8	8	N
301	Wayne County	Metro	12146	""	FARMINGTON ROAD	BELL CREEK	LIVONIA       N/FIVE MILE	5 Highway-pedestrian	5 Waterway	1967				3	93.8	73.8	3	2 Concrete Continuous	01 Slab	0	""	""	1 Monolithic Concrete	6 MS18(HS20)+mod	5		42.4	-83.37389	2025-08-18T00:00:00	POINT (-83.37389 42.4)	Taylor	NBI	NHS	6922.44	59.7	1690602	3.74	2025-06-05T00:00:00	24	P	5	5	6	N
302	Wayne County	Metro	12298	""	WARRENDALE DRIVE	MIDDLE ROUGE RIVER	DBN HTS   S/E N HINES DRV	5 Highway-pedestrian	5 Waterway	1959				2	77.8	32.8	2	4 Steel Continuous	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	2		42.34	-83.26855	2025-08-18T00:00:00	POINT (-83.26855 42.34)	Taylor	NBI	Non-NHS	2551.84	24	1648010	0.25	2025-04-29T00:00:00	12	D	5	5	4	N
303	Macomb County	Metro	6228	""	32 MILE ROAD	COON CREEK	0.9MI WEST OF NORTH AVE	1 Highway	5 Waterway	1968				3	45.9	39	3	3 Steel	19 Culvert	0	""	""	N N/A (no deck (NBI))	4 M 18 (H 20)	2		42.81	-82.9012	2025-08-18T00:00:00	POINT (-82.9012 42.81)	Macomb	NBI	Non-NHS	1790.1	0	815804	10.13	2024-05-01T00:00:00	24	A	N	N	N	6
304	MDOT	Metro	8031	63173-S01	HOLCOMB RD	I-75	0.7 MI W OF M-15	1 Highway	1 Highway	1962		2023	2004	4	376.2	30.9	4	3 Steel	82 Pl Girder Comp	0	""	""	3 Latex Concrete/Similar	2 M 13.5 (H 15)	2	6	42.75	-83.432556	2025-08-18T00:00:00	POINT (-83.432556 42.75)	Oakland	NBI	Non-NHS	11624.58	27.5	689110	1.65	2025-07-10T00:00:00	24	A	7	6	7	N
305	Wayne County	Metro	12005	""	GROSSE ILE PARKWAY	ELIZABETH PARK CANAL	TRENTON       E/JEFFERSON	5 Highway-pedestrian	5 Waterway	1931				1	51.8	45.9	1	1 Concrete	12 Arch- Thru	0	0 Other	00 Other	N N/A (no deck (NBI))	6 MS18(HS20)+mod	3		42.13	-83.18372	2025-08-18T00:00:00	POINT (-83.18372 42.13)	Taylor	NBI	Non-NHS	2377.62	38.1	1692407	0.08	2024-11-13T00:00:00	24	A	6	5	6	N
306	MDOT	Metro	11832	82251-S30-5	I-75 S-E RAMP	I-75 SB	IN DETROIT	7 3d level interchg	1 Highway	1962		1979	1983	2	192.9	29.2	2	3 Steel	82 Pl Girder Comp	0	""	""	3 Latex Concrete/Similar	6 MS18(HS20)+mod	1	3	42.37	-83.05844722	2025-08-18T00:00:00	POINT (-83.05844722 42.37)	Detroit	NBI	NHS	5632.68	26.3	1577708	0.02	2024-04-04T00:00:00	24	A	5	7	7	N
307	MDOT	Metro	7864	63052-S01	ORCHARD LAKE RD	US-24	IN PONTIAC	5 Highway-pedestrian	1 Highway	2000				4	183	78.8	4	5 Prestressed Concrete	05 Box Bm/Gird- Multiple	0	""	""	1 Monolithic Concrete	9 MS22.5(HS25)or greater	5	6	42.62	-83.32074	2025-08-18T00:00:00	POINT (-83.32074 42.62)	Oakland	NBI	NHS	14420.4	64	641405	1.88	2025-03-06T00:00:00	24	A	7	7	7	N
308	MDOT	Metro	11251	82025-S07	DICKERSON AVE	I-94	IN DETROIT	5 Highway-pedestrian	1 Highway	1958	2001		2000	4	164.3	71.9	4	3 Steel	02 Multi Str Non Comp	0	""	""	5 Epoxy Overlay	5 MS 18 (HS 20)	4	6	42.4	-82.97303	2025-08-18T00:00:00	POINT (-82.97303 42.4)	Detroit	NBI	Non-NHS	11813.17	49.9	4705398	2.36	2024-06-25T00:00:00	24	A	7	6	7	N
309	Wayne County	Metro	12183	""	FORT STREET	HURON RIVER	ROCKWOOD S/HURON RIVER DR	1 Highway	5 Waterway	1981		1980	1980	3	180.8	54.5	3	4 Steel Continuous	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	0 Unknown	2		42.06	-83.25372	2025-08-18T00:00:00	POINT (-83.25372 42.06)	Taylor	NBI	Non-NHS	9853.6	50.5	4302168	0.13	2025-06-13T00:00:00	24	A	5	7	6	N
310	MDOT	Metro	6150	50111-S04	STEPHENS DR	I-94	W LTS OF ST CLAIR SHORES	5 Highway-pedestrian	1 Highway	1966	2002	2002	1998	4	196.3	40.4	4	3 Steel	32 Multi Str Comp	0	""	""	0 None	4 M 18 (H 20)	2	6	42.47	-82.91654	2025-08-18T00:00:00	POINT (-82.91654 42.47)	Macomb	NBI	Non-NHS	7930.52	25.9	803008	3.71	2025-07-09T00:00:00	24	A	7	6	5	N
311	Troy	Metro	8310	""	SOUTER ROAD	BARNARD DRAIN	0.2 MI S OF MAPLE ROAD	1 Highway	5 Waterway	1974				2	29.5	29.9	2	2 Concrete Continuous	19 Culvert	0	""	""	1 Monolithic Concrete	6 MS18(HS20)+mod	2		42.55	-83.12931667	2025-08-18T00:00:00	POINT (-83.12931667 42.55)	Oakland	NBI	Non-NHS	882.05	29.9	695507	0.2	2025-04-08T00:00:00	24	A	N	N	N	6
312	MDOT	Metro	8008	63172-S07-3	M-24 CONN EB	I-75	@ M-24 (I-75 SB TO M-24)	1 Highway	1 Highway	1962	2002		2002	4	246.5	29.3	4	3 Steel	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	1	9	42.69	-83.25094	2025-08-18T00:00:00	POINT (-83.25094 42.69)	Oakland	NBI	NHS	7222.45	26	1849507	0	2025-03-14T00:00:00	24	A	7	6	7	N
313	Macomb County	Metro	6330	""	28 MILE ROAD	KIRKHAM DRAIN	0.8 MI EAST OF GRATIOT	1 Highway	5 Waterway	2003				1	45	43.9	1	5 Prestressed Concrete	05 Box Bm/Gird- Multiple	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	2		42.75	-82.75647	2025-08-18T00:00:00	POINT (-82.75647 42.75)	Macomb	NBI	Non-NHS	1975.5	42	822109	4.27	2023-07-28T00:00:00	24	A	7	8	8	N
314	Other Local Agencies	Metro	13369	""	SB DINGELL RD	EAST SERVICE RD	0.8 MI S OF I-94	5 Highway-pedestrian	1 Highway	2000				1	63	42.9	1	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	9 MS22.5(HS25)or greater	2	2	42.23	-83.34351	2025-08-18T00:00:00	POINT (-83.34351 42.23)	Taylor	NBI	NHS	2702.7	30.8	4711337	2.62	2025-05-27T00:00:00	24	A	7	7	5	N
315	Macomb County	Metro	6279	""	NEW HAVEN RD	E B COON CREEK	0.1 MILE WEST OF 28 MILE	1 Highway	5 Waterway	2022				1	85.3	43.5	1	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	B Greater than HL 93	2		42.75	-82.842735	2025-08-18T00:00:00	POINT (-82.842735 42.75)	Macomb	NBI	Non-NHS	3710.55	40.5	814905	7.41	2024-08-30T00:00:00	24	A	9	9	9	N
316	Wayne County	Metro	12108	""	SUMPTER ROAD	SWAN CREEK	SUMPTER          S/WILLIS	1 Highway	5 Waterway	1950	1972			1	24	37.4	1	1 Concrete	01 Slab	0	0 Other	00 Other	6 Bituminous	0 Unknown	2		42.16	-83.48222	2025-08-18T00:00:00	POINT (-83.48222 42.16)	Taylor	NBI	Non-NHS	897.6	35.8	1670701	4.91	2025-04-29T00:00:00	12	A	6	6	4	N
317	MDOT	Metro	11516	82122-S28	MERRIMAN ROAD LT T	I-96	IN LIVONIA	1 Highway	1 Highway	1973	2014		2001	2	176	22.4	2	3 Steel	02 Multi Str Non Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	2	8	42.38	-83.35208	2025-08-18T00:00:00	POINT (-83.35208 42.38)	Taylor	NBI	Non-NHS	3942.4	20	1803807	0.02	2024-11-12T00:00:00	24	A	8	7	7	N
318	MDOT	Metro	11785	82211-B01-1	M-85 NB	MARSH CREEK	0.5 MI SW OF TRENTON	1 Highway	5 Waterway	2016				1	43	45.3	1	5 Prestressed Concrete	06 Box Bms- Single/Sprd	0	""	""	1 Monolithic Concrete	B Greater than HL 93	2		42.11	-83.21898	2025-08-18T00:00:00	POINT (-83.21898 42.11)	Taylor	NBI	NHS	1947.9	42	1592105	2.3	2024-05-15T00:00:00	24	A	8	8	8	N
319	MDOT	Metro	14398	63101-B01	I-696	MINNOW POND DRAIN	0.5 MI E OF FARMINGTON RD	1 Highway	5 Waterway	2023				1	42	69	1	1 Concrete	19 Culvert	0	""	""	N N/A (no deck (NBI))	B Greater than HL 93	8		42.5	-83.36881	2025-08-18T00:00:00	POINT (-83.36881 42.5)	Oakland	NBI	NHS	2898	142	710702	4.06	2024-10-15T00:00:00	24	A	N	N	N	9
320	Macomb County	Metro	6406	""	30 MILE ROAD	HEALY BROOK DRAIN	1.3 MI EAST OF VAN DYKE	1 Highway	5 Waterway	2008				1	33.9	40	1	1 Concrete	19 Culvert	0	""	""	6 Bituminous	5 MS 18 (HS 20)	2		42.77	-82.99095	2025-08-18T00:00:00	POINT (-82.99095 42.77)	Macomb	NBI	Non-NHS	1356	40	4210209	0.92	2023-07-14T00:00:00	24	A	N	N	N	7
321	Sterling Heights	Metro	6425	""	17 MILE RD	CONRAIL RAILROAD	EAST OF MOUND RD	1 Highway	2 Railroad	1981	2014			4	214.7	72.2	4	4 Steel Continuous	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	9 MS22.5(HS25)or greater	5		42.58	-83.03994	2025-08-18T00:00:00	POINT (-83.03994 42.58)	Macomb	NBI	Non-NHS	15501.34	68.1	805203	2.52	2024-09-19T00:00:00	24	A	7	7	5	N
322	Wayne County	Metro	12000	""	VREELAND ROAD	FRANK & POET DRAIN	GIBRALTAR/TRENTON  E/FORT	1 Highway	5 Waterway	1965				3	23	40	3	3 Steel	19 Culvert	0	""	""	N N/A (no deck (NBI))	6 MS18(HS20)+mod	2		42.11	-83.20544	2025-08-18T00:00:00	POINT (-83.20544 42.11)	Taylor	NBI	Non-NHS	920	38.1	1606105	4.12	2024-08-26T00:00:00	12	P	N	N	N	3
323	Macomb County	Metro	6305	""	CAMP GROUND ROAD	EAST MILL LAKE OUTLET	300 FT NORTH OF 33 MILE	1 Highway	5 Waterway	1969				2	24	29.5	2	3 Steel	19 Culvert	0	""	""	N N/A (no deck (NBI))	4 M 18 (H 20)	2		42.82	-83.03949	2025-08-18T00:00:00	POINT (-83.03949 42.82)	Macomb	NBI	Non-NHS	708	0	6800425	1.07	2023-07-14T00:00:00	24	A	N	N	N	6
324	MDOT	Metro	8061	63174-S04-2	I-75 SB	13 MILE RD	IN MADISON HTS	1 Highway	1 Highway	2021				1	111.5	73.8	1	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	B Greater than HL 93	4	5	42.52	-83.11561	2025-08-18T00:00:00	POINT (-83.11561 42.52)	Oakland	NBI	NHS	8228.7	70.4	646106	5.41	2025-04-16T00:00:00	24	A	8	8	8	N
325	MDOT	Metro	7788	63022-C01	I-96	NORTON CREEK	5.0 MI NW OF NOVI	1 Highway	5 Waterway	2024				1	20	114	1	1 Concrete	19 Culvert	0	""	""	4 Low Slump Concrete	B Greater than HL 93	6		42.5	-83.5627	2025-08-18T00:00:00	POINT (-83.5627 42.5)	Oakland	NBI	NHS	2280	0	657303	5.77	2024-11-25T00:00:00	24	A	N	N	N	9
326	Macomb County	Metro	6262	""	ROMEO PLANK RD	N B CLINTON RIVER	0.7 MI S OF 32 MILE ROAD	5 Highway-pedestrian	5 Waterway	1964	2019		2019	1	65	37.1	1	3 Steel	32 Multi Str Comp	0	""	""	4 Low Slump Concrete	5 MS 18 (HS 20)	2		42.8	-82.96233	2025-08-18T00:00:00	POINT (-82.96233 42.8)	Macomb	NBI	Non-NHS	2411.5	29.5	816509	6.53	2023-07-14T00:00:00	24	A	8	8	7	N
327	MDOT	Metro	11767	82195-S09	M-10S TO I-75E RMP	M-10	IN DETROIT	1 Highway	1 Highway	1970	1998		1990	6	400.2	28.2	6	3 Steel	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	6 MS18(HS20)+mod	1	10	42.33	-83.06336	2025-08-18T00:00:00	POINT (-83.06336 42.33)	Detroit	NBI	NHS	11285.64	25.9	1585002	0.19	2025-05-29T00:00:00	24	A	7	6	6	N
328	Oakland County	Metro	13423	""	BUNO ROAD	HURON RIVER	MILFORD TWP SEC 28	1 Highway	5 Waterway	1940				3	126	58.1	3	1 Concrete	04 Tee Beam	0	""	""	2 Integral Concrete	6 MS18(HS20)+mod	2		42.55	-83.63128	2025-08-18T00:00:00	POINT (-83.63128 42.55)	Oakland	NBI	Non-NHS	7320.6	40	982404	2.74	2025-06-25T00:00:00	12	P	5	5	5	N
329	MDOT	Metro	11585	82123-S37	W GD BLVD&TIREMAN	I-96	IN DETROIT	5 Highway-pedestrian	1 Highway	1972	1996		1996	2	192.9	53.1	2	3 Steel	82 Pl Girder Comp	0	""	""	5 Epoxy Overlay	5 MS 18 (HS 20)	3	8	42.36	-83.1104	2025-08-18T00:00:00	POINT (-83.1104 42.36)	Detroit	NBI	Non-NHS	10242.99	47.2	1577308	1.66	2023-09-05T00:00:00	24	A	6	6	6	N
330	Wayne County	Metro	12289	""	GRAHAM ROAD	UPPER ROUGE RIVER	REDFORD       W/TELEGRAPH	1 Highway	5 Waterway	1947				3	64	29.9	3	2 Concrete Continuous	01 Slab	0	""	""	2 Integral Concrete	4 M 18 (H 20)	2		42.4	-83.27833	2025-08-18T00:00:00	POINT (-83.27833 42.4)	Taylor	NBI	Non-NHS	1913.6	24	1579604	0.39	2025-05-14T00:00:00	24	P	5	5	5	N
331	Macomb County	Metro	6247	""	EARL MEM HWY	M B CLINTON RIVER	0.3 MI SOUTH OF 25 MI RD	1 Highway	5 Waterway	2012				1	26.5	60	1	1 Concrete	19 Culvert	0	""	""	N N/A (no deck (NBI))	B Greater than HL 93	5		42.69	-83.03465	2025-08-18T00:00:00	POINT (-83.03465 42.69)	Macomb	NBI	Non-NHS	1590	62.7	4211016	6.42	2024-09-16T00:00:00	24	A	N	N	N	8
332	MDOT	Metro	7970	63103-S09	I-696 RAMPS GH&GD	N SERVICE RD	IN MADISON HTS	1 Highway	1 Highway	1971	2007	2007	2007	1	75.4	44.4	1	3 Steel	32 Multi Str Comp	0	""	""	3 Latex Concrete/Similar	5 MS 18 (HS 20)	2	2	42.48	-83.108574	2025-08-18T00:00:00	POINT (-83.108574 42.48)	Oakland	NBI	NHS	3347.76	27.5	607606	0.12	2025-07-15T00:00:00	24	A	5	7	6	N
333	MDOT	Metro	14043	82111-S17-4	MLK JR BLVD WB	M-10	IN DETROIT	5 Highway-pedestrian	1 Highway	2017				2	149	58.3	2	5 Prestressed Concrete	06 Box Bms- Single/Sprd	0	""	""	1 Monolithic Concrete	B Greater than HL 93	2	7	42.34	-83.0681	2025-08-18T00:00:00	POINT (-83.0681 42.34)	Detroit	NBI	NHS	8686.7	34	4700471	1.6	2024-03-07T00:00:00	24	A	8	8	8	N
334	MDOT	Metro	6169	50111-S26	I-94	METRO BEACH PKWY RD	1.0 MI NE OF OLD M-29	1 Highway	1 Highway	1963	2002		2002	4	202	142	4	3 Steel	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	9 MS22.5(HS25)or greater	8	6	42.57	-82.85845	2025-08-18T00:00:00	POINT (-82.85845 42.57)	Macomb	NBI	NHS	28684	135.4	798501	10.2	2025-06-26T00:00:00	24	A	6	8	5	N
335	MDOT	Metro	7838	63043-R03	M-59 WB	CLINTON RIVER TRAIL	2.5 MI E OF I-75	1 Highway	3 Pedestrian-bicycle	1967	2010	2010	2010	3	202	68.6	3	3 Steel	32 Multi Str Comp	0	""	""	3 Latex Concrete/Similar	9 MS22.5(HS25)or greater	3		42.64	-83.18885	2025-08-18T00:00:00	POINT (-83.18885 42.64)	Oakland	NBI	NHS	13857.2	65	677208	4.8	2025-05-20T00:00:00	24	A	6	5	7	N
336	MDOT	Metro	11133	82022-S27	I-94	GREENFIELD RD	IN DEARBORN	1 Highway	1 Highway	1971	2004		1971	2	178	122	2	3 Steel	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	6	4	42.3	-83.18309	2025-08-18T00:00:00	POINT (-83.18309 42.3)	Taylor	NBI	NHS	21716	119.8	1576405	20.38	2023-09-12T00:00:00	24	A	7	7	7	N
337	MDOT	Metro	7985	63112-B01	M-24	PAINT CREEK	IN LAKE ORION	5 Highway-pedestrian	5 Waterway	1988				2	57	76.4	2	5 Prestressed Concrete	05 Box Bm/Gird- Multiple	0	""	""	5 Epoxy Overlay	9 MS22.5(HS25)or greater	4		42.78	-83.24059	2025-08-18T00:00:00	POINT (-83.24059 42.78)	Oakland	NBI	NHS	4354.8	52	616604	7.29	2024-06-07T00:00:00	24	A	7	8	7	N
338	Macomb County	Metro	6240	""	SB & NB MOUND RD	RED RUN DRAIN	0.1 MI N OF CHICAGO RD	5 Highway-pedestrian	5 Waterway	1996				1	74	181.5	1	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	5 Epoxy Overlay	9 MS22.5(HS25)or greater	10		42.53	-83.047516	2025-08-18T00:00:00	POINT (-83.047516 42.53)	Macomb	NBI	NHS	13431	127.1	812510	5.6	2024-06-13T00:00:00	24	A	7	8	7	N
339	Wayne County	Metro	12065	""	WILCOX & HINES DR	MIDDLE ROUGE RIVER	PLYMOUTH TW N/PLYMOUTH RD	1 Highway	5 Waterway	1933				3	72.1	45.9	3	2 Concrete Continuous	19 Culvert	0	""	""	1 Monolithic Concrete	4 M 18 (H 20)	4		42.38	-83.45711	2025-08-18T00:00:00	POINT (-83.45711 42.38)	Taylor	NBI	NHS	3309.39	86	4711779	24.61	2025-05-12T00:00:00	24	A	N	N	N	5
340	Wayne County	Metro	12186	""	ALLEN & PELHAM RDS	SEXTON KILFOIL DRAIN	ALLEN PK/TAYLOR N/GODDARD	5 Highway-pedestrian	5 Waterway	1928	1967			1	47.9	98.8	1	5 Prestressed Concrete	02 Multi Str Non Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	6		42.23	-83.22993	2025-08-18T00:00:00	POINT (-83.22993 42.23)	Taylor	NBI	NHS	4732.52	81	1652704	0.04	2025-03-05T00:00:00	12	A	4	7	6	N
341	MDOT	Metro	7934	63102-S19	COOLIDGE ROAD U TU	I-696	EAST OF COOLIDGE	1 Highway	1 Highway	1985				2	154	76.3	2	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	9 MS22.5(HS25)or greater	2	8	42.47	-83.18092	2025-08-18T00:00:00	POINT (-83.18092 42.47)	Oakland	NBI	Non-NHS	11750.2	41	4416481	0.01	2024-07-09T00:00:00	24	A	6	7	7	N
342	Lincoln Park	Metro	12500	""	EMMONS ST	S BR ECORSE RIVER	IN LINCOLN PARK	5 Highway-pedestrian	5 Waterway	1964		1994		2	52.8	41	2	2 Concrete Continuous	04 Tee Beam	0	""	""	1 Monolithic Concrete	6 MS18(HS20)+mod	2		42.23	-83.16295	2025-08-18T00:00:00	POINT (-83.16295 42.23)	Taylor	NBI	Non-NHS	2164.8	29.9	1593310	1.62	2024-08-20T00:00:00	12	P	4	5	6	N
343	MDOT	Metro	7954	63102-S42	MAPLEFIELD U-TURN	I-696	0.4 M W OF WOODWARD	1 Highway	1 Highway	1985				2	199.8	56.1	2	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	9 MS22.5(HS25)or greater	2	12	42.47	-83.15549	2025-08-18T00:00:00	POINT (-83.15549 42.47)	Oakland	NBI	Non-NHS	11208.78	42	4412696	0.01	2024-07-24T00:00:00	24	A	7	7	6	N
344	Macomb County	Metro	6387	""	OMO ROAD	EAST BRANCH COON CREEK	0.5 MI NORTH OF 26 MILE	1 Highway	5 Waterway	1999				2	120.1	43.3	2	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	2		42.73	-82.86488	2025-08-18T00:00:00	POINT (-82.86488 42.73)	Macomb	NBI	Non-NHS	5200.33	39.4	4208329	0.5	2025-05-20T00:00:00	24	A	7	7	7	N
345	MDOT	Metro	13899	82191-B08	I-75 NB	SEXTON AND KILFOIL DRAIN	IN ALLEN PARK	1 Highway	5 Waterway	2018			2018	3	503.5	63.3	3	4 Steel Continuous	82 Pl Girder Comp	0	""	""	1 Monolithic Concrete	B Greater than HL 93	3		42.23	-83.20868	2025-08-18T00:00:00	POINT (-83.20868 42.23)	Taylor	NBI	NHS	31871.55	60	1592010	13.49	2023-11-27T00:00:00	24	A	8	8	8	N
346	Oakland County	Metro	8186	""	ANDERSONVILLE RD	CLINTON RIVER	BET AIRPORT AND CLEMENT R	1 Highway	5 Waterway	1990				1	27.9	49.9	1	5 Prestressed Concrete	05 Box Bm/Gird- Multiple	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	2		42.7	-83.41966	2025-08-18T00:00:00	POINT (-83.41966 42.7)	Oakland	NBI	Non-NHS	1392.21	46	650409	1.31	2024-07-18T00:00:00	24	A	6	6	7	N
347	MDOT	Metro	14267	63174-B05-1	I-75 NB	BARNARD DRAIN	0.3 MI S OF MAPLE RD	1 Highway	5 Waterway	2019				1	41	76.2	1	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	B Greater than HL 93	4		42.55	-83.116425	2025-08-18T00:00:00	POINT (-83.116425 42.55)	Oakland	NBI	NHS	3124.2	72.8	647308	7.19	2023-12-19T00:00:00	24	A	8	8	8	N
348	MDOT	Metro	6083	50061-S11-4	11 MI RD WB	MND RD &RMPS C&D O I-696	CITY OF WARREN	5 Highway-pedestrian	1 Highway	1977				4	358.7	72.7	4	3 Steel	82 Pl Girder Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	4	8	42.49	-83.04525	2025-08-18T00:00:00	POINT (-83.04525 42.49)	Macomb	NBI	Non-NHS	26077.49	58.8	803209	2.2	2025-04-24T00:00:00	24	A	5	7	7	N
349	MDOT	Metro	11650	82191-S08	KING RD	I-75	N LTS OF WOODHAVEN	5 Highway-pedestrian	1 Highway	2006				2	221.7	60.8	2	3 Steel	82 Pl Girder Comp	0	""	""	2 Integral Concrete	6 MS18(HS20)+mod	2	6	42.15	-83.24224	2025-08-18T00:00:00	POINT (-83.24224 42.15)	Taylor	NBI	Non-NHS	13479.36	44	1592206	3.23	2024-07-09T00:00:00	24	A	7	7	7	N
350	Other Local Agencies	Metro	13364	""	S LOT ACCESS DRIVE	PARALLEL FRANK & POET DR	500 FT N OF EUREKA	1 Highway	5 Waterway	2001				1	30	29.9	1	1 Concrete	19 Culvert	0	""	""	6 Bituminous	5 MS 18 (HS 20)	2		42.19	-83.35609	2025-08-18T00:00:00	POINT (-83.35609 42.19)	Taylor	NBI	Non-NHS	897	38	4718373	0.09	2025-05-29T00:00:00	24	A	N	N	N	7
351	MDOT	Metro	11448	82112-S23	WYOMING AVE	M-10	IN DETROIT	5 Highway-pedestrian	1 Highway	1955	1989		2006	5	234.4	79.7	5	4 Steel Continuous	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	5	5	42.41	-83.159805	2025-08-18T00:00:00	POINT (-83.159805 42.41)	Detroit	NBI	NHS	18681.68	55.8	4700001	5.18	2024-08-13T00:00:00	24	A	6	6	6	N
352	MDOT	Metro	11191	82023-S23	I-94 EB	I-94 RAMP TO M-10	IN DETROIT OVER RAMP D-A	5 Highway-pedestrian	1 Highway	1955	1995		1995	3	186.5	54.3	3	3 Steel	52 Pl Girder Non Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	3	2	42.36	-83.077286	2025-08-18T00:00:00	POINT (-83.077286 42.36)	Detroit	NBI	NHS	10126.95	51.3	1576405	27.4	2024-04-22T00:00:00	24	A	7	7	6	N
353	Wayne County	Metro	12099	""	BASE LINE/NOVI RD	MIDDLE ROUGE RIVER	NORTHVILLE       E/CENTER	1 Highway	5 Waterway	1960				3	48	67.9	3	3 Steel	19 Culvert	0	""	""	N N/A (no deck (NBI))	6 MS18(HS20)+mod	6		42.44	-83.47605	2025-08-18T00:00:00	POINT (-83.47605 42.44)	Taylor	NBI	NHS	3259.2	0	4412702	0.86	2025-05-27T00:00:00	24	A	N	N	N	5
354	MDOT	Metro	11261	82025-S16-1	MOROSS RD NB	I-94	IN DETROIT	5 Highway-pedestrian	1 Highway	2003				2	163.5	69.7	2	5 Prestressed Concrete	05 Box Bm/Gird- Multiple	0	""	""	5 Epoxy Overlay	9 MS22.5(HS25)or greater	4	6	42.42	-82.928444	2025-08-18T00:00:00	POINT (-82.928444 42.42)	Detroit	NBI	NHS	11395.95	59	1632608	2.46	2024-06-14T00:00:00	24	A	7	7	7	N
355	Wayne County	Metro	12255	""	LOTZ ROAD	WILLOW CREEK	CANTON             S/FORD	1 Highway	5 Waterway	1972				2	25.9	22	2	1 Concrete	19 Culvert	0	""	""	N N/A (no deck (NBI))	0 Unknown	3		42.32	-83.43371	2025-08-18T00:00:00	POINT (-83.43371 42.32)	Taylor	NBI	Non-NHS	569.8	0	4705519	2.86	2025-06-17T00:00:00	24	A	N	N	N	8
356	MDOT	Metro	13250	63071-C02	M-15	CLINTON RIVER	INDEPENDENCE TWP SEC 20	5 Highway-pedestrian	5 Waterway	2005				1	21.7	87	1	1 Concrete	19 Culvert	0	""	""	3 Latex Concrete/Similar	9 MS22.5(HS25)or greater	5		42.74	-83.41944	2025-08-18T00:00:00	POINT (-83.41944 42.74)	Oakland	NBI	NHS	1887.9	91.5	627809	1.64	2025-07-10T00:00:00	24	A	N	N	N	8
357	MDOT	Metro	11909	82291-S14-4	I-94 WB	I-275	IN ROMULUS	1 Highway	1 Highway	1972	2011		1992	4	360	63.3	4	3 Steel	82 Pl Girder Comp	0	""	""	1 Monolithic Concrete	6 MS18(HS20)+mod	3	9	42.22	-83.41207	2025-08-18T00:00:00	POINT (-83.41207 42.22)	Taylor	NBI	NHS	22788	60	1588802	6.72	2024-08-30T00:00:00	24	A	7	7	7	N
358	Keego Harbor	Metro	8238	""	WILLOW BEACH ROAD	CHANNEL DOLLAR & CASS LK	CITY OF KEEGO HARBOR	1 Highway	5 Waterway	1984				1	40	28	1	5 Prestressed Concrete	05 Box Bm/Gird- Multiple	0	""	""	6 Bituminous	6 MS18(HS20)+mod	2		42.61	-83.34759	2025-08-18T00:00:00	POINT (-83.34759 42.61)	Oakland	NBI	Non-NHS	1120	27.7	641206	0.11	2025-01-23T00:00:00	12	P	5	3	4	N
359	MDOT	Metro	6107	50061-S41	ARSENAL AVE	I-696	IN WARREN & CENTERLINE	5 Highway-pedestrian	1 Highway	1972	2005		1999	2	211	48.4	2	4 Steel Continuous	82 Pl Girder Comp	0	""	""	1 Monolithic Concrete	6 MS18(HS20)+mod	2	8	42.49	-83.022095	2025-08-18T00:00:00	POINT (-83.022095 42.49)	Macomb	NBI	Non-NHS	10212.4	30	850402	0.44	2025-03-12T00:00:00	24	A	6	6	7	N
360	MDOT	Metro	11608	82124-S03	ML KING JR BLVD	I-96	IN DETROIT	5 Highway-pedestrian	1 Highway	1971			1992	2	174	116.1	2	3 Steel	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	6	8	42.34	-83.09042	2025-08-18T00:00:00	POINT (-83.09042 42.34)	Detroit	NBI	NHS	20201.4	93.8	1581907	0.52	2023-10-16T00:00:00	24	A	6	6	6	N
361	MDOT	Metro	6126	50072-B01	M-29	FISH CREEK	1.4 MI W OF NEW BALTIMORE	5 Highway-pedestrian	5 Waterway	1972	2008	2008		1	40	78.4	1	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	3 Latex Concrete/Similar	5 MS 18 (HS 20)	5		42.68	-82.78548	2025-08-18T00:00:00	POINT (-82.78548 42.68)	Macomb	NBI	Non-NHS	3136	64	807106	15.9	2023-12-19T00:00:00	24	A	7	8	7	N
362	MDOT	Metro	6041	50015-B01	M-53 SB	EAST POND CREEK	0.1 MI S OF 33 MILE RD	1 Highway	5 Waterway	1990		1991		1	60	65.3	1	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	2		42.82	-83.00258	2025-08-18T00:00:00	POINT (-83.00258 42.82)	Macomb	NBI	NHS	3918	62	813706	19.4	2023-12-15T00:00:00	24	A	6	7	6	N
363	MDOT	Metro	8137	63201-B02	I-75 BR	CLINTON RIVER	AT LAWRENCE STREET	1 Highway	5 Waterway	1964		1964	1964	3	30.8	62	3	3 Steel	19 Culvert	0	""	""	1 Monolithic Concrete	6 MS18(HS20)+mod	5		42.64	-83.29504	2025-08-18T00:00:00	POINT (-83.29504 42.64)	Oakland	NBI	NHS	1909.6	60	641407	0.6	2024-10-29T00:00:00	20	A	N	N	N	4
364	MDOT	Metro	13403	82194-S34-2	PLAZA TO I-75	NB&SB RMPS TO VERNOR	AMBASSADOR GATEWAY	1 Highway	1 Highway	2007			2007	2	201.2	31.5	2	4 Steel Continuous	82 Pl Girder Comp	0	""	""	2 Integral Concrete	9 MS22.5(HS25)or greater	1		42.32	-83.08152778	2025-08-18T00:00:00	POINT (-83.08152778 42.32)	Detroit	NBI	NHS	6337.8	28	4718923	0.07	2024-06-14T00:00:00	24	A	7	8	8	N
365	MDOT	Metro	6108	50061-S42	CAMPBELL RD	I-696	IN WARREN	5 Highway-pedestrian	1 Highway	1972	2005		2000	2	198	44.4	2	4 Steel Continuous	82 Pl Girder Comp	0	""	""	1 Monolithic Concrete	2 M 13.5 (H 15)	2	8	42.49	-83.0144	2025-08-18T00:00:00	POINT (-83.0144 42.49)	Macomb	NBI	Non-NHS	8791.2	30	805604	0.24	2025-03-12T00:00:00	24	A	6	6	5	N
366	MDOT	Metro	11825	82251-S24	I-94 W-S RAMP	I-94	IN DETROIT	1 Highway	1 Highway	1962	2002			4	309.2	38.1	4	3 Steel	82 Pl Girder Comp	0	""	""	1 Monolithic Concrete	9 MS22.5(HS25)or greater	2	8	42.37	-83.05979	2025-08-18T00:00:00	POINT (-83.05979 42.37)	Detroit	NBI	NHS	11780.52	34.1	1577703	0.22	2023-12-15T00:00:00	24	A	7	7	6	N
367	MDOT	Metro	7808	63022-S12-4	M-5 WB	FARMINGTON RD	IN FARMINGTON	1 Highway	1 Highway	1956	1997		1997	3	128.7	48.2	3	3 Steel	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	9 MS22.5(HS25)or greater	2	5	42.46	-83.37597	2025-08-18T00:00:00	POINT (-83.37597 42.46)	Oakland	NBI	NHS	6203.34	42	657304	16.23	2024-11-07T00:00:00	24	A	7	6	6	N
368	MDOT	Metro	11580	82123-S32	UNDERWOOD AVE	I-96	IN DETROIT	5 Highway-pedestrian	1 Highway	1972	2009		1992	2	174.1	41.9	2	3 Steel	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	2	8	42.37	-83.13327	2025-08-18T00:00:00	POINT (-83.13327 42.37)	Detroit	NBI	Non-NHS	7294.79	29.5	1581805	0.36	2024-09-23T00:00:00	24	A	7	7	7	N
369	MDOT	Metro	7949	63102-S36	RED RIVER AVE U-T	I-696	E OF EVERGREEN	1 Highway	1 Highway	1987				2	130	64.4	2	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	9 MS22.5(HS25)or greater	4	6	42.49	-83.23953	2025-08-18T00:00:00	POINT (-83.23953 42.49)	Oakland	NBI	Non-NHS	8372	50.2	4413530	0.01	2024-07-22T00:00:00	24	A	6	7	7	N
370	MDOT	Metro	11295	82053-S01	US-24 SB	HINES DRIVE	IN DEARBORN HTS	1 Highway	1 Highway	1959	2006			3	136.7	67.3	3	5 Prestressed Concrete	06 Box Bms- Single/Sprd	0	""	""	1 Monolithic Concrete	6 MS18(HS20)+mod	3	2	42.35	-83.27388	2025-08-18T00:00:00	POINT (-83.27388 42.35)	Taylor	NBI	NHS	9199.91	56.6	1576806	10.88	2024-08-27T00:00:00	24	A	7	8	7	N
371	MDOT	Metro	11968	82293-S05	I-275 SB	E HINES DR	0.3 MI W OF LIVONIA LTS	1 Highway	1 Highway	1972	2012	2012		1	120	55.7	1	3 Steel	82 Pl Girder Comp	0	""	""	3 Latex Concrete/Similar	5 MS 18 (HS 20)	3	2	42.37	-83.43659	2025-08-18T00:00:00	POINT (-83.43659 42.37)	Taylor	NBI	NHS	6684	52.5	1607610	20.63	2024-10-11T00:00:00	24	A	7	7	6	N
372	MDOT	Metro	11896	82291-R03	I-275 NB	CSX RR	IN ROMULUS (SW)	1 Highway	2 Railroad	1974		1997		3	190.3	56.5	3	3 Steel	32 Multi Str Comp	0	""	""	3 Latex Concrete/Similar	9 MS22.5(HS25)or greater	3		42.21	-83.394936	2025-08-18T00:00:00	POINT (-83.394936 42.21)	Taylor	NBI	NHS	10751.95	53.2	1607208	8.19	2023-09-20T00:00:00	24	A	6	7	7	N
373	MDOT	Metro	11716	82194-B01	I-75	ROUGE R,DEARBORN ST & RR	IN DETROIT	1 Highway	8 Hwy-waterway-RR	1967	2018		2003	106	8627	132	3	4 Steel Continuous	82 Pl Girder Comp	103	3 Steel	82 Pl Girder Comp	1 Monolithic Concrete	6 MS18(HS20)+mod	8	18	42.29	-83.127075	2025-08-18T00:00:00	POINT (-83.127075 42.29)	Detroit	NBI	NHS	1138764	125.1	1592010	16.7	2024-04-24T00:00:00	24	A	7	6	5	N
374	Dearborn Height	Metro	12328	""	MONROE ROAD	ECORSE CREEK	IN DEARBORN HEIGHTS	5 Highway-pedestrian	5 Waterway	1977				1	34.8	55.1	1	5 Prestressed Concrete	05 Box Bm/Gird- Multiple	0	""	""	2 Integral Concrete	6 MS18(HS20)+mod	2		42.27	-83.250694	2025-08-18T00:00:00	POINT (-83.250694 42.27)	Taylor	NBI	Non-NHS	1917.48	36.1	4705943	2.92	2023-10-17T00:00:00	24	A	8	7	6	N
375	MDOT	Metro	11521	82122-S33	LFT TRN E INKSTER	I-96	@ E LTS OF LIVONIA	1 Highway	1 Highway	1971	2014		2001	2	166.5	22.4	2	3 Steel	02 Multi Str Non Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	2	8	42.38	-83.312675	2025-08-18T00:00:00	POINT (-83.312675 42.38)	Taylor	NBI	Non-NHS	3729.6	20	1579508	0.01	2024-09-27T00:00:00	24	A	7	7	7	N
376	MDOT	Metro	11497	82122-S11	MIDDLEBELT RD	I-96	IN LIVONIA	5 Highway-pedestrian	1 Highway	1971		2014	2001	2	166.5	106.4	2	3 Steel	02 Multi Str Non Comp	0	""	""	3 Latex Concrete/Similar	5 MS 18 (HS 20)	7	8	42.38	-83.3337	2025-08-18T00:00:00	POINT (-83.3337 42.38)	Taylor	NBI	NHS	17715.6	88	1674403	18.38	2024-09-16T00:00:00	24	A	6	6	6	N
377	MDOT	Metro	11792	82211-B05	M-85 NB	ECORSE CREEK	IN LINCOLN PARK	5 Highway-pedestrian	5 Waterway	1970	2024			2	55.4	64.3	2	4 Steel Continuous	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	B Greater than HL 93	4		42.26	-83.167206	2025-08-18T00:00:00	POINT (-83.167206 42.26)	Taylor	NBI	NHS	3562.22	42.1	1592105	13.89	2024-11-06T00:00:00	18	A	9	9	7	N
378	Pontiac	Metro	13768	""	BAGLEY STREET	CLINTON RIVER	S OF ORCHARD LAKE RD	1 Highway	5 Waterway	1975				2	24	30	2	1 Concrete	19 Culvert	0	""	""	N N/A (no deck (NBI))	0 Unknown	2		42.63	-83.297	2025-08-18T00:00:00	POINT (-83.297 42.63)	Oakland	NBI	Non-NHS	720		641410	1.37	2024-06-28T00:00:00	24	A	N	N	N	6
379	Detroit	Metro	12426	""	KORTE AVE	FOX CREEK	BETWEEN ALTER AND ASHLAND	5 Highway-pedestrian	5 Waterway	2004				1	38	25.9	1	1 Concrete	19 Culvert	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	2		42.36	-82.93311	2025-08-18T00:00:00	POINT (-82.93311 42.36)	Detroit	NBI	Non-NHS	984.2	27.9	1714506	0.66	2023-12-13T00:00:00	24	A	N	N	N	8
380	Wayne County	Metro	12077	""	FIVE MILE ROAD	UPPER ROUGE RIVER	REDFORD      E/BEECH-DALY	5 Highway-pedestrian	5 Waterway	1978				3	93.8	84.3	3	4 Steel Continuous	32 Multi Str Comp	0	0 Other	00 Other	1 Monolithic Concrete	6 MS18(HS20)+mod	5		42.4	-83.28603	2025-08-18T00:00:00	POINT (-83.28603 42.4)	Taylor	NBI	Non-NHS	7907.34	62	1579605	1.47	2025-06-30T00:00:00	24	P	6	7	7	N
381	MDOT	Metro	11196	82023-S28	I-94 WB	I-94 RAMP FROM M-10	IN DETROIT,OVER RAMP HE,S	5 Highway-pedestrian	1 Highway	1955	1995		1995	3	198.8	53.9	3	3 Steel	52 Pl Girder Non Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	3	2	42.36	-83.0755	2025-08-18T00:00:00	POINT (-83.0755 42.36)	Detroit	NBI	NHS	10715.32	50.5	1588802	27.51	2024-04-22T00:00:00	24	A	6	5	6	N
382	Macomb County	Metro	6313	""	24 MILE ROAD	FISH CREEK	0.3 MI WEST OF SASS ROAD	1 Highway	5 Waterway	1999				1	20	39.4	1	9 Aluminum, WI, CI	19 Culvert	0	""	""	N N/A (no deck (NBI))	5 MS 18 (HS 20)	2		42.69	-82.7934	2025-08-18T00:00:00	POINT (-82.7934 42.69)	Macomb	NBI	Non-NHS	788	24	819202	0.11	2023-08-16T00:00:00	24	A	N	N	N	7
383	MDOT	Metro	11358	82102-S05	BECK ROAD	M-14	1.0 MI W. OF PLYMOUTH	1 Highway	1 Highway	1976			2006	2	276	93.5	2	3 Steel	82 Pl Girder Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	6	8	42.38	-83.510086	2025-08-18T00:00:00	POINT (-83.510086 42.38)	Taylor	NBI	NHS	25806	89.5	1595603	7.92	2023-10-10T00:00:00	24	A	5	6	6	N
384	Southfield	Metro	13497	""	INKSTER ROAD	ROUGE RIVER	IN SOUTHFIELD	1 Highway	5 Waterway	1970				2	33	25.9	2	3 Steel	19 Culvert	0	""	""	6 Bituminous	0 Unknown	2		42.46	-83.317535	2025-08-18T00:00:00	POINT (-83.317535 42.46)	Oakland	NBI	Non-NHS	854.7	34.1	636410	1.06	2024-09-20T00:00:00	12	P	N	N	N	3
385	MDOT	Metro	11352	82102-R01	M-14 WB	CSX RR	1.5 MI W OF PLYMOUTH	1 Highway	2 Railroad	1976	2006	2006	2006	3	287	63.7	3	3 Steel	82 Pl Girder Comp	0	""	""	3 Latex Concrete/Similar	9 MS22.5(HS25)or greater	3		42.38	-83.48811	2025-08-18T00:00:00	POINT (-83.48811 42.38)	Taylor	NBI	NHS	18281.9	60.5	1606204	3.49	2023-10-23T00:00:00	24	A	5	7	5	N
386	MDOT	Metro	11740	82194-S12	CLARK AVE	I-75	IN DETROIT	5 Highway-pedestrian	1 Highway	2022				2	175.7	116	2	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	B Greater than HL 93	4	10	42.31	-83.09094	2025-08-18T00:00:00	POINT (-83.09094 42.31)	Detroit	NBI	NHS	20381.2	56.2	1581210	1.37	2025-06-24T00:00:00	24	A	8	8	8	N
387	MDOT	Metro	13852	82191-S27-2	I-75 SB	GODDARD ROAD	IN ALLEN PARK	1 Highway	1 Highway	2017				2	221	63.3	2	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	B Greater than HL 93	3	4	42.23	-83.2125	2025-08-18T00:00:00	POINT (-83.2125 42.23)	Taylor	NBI	NHS	13989.3	60	1595106	11.73	2023-11-16T00:00:00	24	A	8	8	8	N
388	MDOT	Metro	13038	50015-B02	M-53 NB	EAST POND CREEK	BRUCE TWP SEC 35-36	1 Highway	5 Waterway	2002				1	75.5	60.83	1	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	9 MS22.5(HS25)or greater	2		42.82	-83.00206	2025-08-18T00:00:00	POINT (-83.00206 42.82)	Macomb	NBI	NHS	4592.67	57.5	4210208	19.38	2023-12-21T00:00:00	24	A	7	7	7	N
389	Ortonville	Metro	8250	""	MILL	KEARSLEY DRAIN	IN ORTONVILLE	5 Highway-pedestrian	5 Waterway	1966				2	27.9	35	2	3 Steel	19 Culvert	0	""	""	6 Bituminous	6 MS18(HS20)+mod	2		42.85	-83.44631389	2025-08-18T00:00:00	POINT (-83.44631389 42.85)	Oakland	NBI	Non-NHS	976.5	0	654508	0.29	2023-09-01T00:00:00	24	A	N	N	N	6
390	MDOT	Metro	11332	82081-R03	M-153	CSX RR	1M E OF I-275 IN WESTLAND	1 Highway	2 Railroad	1982		2010	1982	13	1141.5	71.9	3	4 Steel Continuous	82 Pl Girder Comp	10	5 Prestressed Concrete	32 Multi Str Comp	5 Epoxy Overlay	5 MS 18 (HS 20)	5		42.32	-83.4246	2025-08-18T00:00:00	POINT (-83.4246 42.32)	Taylor	NBI	NHS	82073.85	68	1595510	6.22	2025-06-18T00:00:00	24	A	6	6	5	N
391	MDOT	Metro	11405	82111-S18	FOREST AVE	M-10	IN DETROIT	5 Highway-pedestrian	1 Highway	1950	1994		1994	2	110.5	103	2	4 Steel Continuous	02 Multi Str Non Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	6	6	42.35	-83.07208	2025-08-18T00:00:00	POINT (-83.07208 42.35)	Detroit	NBI	NHS	11381.5	78	1584908	0.73	2024-08-28T00:00:00	24	A	6	7	5	N
392	MDOT	Metro	11641	82191-R02-2	I-75 SB	GTW RR	IN TAYLOR	1 Highway	2 Railroad	1965	2006	2006	1965	3	213.3	54.5	3	3 Steel	32 Multi Str Comp	0	""	""	5 Epoxy Overlay	6 MS18(HS20)+mod	3		42.2	-83.23366	2025-08-18T00:00:00	POINT (-83.23366 42.2)	Taylor	NBI	NHS	11624.85	51.5	1595106	9.69	2024-09-27T00:00:00	24	A	6	7	7	N
393	Wayne County	Metro	12115	""	E N HINES DRIVE	MIDDLE ROUGE RIVER	NORTHVILLE      E/SHELDON	5 Highway-pedestrian	5 Waterway	1932	1978			1	33.8	52.8	1	1 Concrete	04 Tee Beam	0	0 Other	00 Other	2 Integral Concrete	6 MS18(HS20)+mod	4		42.43	-83.48106	2025-08-18T00:00:00	POINT (-83.48106 42.43)	Taylor	NBI	NHS	1784.64	40	4705216	1.81	2025-03-11T00:00:00	24	A	5	5	6	N
394	MDOT	Metro	6119	50062-S06	SOUTH SERVICE RD	I-696	IN ROSEVILLE	5 Highway-pedestrian	1 Highway	1972	2008		2000	3	284.5	37.9	3	3 Steel	82 Pl Girder Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	2	4	42.49	-82.92395	2025-08-18T00:00:00	POINT (-82.92395 42.49)	Macomb	NBI	Non-NHS	10782.55	29.5	803208	8.49	2025-04-22T00:00:00	24	A	7	5	6	N
395	MDOT	Metro	11595	82123-S47	GRD RIV AVE EXIT R	I-96 RAMP	IN DETROIT	1 Highway	1 Highway	1971	2004		2004	3	135.6	24.4	3	4 Steel Continuous	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	6 MS18(HS20)+mod	1	1	42.35	-83.09739	2025-08-18T00:00:00	POINT (-83.09739 42.35)	Detroit	NBI	NHS	3308.64	21	4710307	0.16	2023-10-25T00:00:00	24	A	7	7	7	N
396	MDOT	Metro	8039	63173-S09	BELFORD RD	I-75	1.1 MI SE OF GENESEE COL	1 Highway	1 Highway	1962		2023		4	220.25	30.8	4	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	3 Latex Concrete/Similar	2 M 13.5 (H 15)	2	6	42.86	-83.59102	2025-08-18T00:00:00	POINT (-83.59102 42.86)	Oakland	NBI	Non-NHS	6783.7	27.5	649602	4.3	2024-12-16T00:00:00	24	A	6	8	7	N
397	MDOT	Metro	6049	50022-B03	M-59 WB	N BR CLINTON RIVER	0.7 MI W OF M-97	1 Highway	5 Waterway	1996		1996		3	230	62.8	3	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	5 Epoxy Overlay	9 MS22.5(HS25)or greater	3		42.63	-82.88903	2025-08-18T00:00:00	POINT (-82.88903 42.63)	Macomb	NBI	NHS	14444	54	807801	10.33	2023-12-20T00:00:00	24	A	7	8	8	N
398	MDOT	Metro	6030	50013-S08	21 MI RD	M-53	1.0 MI N OF M-59	1 Highway	1 Highway	1965				4	207.3	33.4	4	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	2 M 13.5 (H 15)	2	4	42.64	-83.0136	2025-08-18T00:00:00	POINT (-83.0136 42.64)	Macomb	NBI	Non-NHS	6923.82	26	817708	1.26	2023-12-14T00:00:00	24	A	7	6	7	N
399	MDOT	Metro	11399	82111-S13	HOWARD ST	M-10	IN DETROIT	5 Highway-pedestrian	1 Highway	1953	2001	1984	1979	2	123.3	62	2	4 Steel Continuous	32 Multi Str Comp	0	""	""	3 Latex Concrete/Similar	5 MS 18 (HS 20)	3	6	42.33	-83.05766	2025-08-18T00:00:00	POINT (-83.05766 42.33)	Detroit	NBI	NHS	7644.6	42	4705597	0.59	2024-08-13T00:00:00	24	A	7	7	7	N
400	Wayne County	Metro	12049	""	ROTUNDA DRIVE	ROUGE RIVER (RE-LOCATED)	DEARBORN     E/SOUTHFIELD	5 Highway-pedestrian	5 Waterway	1964		1993		6	376	97.4	6	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	6 Bituminous	5 MS 18 (HS 20)	7		42.3	-83.19913	2025-08-18T00:00:00	POINT (-83.19913 42.3)	Taylor	NBI	Non-NHS	36622.4	79.1	1577009	2.27	2025-04-25T00:00:00	12	P	5	5	3	N
401	Other Local Agencies	Metro	14720	""	BEAUBIEN BLVD	RING ROAD	S OF JEFFERSON AVE	5 Highway-pedestrian	0 Other	1977	2004	2014		36	765.8	51.1	36	2 Concrete Continuous	01 Slab	0	""	""	5 Epoxy Overlay	1 M 9 (H 10)	3				2025-08-18T00:00:00	""	Detroit	NBI	Non-NHS	39132.38	38	1587305	0	2024-07-18T00:00:00	24	P	5	5	5	N
402	MDOT	Metro	8022	63172-S17	M-15	I-75	@ M-15	1 Highway	1 Highway	2005				2	196.2	90.8	2	5 Prestressed Concrete	05 Box Bm/Gird- Multiple	0	""	""	1 Monolithic Concrete	9 MS22.5(HS25)or greater	4	8	42.75	-83.41952	2025-08-18T00:00:00	POINT (-83.41952 42.75)	Oakland	NBI	NHS	17814.96	72	627809	1.78	2024-12-23T00:00:00	15	A	7	7	6	N
403	MDOT	Metro	11246	82025-S02	CADILLAC AVE	I-94	IN DETROIT	5 Highway-pedestrian	1 Highway	2022				2	217.5	60.8	2	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	B Greater than HL 93	2	7	42.39	-83.00325	2025-08-18T00:00:00	POINT (-83.00325 42.39)	Detroit	NBI	Non-NHS	13224	38	1578001	2.39	2024-06-28T00:00:00	24	A	8	8	8	N
404	Macomb County	Metro	6400	""	JEWELL ROAD	YATES DRAIN	0.4 MI SOUTH OF 26 MILE	1 Highway	5 Waterway	1985		2004		1	35.8	41	1	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	2		42.71	-83.01574	2025-08-18T00:00:00	POINT (-83.01574 42.71)	Macomb	NBI	Non-NHS	1467.8	39	816307	1.64	2024-06-14T00:00:00	24	A	7	8	6	N
405	MDOT	Metro	7871	63081-B02	M-10 WB	ROUGE RIVER	IN SOUTHFIELD	1 Highway	5 Waterway	1929	1969	2006	2006	1	59	90.6	1	3 Steel	02 Multi Str Non Comp	0	""	""	3 Latex Concrete/Similar	4 M 18 (H 20)	6		42.49	-83.2767	2025-08-18T00:00:00	POINT (-83.2767 42.49)	Oakland	NBI	NHS	5345.4	85.6	710102	5.13	2025-05-09T00:00:00	24	A	5	6	5	N
406	MDOT	Metro	11673	82192-B02	M-39	ROUGE RIVER	IN DEARBORN	1 Highway	5 Waterway	1963	2001		2001	5	340	92.5	5	4 Steel Continuous	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	4		42.31	-83.2143	2025-08-18T00:00:00	POINT (-83.2143 42.31)	Taylor	NBI	NHS	31450	85.8	1592408	5.96	2024-10-28T00:00:00	24	A	7	7	6	N
407	MDOT	Metro	11685	82192-S08-3	HUBBARD AV EB	M-39	IN DEARBORN	5 Highway-pedestrian	1 Highway	1964	1996		1996	4	177.5	69.7	4	4 Steel Continuous	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	4	6	42.32	-83.21522	2025-08-18T00:00:00	POINT (-83.21522 42.32)	Taylor	NBI	Non-NHS	12371.75	56.4	1594801	0.86	2023-11-16T00:00:00	24	A	5	6	4	N
408	Oakland County	Metro	13811	""	COUNTY LINE ROAD	KEARSLEY DRAIN	GROVELAND TWP SEC 1	1 Highway	5 Waterway	1995				2	26	24	2	3 Steel	19 Culvert	0	""	""	8 Gravel	0 Unknown	2		42.88	-83.46003	2025-08-18T00:00:00	POINT (-83.46003 42.88)	Oakland	NBI	Non-NHS	624	28	1501503	0.6	2025-07-23T00:00:00	12	A	N	N	N	4
409	Oakland County	Metro	8150	""	ADAMS ROAD	ROUGE RIVER	BET WATTLES AND BIG BEAVE	1 Highway	5 Waterway	2004				1	40	40	1	1 Concrete	19 Culvert	0	""	""	6 Bituminous	5 MS 18 (HS 20)	2		42.57	-83.20707	2025-08-18T00:00:00	POINT (-83.20707 42.57)	Oakland	NBI	NHS	1600	40	4415861	2.55	2024-08-23T00:00:00	24	A	N	N	N	7
410	MDOT	Metro	7882	63081-S10	MOUNT VERNON ST	M-10	IN SOUTHFIELD (M-10)	5 Highway-pedestrian	1 Highway	1963	1997	2020	2020	2	121	38.4	2	3 Steel	32 Multi Str Comp	0	""	""	3 Latex Concrete/Similar	2 M 13.5 (H 15)	2	6	42.47	-83.230675	2025-08-18T00:00:00	POINT (-83.230675 42.47)	Oakland	NBI	Non-NHS	4646.4	26	688107	0.01	2024-06-13T00:00:00	24	A	7	8	8	N
411	Wayne County	Metro	12012	""	WEST ROAD	FRANK & POET DRAIN	TRENTON            W/FORT	5 Highway-pedestrian	5 Waterway	2020				3	93.7	81.4	3	1 Concrete	01 Slab	0	""	""	1 Monolithic Concrete	B Greater than HL 93	5		42.14	-83.20618	2025-08-18T00:00:00	POINT (-83.20618 42.14)	Taylor	NBI	NHS	7627.18	63	1674210	8.07	2024-11-29T00:00:00	24	A	8	8	8	N
412	Wayne County	Metro	12055	""	WARREN AVENUE	E N HINES DRIVE	DBN HTS W/ANN ARBOR TRAIL	5 Highway-pedestrian	1 Highway	1957		1985		1	73.8	78	1	1 Concrete	07 Frame- Rigid exc Culv	0	""	""	5 Epoxy Overlay	6 MS18(HS20)+mod	5	2	42.34	-83.26318	2025-08-18T00:00:00	POINT (-83.26318 42.34)	Taylor	NBI	NHS	5756.4	60	4710470	14.91	2024-09-13T00:00:00	24	A	6	6	7	N
413	Wayne County	Metro	12089	""	SIX MILE ROAD	TARABUSI DRAIN	LIVONIA     E/MIDDLE BELT	5 Highway-pedestrian	5 Waterway	1976				3	79.7	84.3	3	4 Steel Continuous	32 Multi Str Comp	0	0 Other	00 Other	1 Monolithic Concrete	6 MS18(HS20)+mod	5		42.41	-83.33047	2025-08-18T00:00:00	POINT (-83.33047 42.41)	Taylor	NBI	NHS	6718.71	61.4	1680701	11.27	2025-06-10T00:00:00	24	A	6	7	6	N
414	Taylor	Metro	12514	""	MORTENVIEW DRIVE	SEXTON-KILFOIL DRAIN	IN TAYLOR	1 Highway	5 Waterway	1999				1	40	29.9	1	1 Concrete	19 Culvert	0	""	""	N N/A (no deck (NBI))	5 MS 18 (HS 20)	2		42.23	-83.240166	2025-08-18T00:00:00	POINT (-83.240166 42.23)	Taylor	NBI	Non-NHS	1196	0	1656610	0.56	2024-12-03T00:00:00	24	P	N	N	N	7
415	MDOT	Metro	6060	50023-S04-4	M-59 WB	RYAN RD	1.5 MI W OF UTICA	1 Highway	1 Highway	1971	2009		2005	1	116.8	68.6	1	3 Steel	82 Pl Girder Comp	0	""	""	1 Monolithic Concrete	9 MS22.5(HS25)or greater	2	2	42.62	-83.071785	2025-08-18T00:00:00	POINT (-83.071785 42.62)	Macomb	NBI	NHS	8012.48	65.3	807801	1	2025-05-14T00:00:00	24	A	7	7	7	N
416	Macomb County	Metro	6202	""	SOUTH RIVER RD	CHANNEL BETW LAKE & RIVR	0.3 MI E OF LAKE SHORE DR	1 Highway	5 Waterway	2025				1	45	31.4	1	5 Prestressed Concrete	05 Box Bm/Gird- Multiple	0	""	""	1 Monolithic Concrete	B Greater than HL 93	2		42.59	-82.785484	2025-08-18T00:00:00	POINT (-82.785484 42.59)	Macomb	NBI	Non-NHS	1413	28.3	800901	4.98	2025-04-18T00:00:00	12	P	3	3	3	N
417	MDOT	Metro	11562	82123-S14	SCHAEFER RD	I-96 (JEFFRIES FRWY)	IN DETROIT	5 Highway-pedestrian	1 Highway	1971	2023		1991	4	286.3	81.4	4	3 Steel	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	5	12	42.38	-83.17835	2025-08-18T00:00:00	POINT (-83.17835 42.38)	Detroit	NBI	NHS	23304.82	59	4706528	7.47	2024-01-02T00:00:00	24	A	9	6	7	N
418	Ortonville	Metro	8251	""	BALL ST	KEARSLEY CREEK	IN ORTONVILLE	1 Highway	5 Waterway	2014				1	38	31.8	1	5 Prestressed Concrete	05 Box Bm/Gird- Multiple	0	""	""	5 Epoxy Overlay	B Greater than HL 93	2		42.86	-83.4478	2025-08-18T00:00:00	POINT (-83.4478 42.86)	Oakland	NBI	Non-NHS	1208.4	22.8	670207	0.16	2023-09-01T00:00:00	24	A	8	8	8	N
419	MDOT	Metro	11511	82122-S23	SCHOOLCRAFT X-OVER	I-96	IN DETROIT	1 Highway	1 Highway	1970	2003		2003	4	381.4	43	4	3 Steel	82 Pl Girder Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	2	12	42.39	-83.2446	2025-08-18T00:00:00	POINT (-83.2446 42.39)	Detroit	NBI	Non-NHS	16400.2	30.2	4705231	10.5	2024-04-25T00:00:00	24	A	6	7	5	N
420	Macomb County	Metro	6371	""	28 MILE ROAD	TUPPER BROOK DRAIN	0.4 MI WEST OF NORTH AVE	1 Highway	5 Waterway	1972				2	30.8	29.5	2	3 Steel	19 Culvert	0	""	""	N N/A (no deck (NBI))	4 M 18 (H 20)	2		42.75	-82.88943	2025-08-18T00:00:00	POINT (-82.88943 42.75)	Macomb	NBI	Non-NHS	908.6	0	4208920	10.55	2023-07-26T00:00:00	24	A	N	N	N	6
421	MDOT	Metro	7912	63101-S15	M-10 NWESTERN HWY	I-696 RAMP D	IN SOUTHFIELD	1 Highway	1 Highway	1964	1997			3	101.5	86.9	3	5 Prestressed Concrete	06 Box Bms- Single/Sprd	0	""	""	1 Monolithic Concrete	9 MS22.5(HS25)or greater	5	1	42.49	-83.287384	2025-08-18T00:00:00	POINT (-83.287384 42.49)	Oakland	NBI	NHS	8820.35	83.7	710102	4.52	2025-05-20T00:00:00	24	A	7	7	7	N
422	MDOT	Metro	11848	82252-S08	7 MI RD SB LFT TRN	I-75	IN DETROIT	1 Highway	1 Highway	1967	2003			4	216.3	24	4	5 Prestressed Concrete	06 Box Bms- Single/Sprd	0	""	""	1 Monolithic Concrete	6 MS18(HS20)+mod	1	8	42.43	-83.095	2025-08-18T00:00:00	POINT (-83.095 42.43)	Detroit	NBI	Non-NHS	5191.2	20.6	1585909	0.01	2024-04-23T00:00:00	24	A	7	6	6	N
423	MDOT	Metro	6180	50112-B01-4	I-94 WB	SALT RIVER	0.4 MI NE OF M-19	1 Highway	5 Waterway	1963		1996	2023	2	124	42.9	2	3 Steel	32 Multi Str Comp	0	""	""	5 Epoxy Overlay	6 MS18(HS20)+mod	2		42.71	-82.77004	2025-08-18T00:00:00	POINT (-82.77004 42.71)	Macomb	NBI	NHS	5319.6	39.5	798502	21.35	2025-06-10T00:00:00	24	A	6	7	7	N
424	Birmingham	Metro	8233	""	REDDING ST	ROUGE RIVER	0.2 MI W OF WOODWARD AVE	5 Highway-pedestrian	5 Waterway	1988				1	25.9	40.7	1	5 Prestressed Concrete	05 Box Bm/Gird- Multiple	0	""	""	6 Bituminous	5 MS 18 (HS 20)	2		42.56	-83.22665	2025-08-18T00:00:00	POINT (-83.22665 42.56)	Oakland	NBI	Non-NHS	1054.13	27.9	4410091	0.68	2024-10-24T00:00:00	24	A	6	6	6	N
425	Detroit	Metro	11481	""	I-96 WB SERV RD	ROUGE RIVER	IN DETROIT	5 Highway-pedestrian	5 Waterway	1970	2011		2011	3	270	39.9	3	3 Steel	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	6 MS18(HS20)+mod	2		42.39	-83.2668	2025-08-18T00:00:00	POINT (-83.2668 42.39)	Detroit	NBI	Non-NHS	10773	24	4705258	9.44	2024-06-05T00:00:00	24	A	7	7	7	N
426	Sterling Heights	Metro	6430	""	DODGE PARK RD	PLUM BROOK DRAIN	N OF 16 MILE RD	5 Highway-pedestrian	5 Waterway	1972		2016	1995	2	97	48.3	2	3 Steel	32 Multi Str Comp	0	""	""	3 Latex Concrete/Similar	6 MS18(HS20)+mod	3		42.57	-83.01056	2025-08-18T00:00:00	POINT (-83.01056 42.57)	Macomb	NBI	Non-NHS	4685.1	36	812702	1.55	2024-09-17T00:00:00	24	A	5	4	5	N
427	MDOT	Metro	11981	82293-S18-1	I-275 NB	SCHOOLCRAFT RD	0.2 MI W OF LIVONIA	1 Highway	1 Highway	1971		2001	2001	4	293.4	56.8	4	3 Steel	32 Multi Str Comp	0	""	""	5 Epoxy Overlay	5 MS 18 (HS 20)	3	4	42.38	-83.43668	2025-08-18T00:00:00	POINT (-83.43668 42.38)	Taylor	NBI	NHS	16665.12	53.8	1607208	21.49	2024-09-13T00:00:00	24	A	6	6	7	N
428	Oakland County	Metro	12728	""	LONG LK SHORES DR	LONG LAKE CANAL	BLOOMFIELD TWP SEC 7	1 Highway	5 Waterway	1930	2002			2	52	28	2	7 Timber	71 Slab-Timb Comp	0	""	""	6 Bituminous	5 MS 18 (HS 20)	2		42.59	-83.31966	2025-08-18T00:00:00	POINT (-83.31966 42.59)	Oakland	NBI	Non-NHS	1456	25.9	640402	0.51	2024-08-23T00:00:00	24	P	7	7	5	N
429	MDOT	Metro	11380	82104-S08	GODDARD AVENUE	M-8	IN DETROIT	5 Highway-pedestrian	1 Highway	1971	2009		2009	2	216.5	59.4	2	3 Steel	82 Pl Girder Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	2	10	42.41	-83.07283	2025-08-18T00:00:00	POINT (-83.07283 42.41)	Detroit	NBI	Non-NHS	12860.1	37	1591010	0.46	2023-10-05T00:00:00	24	A	7	7	7	N
430	MDOT	Metro	8117	63191-S03	HAGGERTY RD	I-96 WB	E LTS OF NOVI	1 Highway	1 Highway	1971		2001	1999	4	246.7	44.4	4	3 Steel	02 Multi Str Non Comp	0	""	""	5 Epoxy Overlay	4 M 18 (H 20)	2	4	42.49	-83.43576	2025-08-18T00:00:00	POINT (-83.43576 42.49)	Oakland	NBI	NHS	10953.48	40.5	639005	3.27	2024-11-18T00:00:00	24	A	6	6	7	N
431	Wayne County	Metro	12303	""	ELIZABETH PK DRIVE	ELIZABETH PK CANAL	TRENTON        S/WEST RD	5 Highway-pedestrian	5 Waterway	1923				1	59.7	59.1	1	1 Concrete	11 Arch- Deck, Filled Sp	0	""	""	N N/A (no deck (NBI))	4 M 18 (H 20)	4		42.14	-83.179	2025-08-18T00:00:00	POINT (-83.179 42.14)	Taylor	NBI	Non-NHS	3528.27	39	1704303	0.61	2024-11-12T00:00:00	24	A	5	5	7	N
432	Macomb County	Metro	6308	""	BROWN ROAD	N B CLINTON RIVER	0.2 MI NORTH OF EBELING	5 Highway-pedestrian	5 Waterway	1974				1	51.8	33.8	1	5 Prestressed Concrete	05 Box Bm/Gird- Multiple	0	""	""	6 Bituminous	5 MS 18 (HS 20)	2		42.86	-82.99173	2025-08-18T00:00:00	POINT (-82.99173 42.86)	Macomb	NBI	Non-NHS	1750.84	26.2	824303	0.72	2024-07-22T00:00:00	24	A	6	7	7	N
433	MDOT	Metro	11979	82293-S16	I-275 SB	KOPPERNICK RD	1 MI W OF LIVONIA LTS	1 Highway	1 Highway	1972				1	98.5	56.5	1	3 Steel	82 Pl Girder Comp	0	""	""	5 Epoxy Overlay	5 MS 18 (HS 20)	3	2	42.34	-83.44224	2025-08-18T00:00:00	POINT (-83.44224 42.34)	Taylor	NBI	NHS	5565.25	53.2	1607610	18.6	2024-08-21T00:00:00	24	A	6	5	7	N
434	MDOT	Metro	7917	63102-S01	US-24 NB TO 696 EB	M-10 SB	IN SOUTHFIELD	1 Highway	1 Highway	1967	1988	1988	2009	3	1575.7	26.9	3	3 Steel	32 Multi Str Comp	0	""	""	3 Latex Concrete/Similar	6 MS18(HS20)+mod	1	4	42.49	-83.28179	2025-08-18T00:00:00	POINT (-83.28179 42.49)	Oakland	NBI	NHS	42386.33	23	1903806	0.08	2024-03-25T00:00:00	24	A	5	6	6	N
435	MDOT	Metro	11364	82102-S11	SCHOOLCRAFT CONN	M-14	1 MI W OF W CTY LTS LIVON	1 Highway	1 Highway	1977	2024			2	288.8	64.8	2	3 Steel	02 Multi Str Non Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	4	6	42.39	-83.44887	2025-08-18T00:00:00	POINT (-83.44887 42.39)	Taylor	NBI	Non-NHS	18714.24	53.3	1689310	0.89	2024-10-23T00:00:00	12	A	9	7	6	N
436	MDOT	Metro	6076	50061-S03	RYAN ST	I-696	IN WARREN	5 Highway-pedestrian	1 Highway	1972		2008	2008	2	178	78.4	2	3 Steel	32 Multi Str Comp	0	""	""	5 Epoxy Overlay	4 M 18 (H 20)	4	10	42.49	-83.066925	2025-08-18T00:00:00	POINT (-83.066925 42.49)	Macomb	NBI	Non-NHS	13955.2	64	799302	3.02	2025-03-13T00:00:00	24	A	5	7	7	N
437	Wayne County	Metro	12106	""	BECK ROAD	FELLOWS CREEK	CANTON T           N/FORD	1 Highway	5 Waterway	1993		1993		1	31.8	50.2	1	5 Prestressed Concrete	05 Box Bm/Gird- Multiple	0	""	""	1 Monolithic Concrete	9 MS22.5(HS25)or greater	3		42.32	-83.50723	2025-08-18T00:00:00	POINT (-83.50723 42.32)	Taylor	NBI	NHS	1596.36	42	1595603	3.71	2025-03-11T00:00:00	24	A	5	7	7	N
438	MDOT	Metro	6090	50061-S22	HOOVER RD	I-696	IN WARREN	5 Highway-pedestrian	1 Highway	1972	2010		2000	2	206	78.4	2	4 Steel Continuous	82 Pl Girder Comp	0	""	""	1 Monolithic Concrete	4 M 18 (H 20)	5	8	42.49	-83.00658	2025-08-18T00:00:00	POINT (-83.00658 42.49)	Macomb	NBI	Non-NHS	16150.4	64	798909	3	2023-09-22T00:00:00	24	A	8	6	7	N
439	MDOT	Metro	7946	63102-S33	HARVARD	I-696	SOUTHFIELD,W/CENT PK BLVD	1 Highway	1 Highway	1987				2	175.2	62.1	2	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	2	8	42.49	-83.24943	2025-08-18T00:00:00	POINT (-83.24943 42.49)	Oakland	NBI	Non-NHS	10879.92	42	4413505	0	2024-07-19T00:00:00	24	A	6	7	6	N
440	MDOT	Metro	13018	50015-S04	M-53 NB	29 MILE RD	WASHINGTON TWP SEC 14-23	1 Highway	1 Highway	2002				3	238	48.6	3	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	9 MS22.5(HS25)or greater	2	2	42.76	-83.01258	2025-08-18T00:00:00	POINT (-83.01258 42.76)	Macomb	NBI	NHS	11566.8	45.3	4210208	15.2	2023-12-21T00:00:00	24	A	6	8	7	N
441	Gibraltar	Metro	12496	""	YOUNG DRIVE	W GIBRALTAR WATERWAY	EAST OF WORTH	1 Highway	5 Waterway	1990				2	77.1	31.2	2	5 Prestressed Concrete	05 Box Bm/Gird- Multiple	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	2		42.09	-83.19578333	2025-08-18T00:00:00	POINT (-83.19578333 42.09)	Taylor	NBI	Non-NHS	2405.52	27.9	1698408	0.51	2025-08-05T00:00:00	12	P	5	5	4	N
442	Oakland County	Metro	8216	""	LAKE GROVE DR	WHITE LAKE CANAL	NORTH OF JACKSON RD	1 Highway	5 Waterway	2002				1	30	28	1	7 Timber	01 Slab	0	""	""	6 Bituminous	5 MS 18 (HS 20)	2		42.68	-83.55904	2025-08-18T00:00:00	POINT (-83.55904 42.68)	Oakland	NBI	Non-NHS	840	25.9	649901	0.1	2024-06-12T00:00:00	24	A	7	7	7	N
443	Wayne County	Metro	12131	""	HAGGERTY ROAD	LOWER ROUGE RIVER	CANTON         N/MICHIGAN	1 Highway	5 Waterway	1931	1997			1	69.83	66.42	1	5 Prestressed Concrete	05 Box Bm/Gird- Multiple	0	""	""	5 Epoxy Overlay	5 MS 18 (HS 20)	4		42.28	-83.446915	2025-08-18T00:00:00	POINT (-83.446915 42.28)	Taylor	NBI	Non-NHS	4638.11	52	4706524	4.94	2025-03-11T00:00:00	24	A	6	7	8	N
444	MDOT	Metro	8013	63172-S10-1	I-75 NB	JOSLYN  RD	2.0 MI NW OF M-24 (JOSLYN	1 Highway	1 Highway	1962	2008	2008	1988	3	214	66.9	3	3 Steel	32 Multi Str Comp	0	""	""	5 Epoxy Overlay	5 MS 18 (HS 20)	4	4	42.7	-83.28414	2025-08-18T00:00:00	POINT (-83.28414 42.7)	Oakland	NBI	NHS	14316.6	63.6	647308	24.14	2025-03-14T00:00:00	24	A	5	6	6	N
445	MDOT	Metro	11948	82292-S06	PALMER RD	I-275	1 MI NW OF WAYNE	1 Highway	1 Highway	1974			2022	2	293	48.4	2	3 Steel	82 Pl Girder Comp	0	""	""	5 Epoxy Overlay	5 MS 18 (HS 20)	2	6	42.29	-83.44313	2025-08-18T00:00:00	POINT (-83.44313 42.29)	Taylor	NBI	Non-NHS	14181.2	44.5	1607406	2.18	2024-10-11T00:00:00	24	A	7	7	7	N
446	MDOT	Metro	7994	63171-S01	CORNELL RD	M-39	IN SOUTHFIELD	5 Highway-pedestrian	1 Highway	1963	2000			2	108.5	58.7	2	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	3	6	42.45	-83.21986	2025-08-18T00:00:00	POINT (-83.21986 42.45)	Oakland	NBI	Non-NHS	6368.95	44	4401144	0.01	2025-06-25T00:00:00	24	A	7	7	6	N
447	Sterling Heights	Metro	6423	""	15 MILE RD	RED RUN DRAIN	EAST OF SCHOENHERR RD	5 Highway-pedestrian	5 Waterway	1992				3	210	78.4	3	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	5		42.55	-82.985855	2025-08-18T00:00:00	POINT (-82.985855 42.55)	Macomb	NBI	Non-NHS	16464	59.1	803605	5.21	2024-09-04T00:00:00	24	A	6	6	6	N
448	MDOT	Metro	11771	82195-S13	I-75 W S RAMP	M-10	IN DETROIT	1 Highway	1 Highway	1970		1998	1990	4	228	30.4	4	3 Steel	32 Multi Str Comp	0	""	""	5 Epoxy Overlay	6 MS18(HS20)+mod	1	6	42.34	-83.064995	2025-08-18T00:00:00	POINT (-83.064995 42.34)	Detroit	NBI	NHS	6931.2	27.5	1585004	0.09	2024-04-17T00:00:00	24	A	5	7	7	N
449	Gibraltar	Metro	11996	""	STOEFLET ROAD	E GIBRALTAR WATERWAY	GIBRALTAR,  W/BAYVIEW	5 Highway-pedestrian	5 Waterway	1992				1	26.9	37.7	1	5 Prestressed Concrete	05 Box Bm/Gird- Multiple	0	""	""	1 Monolithic Concrete	9 MS22.5(HS25)or greater	2		42.09	-83.19143	2025-08-18T00:00:00	POINT (-83.19143 42.09)	Taylor	NBI	Non-NHS	1014.13	24	1698403	0.48	2025-08-04T00:00:00	24	A	5	6	5	N
450	MDOT	Metro	8065	63174-S06-2	I-75 SB	M-150 (ROCHESTER RD.)	IN TROY	1 Highway	1 Highway	2020				2	188.2	86	2	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	B Greater than HL 93	5	6	42.56	-83.12956	2025-08-18T00:00:00	POINT (-83.12956 42.56)	Oakland	NBI	NHS	16185.2	82.6	646106	8.58	2024-09-10T00:00:00	24	A	8	8	8	N
451	Macomb County	Metro	6268	""	NORTH AVE	COON CREEK	0.3 MI NORTH OF 31 MILE	1 Highway	5 Waterway	1999				1	31.8	42.7	1	1 Concrete	19 Culvert	0	""	""	N N/A (no deck (NBI))	9 MS22.5(HS25)or greater	2		42.79	-82.882965	2025-08-18T00:00:00	POINT (-82.882965 42.79)	Macomb	NBI	Non-NHS	1357.86	42.7	1817105	11.67	2025-05-20T00:00:00	24	A	N	N	N	6
452	Macomb County	Metro	6258	""	ROMEO PLANK RD	GLOEDE DRAIN	0.5 MILES SOUTH OF M-59	5 Highway-pedestrian	5 Waterway	2009				1	36	60	1	1 Concrete	19 Culvert	0	""	""	N N/A (no deck (NBI))	5 MS 18 (HS 20)	5		42.62	-82.93438	2025-08-18T00:00:00	POINT (-82.93438 42.62)	Macomb	NBI	NHS	2160	64	819207	2.23	2025-07-11T00:00:00	24	A	N	N	N	7
453	Wayne County	Metro	12252	""	LELAND DRIVE	SILVER CREEK	BRNTWNW/JEFFERSON	1 Highway	5 Waterway	1930				1	24	23	1	1 Concrete	01 Slab	0	""	""	8 Gravel	2 M 13.5 (H 15)	2		42.05	-83.2117	2025-08-18T00:00:00	POINT (-83.2117 42.05)	Taylor	NBI	Non-NHS	552	21	1709801	0.08	2025-04-30T00:00:00	12	P	3	3	4	N
454	Oakland County	Metro	8160	""	BENSTEIN	HURON RIVER	NORTH OF OAKLEY PARK	1 Highway	5 Waterway	2008				1	30	48	1	1 Concrete	19 Culvert	0	""	""	N N/A (no deck (NBI))	9 MS22.5(HS25)or greater	3		42.57	-83.5042	2025-08-18T00:00:00	POINT (-83.5042 42.57)	Oakland	NBI	Non-NHS	1440	48	629509	2.53	2024-06-06T00:00:00	24	A	N	N	N	7
455	MDOT	Metro	11455	82112-S28	SCHAFFER	M-10	IN DETROIT	5 Highway-pedestrian	1 Highway	1964	2000		2000	2	178.8	78.4	2	3 Steel	32 Multi Str Comp	0	""	""	0 None	5 MS 18 (HS 20)	4	6	42.42	-83.18019	2025-08-18T00:00:00	POINT (-83.18019 42.42)	Detroit	NBI	NHS	14017.92	54	4706528	10.36	2025-04-18T00:00:00	24	A	6	6	6	N
456	Oakland County	Metro	8182	""	AVON ROAD	CLINTON RIVER	BET JOHN R AND DEQUINDRE	1 Highway	5 Waterway	2022				1	71	92.2	1	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	0 None	B Greater than HL 93	2		42.67	-83.09662	2025-08-18T00:00:00	POINT (-83.09662 42.67)	Oakland	NBI	NHS	6546.2	56.7	605102	5.04	2024-04-16T00:00:00	24	A	8	8	8	N
457	MDOT	Metro	6135	50092-B02	M-19	SALT RIVER	5.2 MI SW OF ST CLAIR COL	5 Highway-pedestrian	5 Waterway	1991				1	45	51.3	1	5 Prestressed Concrete	05 Box Bm/Gird- Multiple	0	""	""	1 Monolithic Concrete	9 MS22.5(HS25)or greater	2		42.73	-82.78813	2025-08-18T00:00:00	POINT (-82.78813 42.73)	Macomb	NBI	Non-NHS	2308.5	48	832010	9.98	2024-04-09T00:00:00	24	A	5	6	6	N
458	Oakland County	Metro	14272	""	MUELLER RD	BROWN DRAIN	ORION TWP SEC 29	1 Highway	5 Waterway	1998				3	22	28	3	1 Concrete	19 Culvert	0	""	""	6 Bituminous	5 MS 18 (HS 20)	2		42.73	-83.299255	2025-08-18T00:00:00	POINT (-83.299255 42.73)	Oakland	NBI	Non-NHS	616	28	669420	0.12	2024-07-23T00:00:00	24	A	N	N	N	6
459	Oakland County	Metro	8145	""	MIDDLEBELT RD	ROUGE RIVER	BET GRAND RIVER AND 8 MIL	1 Highway	5 Waterway	1964	2005			1	35	59.7	1	5 Prestressed Concrete	05 Box Bm/Gird- Multiple	0	""	""	1 Monolithic Concrete	6 MS18(HS20)+mod	4		42.45	-83.33656	2025-08-18T00:00:00	POINT (-83.33656 42.45)	Oakland	NBI	Non-NHS	2089.5	48.9	634610	0.35	2024-07-30T00:00:00	24	A	7	7	5	N
460	MDOT	Metro	11279	82052-B03-1	US-24 NB	ECORSE CREEK	IN DEARBORN HTS	1 Highway	5 Waterway	1987				1	33	67.8	1	5 Prestressed Concrete	02 Multi Str Non Comp	0	""	""	5 Epoxy Overlay	9 MS22.5(HS25)or greater	4		42.27	-83.27015	2025-08-18T00:00:00	POINT (-83.27015 42.27)	Taylor	NBI	NHS	2237.4	54	4700038	12.58	2024-08-12T00:00:00	24	A	7	8	7	N
461	Wayne County	Metro	12171	""	INKSTER ROAD	UPPER ROUGE RIVER	LIVONIA/REDFORD  S/7 MILE	1 Highway	5 Waterway	1995				1	60	65.6	1	5 Prestressed Concrete	05 Box Bm/Gird- Multiple	0	""	""	5 Epoxy Overlay	9 MS22.5(HS25)or greater	4		42.42	-83.31608	2025-08-18T00:00:00	POINT (-83.31608 42.42)	Taylor	NBI	NHS	3936	49.9	1674404	21.87	2025-06-11T00:00:00	24	A	6	7	7	N
462	Oakland County	Metro	13645	""	12 MILE ROAD	MINNOW POND DRAIN	FARMINGTON HILLS TWP10/13	1 Highway	5 Waterway	1994				1	26	60	1	1 Concrete	19 Culvert	0	""	""	6 Bituminous	5 MS 18 (HS 20)	5		42.5	-83.373055	2025-08-18T00:00:00	POINT (-83.373055 42.5)	Oakland	NBI	NHS	1560	62	4462980	7.31	2024-06-28T00:00:00	24	A	N	N	N	6
463	MDOT	Metro	11145	82022-S40	I-94  EB RAMP	PELHAM RD	IN TAYLOR & ALLEN PARK	1 Highway	1 Highway	1981			2011	1	125.3	47.9	1	3 Steel	02 Multi Str Non Comp	0	""	""	5 Epoxy Overlay	9 MS22.5(HS25)or greater	2	5	42.27	-83.2317	2025-08-18T00:00:00	POINT (-83.2317 42.27)	Taylor	NBI	NHS	6001.87	44	1576901	0.43	2024-11-26T00:00:00	24	A	6	7	7	N
464	MDOT	Metro	6141	50111-B03	I-94 WB	CLINTON RIVER, N&S RDS	0.2 MI E OF MT CLEMENS	5 Highway-pedestrian	6 Highway-waterway	1963	1998		1998	6	357.8	60	6	3 Steel	32 Multi Str Comp	0	""	""	3 Latex Concrete/Similar	6 MS18(HS20)+mod	4	4	42.59	-82.857475	2025-08-18T00:00:00	POINT (-82.857475 42.59)	Macomb	NBI	NHS	21468	56.8	798502	11.55	2025-06-19T00:00:00	24	A	7	7	6	N
465	MDOT	Metro	7812	63031-B02	US-24 & US-10	FRANKLIN RIVER	IN BINGHAM FARMS	1 Highway	5 Waterway	1931	1977	1977		3	35	96	3	1 Concrete	19 Culvert	0	""	""	N N/A (no deck (NBI))	6 MS18(HS20)+mod	6		42.52	-83.28566	2025-08-18T00:00:00	POINT (-83.28566 42.52)	Oakland	NBI	NHS	1813	35.8	710106	5.31	2025-05-08T00:00:00	24	A	N	N	N	6
466	MDOT	Metro	11557	82123-S10-7	I-96 RAMP	E B SERVICE RD	IN DETROIT	1 Highway	1 Highway	1973		2005	1988	8	624	27.9	8	3 Steel	82 Pl Girder Comp	0	""	""	3 Latex Concrete/Similar	5 MS 18 (HS 20)	1	2	42.38	-83.21138	2025-08-18T00:00:00	POINT (-83.21138 42.38)	Detroit	NBI	NHS	17409.6	25.9	4710306	0.01	2023-08-14T00:00:00	24	A	5	6	6	N
467	Wayne County	Metro	12095	""	SEVEN MILE ROAD	TARABUSI DRAIN	LIVONIA        W/MERRIMAN	1 Highway	5 Waterway	2007		2007		1	22	63	1	1 Concrete	19 Culvert	0	""	""	1 Monolithic Concrete	6 MS18(HS20)+mod	5		42.43	-83.36342	2025-08-18T00:00:00	POINT (-83.36342 42.43)	Taylor	NBI	NHS	1386	63	1700106	3.56	2025-06-17T00:00:00	24	A	N	N	N	7
468	MDOT	Metro	11942	82292-R02	I-275 NB	MDOT RR CORRIDOR	2.2 MI W OF WAYNE	5 Highway-pedestrian	2 Railroad	1974	2012	2012		3	155.3	63.1	3	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	3 Latex Concrete/Similar	9 MS22.5(HS25)or greater	3		42.27	-83.4407	2025-08-18T00:00:00	POINT (-83.4407 42.27)	Taylor	NBI	NHS	9799.43	52.5	1607208	13.55	2025-06-11T00:00:00	24	A	7	8	7	N
469	MDOT	Metro	11118	82022-S08	I-94 WB	INKSTER RD	W LTS OF TAYLOR	1 Highway	1 Highway	2002				1	125.3	68	1	5 Prestressed Concrete	05 Box Bm/Gird- Multiple	0	""	""	5 Epoxy Overlay	9 MS22.5(HS25)or greater	3	2	42.25	-83.30838	2025-08-18T00:00:00	POINT (-83.30838 42.25)	Taylor	NBI	NHS	8520.4	64.7	1588802	12.43	2023-08-30T00:00:00	24	A	8	6	7	N
470	MDOT	Metro	6009	50011-B06	M-53 SB	CLINTON RIVER	1.6 MI S OF M-59	1 Highway	5 Waterway	1966		2024	1993	3	250	36.42	3	3 Steel	32 Multi Str Comp	0	""	""	3 Latex Concrete/Similar	5 MS 18 (HS 20)	2		42.6	-83.02047	2025-08-18T00:00:00	POINT (-83.02047 42.6)	Macomb	NBI	NHS	9105	31	813706	4.17	2024-09-12T00:00:00	18	A	7	6	7	N
471	MDOT	Metro	13021	50015-S08	M-53 NB	31 MILE RD	WASHINGTON TWP SEC 2-11	1 Highway	1 Highway	2002				3	136.5	48.6	3	5 Prestressed Concrete	05 Box Bm/Gird- Multiple	0	""	""	1 Monolithic Concrete	9 MS22.5(HS25)or greater	2	2	42.79	-83.005226	2025-08-18T00:00:00	POINT (-83.005226 42.79)	Macomb	NBI	NHS	6633.9	45.3	4210208	17.3	2023-12-22T00:00:00	24	A	6	7	7	N
472	Macomb County	Metro	6354	""	CHAPMAN RD	DEER CREEK	0.3 MI EAST OF NORTH AVE	1 Highway	5 Waterway	2016				1	48	28.4	1	5 Prestressed Concrete	06 Box Bms- Single/Sprd	0	""	""	1 Monolithic Concrete	B Greater than HL 93	2		42.7	-82.87243889	2025-08-18T00:00:00	POINT (-82.87243889 42.7)	Macomb	NBI	Non-NHS	1363.2	26	818406	0.31	2024-08-29T00:00:00	24	A	8	8	8	N
473	MDOT	Metro	7832	63043-B04	M-59 EB	CLINTON RIVER	E LTS OF PONTIAC	1 Highway	5 Waterway	1967			1997	3	127.8	42.3	3	3 Steel	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	2		42.64	-83.25991	2025-08-18T00:00:00	POINT (-83.25991 42.64)	Oakland	NBI	NHS	5405.94	40	648906	22.73	2024-09-18T00:00:00	24	A	7	7	7	N
474	Armada	Metro	6411	""	NORTH FULTON ST	E BR COON CREEK	0.25 MI S OF ARMADACENTER	5 Highway-pedestrian	5 Waterway	1995				1	52.5	42.7	1	5 Prestressed Concrete	05 Box Bm/Gird- Multiple	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	2		42.85	-82.88481	2025-08-18T00:00:00	POINT (-82.88481 42.85)	Macomb	NBI	Non-NHS	2241.75	39	1817105	15.4	2023-10-18T00:00:00	24	A	7	8	7	N
475	Macomb County	Metro	6294	""	HOLMES ROAD	NEWLAND DRAIN	0.6 MI SOUTH OF BORDMAN	1 Highway	5 Waterway	1972				2	25.9	26.2	2	3 Steel	19 Culvert	0	""	""	N N/A (no deck (NBI))	4 M 18 (H 20)	2		42.88	-82.95582	2025-08-18T00:00:00	POINT (-82.95582 42.88)	Macomb	NBI	Non-NHS	678.58	0	819909	1.15	2023-08-01T00:00:00	24	A	N	N	N	6
476	Macomb County	Metro	6385	""	WOLCOTT ROAD	N BRANCH CLINTON RIVER	0.4 MI NORTH OF 29 MILE	1 Highway	5 Waterway	2014				2	100	33	2	5 Prestressed Concrete	06 Box Bms- Single/Sprd	0	""	""	5 Epoxy Overlay	B Greater than HL 93	2		42.77	-82.92679	2025-08-18T00:00:00	POINT (-82.92679 42.77)	Macomb	NBI	Non-NHS	3300	30	817008	1.39	2025-04-18T00:00:00	24	A	8	8	7	N
477	Macomb County	Metro	6215	""	26 MILE ROAD	HEALY BROOK DRAIN	0.5MILE W OF ROMEO PLANK	1 Highway	5 Waterway	1993				1	57.7	47.2	1	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	9 MS22.5(HS25)or greater	2		42.72	-82.96707	2025-08-18T00:00:00	POINT (-82.96707 42.72)	Macomb	NBI	Non-NHS	2723.44	42.7	816702	6.35	2025-06-17T00:00:00	24	A	7	7	7	N
478	Detroit	Metro	12456	""	RIVERSIDE AVE	CANAL	CANAL AT RIVERSIDE AVE	1 Highway	5 Waterway	2001				1	41	39	1	1 Concrete	19 Culvert	0	""	""	0 None	5 MS 18 (HS 20)	2		42.36	-82.932556	2025-08-18T00:00:00	POINT (-82.932556 42.36)	Detroit	NBI	Non-NHS	1599	27.9	1714603	0.14	2023-12-13T00:00:00	24	A	N	N	N	8
479	MDOT	Metro	11868	82252-S33	DAVISON RAMP(M-8)	I-75	IN DETROIT OVER I-75 RAMP	7 3d level interchg	1 Highway	1969		2003	2003	6	658.5	28.2	6	4 Steel Continuous	82 Pl Girder Comp	0	""	""	5 Epoxy Overlay	6 MS18(HS20)+mod	1	10	42.41	-83.07957	2025-08-18T00:00:00	POINT (-83.07957 42.41)	Detroit	NBI	NHS	18569.7	24.6	1585810	0.05	2025-05-30T00:00:00	24	A	7	7	7	N
480	Wayne County	Metro	12152	""	MERRIMAN ROAD	E N HINES DRIVE	WESTLAND         N/WARREN	5 Highway-pedestrian	1 Highway	2024				1	73.8	62.8	1	5 Prestressed Concrete	06 Box Bms- Single/Sprd	0	""	""	1 Monolithic Concrete	B Greater than HL 93	4	2	42.34	-83.350136	2025-08-18T00:00:00	POINT (-83.350136 42.34)	Taylor	NBI	NHS	4634.64	48	4700000	8.58	2025-01-30T00:00:00	24	A	9	9	8	N
481	Oakland County	Metro	8177	""	LONG LAKE RD	GIBSON DRAIN	BET JOHN R AND DEQUINDRE	1 Highway	5 Waterway	2004				1	26.3	38.1	1	1 Concrete	19 Culvert	0	""	""	1 Monolithic Concrete	9 MS22.5(HS25)or greater	5		42.59	-83.10802	2025-08-18T00:00:00	POINT (-83.10802 42.59)	Oakland	NBI	NHS	1002.03	60	641102	13.35	2024-08-23T00:00:00	24	A	N	N	N	6
482	MDOT	Metro	8085	63174-S18-5	I-75 BL RMP EN TOP	I-75 SB & I-75BL	9.5 MI E OF PONTIAC	7 3d level interchg	1 Highway	2017				4	469.3	47.3	4	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	B Greater than HL 93	2	5	42.61	-83.2328	2025-08-18T00:00:00	POINT (-83.2328 42.61)	Oakland	NBI	NHS	22197.89	44	4400017	0.34	2023-10-25T00:00:00	24	A	7	8	8	N
483	Southfield	Metro	8297	""	ELEVEN MILE RD	RIVER ROUGE	E OF TELEGRAPH RD	5 Highway-pedestrian	5 Waterway	2004				1	103.2	53.9	1	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	9 MS22.5(HS25)or greater	2		42.49	-83.27653	2025-08-18T00:00:00	POINT (-83.27653 42.49)	Oakland	NBI	Non-NHS	5562.48	41	4400088	0.74	2023-09-20T00:00:00	24	A	7	9	7	N
484	MDOT	Metro	11427	82112-S02	W GRAND BOULEVARD	M-10	IN DETROIT	5 Highway-pedestrian	1 Highway	1950	1995		1995	2	111.5	160.1	2	4 Steel Continuous	02 Multi Str Non Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	9	6	42.37	-83.08167	2025-08-18T00:00:00	POINT (-83.08167 42.37)	Detroit	NBI	Non-NHS	17851.15	99.8	1577308	3.34	2025-04-11T00:00:00	24	A	5	6	6	N
485	MDOT	Metro	11178	82023-S10	30TH ST	I-94	IN DETROIT	5 Highway-pedestrian	1 Highway	1951	1996		1997	4	178.1	67.6	4	3 Steel	02 Multi Str Non Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	4	6	42.34	-83.11512	2025-08-18T00:00:00	POINT (-83.11512 42.34)	Detroit	NBI	Non-NHS	12039.56	44	1577302	0.49	2024-06-07T00:00:00	24	A	6	6	5	N
486	MDOT	Metro	8082	63174-S16-2	I-75 SB	ADAMS RD	IN TROY (OVER ADAMS RD)	1 Highway	1 Highway	2017				3	153.2	92	3	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	B Greater than HL 93	5	4	42.61	-83.20854	2025-08-18T00:00:00	POINT (-83.20854 42.61)	Oakland	NBI	NHS	14094.4	88.7	646106	15.29	2023-12-08T00:00:00	24	A	8	8	8	N
487	MDOT	Metro	11454	82112-S27-4	OUTER DRIVE WB	M-10	IN DETROIT	5 Highway-pedestrian	1 Highway	1964	2006		2006	2	110	78.4	2	3 Steel	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	5	6	42.42	-83.17625	2025-08-18T00:00:00	POINT (-83.17625 42.42)	Detroit	NBI	Non-NHS	8624	66	4704567	2.75	2024-08-27T00:00:00	24	A	6	6	7	N
488	MDOT	Metro	11656	82191-S14-1	I-75 NB	EUREKA RD	IN TAYLOR OVER EUREKA RD	1 Highway	1 Highway	1966	2019		2019	4	229.8	81.3	4	3 Steel	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	6 MS18(HS20)+mod	4	8	42.2	-83.23916	2025-08-18T00:00:00	POINT (-83.23916 42.2)	Taylor	NBI	NHS	18682.74	78	1592010	9.17	2025-07-08T00:00:00	24	A	7	7	7	N
489	MDOT	Metro	11257	82025-S12	WHITTIER RD	I-94	IN DETROIT	5 Highway-pedestrian	1 Highway	1959	2000		2000	4	168.5	65.9	4	3 Steel	02 Multi Str Non Comp	0	""	""	5 Epoxy Overlay	5 MS 18 (HS 20)	4	6	42.41	-82.943214	2025-08-18T00:00:00	POINT (-82.943214 42.41)	Detroit	NBI	Non-NHS	11104.15	44	1635202	2.76	2024-06-17T00:00:00	24	A	6	6	7	N
490	MDOT	Metro	11433	82112-S08	CHICAGO BLVD	M-10	IN DETROIT	5 Highway-pedestrian	1 Highway	1955	1994		2006	4	224.8	117.8	4	4 Steel Continuous	02 Multi Str Non Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	6	6	42.38	-83.09465	2025-08-18T00:00:00	POINT (-83.09465 42.38)	Detroit	NBI	Non-NHS	26481.44	66	4705652	1.5	2025-04-11T00:00:00	24	A	6	5	5	N
491	Macomb County	Metro	14319	""	34 MILE RD	HIGHBANK CREEK	1200' E OF ARMADA RIDGE	1 Highway	5 Waterway	2025				1	27.2	32	1	1 Concrete	19 Culvert	0	""	""	N N/A (no deck (NBI))	B Greater than HL 93	2		42.84	-82.8235	2025-08-18T00:00:00	POINT (-82.8235 42.84)	Macomb	NBI	Non-NHS	870.4	32	817609	0.25	2025-06-25T00:00:00	24	A	N	N	N	9
492	MDOT	Metro	6183	50112-S02	M-19 NEW HAVEN RD	I-94	@ M-19	1 Highway	1 Highway	1963		2002	2002	4	215.8	37.4	4	3 Steel	32 Multi Str Comp	0	""	""	5 Epoxy Overlay	5 MS 18 (HS 20)	2	4	42.71	-82.77366	2025-08-18T00:00:00	POINT (-82.77366 42.71)	Macomb	NBI	Non-NHS	8070.92	30	814905	2.81	2024-05-15T00:00:00	24	A	6	7	6	N
493	MDOT	Metro	7975	63103-S14	DEQUINDRE LFT TRN	I-696	IN MADISON HEIGHTS	1 Highway	1 Highway	1972		2002	2002	2	172	23.6	2	3 Steel	32 Multi Str Comp	0	""	""	3 Latex Concrete/Similar	5 MS 18 (HS 20)	1	8	42.48	-83.08598	2025-08-18T00:00:00	POINT (-83.08598 42.48)	Oakland	NBI	Non-NHS	4059.2	18.7	1813204	0.01	2025-07-18T00:00:00	24	A	5	6	6	N
494	MDOT	Metro	11964	82293-S01	WARREN RD	I-275	3 MI SE OF PLYMOUTH	1 Highway	1 Highway	1972	2012		2012	4	325.8	69.2	4	3 Steel	82 Pl Girder Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	2	6	42.33	-83.44295	2025-08-18T00:00:00	POINT (-83.44295 42.33)	Taylor	NBI	Non-NHS	22545.36	52	4710470	5.37	2024-10-11T00:00:00	24	A	7	8	7	N
495	Wayne County	Metro	12165	""	INKSTER ROAD	BLAKELY DRAIN	BROWNSTOWN/HURON S/PENNSL	1 Highway	5 Waterway	1940	1970		1970	1	24	41	1	1 Concrete	04 Tee Beam	0	""	""	6 Bituminous	0 Unknown	2		42.18	-83.305984	2025-08-18T00:00:00	POINT (-83.305984 42.18)	Taylor	NBI	Non-NHS	984	38.1	1674404	5.03	2025-05-27T00:00:00	12	A	4	4	5	N
496	MDOT	Metro	11311	82062-S01-3	US-12 EB	US-24	IN DEARBORN OVER US-24	5 Highway-pedestrian	1 Highway	1937	1983		1983	2	95.2	63	2	3 Steel	02 Multi Str Non Comp	0	""	""	5 Epoxy Overlay	4 M 18 (H 20)	4	4	42.3	-83.27161	2025-08-18T00:00:00	POINT (-83.27161 42.3)	Taylor	NBI	NHS	5997.6	54.2	1600206	14.71	2024-12-30T00:00:00	24	A	6	7	6	N
497	Macomb County	Metro	6392	""	34 MILE ROAD	HIGHBANK CREEK	0.9 MI EAST OF OMO ROAD	1 Highway	5 Waterway	1997				1	24.9	39	1	1 Concrete	19 Culvert	0	""	""	8 Gravel	5 MS 18 (HS 20)	2		42.84	-82.839165	2025-08-18T00:00:00	POINT (-82.839165 42.84)	Macomb	NBI	Non-NHS	971.1	0	818502	0.67	2024-06-07T00:00:00	24	A	N	N	N	7
498	Oakland County	Metro	8192	""	TIENKEN RD	STONY CREEK	EAST OF SHELDON	1 Highway	5 Waterway	2010				1	52	28.9	1	1 Concrete	19 Culvert	0	""	""	6 Bituminous	B Greater than HL 93	2		42.7	-83.1166	2025-08-18T00:00:00	POINT (-83.1166 42.7)	Oakland	NBI	Non-NHS	1502.8	27.9	626010	5.4	2024-09-26T00:00:00	24	A	N	N	N	6
499	MDOT	Metro	11734	82194-S06	I-75	FORT ST	IN DETROIT	1 Highway	1 Highway	1967	2018		2018	10	821.7	132	10	3 Steel	82 Pl Girder Comp	0	""	""	1 Monolithic Concrete	6 MS18(HS20)+mod	8	6	42.3	-83.12338	2025-08-18T00:00:00	POINT (-83.12338 42.3)	Detroit	NBI	NHS	108464.4	125.1	1592010	18.45	2024-05-30T00:00:00	24	A	7	6	7	N
500	MDOT	Metro	11614	82125-S05	SIX MILE RD	I-96	IN LIVONIA	5 Highway-pedestrian	1 Highway	1974			1998	4	307	78.4	4	3 Steel	02 Multi Str Non Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	4	10	42.41	-83.423485	2025-08-18T00:00:00	POINT (-83.423485 42.41)	Taylor	NBI	NHS	24068.8	55	1680701	6.49	2024-10-21T00:00:00	24	A	6	5	6	N
501	Southfield	Metro	8294	""	BEECH RD	ROUGE RIVER	IN SOUTHFIELD	1 Highway	5 Waterway	2012				1	71.8	49.1	1	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	B Greater than HL 93	2		42.45	-83.29765	2025-08-18T00:00:00	POINT (-83.29765 42.45)	Oakland	NBI	Non-NHS	3525.38	40	684801	0.37	2023-09-19T00:00:00	24	A	8	9	8	N
502	Wayne County	Metro	12130	""	HAGGERTY ROAD	BELLEVILLE LAKE	VAN BUREN          S/I-94	1 Highway	5 Waterway	1964	1975			1	20	66	1	1 Concrete	01 Slab	0	""	""	N N/A (no deck (NBI))	0 Unknown	5		42.22	-83.43969	2025-08-18T00:00:00	POINT (-83.43969 42.22)	Taylor	NBI	Non-NHS	1320	63	4706524	0.48	2025-06-17T00:00:00	24	A	6	6	5	N
503	MDOT	Metro	11729	82194-S01	CICOTTE AVE	I-75	IN LINCOLN PARK	5 Highway-pedestrian	1 Highway	1966	2002		2001	4	190.2	42.3	4	5 Prestressed Concrete	06 Box Bms- Single/Sprd	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	2	6	42.26	-83.179535	2025-08-18T00:00:00	POINT (-83.179535 42.26)	Taylor	NBI	Non-NHS	8045.46	27.9	1592410	1.26	2025-06-12T00:00:00	24	A	7	7	7	N
504	Dearborn Height	Metro	12332	""	WEST SRV DR SOFLD	ECORSE CREEK	IN DEARBORN HEIGHTS	1 Highway	5 Waterway	1962		1986		1	32.8	36.1	1	3 Steel	02 Multi Str Non Comp	0	""	""	1 Monolithic Concrete	6 MS18(HS20)+mod	2		42.27	-83.22089	2025-08-18T00:00:00	POINT (-83.22089 42.27)	Taylor	NBI	Non-NHS	1184.08	24	1595505	0.41	2023-10-24T00:00:00	24	A	5	7	6	N
505	MDOT	Metro	11924	82292-B07	I-275 SB ON RAMP	MCCLAUGHREY DRAIN	1 MI SW OF WAYNE	1 Highway	5 Waterway	1974	2012	2012		1	54	29.2	1	3 Steel	32 Multi Str Comp	0	""	""	3 Latex Concrete/Similar	9 MS22.5(HS25)or greater	1		42.25	-83.44318	2025-08-18T00:00:00	POINT (-83.44318 42.25)	Taylor	NBI	NHS	1576.8	26	1600507	0.03	2024-10-09T00:00:00	24	A	7	7	7	N
506	MDOT	Metro	7795	63022-R02-4	I-96 WB	CSX RR	IN NOVI	1 Highway	2 Railroad	2008			2008	1	108.3	67.6	1	3 Steel	82 Pl Girder Comp	0	""	""	5 Epoxy Overlay	B Greater than HL 93	3		42.49	-83.48857	2025-08-18T00:00:00	POINT (-83.48857 42.49)	Oakland	NBI	NHS	7321.08	64.3	657304	9.71	2024-11-05T00:00:00	24	A	7	7	8	N
507	Wayne County	Metro	12033	""	DENTON ROAD	BELLEVILLE LK HURON RIVR	BELLEVILLE W/BELLEVILL RD	5 Highway-pedestrian	5 Waterway	1947			1958	3	104	29.2	3	4 Steel Continuous	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	6 MS18(HS20)+mod	2		42.21	-83.49498	2025-08-18T00:00:00	POINT (-83.49498 42.21)	Taylor	NBI	Non-NHS	3036.8	22	1675103	1.57	2024-11-12T00:00:00	12	K	5	6	2	N
508	Macomb County	Metro	6356	""	25 MILE ROAD	MCBRIDE DRAIN	1.5 MI E OF ROMEO PLANK	1 Highway	5 Waterway	1997				1	20.7	24	1	1 Concrete	19 Culvert	0	""	""	6 Bituminous	5 MS 18 (HS 20)	2		42.7	-82.929016	2025-08-18T00:00:00	POINT (-82.929016 42.7)	Macomb	NBI	Non-NHS	496.8	0	4211019	8.45	2023-07-26T00:00:00	24	A	N	N	N	7
509	MDOT	Metro	11871	82252-S37	DAVISON RMP TO 75	DEQUINDRE AVE	IN DETROIT OVER DEQUINDRE	1 Highway	1 Highway	1971		2003	2003	4	351	39.7	4	3 Steel	82 Pl Girder Comp	0	""	""	5 Epoxy Overlay	6 MS18(HS20)+mod	2	4	42.41	-83.0776	2025-08-18T00:00:00	POINT (-83.0776 42.41)	Detroit	NBI	NHS	13934.7	28.2	1586201	0.31	2025-04-18T00:00:00	24	A	7	7	7	N
510	Wayne County	Metro	12282	""	BELL ROAD	SWAN CREEK	HURON     N/WILL CARLETON	1 Highway	5 Waterway	1952				2	28.9	28.9	2	4 Steel Continuous	32 Multi Str Comp	0	""	""	8 Gravel	4 M 18 (H 20)	2		42.1	-83.38656	2025-08-18T00:00:00	POINT (-83.38656 42.1)	Taylor	NBI	Non-NHS	835.21	24	1673901	0.39	2024-08-28T00:00:00	12	A	6	6	4	N
511	MDOT	Metro	11577	82123-S29	WEST CHICAGO AVE	I-96	IN DETROIT	5 Highway-pedestrian	1 Highway	2001				2	174	62.6	2	5 Prestressed Concrete	05 Box Bm/Gird- Multiple	0	""	""	5 Epoxy Overlay	5 MS 18 (HS 20)	3	8	42.37	-83.13976	2025-08-18T00:00:00	POINT (-83.13976 42.37)	Detroit	NBI	Non-NHS	10892.4	51.9	1581803	5.62	2023-08-25T00:00:00	24	A	6	7	7	N
512	Wayne County	Metro	12155	""	MIDDLE BELT ROAD	BLAKELY DRAIN	HURON      S/PENNSYLVANIA	1 Highway	5 Waterway	1922	1972			2	24.9	35.4	2	2 Concrete Continuous	01 Slab	0	""	""	6 Bituminous	0 Unknown	2		42.18	-83.32542	2025-08-18T00:00:00	POINT (-83.32542 42.18)	Taylor	NBI	Non-NHS	881.46	33.1	1674403	4.24	2024-09-18T00:00:00	24	A	5	5	5	N
513	Detroit	Metro	12470	""	HARBOR AVE	CANAL	HARBOR ISLAND	5 Highway-pedestrian	5 Waterway	1984				2	40	37.7	2	5 Prestressed Concrete	05 Box Bm/Gird- Multiple	0	""	""	6 Bituminous	5 MS 18 (HS 20)	2		42.36	-82.93663	2025-08-18T00:00:00	POINT (-82.93663 42.36)	Detroit	NBI	Non-NHS	1508	25.9	1714602	0.02	2023-11-14T00:00:00	24	P	5	4	7	N
514	MDOT	Metro	11684	82192-S06	VILLAGE RD	M-39	0.25 MILES S OF RIVER RD	5 Highway-pedestrian	1 Highway	1964	2001			4	180	58.9	4	4 Steel Continuous	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	9 MS22.5(HS25)or greater	4	6	42.31	-83.2125	2025-08-18T00:00:00	POINT (-83.2125 42.31)	Taylor	NBI	Non-NHS	10602	46.3	1652107	2.22	2023-11-16T00:00:00	24	A	7	7	6	N
515	Macomb County	Metro	6220	""	26 MILE ROAD	KIRKHAM DRAIN	1.3 MI E OF NEW HAVEN RD	1 Highway	5 Waterway	2010				1	22	40	1	1 Concrete	19 Culvert	0	""	""	N N/A (no deck (NBI))	B Greater than HL 93	2		42.72	-82.76798	2025-08-18T00:00:00	POINT (-82.76798 42.72)	Macomb	NBI	Non-NHS	880	40	816702	16.48	2025-04-18T00:00:00	24	A	N	N	N	7
516	MDOT	Metro	11904	82291-S08	I-275 SB	NORTHLINE RD	IN ROMULUS	1 Highway	1 Highway	1974		1998	2009	3	209.9	62.5	3	3 Steel	82 Pl Girder Comp	0	""	""	1 Monolithic Concrete	9 MS22.5(HS25)or greater	3	2	42.21	-83.39314	2025-08-18T00:00:00	POINT (-83.39314 42.21)	Taylor	NBI	NHS	13118.75	59.2	1607610	8.04	2023-09-19T00:00:00	24	A	6	7	7	N
517	Rochester Hills	Metro	8280	""	SHAGBARK ROAD	SARGENT CREEK	0.3 MI N OF WALTON BLVD	5 Highway-pedestrian	5 Waterway	1965	2002			1	26.7	25.9	1	1 Concrete	19 Culvert	0	""	""	6 Bituminous	5 MS 18 (HS 20)	2		42.68	-83.16373	2025-08-18T00:00:00	POINT (-83.16373 42.68)	Oakland	NBI	Non-NHS	691.53	27.9	609101	0.35	2024-11-06T00:00:00	24	A	N	N	N	7
518	Novi	Metro	14274	""	9 MILE ROAD	THORNTON CREEK	0.5 MI W OF NOVI RD	1 Highway	5 Waterway	1970				2	26.6	24	2	3 Steel	19 Culvert	0	""	""	6 Bituminous	0 Unknown	2		42.45	-83.4841	2025-08-18T00:00:00	POINT (-83.4841 42.45)	Oakland	NBI	Non-NHS	638.4	0	633603	0.56	2024-09-30T00:00:00	12	A	N	N	N	4
519	MDOT	Metro	7877	63081-S06	M-39 NB	9 MILE RD	IN SOUTHFIELD	1 Highway	1 Highway	1998				3	133.4	89.6	3	5 Prestressed Concrete	06 Box Bms- Single/Sprd	0	""	""	1 Monolithic Concrete	9 MS22.5(HS25)or greater	5	4	42.46	-83.2196	2025-08-18T00:00:00	POINT (-83.2196 42.46)	Oakland	NBI	NHS	11952.64	84.3	710608	0.31	2024-08-15T00:00:00	24	A	6	7	7	N
520	Macomb County	Metro	6203	""	18 MILE RD	GIBSON DRAIN	0.3 MI EAST OF DEQUINDRE	1 Highway	5 Waterway	1985				1	25.9	42.7	1	1 Concrete	19 Culvert	0	""	""	N N/A (no deck (NBI))	9 MS22.5(HS25)or greater	2		42.59	-83.08235	2025-08-18T00:00:00	POINT (-83.08235 42.59)	Macomb	NBI	NHS	1105.93	0	805207	0.38	2025-06-17T00:00:00	24	A	N	N	N	7
521	MDOT	Metro	6029	50013-S03	26 MI RD	M-53	6.2 MI N OF M-59	1 Highway	1 Highway	2009				2	209	68.8	2	5 Prestressed Concrete	06 Box Bms- Single/Sprd	0	""	""	1 Monolithic Concrete	A HL 93	4	5	42.71	-83.025986	2025-08-18T00:00:00	POINT (-83.025986 42.71)	Macomb	NBI	NHS	14379.2	56	816702	3.32	2023-12-18T00:00:00	24	A	7	8	8	N
522	Oakland County	Metro	8165	""	10 MILE RD	ROUGE RIVER	BET TELEGRAPH AND BEECH	1 Highway	5 Waterway	1995				1	70.9	78.1	1	5 Prestressed Concrete	05 Box Bm/Gird- Multiple	0	""	""	1 Monolithic Concrete	6 MS18(HS20)+mod	2		42.47	-83.288574	2025-08-18T00:00:00	POINT (-83.288574 42.47)	Oakland	NBI	Non-NHS	5537.29	68.9	633409	4.4	2024-07-30T00:00:00	24	P	7	7	7	N
523	MDOT	Metro	11850	82252-S10	M-102 8 MILE RD	I-75	IN DETROIT OVER I-75 SERV	1 Highway	1 Highway	1969		1980	1988	11	1069.6	92.4	11	4 Steel Continuous	82 Pl Girder Comp	0	""	""	3 Latex Concrete/Similar	5 MS 18 (HS 20)	6	14	42.45	-83.094345	2025-08-18T00:00:00	POINT (-83.094345 42.45)	Detroit	NBI	NHS	98831.04	82	1817406	11.51	2024-03-06T00:00:00	24	D	5	6	6	N
524	MDOT	Metro	7913	63102-B01-3	I-696 EB	ROUGE RIVER	IN SOUTHFIELD	1 Highway	5 Waterway	2023				1	162.82	88.25	1	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	B Greater than HL 93	4		42.49	-83.27859	2025-08-18T00:00:00	POINT (-83.27859 42.49)	Oakland	NBI	NHS	14368.87	84.88	710701	8.93	2024-10-15T00:00:00	17	A	9	9	9	N
525	MDOT	Metro	11707	82193-S04	PURITAN AVE	M-39	IN DETROIT	5 Highway-pedestrian	1 Highway	1962	2010		1991	4	154.8	70.2	4	4 Steel Continuous	02 Multi Str Non Comp	0	""	""	1 Monolithic Concrete	6 MS18(HS20)+mod	2	6	42.41	-83.21853	2025-08-18T00:00:00	POINT (-83.21853 42.41)	Detroit	NBI	Non-NHS	10866.96	44	4707953	0.51	2023-08-16T00:00:00	24	A	7	7	7	N
526	MDOT	Metro	14639	82111-Z01-3	M-10 EB	FORD UNDERGROUND GARAGE	@ BATES STREET	1 Highway	0 Other	1955				18	488	106	18	1 Concrete	04 Tee Beam	0	""	""	6 Bituminous	0 Unknown	4		42.33	-83.04344	2025-08-18T00:00:00	POINT (-83.04344 42.33)	Detroit	NBI	NHS	51728	48	1577509	12.68	2025-07-24T00:00:00	24	A	5	5	6	N
527	MDOT	Metro	7803	63022-S07	NOVI RD	I-96	IN NOVI	1 Highway	1 Highway	1979			2008	2	227	103.9	2	3 Steel	82 Pl Girder Comp	0	""	""	5 Epoxy Overlay	9 MS22.5(HS25)or greater	6	8	42.49	-83.47582	2025-08-18T00:00:00	POINT (-83.47582 42.49)	Oakland	NBI	NHS	23585.3	90.8	621910	1.59	2024-11-20T00:00:00	24	A	7	7	7	N
528	MDOT	Metro	11426	82112-S01	MILWAUKEE AVE	M-10	IN DETROIT	5 Highway-pedestrian	1 Highway	1949	1995		1995	2	110.7	69.2	2	4 Steel Continuous	02 Multi Str Non Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	4	6	42.37	-83.080894	2025-08-18T00:00:00	POINT (-83.080894 42.37)	Detroit	NBI	Non-NHS	7660.44	44	1585705	0.3	2025-04-11T00:00:00	24	A	6	6	5	N
529	Novi	Metro	13858	""	9 MILE ROAD	BISHOP CREEK	0.3 MI W OF MEADOWBROOK	5 Highway-pedestrian	5 Waterway	1965				2	29.9	40.5	2	3 Steel	19 Culvert	0	""	""	6 Bituminous	4 M 18 (H 20)	3		42.45	-83.46075	2025-08-18T00:00:00	POINT (-83.46075 42.45)	Oakland	NBI	Non-NHS	1210.95	39.1	633603	4.52	2024-09-30T00:00:00	24	A	N	N	N	6
530	MDOT	Metro	11363	82102-S10	ROBINWOOD DRIVE	M-14	0.3 MI NORTH OF PLYMOUTH	1 Highway	1 Highway	1976			2006	2	181	42.4	2	3 Steel	82 Pl Girder Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	2	6	42.39	-83.455666	2025-08-18T00:00:00	POINT (-83.455666 42.39)	Taylor	NBI	Non-NHS	7674.4	28	1689308	0.2	2023-10-23T00:00:00	24	A	7	7	7	N
531	MDOT	Metro	8134	63192-S04-2	M-5 SB MAINLINE	12 MILE ROAD	I-96,I-696 M-5 INTRCHG	1 Highway	1 Highway	1993				2	208.8	63.3	2	5 Prestressed Concrete	02 Multi Str Non Comp	0	""	""	1 Monolithic Concrete	6 MS18(HS20)+mod	3	4	42.5	-83.446686	2025-08-18T00:00:00	POINT (-83.446686 42.5)	Oakland	NBI	NHS	13217.04	59.7	4402005	4.08	2025-03-07T00:00:00	24	A	6	6	7	N
532	Other Local Agencies	Metro	13366	""	DINGELL RD	PERIMETER RD	950 FT N OF EUREKA RD	1 Highway	1 Highway	1991		2011		1	32	127.8	1	5 Prestressed Concrete	05 Box Bm/Gird- Multiple	0	""	""	1 Monolithic Concrete	9 MS22.5(HS25)or greater	4	2	42.19	-83.36348	2025-08-18T00:00:00	POINT (-83.36348 42.19)	Taylor	NBI	NHS	4089.6	123.4	4711337	0.19	2025-05-28T00:00:00	24	A	6	5	7	N
533	MDOT	Metro	11224	82024-S17	CHENE RAMP TO I-94	E BD E GRAND BLVD	CITY OF DETROIT	1 Highway	1 Highway	1983		1983	1983	3	182.8	29.8	3	3 Steel	82 Pl Girder Comp	0	""	""	3 Latex Concrete/Similar	9 MS22.5(HS25)or greater	2	3	42.37	-83.0489	2025-08-18T00:00:00	POINT (-83.0489 42.37)	Detroit	NBI	NHS	5447.44	25.8	4705754	0.13	2024-04-17T00:00:00	24	A	6	5	7	N
534	MDOT	Metro	11545	82123-R05-5	ON RAMP @ GRNFLD.	LAND	IN DETROIT	1 Highway	0 Other	1973		1993	1993	5	355	36.4	5	3 Steel	32 Multi Str Comp	0	""	""	3 Latex Concrete/Similar	5 MS 18 (HS 20)	2		42.38	-83.1999	2025-08-18T00:00:00	POINT (-83.1999 42.38)	Detroit	NBI	NHS	12922	28.2	1590605	0.02	2025-08-12T00:00:00	24	A	7	7	7	N
535	Wayne County	Metro	12250	""	STREICHER ROAD	SMITH CREEK	BRNTWNW/JEFFERSON	1 Highway	5 Waterway	1937	1975			1	26.9	26.9	1	5 Prestressed Concrete	04 Tee Beam	0	""	""	2 Integral Concrete	5 MS 18 (HS 20)	2		42.06	-83.22446	2025-08-18T00:00:00	POINT (-83.22446 42.06)	Taylor	NBI	Non-NHS	723.61	23.6	1709607	0.72	2024-09-19T00:00:00	12	A	5	6	4	N
536	MDOT	Metro	11114	82022-S04-4	I-94 WB	MERRIMAN RD	1.9 MI W OF TAYLOR	1 Highway	1 Highway	1993				2	144.4	109.8	2	5 Prestressed Concrete	05 Box Bm/Gird- Multiple	0	""	""	5 Epoxy Overlay	9 MS22.5(HS25)or greater	5	6	42.24	-83.34172	2025-08-18T00:00:00	POINT (-83.34172 42.24)	Taylor	NBI	NHS	15855.12	103.7	1588802	10.55	2025-08-06T00:00:00	24	A	6	6	8	N
537	Wayne County	Metro	12054	""	WARREN ROAD	MIDDLE ROUGE RIVER	DBN HTS W/ANN ARBR TRAIL	5 Highway-pedestrian	5 Waterway	2023				1	87.33	80	1	5 Prestressed Concrete	32 Multi Str Comp	0	1 Concrete	01 Slab	1 Monolithic Concrete	A HL 93	5		42.34	-83.263916	2025-08-18T00:00:00	POINT (-83.263916 42.34)	Taylor	NBI	NHS	6986.4	64	4710470	14.87	2025-05-12T00:00:00	24	A	8	8	8	N
538	MDOT	Metro	6034	50013-S12	M-53 NB	24 MILE RD	4.0 MI N OF M-59	1 Highway	1 Highway	1965	2001			3	107.5	45.5	3	5 Prestressed Concrete	06 Box Bms- Single/Sprd	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	2	2	42.68	-83.015976	2025-08-18T00:00:00	POINT (-83.015976 42.68)	Macomb	NBI	NHS	4891.25	42.2	4210208	9.86	2025-07-08T00:00:00	24	A	7	7	7	N
539	MDOT	Metro	8064	63174-S06-1	I-75 NB	M-150 (ROCHESTER RD)	IN TROY	1 Highway	1 Highway	2019				2	188.2	87.5	2	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	B Greater than HL 93	5	7	42.56	-83.12954	2025-08-18T00:00:00	POINT (-83.12954 42.56)	Oakland	NBI	NHS	16467.5	82.5	647308	8.61	2024-09-10T00:00:00	24	A	8	8	8	N
540	MDOT	Metro	13959	63174-S42	SB I-75	NORTH TO WEST RAMP	SQUARE LAKE INTERCHANGE	1 Highway	1 Highway	2017				1	143	75.3	1	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	B Greater than HL 93	4	2	42.61	-83.2335	2025-08-18T00:00:00	POINT (-83.2335 42.61)	Oakland	NBI	NHS	10767.9	72	646106	16.58	2023-10-25T00:00:00	24	A	8	8	8	N
541	Macomb County	Metro	6213	""	26 MILE ROAD	YATES DRAIN	0.2 MI EAST OF M-53	1 Highway	5 Waterway	1972			1972	1	67.9	59.4	1	3 Steel	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	4		42.71	-83.021095	2025-08-18T00:00:00	POINT (-83.021095 42.71)	Macomb	NBI	Non-NHS	4033.26	56.1	816702	3.59	2024-06-14T00:00:00	24	A	6	6	6	N
542	MDOT	Metro	7943	63102-S29-8	MOHAWK AVENUE(UTN)	I-696	IN ROYAL OAK	5 Highway-pedestrian	1 Highway	1984		1984		2	180	29.5	2	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	1	10	42.48	-83.132904	2025-08-18T00:00:00	POINT (-83.132904 42.48)	Oakland	NBI	Non-NHS	5310	21	4413937	0.01	2024-07-17T00:00:00	24	A	7	7	7	N
543	MDOT	Metro	6101	50061-S33-2	SB MOUND RD	I-696	IN THE CITY OF WARREN	6 2d level interchg	1 Highway	1976			2008	2	174.8	81.7	2	3 Steel	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	9 MS22.5(HS25)or greater	3	8	42.49	-83.04598	2025-08-18T00:00:00	POINT (-83.04598 42.49)	Macomb	NBI	NHS	14281.16	79.7	812510	2.75	2025-04-09T00:00:00	24	A	7	7	7	N
544	Gibraltar	Metro	11997	""	GIBRALTAR ROAD	FRANK & POET DRAIN	GIBRALTAR     E/JEFFERSON	5 Highway-pedestrian	5 Waterway	1932				1	27.2	55.8	1	1 Concrete	04 Tee Beam	0	""	""	6 Bituminous	6 MS18(HS20)+mod	4		42.09	-83.20275278	2025-08-18T00:00:00	POINT (-83.20275278 42.09)	Taylor	NBI	Non-NHS	1517.76	40	1692303	4.49	2025-08-05T00:00:00	12	A	4	4	4	N
545	Macomb County	Metro	6188	""	14 MILE ROAD	RED RUN DRAIN	310 FT W OF HOOVER RD	5 Highway-pedestrian	5 Waterway	2009				5	280	73.7	5	5 Prestressed Concrete	06 Box Bms- Single/Sprd	0	""	""	1 Monolithic Concrete	9 MS22.5(HS25)or greater	5		42.54	-83.00607	2025-08-18T00:00:00	POINT (-83.00607 42.54)	Macomb	NBI	NHS	20636	59.1	798407	6.33	2024-07-31T00:00:00	24	A	7	8	7	N
546	MDOT	Metro	11210	82024-S03	M-1 WOODWARD AVE	I-94	IN DETROIT	5 Highway-pedestrian	1 Highway	2014			2014	2	234.7	108.8	2	4 Steel Continuous	82 Pl Girder Comp	0	""	""	1 Monolithic Concrete	B Greater than HL 93	5	13	42.36	-83.0687	2025-08-18T00:00:00	POINT (-83.0687 42.36)	Detroit	NBI	NHS	25535.36	83	1591001	4.15	2023-11-13T00:00:00	24	A	8	8	8	N
547	Macomb County	Metro	6348	""	22 MILE ROAD	SALT SLANG GLOEDE DRAIN	0.8 MI EAST OF HAYES ROAD	1 Highway	5 Waterway	2021				1	22.8	40	1	1 Concrete	19 Culvert	0	""	""	6 Bituminous	B Greater than HL 93	2		42.66	-82.96044	2025-08-18T00:00:00	POINT (-82.96044 42.66)	Macomb	NBI	Non-NHS	912	40	807104	5.86	2023-11-16T00:00:00	24	A	N	N	N	8
548	MDOT	Metro	6062	50023-S06	SB MOUND RD	M-59	0.5 MI. WEST OF UTICA	1 Highway	1 Highway	1994				2	130	52.5	2	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	9 MS22.5(HS25)or greater	3	6	42.62	-83.05231	2025-08-18T00:00:00	POINT (-83.05231 42.62)	Macomb	NBI	NHS	6825	44	812510	12.21	2023-11-30T00:00:00	24	A	7	7	7	N
549	MDOT	Metro	11733	82194-S05	I-75	M-85 (FORT ST)	IN DETROIT	1 Highway	1 Highway	1967	2002		2002	4	297.4	153.5	2	4 Steel Continuous	82 Pl Girder Comp	2	3 Steel	82 Pl Girder Comp	1 Monolithic Concrete	9 MS22.5(HS25)or greater	9	8	42.28	-83.15341	2025-08-18T00:00:00	POINT (-83.15341 42.28)	Detroit	NBI	NHS	45650.9	147	1592010	16.37	2025-06-12T00:00:00	24	A	6	8	7	N
550	Oakland County	Metro	13815	""	DARTMOUTH ROAD	PAINT CREEK	SECT 35/36 BRANDON TWP	1 Highway	5 Waterway	2000				2	21.5	25	2	3 Steel	19 Culvert	0	""	""	8 Gravel	5 MS 18 (HS 20)	2		42.81	-83.353386	2025-08-18T00:00:00	POINT (-83.353386 42.81)	Oakland	NBI	Non-NHS	537.5	29	653806	1.93	2024-07-23T00:00:00	24	A	N	N	N	5
551	MDOT	Metro	6159	50111-S16	12 MI RD N INTERCH	I-94	W LTS OF ST CLAIR SHORES	1 Highway	1 Highway	1967	2002		1997	4	194.7	28.6	4	3 Steel	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	6 MS18(HS20)+mod	1	6	42.51	-82.91825	2025-08-18T00:00:00	POINT (-82.91825 42.51)	Macomb	NBI	Non-NHS	5568.42	24.9	1803406	0.02	2025-06-25T00:00:00	24	A	7	6	6	N
552	MDOT	Metro	7926	63102-S10	E B 11 MILE SER RO	I-696	IN SOUTHFIELD	1 Highway	1 Highway	1987	2009		2009	2	285.7	40	2	4 Steel Continuous	82 Pl Girder Comp	0	""	""	1 Monolithic Concrete	9 MS22.5(HS25)or greater	2	6	42.49	-83.212524	2025-08-18T00:00:00	POINT (-83.212524 42.49)	Oakland	NBI	Non-NHS	11428	29.2	1903708	0	2024-07-23T00:00:00	24	A	6	8	5	N
553	MDOT	Metro	11142	82022-S36	WYOMING AVE	I-94	W LTS OF DETROIT	5 Highway-pedestrian	1 Highway	1949	1995		1995	4	183.5	87.8	4	3 Steel	02 Multi Str Non Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	6	6	42.33	-83.15668	2025-08-18T00:00:00	POINT (-83.15668 42.33)	Detroit	NBI	NHS	16111.3	60	4706472	0.06	2023-09-26T00:00:00	24	A	6	6	6	N
554	MDOT	Metro	12810	82251-S07-6	BRUSH ST ENTR RMP	I-75 SB TO EB RAMP	I-75 & I-375 INTERCHANGE	1 Highway	1 Highway	1970	1998		1998	1	28.9	27.9	1	3 Steel	02 Multi Str Non Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	1	1	42.34	-83.04608	2025-08-18T00:00:00	POINT (-83.04608 42.34)	Detroit	NBI	NHS	806.31	23.6	1591206	0.09	2024-03-06T00:00:00	24	A	7	7	7	N
555	Southfield	Metro	8300	""	BERG ROAD	EVANS BRANCH ROUGE RIVER	IN SOUTHFIELD	1 Highway	5 Waterway	1970		2022	2022	1	40	37.5	1	3 Steel	32 Multi Str Comp	0	""	""	3 Latex Concrete/Similar	6 MS18(HS20)+mod	2		42.44	-83.26875	2025-08-18T00:00:00	POINT (-83.26875 42.44)	Oakland	NBI	Non-NHS	1500	33	4410215	0.04	2023-09-19T00:00:00	24	A	6	6	6	N
556	Pontiac	Metro	13766	""	WATER STREET	CLINTON RIVER	W OF WOODWARD	1 Highway	5 Waterway	1963				2	24	43	2	1 Concrete	19 Culvert	0	""	""	N N/A (no deck (NBI))	0 Unknown	2		42.64	-83.28928	2025-08-18T00:00:00	POINT (-83.28928 42.64)	Oakland	NBI	Non-NHS	1032		676009	0.02	2024-06-28T00:00:00	24	A	N	N	N	6
557	MDOT	Metro	12666	82102-S07-4	RAMP A (WB)	M-14	0.9 MI W OF PLYMOUTH	1 Highway	1 Highway	1976			2006	4	220	29.3	4	3 Steel	82 Pl Girder Comp	0	""	""	1 Monolithic Concrete	9 MS22.5(HS25)or greater	2	6	42.39	-83.47541	2025-08-18T00:00:00	POINT (-83.47541 42.39)	Taylor	NBI	NHS	6446	26.5	1778206	0.43	2023-10-23T00:00:00	24	A	6	7	6	N
558	MDOT	Metro	11276	82052-B01	US-24	BLAKLEY DRAIN	IN TAYLOR	1 Highway	5 Waterway	1986		1986		1	28	82.7	1	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	3 Latex Concrete/Similar	9 MS22.5(HS25)or greater	4		42.19	-83.26728	2025-08-18T00:00:00	POINT (-83.26728 42.19)	Taylor	NBI	NHS	2315.6	79.1	4700038	6.61	2024-08-08T00:00:00	24	A	7	8	6	N
559	Oakland County	Metro	8146	""	FRANKLIN	ROUGE RIVER	NORTH OF FOURTEEN MILE	1 Highway	5 Waterway	1959				2	29.9	24	2	3 Steel	19 Culvert	0	""	""	6 Bituminous	6 MS18(HS20)+mod	2		42.53	-83.305176	2025-08-18T00:00:00	POINT (-83.305176 42.53)	Oakland	NBI	Non-NHS	717.6	36	4400056	2.06	2024-08-23T00:00:00	12	P	N	N	N	3
560	Wayne County	Metro	11985	""	OAKVILLE-WALTZ RD	SWAN CREEK	HURON/MONROE CO  W/I-275	1 Highway	5 Waterway	1927	1958	2016	1976	1	34.8	34.8	1	3 Steel	32 Multi Str Comp	0	""	""	6 Bituminous	5 MS 18 (HS 20)	2		42.09	-83.38392	2025-08-18T00:00:00	POINT (-83.38392 42.09)	Taylor	NBI	Non-NHS	1211.04	29.9	1228108	1.89	2024-08-15T00:00:00	24	A	7	7	5	N
561	MDOT	Metro	11856	82252-S14	CARPENTER AVE	I-75	IN HAMTRAMCK	5 Highway-pedestrian	1 Highway	1969	2003		1988	2	203.2	40.4	2	3 Steel	82 Pl Girder Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	2	10	42.4	-83.0724	2025-08-18T00:00:00	POINT (-83.0724 42.4)	Detroit	NBI	Non-NHS	8209.28	28.5	1585803	0.02	2024-04-09T00:00:00	24	A	7	6	7	N
562	Macomb County	Metro	6401	""	SCHOENHERR RD	MIDDLE BR CLINTON RIVER	0.1 MI NORTH OF 25 MILE	1 Highway	5 Waterway	1969				1	53.8	34.1	1	5 Prestressed Concrete	05 Box Bm/Gird- Multiple	0	""	""	6 Bituminous	5 MS 18 (HS 20)	2		42.7	-82.9956	2025-08-18T00:00:00	POINT (-82.9956 42.7)	Macomb	NBI	Non-NHS	1834.58	29.9	820804	7.75	2024-06-14T00:00:00	24	A	6	7	7	N
563	Macomb County	Metro	6333	""	29 MILE ROAD	DEER CREEK	0.2 MI EAST OF BATES ROAD	1 Highway	5 Waterway	2003				1	45	43.9	1	5 Prestressed Concrete	05 Box Bm/Gird- Multiple	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	2		42.76	-82.818344	2025-08-18T00:00:00	POINT (-82.818344 42.76)	Macomb	NBI	Non-NHS	1975.5	42	815710	12.19	2023-07-28T00:00:00	24	A	7	8	8	N
564	MDOT	Metro	6012	50011-S04	CLINTON RIVER RD	M-53	1.2 MI S OF M-59	1 Highway	1 Highway	1966	2024	2001	2001	5	317.5	35.4	5	3 Steel	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	2 M 13.5 (H 15)	2	4	42.61	-83.01616	2025-08-18T00:00:00	POINT (-83.01616 42.61)	Macomb	NBI	Non-NHS	11239.5	28	820606	1.41	2024-11-27T00:00:00	16	A	9	7	7	N
565	MDOT	Metro	11153	82022-S50-6	I-94 WB RAMP H	M-39	RAMP TO PELHAM RD	1 Highway	1 Highway	1985				4	274.5	40	4	5 Prestressed Concrete	02 Multi Str Non Comp	0	""	""	5 Epoxy Overlay	9 MS22.5(HS25)or greater	1	6	42.27	-83.22394	2025-08-18T00:00:00	POINT (-83.22394 42.27)	Taylor	NBI	NHS	10980	35.8	1869510	0.02	2024-11-19T00:00:00	24	A	7	7	7	N
566	MDOT	Metro	11392	82111-S03	LARNED ST	I-375	IN DETROIT	5 Highway-pedestrian	1 Highway	1960		1986	2005	4	166.3	114	4	3 Steel	32 Multi Str Comp	0	""	""	3 Latex Concrete/Similar	6 MS18(HS20)+mod	5	4	42.33	-83.036156	2025-08-18T00:00:00	POINT (-83.036156 42.33)	Detroit	NBI	NHS	18958.2	90	1585504	0.84	2025-06-24T00:00:00	12	A	4	5	4	N
567	MDOT	Metro	6164	50111-S22	I-94	14 MILE RD	N LTS ST CLAIR SHORES	1 Highway	1 Highway	1964	2002	1980	2002	3	191.9	126.3	3	3 Steel	32 Multi Str Comp	0	""	""	3 Latex Concrete/Similar	6 MS18(HS20)+mod	6	2	42.54	-82.88594	2025-08-18T00:00:00	POINT (-82.88594 42.54)	Macomb	NBI	NHS	24236.97	119.6	798501	7.3	2025-06-07T00:00:00	24	A	7	5	5	N
568	MDOT	Metro	11473	82121-B01	M-5 EB	ROUGE RIVER	IN DETROIT	5 Highway-pedestrian	5 Waterway	2003				1	102.2	60.5	1	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	9 MS22.5(HS25)or greater	4		42.42	-83.26805	2025-08-18T00:00:00	POINT (-83.26805 42.42)	Detroit	NBI	NHS	6183.1	52.2	1600604	3.1	2024-11-15T00:00:00	24	A	7	8	8	N
569	Wayne County	Metro	12114	""	SHELDON ROAD	JOHNSON DRAIN	NORTHVILLE S/E N HINES DR	1 Highway	5 Waterway	1933		1996		2	38.7	35.8	2	1 Concrete	19 Culvert	0	""	""	N N/A (no deck (NBI))	4 M 18 (H 20)	2		42.43	-83.48259	2025-08-18T00:00:00	POINT (-83.48259 42.43)	Taylor	NBI	NHS	1385.46	40	5495471	5.57	2025-06-05T00:00:00	24	A	N	N	N	6
570	MDOT	Metro	11667	82191-S23-2	I-75 SB	M-39	IN LINCOLN PARK	1 Highway	1 Highway	1966	2002		2002	2	204.3	73.5	2	4 Steel Continuous	82 Pl Girder Comp	0	""	""	1 Monolithic Concrete	9 MS22.5(HS25)or greater	4	8	42.25	-83.18523	2025-08-18T00:00:00	POINT (-83.18523 42.25)	Taylor	NBI	NHS	15016.05	70.2	1595106	13.93	2024-05-15T00:00:00	24	A	7	7	7	N
571	Macomb County	Metro	6254	""	SCHOENHERR RD SBD	CLINTON RIVER	0.6 MI NORTH OF UTICA RD	5 Highway-pedestrian	5 Waterway	1992				2	159.8	38.7	2	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	9 MS22.5(HS25)or greater	2		42.59	-82.992905	2025-08-18T00:00:00	POINT (-82.992905 42.59)	Macomb	NBI	NHS	6184.26	29.5	1922901	3.49	2025-05-14T00:00:00	24	A	7	7	7	N
572	MDOT	Metro	8017	63172-S12-2	I-75 SB	CLINTONVILLE RD	4.1 MI SE OF M-15	1 Highway	1 Highway	1962	1988	1983	1988	3	162	62	3	3 Steel	02 Multi Str Non Comp	0	""	""	5 Epoxy Overlay	5 MS 18 (HS 20)	3	2	42.72	-83.3493	2025-08-18T00:00:00	POINT (-83.3493 42.72)	Oakland	NBI	NHS	10044	58.9	646106	27.88	2025-03-14T00:00:00	24	A	6	6	7	N
573	MDOT	Metro	6080	50061-S08	RAMP G AT MOUND RD	I-696	CITY OF WARREN	1 Highway	1 Highway	1975				15	1344.4	44.5	15	4 Steel Continuous	82 Pl Girder Comp	0	""	""	1 Monolithic Concrete	9 MS22.5(HS25)or greater	2	22	42.49	-83.04375	2025-08-18T00:00:00	POINT (-83.04375 42.49)	Macomb	NBI	NHS	59825.8	40.9	1740506	0.17	2025-04-09T00:00:00	24	A	5	7	7	N
574	MDOT	Metro	11593	82123-S45	I94WB RAMP TO I96E	I-94	IN DETROIT	1 Highway	1 Highway	1971	2005		2005	4	210.6	31.2	4	3 Steel	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	6 MS18(HS20)+mod	1	8	42.35	-83.099815	2025-08-18T00:00:00	POINT (-83.099815 42.35)	Detroit	NBI	NHS	6570.72	27.9	1577402	0.16	2023-10-24T00:00:00	24	A	7	7	7	N
575	MDOT	Metro	11674	82192-B02-5	M-39 NB SERV RD	ROUGE RIVER	IN DEARBORN	5 Highway-pedestrian	5 Waterway	1963		2020	1997	5	340	39.5	5	4 Steel Continuous	32 Multi Str Comp	0	""	""	6 Bituminous	6 MS18(HS20)+mod	2		42.31	-83.21414	2025-08-18T00:00:00	POINT (-83.21414 42.31)	Taylor	NBI	NHS	13430	30	1651008	2.83	2023-10-04T00:00:00	24	A	5	6	7	N
576	MDOT	Metro	11952	82292-S11	I-275 NB	MICHIGAN AVE(US-12)	3/4 MI W OF WAYNE  C LTS	1 Highway	1 Highway	1974			2012	2	269	63.7	2	3 Steel	02 Multi Str Non Comp	0	""	""	5 Epoxy Overlay	9 MS22.5(HS25)or greater	4	9	42.28	-83.44122	2025-08-18T00:00:00	POINT (-83.44122 42.28)	Taylor	NBI	NHS	17135.3	60.5	1607208	14.34	2024-10-29T00:00:00	24	A	7	7	7	N
577	MDOT	Metro	7999	63172-S01-1	I-75 NB	M-59	@ (M-59) E OF PONTIAC	1 Highway	1 Highway	1963		2019	1963	4	230.8	75.5	4	3 Steel	82 Pl Girder Comp	0	""	""	3 Latex Concrete/Similar	6 MS18(HS20)+mod	3	8	42.64	-83.23824	2025-08-18T00:00:00	POINT (-83.23824 42.64)	Oakland	NBI	NHS	17425.4	72.2	647308	18.58	2025-07-10T00:00:00	24	A	5	7	6	N
578	MDOT	Metro	11880	82271-R01-2	US-24-I-75 CONN SB	CONRAIL	IN TAYLOR	1 Highway	2 Railroad	1963	2001		2001	3	181.9	43.3	3	3 Steel	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	6 MS18(HS20)+mod	2		42.19	-83.254105	2025-08-18T00:00:00	POINT (-83.254105 42.19)	Taylor	NBI	NHS	7876.27	40	1578409	0.7	2023-11-16T00:00:00	24	A	7	5	5	N
579	MDOT	Metro	11906	82291-S10	W HURON RIVER DR	I-275	IN ROMULUS	5 Highway-pedestrian	1 Highway	1974			2009	4	401.8	66.4	4	3 Steel	82 Pl Girder Comp	0	""	""	5 Epoxy Overlay	5 MS 18 (HS 20)	4	7	42.22	-83.409676	2025-08-18T00:00:00	POINT (-83.409676 42.22)	Taylor	NBI	Non-NHS	26679.52	52	4705582	4.17	2023-09-26T00:00:00	24	A	6	7	7	N
580	MDOT	Metro	11348	82101-S01	HINES DRIVE	OLD M-14 (ANN ARBOR RD)	IN LIVONIA	5 Highway-pedestrian	1 Highway	1948		1982	1948	1	72.7	65.9	1	1 Concrete	07 Frame- Rigid exc Culv	0	""	""	3 Latex Concrete/Similar	5 MS 18 (HS 20)	4	2	42.37	-83.40827	2025-08-18T00:00:00	POINT (-83.40827 42.37)	Taylor	NBI	NHS	4790.93	47.9	1689409	4.66	2025-04-11T00:00:00	12	K	3	4	5	N
581	MDOT	Metro	11643	82191-S02	WOODRUFF RD	I-75 & M-85	0.8 MI N OF MONROE COL	5 Highway-pedestrian	1 Highway	2008				4	344.8	53.6	4	4 Steel Continuous	82 Pl Girder Comp	0	""	""	1 Monolithic Concrete	A HL 93	2	8	42.08	-83.243256	2025-08-18T00:00:00	POINT (-83.243256 42.08)	Taylor	NBI	Non-NHS	18481.28	46	1694803	1.8	2024-07-12T00:00:00	24	A	7	8	7	N
582	MDOT	Metro	7903	63101-S07	ORCHARD LAKE RD	I-696	4.7 MI E OF I-96	1 Highway	1 Highway	1962	1988	2008		4	236.7	123.2	4	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	5 Epoxy Overlay	5 MS 18 (HS 20)	8	9	42.5	-83.358475	2025-08-18T00:00:00	POINT (-83.358475 42.5)	Oakland	NBI	NHS	29161.44	112	634003	2.74	2024-03-28T00:00:00	24	A	6	6	6	N
583	Birmingham	Metro	8230	""	DERBY ST	GRAND TRUNK WESTERN RR	0.9 MI W OF COOLIDGE HWY	5 Highway-pedestrian	2 Railroad	1930	2007			5	165	43	5	1 Concrete	04 Tee Beam	0	""	""	3 Latex Concrete/Similar	0 Unknown	2		42.55	-83.20304	2025-08-18T00:00:00	POINT (-83.20304 42.55)	Oakland	NBI	Non-NHS	7095	29.9	614406	0.17	2024-10-24T00:00:00	24	P	4	4	5	N
584	Wayne County	Metro	12090	""	SIX MILE ROAD	UPPER ROUGE RIVER	REDFORD         E/INKSTER	5 Highway-pedestrian	5 Waterway	2023				1	36	50.8	1	1 Concrete	19 Culvert	0	""	""	4 Low Slump Concrete	B Greater than HL 93	4		42.41	-83.30779	2025-08-18T00:00:00	POINT (-83.30779 42.41)	Taylor	NBI	NHS	1828.8	50.8	1680701	12.43	2025-05-12T00:00:00	24	A	N	N	N	8
585	MDOT	Metro	7963	63103-S02	I-696	N-S SERVICE ROAD	IN CITY OF ROYAL OAK	1 Highway	1 Highway	1982				1	77	163.4	1	5 Prestressed Concrete	02 Multi Str Non Comp	0	""	""	1 Monolithic Concrete	9 MS22.5(HS25)or greater	5	2	42.48	-83.115005	2025-08-18T00:00:00	POINT (-83.115005 42.48)	Oakland	NBI	NHS	12581.8	154.5	1903903	4.42	2025-07-10T00:00:00	24	A	6	7	7	N
586	MDOT	Metro	11508	82122-S20	VIRGIL ST	I-96	IN DETROIT	5 Highway-pedestrian	1 Highway	1970			2003	2	239.1	59.4	2	3 Steel	82 Pl Girder Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	2	11	42.39	-83.27111	2025-08-18T00:00:00	POINT (-83.27111 42.39)	Detroit	NBI	Non-NHS	14202.54	36.7	1580201	0.44	2025-04-22T00:00:00	12	A	4	5	5	N
587	MDOT	Metro	6015	50011-S07	M-59 EB	M-53	M-59 EB OV M-53	1 Highway	1 Highway	1994				2	234	76.1	2	5 Prestressed Concrete	05 Box Bm/Gird- Multiple	0	""	""	5 Epoxy Overlay	9 MS22.5(HS25)or greater	4	6	42.63	-83.01263	2025-08-18T00:00:00	POINT (-83.01263 42.63)	Macomb	NBI	NHS	17807.4	64	820202	1.02	2023-11-13T00:00:00	24	A	7	6	7	N
588	MDOT	Metro	13443	82191-S01-2	I-75 SB	N HURON RIVER DRIVE	IN ROCKWOOD	1 Highway	1 Highway	2008				3	154.3	79.4	3	3 Steel	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	B Greater than HL 93	4	4	42.06	-83.258545	2025-08-18T00:00:00	POINT (-83.258545 42.06)	Taylor	NBI	NHS	12251.42	76	1595106	0.18	2024-07-24T00:00:00	24	A	7	7	8	N
589	Wayne County	Metro	12019	""	PENNSYLVANIA ROAD	BLAKELY DRAIN	BWNSTN/TAYLORE/INKSTER	5 Highway-pedestrian	5 Waterway	1950	1972		1972	1	22	51.8	1	1 Concrete	01 Slab	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	2		42.18	-83.27915	2025-08-18T00:00:00	POINT (-83.27915 42.18)	Taylor	NBI	Non-NHS	1139.6	49.9	1674307	7.04	2024-09-13T00:00:00	24	A	5	5	6	N
590	Oakland County	Metro	8178	""	GENERAL MOTORS RD	HURON RIVER	BET MARTINDALE AND GARNER	1 Highway	5 Waterway	1985				1	64.1	43.8	1	5 Prestressed Concrete	05 Box Bm/Gird- Multiple	0	""	""	1 Monolithic Concrete	6 MS18(HS20)+mod	2		42.58	-83.62663	2025-08-18T00:00:00	POINT (-83.62663 42.58)	Oakland	NBI	Non-NHS	2807.58	40.3	661208	1.64	2024-06-20T00:00:00	24	A	6	7	7	N
591	MDOT	Metro	7876	63081-S05	M-39 NB	M-10	IN SOUTHFIELD	1 Highway	1 Highway	1964	2006		2006	4	272.1	47.2	4	3 Steel	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	3	6	42.46	-83.21941	2025-08-18T00:00:00	POINT (-83.21941 42.46)	Oakland	NBI	NHS	12843.12	44	710703	0.9	2025-06-23T00:00:00	24	A	7	7	7	N
592	Wayne County	Metro	12199	""	JEFFERSON AVENUE	FRANK & POET DRAIN	GIBRALTAR     N/GIBRALTAR	5 Highway-pedestrian	5 Waterway	1936				1	21	58.1	1	1 Concrete	01 Slab	0	""	""	6 Bituminous	6 MS18(HS20)+mod	3		42.1	-83.20318	2025-08-18T00:00:00	POINT (-83.20318 42.1)	Taylor	NBI	Non-NHS	1220.1	52.2	4302169	3.84	2024-09-18T00:00:00	24	A	5	5	5	N
593	MDOT	Metro	6075	50061-S02	EB 11 MI RMP I-696	I-696	IN WARREN	5 Highway-pedestrian	1 Highway	1972			2008	2	261.9	37.9	2	4 Steel Continuous	82 Pl Girder Comp	0	""	""	1 Monolithic Concrete	4 M 18 (H 20)	2	8	42.49	-83.07911	2025-08-18T00:00:00	POINT (-83.07911 42.49)	Macomb	NBI	NHS	9926.01	28.7	805404	0.29	2025-03-25T00:00:00	24	A	5	5	7	N
594	New Haven	Metro	6419	""	CLARK	SALT RIVER	0.15 MI W OF M-19	5 Highway-pedestrian	5 Waterway	2007				1	43	49.9	1	5 Prestressed Concrete	05 Box Bm/Gird- Multiple	0	""	""	1 Monolithic Concrete	9 MS22.5(HS25)or greater	2		42.73	-82.78727	2025-08-18T00:00:00	POINT (-82.78727 42.73)	Macomb	NBI	Non-NHS	2145.7	26.9	822108	3.04	2024-08-22T00:00:00	24	A	8	8	6	N
595	Macomb County	Metro	6315	""	KELLY ROAD	HARRINGTON DRAIN	0.5 MI NORTH OF 15 MILE	1 Highway	5 Waterway	1980	2018			1	32	34.3	1	5 Prestressed Concrete	05 Box Bm/Gird- Multiple	0	""	""	1 Monolithic Concrete	B Greater than HL 93	2		42.56	-82.93165	2025-08-18T00:00:00	POINT (-82.93165 42.56)	Macomb	NBI	Non-NHS	1097.6	31.3	827505	2.6	2024-09-27T00:00:00	24	A	9	9	7	N
596	MDOT	Metro	11773	82195-S16	I-75 N TO M-10 RMP	M-10 TO I-75N RAMP	IN DETROIT	1 Highway	1 Highway	1970	1998		1998	3	191.6	27.9	3	3 Steel	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	1	2	42.34	-83.061325	2025-08-18T00:00:00	POINT (-83.061325 42.34)	Detroit	NBI	NHS	5345.64	24.6	1591110	0.13	2024-11-07T00:00:00	19	A	7	5	4	N
597	Other Local Agencies	Metro	13371	""	MIDFIELD RAMP A	DINGELL RD	0.8 MI N OF EUREKA	1 Highway	1 Highway	2002				3	357.5	63.3	3	4 Steel Continuous	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	4	6	42.2	-83.35794	2025-08-18T00:00:00	POINT (-83.35794 42.2)	Taylor	NBI	Non-NHS	22629.75	60	4711995	0.74	2025-05-28T00:00:00	24	P	5	7	6	N
598	MDOT	Metro	11208	82024-S01	SECOND BLVD	I-94	IN DETROIT	5 Highway-pedestrian	1 Highway	2022			2022	1	254.9	82.3	1	3 Steel	12 Arch- Thru	0	""	""	1 Monolithic Concrete	B Greater than HL 93	2	7	42.36	-83.07243	2025-08-18T00:00:00	POINT (-83.07243 42.36)	Detroit	NBI	Non-NHS	20978.27	36	1577604	0.05	2024-08-12T00:00:00	24	A	9	7	9	N
599	MDOT	Metro	7920	63102-S04	11 MILE ROAD	I-696	0.4 MI EAST OF LASHER	1 Highway	1 Highway	1985			2009	2	368.4	42.7	2	4 Steel Continuous	82 Pl Girder Comp	0	""	""	1 Monolithic Concrete	9 MS22.5(HS25)or greater	2	8	42.49	-83.25258	2025-08-18T00:00:00	POINT (-83.25258 42.49)	Oakland	NBI	Non-NHS	15730.68	31.2	4410282	0.07	2024-07-19T00:00:00	24	A	7	7	7	N
600	Wayne County	Metro	12072	""	E N HINES DRIVE	MIDDLE ROUGE RIVER	WESTLAND       E/MERRIMAN	5 Highway-pedestrian	5 Waterway	1952				3	90.9	66.3	3	2 Concrete Continuous	01 Slab	0	""	""	6 Bituminous	6 MS18(HS20)+mod	2		42.34	-83.34697	2025-08-18T00:00:00	POINT (-83.34697 42.34)	Taylor	NBI	NHS	6026.67	47.9	1689409	8.77	2025-06-11T00:00:00	12	P	4	4	5	N
601	Wayne County	Metro	12264	""	LOTZ ROAD	LOWER ROUGE RIVER	CANTON         N/MICHIGAN	5 Highway-pedestrian	5 Waterway	1952				3	73.8	35.8	3	2 Concrete Continuous	01 Slab	0	""	""	2 Integral Concrete	4 M 18 (H 20)	2		42.28	-83.437096	2025-08-18T00:00:00	POINT (-83.437096 42.28)	Taylor	NBI	Non-NHS	2642.04	24	4705519	0.14	2024-09-04T00:00:00	24	P	5	5	6	N
602	MDOT	Metro	11102	82021-S06	I-94 EB	HANNAN RD	3 MI E OF BELLEVILLE	1 Highway	1 Highway	1972		1972	1992	1	105.7	64.5	1	3 Steel	82 Pl Girder Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	3	2	42.22	-83.42425	2025-08-18T00:00:00	POINT (-83.42425 42.22)	Taylor	NBI	NHS	6817.65	61.2	1576405	6.12	2024-08-09T00:00:00	24	A	6	7	7	N
603	MDOT	Metro	6120	50062-S07	NORTH SERVICE RD	I-696	IN ROSEVILLE	5 Highway-pedestrian	1 Highway	1972	2008		2000	3	249	37.9	3	3 Steel	82 Pl Girder Comp	0	""	""	3 Latex Concrete/Similar	5 MS 18 (HS 20)	2	3	42.5	-82.924095	2025-08-18T00:00:00	POINT (-82.924095 42.5)	Macomb	NBI	Non-NHS	9437.1	29.5	803209	8.44	2025-04-22T00:00:00	24	A	6	6	6	N
604	Northville	Metro	12511	""	RURAL HILL DRIVE	JOHNSON DRAIN	0.1 MI S OF FAIRBROOK ST	1 Highway	5 Waterway	1973				1	33.8	25.9	1	1 Concrete	04 Tee Beam	0	""	""	0 None	5 MS 18 (HS 20)	2		42.43	-83.48894	2025-08-18T00:00:00	POINT (-83.48894 42.43)	Taylor	NBI	Non-NHS	875.42	24	1680220	0.1	2024-04-22T00:00:00	24	A	5	5	6	N
605	MDOT	Metro	11944	82292-S02	TYLER RD.	I-275	3.0 MI NE OF BELLEVILLE	1 Highway	1 Highway	1974	2012	2012	2012	2	292	44	2	3 Steel	82 Pl Girder Comp	0	""	""	3 Latex Concrete/Similar	5 MS 18 (HS 20)	2	6	42.24	-83.437836	2025-08-18T00:00:00	POINT (-83.437836 42.24)	Taylor	NBI	Non-NHS	12848	40.5	1675701	3.37	2024-08-28T00:00:00	24	A	7	8	7	N
606	MDOT	Metro	7830	63043-B01	UNIVERSITY DR(CONN	CLINTON R	IN PONTIAC (UNDR M-59 WB)	6 2d level interchg	5 Waterway	1966	1998		1998	3	221.3	35.1	3	3 Steel	32 Multi Str Comp	0	""	""	5 Epoxy Overlay	5 MS 18 (HS 20)	2		42.64	-83.2805	2025-08-18T00:00:00	POINT (-83.2805 42.64)	Oakland	NBI	NHS	7767.63	31	677605	0.13	2025-05-22T00:00:00	24	A	7	6	6	N
607	MDOT	Metro	6142	50111-B04	I-94 EB	CLINTON RIVER, N&S RDS	0.3 MI E OF MT CLEMENS	5 Highway-pedestrian	6 Highway-waterway	1947	1998		1998	6	357.8	53	6	3 Steel	02 Multi Str Non Comp	0	""	""	3 Latex Concrete/Similar	5 MS 18 (HS 20)	3	4	42.59	-82.857124	2025-08-18T00:00:00	POINT (-82.857124 42.59)	Macomb	NBI	NHS	18963.4	49	798501	11.5	2025-06-19T00:00:00	24	A	6	6	5	N
608	MDOT	Metro	8078	63174-S14-2	I-75 SB	COOLIDGE RD	IN TROY	1 Highway	1 Highway	2020				1	113.5	73.8	1	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	B Greater than HL 93	4	3	42.6	-83.18883	2025-08-18T00:00:00	POINT (-83.18883 42.6)	Oakland	NBI	NHS	8376.3	70.4	646106	14.26	2025-07-15T00:00:00	24	A	8	8	8	N
609	MDOT	Metro	7846	63043-S09	M-150	M-59	@ M-150	1 Highway	1 Highway	1970		1970	2009	4	326	84.4	4	3 Steel	82 Pl Girder Comp	0	""	""	3 Latex Concrete/Similar	5 MS 18 (HS 20)	4	6	42.63	-83.13133	2025-08-18T00:00:00	POINT (-83.13133 42.63)	Oakland	NBI	NHS	27514.4	72.5	4413538	5.02	2024-08-08T00:00:00	24	A	6	6	5	N
610	MDOT	Metro	11920	82292-B03	I-275 NB	LOWER ROUGE R/BIKE PATH	2.5 MI W OF WAYNE	1 Highway	5 Waterway	1974			2012	4	238.3	63.3	4	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	9 MS22.5(HS25)or greater	3		42.28	-83.44188	2025-08-18T00:00:00	POINT (-83.44188 42.28)	Taylor	NBI	NHS	15084.39	60.1	1607208	14.5	2024-10-29T00:00:00	24	A	8	8	7	N
611	Wayne County	Metro	12277	""	MERRIMAN ROAD	SILVER CREEK	HURON            S/SIBLEY	1 Highway	5 Waterway	1973				1	24	24.9	1	5 Prestressed Concrete	04 Tee Beam	0	""	""	6 Bituminous	0 Unknown	2		42.16	-83.3444	2025-08-18T00:00:00	POINT (-83.3444 42.16)	Taylor	NBI	Non-NHS	597.6	22	1674410	2.63	2025-06-11T00:00:00	24	A	6	7	5	N
612	MDOT	Metro	11136	82022-S30	ROTUNDA DRIVE	I-94	IN DEARBORN	5 Highway-pedestrian	1 Highway	1963	2005		2005	4	282.5	78.4	4	3 Steel	32 Multi Str Comp	0	""	""	3 Latex Concrete/Similar	5 MS 18 (HS 20)	5	8	42.32	-83.16952	2025-08-18T00:00:00	POINT (-83.16952 42.32)	Taylor	NBI	Non-NHS	22148	64	1577009	4.19	2023-09-15T00:00:00	24	A	7	6	6	N
613	MDOT	Metro	7979	63103-S18	I-696 RAMP EB	I-75 & RAMPS TO I-75 NB	@I-75	6 2d level interchg	1 Highway	1971	2007	2007	2007	4	322	29.4	4	3 Steel	82 Pl Girder Comp	0	""	""	3 Latex Concrete/Similar	6 MS18(HS20)+mod	1	6	42.48	-83.11157	2025-08-18T00:00:00	POINT (-83.11157 42.48)	Oakland	NBI	NHS	9466.8	16	1738903	0.12	2025-07-16T00:00:00	24	K	5	6	6	N
614	MDOT	Metro	7937	63102-S24	I-696 WB SER	M-1 (WOODWARD AVE)	AT I-696 & WOODWARD	5 Highway-pedestrian	1 Highway	1986				2	124.4	114.8	2	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	9 MS22.5(HS25)or greater	6	4	42.48	-83.145706	2025-08-18T00:00:00	POINT (-83.145706 42.48)	Oakland	NBI	Non-NHS	14281.12	96.1	644205	2.3	2023-07-12T00:00:00	24	A	5	7	6	N
615	MDOT	Metro	11155	82022-S52	RAMP H TO SB MERRI	N BD MERRIMAN ROAD	I-94 AT MERRIMAN	1 Highway	1 Highway	1993				1	97.8	33.1	1	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	9 MS22.5(HS25)or greater	1	2	42.24	-83.3423	2025-08-18T00:00:00	POINT (-83.3423 42.24)	Taylor	NBI	NHS	3237.18	29.9	4718584	0.09	2025-03-10T00:00:00	24	A	7	6	5	N
616	MDOT	Metro	11560	82123-S12	HUBBELL AVE	I-96 (JEFFRIES FRWY)	IN DETROIT	5 Highway-pedestrian	1 Highway	1970			2005	4	280.9	66.3	4	3 Steel	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	4	12	42.38	-83.18808	2025-08-18T00:00:00	POINT (-83.18808 42.38)	Detroit	NBI	Non-NHS	18623.67	47.9	1590607	2.01	2023-08-18T00:00:00	24	A	5	7	6	N
617	MDOT	Metro	11291	82053-B03-2	US-24 SB	ROUGE RIVER	2.1 MI S OF M-5	1 Highway	5 Waterway	1960	1996			2	124	73.5	2	5 Prestressed Concrete	05 Box Bm/Gird- Multiple	0	""	""	5 Epoxy Overlay	9 MS22.5(HS25)or greater	4		42.39	-83.27662	2025-08-18T00:00:00	POINT (-83.27662 42.39)	Taylor	NBI	NHS	9114	64.8	1576806	14.08	2023-11-15T00:00:00	24	A	7	5	7	N
618	MDOT	Metro	11466	82112-S34-7	M-102 EB SERV RD	M-10	N LTS OF DETROIT	5 Highway-pedestrian	1 Highway	1965	2009		1984	3	215.9	53.4	3	3 Steel	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	2	7	42.44	-83.20288	2025-08-18T00:00:00	POINT (-83.20288 42.44)	Detroit	NBI	NHS	11529.06	42	1584408	0.28	2024-08-01T00:00:00	24	A	7	7	7	N
619	MDOT	Metro	8011	63172-S08-4	I-75 CONN WB	M-24	@ M-24(I-75 CONN TO I-75	1 Highway	1 Highway	1962		1994		4	183	34.9	4	5 Prestressed Concrete	02 Multi Str Non Comp	0	""	""	5 Epoxy Overlay	9 MS22.5(HS25)or greater	1	6	42.69	-83.24171	2025-08-18T00:00:00	POINT (-83.24171 42.69)	Oakland	NBI	NHS	6386.7	32	1849509	0.32	2025-07-16T00:00:00	24	A	6	6	7	N
620	Macomb County	Metro	6360	""	HAYES ROAD	PRICE BROOK DRAIN	0.2 MI SOUTH OF 26 MILE	1 Highway	5 Waterway	2006				1	32.2	40	1	1 Concrete	19 Culvert	0	""	""	N N/A (no deck (NBI))	5 MS 18 (HS 20)	2		42.71	-82.97677	2025-08-18T00:00:00	POINT (-82.97677 42.71)	Macomb	NBI	Non-NHS	1288	40.4	4208921	9.87	2025-05-20T00:00:00	24	A	N	N	N	7
621	MDOT	Metro	11682	82192-S04	OAKWOOD BLVD	M-39	IN ALLEN PARK	5 Highway-pedestrian	1 Highway	1964	2001	1964	1964	4	163	119.7	4	4 Steel Continuous	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	7	6	42.29	-83.20674	2025-08-18T00:00:00	POINT (-83.20674 42.29)	Taylor	NBI	NHS	19511.1	102.4	1648503	3.53	2023-11-16T00:00:00	24	A	7	6	6	N
622	Rochester	Metro	8274	""	SECOND ST	PAINT CREEK	EAST OF ROCHESTER RD	5 Highway-pedestrian	5 Waterway	2003				1	43.9	40	1	1 Concrete	19 Culvert	0	""	""	0 None	9 MS22.5(HS25)or greater	2		42.68	-83.12927	2025-08-18T00:00:00	POINT (-83.12927 42.68)	Oakland	NBI	Non-NHS	1756	38.1	609801	0.59	2024-09-25T00:00:00	24	A	N	N	N	7
623	MDOT	Metro	7988	63132-B01	M-150	PAINT CREEK	IN ROCHESTER (W MAIN ST)	5 Highway-pedestrian	5 Waterway	1924	1994	1924		1	43.2	77.4	1	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	9 MS22.5(HS25)or greater	5		42.68	-83.13386	2025-08-18T00:00:00	POINT (-83.13386 42.68)	Oakland	NBI	Non-NHS	3343.68	58.7	4413538	8.87	2025-05-15T00:00:00	24	A	7	6	6	N
624	MDOT	Metro	12347	82073-R01	M-85 (FORT ST)	NORFOLK WESTERN RR	FORT ST	5 Highway-pedestrian	2 Railroad	2010				3	393.3	106	3	4 Steel Continuous	82 Pl Girder Comp	0	""	""	1 Monolithic Concrete	B Greater than HL 93	6		42.28	-83.14821	2025-08-18T00:00:00	POINT (-83.14821 42.28)	Detroit	NBI	NHS	41689.8	80	4700047	0.49	2024-05-17T00:00:00	24	A	7	8	7	N
625	MDOT	Metro	11219	82024-S12	FRONTENAC AVE	I-94	IN DETROIT	5 Highway-pedestrian	1 Highway	2022				2	201	60.8	2	4 Steel Continuous	82 Pl Girder Comp	0	""	""	1 Monolithic Concrete	B Greater than HL 93	2	6	42.38	-83.02627	2025-08-18T00:00:00	POINT (-83.02627 42.38)	Detroit	NBI	Non-NHS	12220.8	38	1587703	2.87	2024-08-28T00:00:00	24	A	8	8	8	N
626	MDOT	Metro	11631	82191-C01	I-75 NB	SILVER CREEK	0.3 MI N OF N HURON RI DR	1 Highway	5 Waterway	2008				1	45	145	1	1 Concrete	19 Culvert	0	""	""	1 Monolithic Concrete	B Greater than HL 93	8		42.08	-83.24711	2025-08-18T00:00:00	POINT (-83.24711 42.08)	Taylor	NBI	NHS	6525	144.8	1592010	0.69	2024-07-26T00:00:00	24	A	N	N	N	7
627	MDOT	Metro	11181	82023-S13	SB W GRAND BLVD	I-94	IN DETROIT	5 Highway-pedestrian	1 Highway	2013				2	200	63.4	2	4 Steel Continuous	02 Multi Str Non Comp	0	""	""	1 Monolithic Concrete	B Greater than HL 93	3	6	42.35	-83.10943	2025-08-18T00:00:00	POINT (-83.10943 42.35)	Detroit	NBI	Non-NHS	12680	52	1577307	0.37	2024-04-15T00:00:00	24	A	8	8	8	N
628	Oakland County	Metro	13636	""	MARTIN PARKWAY	WETLANDS	COMMERCE TWP SEC 24	1 Highway	5 Waterway	2011				1	44.3	48	1	1 Concrete	19 Culvert	0	""	""	6 Bituminous	B Greater than HL 93	4		42.56	-83.4514	2025-08-18T00:00:00	POINT (-83.4514 42.56)	Oakland	NBI	Non-NHS	2126.4	48	4403012	0.57	2024-06-06T00:00:00	24	A	N	N	N	7
629	MDOT	Metro	11822	82251-S21	I-94 EB ENT RAMP	I-75 RAMP TO I-94	IN DETROIT	1 Highway	1 Highway	1961		1988	1988	3	171.6	27.1	3	3 Steel	32 Multi Str Comp	0	""	""	3 Latex Concrete/Similar	6 MS18(HS20)+mod	1	2	42.37	-83.06141	2025-08-18T00:00:00	POINT (-83.06141 42.37)	Detroit	NBI	NHS	4650.36	18.1	4705575	0.03	2023-12-15T00:00:00	24	A	6	6	6	N
630	MDOT	Metro	13104	63043-S14-1	NB ADAMS RD	M-59	ROCHESTER HILLS	1 Highway	1 Highway	2004				4	304	62.3	4	5 Prestressed Concrete	05 Box Bm/Gird- Multiple	0	""	""	1 Monolithic Concrete	9 MS22.5(HS25)or greater	3	6	42.65	-83.1931	2025-08-18T00:00:00	POINT (-83.1931 42.65)	Oakland	NBI	NHS	18939.2	44	4415861	8.04	2023-10-27T00:00:00	24	A	7	7	7	N
631	Pontiac	Metro	8268	""	MARTIN LUTHER KING	CLINTON RIVER	1/8 MI N INTER M-59 & EBL	5 Highway-pedestrian	5 Waterway	1938	1973			1	30.42	74.5	1	1 Concrete	07 Frame- Rigid exc Culv	0	""	""	6 Bituminous	6 MS18(HS20)+mod	5		42.65	-83.270035	2025-08-18T00:00:00	POINT (-83.270035 42.65)	Oakland	NBI	NHS	2266.29	63	673106	0.56	2024-07-23T00:00:00	24	A	5	5	5	N
632	MDOT	Metro	11839	82252-R10	M-8 E-S RAMP	GTW RR	IN DETROIT	1 Highway	2 Railroad	1971	2015	2015	1971	3	220	28.4	3	3 Steel	82 Pl Girder Comp	0	""	""	3 Latex Concrete/Similar	6 MS18(HS20)+mod	1		42.41	-83.080826	2025-08-18T00:00:00	POINT (-83.080826 42.41)	Detroit	NBI	NHS	6248	16.6	1591103	0.37	2023-11-30T00:00:00	24	A	6	6	7	N
633	Wayne County	Metro	11990	""	HURON RIVER DRIVE	SMITH CREEK	ROCKWOOD      W/JEFFERSON	1 Highway	5 Waterway	1989		1989		1	24	46.6	1	5 Prestressed Concrete	05 Box Bm/Gird- Multiple	0	""	""	2 Integral Concrete	9 MS22.5(HS25)or greater	2		42.07	-83.22879	2025-08-18T00:00:00	POINT (-83.22879 42.07)	Taylor	NBI	Non-NHS	1118.4	43	1606009	4.22	2024-09-19T00:00:00	24	A	7	7	7	N
634	MDOT	Metro	6007	50011-B04-1	M-53 NB	PLUM CREEK	3.2 MI S OF M-59	1 Highway	5 Waterway	1964		2015		1	56	63	1	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	3 Latex Concrete/Similar	5 MS 18 (HS 20)	3		42.58	-83.030235	2025-08-18T00:00:00	POINT (-83.030235 42.58)	Macomb	NBI	NHS	3528	53.87	4210208	2.52	2023-11-28T00:00:00	24	A	7	7	7	N
635	Macomb County	Metro	14331	""	DEQUINDRE RD	STONY CREEK	@ 33 MILE RD	1 Highway	5 Waterway	1970				2	22	26	2	3 Steel	19 Culvert	0	""	""	6 Bituminous	5 MS 18 (HS 20)	2		42.82	-83.0998	2025-08-18T00:00:00	POINT (-83.0998 42.82)	Macomb	NBI	Non-NHS	572	30	667605	3.65	2024-08-07T00:00:00	12	A	N	N	N	4
636	MDOT	Metro	11731	82194-S02-2	I-75 SB	OUTER DRIVE	IN MELVINDALE	1 Highway	1 Highway	1966	2002		2002	4	290.3	60.4	2	4 Steel Continuous	32 Multi Str Comp	2	3 Steel	32 Multi Str Comp	1 Monolithic Concrete	9 MS22.5(HS25)or greater	3	7	42.27	-83.1713	2025-08-18T00:00:00	POINT (-83.1713 42.27)	Taylor	NBI	NHS	17534.12	57.1	1595106	15.06	2025-06-12T00:00:00	24	A	7	7	7	N
637	Macomb County	Metro	6223	""	29 MILE ROAD	CAMP BROOK DRAIN	0.5MI E OF ROMEO PLANK RD	1 Highway	5 Waterway	2017				1	21.3	24	1	1 Concrete	19 Culvert	0	""	""	6 Bituminous	B Greater than HL 93	2		42.76	-82.95011	2025-08-18T00:00:00	POINT (-82.95011 42.76)	Macomb	NBI	Non-NHS	511.2	32	815710	5.46	2023-11-16T00:00:00	24	A	N	N	N	8
638	MDOT	Metro	11316	82062-S04	SCOTTEN AVE	US-12	IN DETROIT	5 Highway-pedestrian	1 Highway	1941	1999		2000	2	140.9	62.7	2	3 Steel	25 Girder- Thru	0	""	""	1 Monolithic Concrete	4 M 18 (H 20)	4	8	42.33	-83.10124	2025-08-18T00:00:00	POINT (-83.10124 42.33)	Detroit	NBI	Non-NHS	8834.43	42	1577306	1.28	2024-05-31T00:00:00	24	A	6	6	8	N
639	MDOT	Metro	7909	63101-S12	RAMP P TO M-10	I-696	IN SOUTHFIELD (I-696)	1 Highway	1 Highway	1967		1999	2023	4	231	26.5	4	3 Steel	02 Multi Str Non Comp	0	""	""	5 Epoxy Overlay	5 MS 18 (HS 20)	1	6	42.49	-83.285355	2025-08-18T00:00:00	POINT (-83.285355 42.49)	Oakland	NBI	NHS	6121.5	23.2	710101	0.06	2024-12-26T00:00:00	15	A	6	6	7	N
640	MDOT	Metro	6042	50015-S05	M-53 SB	29 MILE RD	3.0 MI S OF ROMEO	1 Highway	1 Highway	1990				3	178.8	50.5	3	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	2	2	42.76	-83.01319722	2025-08-18T00:00:00	POINT (-83.01319722 42.76)	Macomb	NBI	NHS	9029.4	47.2	813706	15.2	2023-12-15T00:00:00	24	A	7	7	6	N
641	MDOT	Metro	8091	63174-S22	MYERS RD	I-75	IN HAZEL PARK	5 Highway-pedestrian	1 Highway	2020				2	190.5	42.7	2	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	B Greater than HL 93	2	10	42.45	-83.09545	2025-08-18T00:00:00	POINT (-83.09545 42.45)	Oakland	NBI	Non-NHS	8134.35	28	607808	0.73	2025-04-17T00:00:00	24	A	8	8	7	N
642	MDOT	Metro	11957	82293-B04	I-275 NB	TONQUISH CR	3.5 MI SE OF PLYMOUTH	1 Highway	5 Waterway	1972				1	35	55.7	1	5 Prestressed Concrete	02 Multi Str Non Comp	0	""	""	5 Epoxy Overlay	6 MS18(HS20)+mod	3		42.33	-83.44311	2025-08-18T00:00:00	POINT (-83.44311 42.33)	Taylor	NBI	NHS	1949.5	52.5	1607208	18.15	2024-10-31T00:00:00	24	A	8	8	7	N
643	MDOT	Metro	11662	82191-S19	LONDON MOORE RD	I-75	IN LINCOLN PARK	5 Highway-pedestrian	1 Highway	1966	2002		2002	2	140.7	52.2	2	4 Steel Continuous	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	2	7	42.24	-83.19938	2025-08-18T00:00:00	POINT (-83.19938 42.24)	Taylor	NBI	Non-NHS	7344.54	29.5	4710165	0.18	2024-10-03T00:00:00	24	A	7	7	7	N
644	MDOT	Metro	11781	82195-S26	JOHN R	I-75	IN DETROIT	5 Highway-pedestrian	1 Highway	1970	1998		1998	2	160.1	83.8	2	3 Steel	32 Multi Str Comp	0	""	""	5 Epoxy Overlay	5 MS 18 (HS 20)	4	8	42.34	-83.050316	2025-08-18T00:00:00	POINT (-83.050316 42.34)	Detroit	NBI	Non-NHS	13416.38	56	4705731	0.06	2024-03-05T00:00:00	24	A	7	5	7	N
645	MDOT	Metro	11487	82122-S01	SCHOOLCRAFT RD	I-96	IN LIVONIA	1 Highway	1 Highway	1972	2014		2001	3	377	37.9	3	3 Steel	02 Multi Str Non Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	2	10	42.38	-83.42244	2025-08-18T00:00:00	POINT (-83.42244 42.38)	Taylor	NBI	Non-NHS	14288.3	29.4	4705258	1.38	2024-10-16T00:00:00	24	A	8	7	7	N
646	Macomb County	Metro	6409	""	MT VERNON RD	STONY CREEK	0.25 MI NORTH OF 26 MILE	1 Highway	5 Waterway	2016			2016	1	45	18	1	3 Steel	02 Multi Str Non Comp	0	""	""	5 Epoxy Overlay	A HL 93	2		42.72	-83.09179	2025-08-18T00:00:00	POINT (-83.09179 42.72)	Macomb	NBI	Non-NHS	810	18	1909604	0.52	2024-10-13T00:00:00	24	A	8	8	7	N
647	MDOT	Metro	11355	82102-S02	NAPIER ROAD	M-14	3 MI W OF PLYMOUTH	1 Highway	1 Highway	1975			2006	4	304.5	47.9	4	3 Steel	82 Pl Girder Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	2	4	42.37	-83.54837	2025-08-18T00:00:00	POINT (-83.54837 42.37)	Taylor	NBI	Non-NHS	14585.55	44.3	1432007	4.23	2023-10-09T00:00:00	24	A	5	7	6	N
648	MDOT	Metro	6066	50031-B01	M-97	CLINTON RIVER	AT S LIMITS OF MT CLEMENS	5 Highway-pedestrian	5 Waterway	1948	2005		2005	3	210	82.3	3	3 Steel	52 Pl Girder Non Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	5		42.59	-82.90143	2025-08-18T00:00:00	POINT (-82.90143 42.59)	Macomb	NBI	NHS	17283	68	803009	11.1	2024-10-18T00:00:00	24	A	6	7	6	N
649	Oakland County	Metro	13599	""	LAKE CREST DRIVE	ROSEWOOD LAKE CANAL	200' N OF AMBERWOOD CT	1 Highway	5 Waterway	1998				5	121	26	5	7 Timber	01 Slab	0	""	""	6 Bituminous	5 MS 18 (HS 20)	2		42.57	-83.43406	2025-08-18T00:00:00	POINT (-83.43406 42.57)	Oakland	NBI	Non-NHS	3146	24	4413204	0.24	2024-06-06T00:00:00	24	A	7	7	7	N
650	Detroit	Metro	12493	""	WILKINS	DEQUINDRE CUT PATHWAY	BETWN ORLEANS & ST AUBIN	5 Highway-pedestrian	3 Pedestrian-bicycle	2015				2	68.5	36	2	1 Concrete	19 Culvert	0	""	""	2 Integral Concrete	B Greater than HL 93	2		42.35	-83.03818611	2025-08-18T00:00:00	POINT (-83.03818611 42.35)	Detroit	NBI	Non-NHS	2466	36	1585607	0.75	2023-11-14T00:00:00	24	A	N	N	N	8
651	Milford	Metro	8243	""	MONT EAGLE ROAD	HURON RIVER	SOUTHEAST OF HURON BRIDGE	5 Highway-pedestrian	5 Waterway	1989				1	37.7	24.6	1	5 Prestressed Concrete	05 Box Bm/Gird- Multiple	0	""	""	6 Bituminous	5 MS 18 (HS 20)	2		42.58	-83.590065	2025-08-18T00:00:00	POINT (-83.590065 42.58)	Oakland	NBI	Non-NHS	927.42	24	660207	0.12	2023-10-25T00:00:00	24	A	7	7	7	N
652	MDOT	Metro	6155	50111-S11	11 MI RD	I-94	W LTS OF ST CLAIR SHORES	5 Highway-pedestrian	1 Highway	1967	2010		1997	4	205.5	78.4	4	3 Steel	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	4	7	42.5	-82.91695	2025-08-18T00:00:00	POINT (-82.91695 42.5)	Macomb	NBI	Non-NHS	16111.2	64	806006	0.25	2025-06-30T00:00:00	24	A	7	6	6	N
653	MDOT	Metro	11519	82122-S31	LFT TRN E MIDLBELT	I-96	IN LIVONIA	1 Highway	1 Highway	1971	2014		2001	2	166.5	26.5	2	3 Steel	02 Multi Str Non Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	2	8	42.38	-83.33239	2025-08-18T00:00:00	POINT (-83.33239 42.38)	Taylor	NBI	Non-NHS	4412.25	24	1803901	0.02	2024-09-16T00:00:00	24	A	7	7	7	N
654	MDOT	Metro	11108	82022-R02	I-94 WB	CSX RR & SHOOK RD	4.0 MI W OF TAYLOR	1 Highway	4 Highway-railroad	2003				4	285	78.5	4	5 Prestressed Concrete	05 Box Bm/Gird- Multiple	0	""	""	1 Monolithic Concrete	9 MS22.5(HS25)or greater	4	2	42.23	-83.395424	2025-08-18T00:00:00	POINT (-83.395424 42.23)	Taylor	NBI	NHS	22372.5	75.3	1588802	7.64	2023-08-16T00:00:00	24	A	6	6	7	N
655	Wayne County	Metro	12292	""	WEAR ROAD	BRADSHAW DRAIN	SUMPTERE/RAWSONVILLE	1 Highway	5 Waterway	1986				2	24	24	2	3 Steel	19 Culvert	0	""	""	N N/A (no deck (NBI))	9 MS22.5(HS25)or greater	2		42.12	-83.53434	2025-08-18T00:00:00	POINT (-83.53434 42.12)	Taylor	NBI	Non-NHS	576	0	1670407	0.31	2024-08-15T00:00:00	24	A	N	N	N	7
656	Macomb County	Metro	6249	""	SCHOENHERR RD	RED RUN DRAIN	0.2 MI S OF 15 MILE RD	5 Highway-pedestrian	5 Waterway	1978				4	250	71.2	4	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	3 Latex Concrete/Similar	5 MS 18 (HS 20)	5		42.55	-82.989624	2025-08-18T00:00:00	POINT (-82.989624 42.55)	Macomb	NBI	NHS	17800	59.1	798810	6.91	2023-09-15T00:00:00	24	A	6	7	6	N
657	Detroit	Metro	12343	""	JEFFERSON AVE	DEQUINDRE CUT GREENWAY	JEFFERSON W OF ST AUBIN	5 Highway-pedestrian	2 Railroad	1923	2006			1	94.8	120	1	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	2 Integral Concrete	9 MS22.5(HS25)or greater	9		42.34	-83.02819	2025-08-18T00:00:00	POINT (-83.02819 42.34)	Detroit	NBI	NHS	11376	99.1	4705824	0.63	2024-12-06T00:00:00	24	A	8	8	7	N
658	Novi	Metro	13862	""	SHORELINE DRIVE	UNNAMED TRIBUTARY	AT END OF TIMBER TRAIL	5 Highway-pedestrian	5 Waterway	1968				1	48.5	28	1	1 Concrete	19 Culvert	0	""	""	6 Bituminous	9 MS22.5(HS25)or greater	2		42.48	-83.54213889	2025-08-18T00:00:00	POINT (-83.54213889 42.48)	Oakland	NBI	Non-NHS	1358	27.7	4414109	0.25	2024-09-27T00:00:00	24	A	N	N	N	8
659	MDOT	Metro	11342	82091-S01	OLD M-39-SCHAEFER	ENT TO FORD PLANT	IN DEARBORN	5 Highway-pedestrian	1 Highway	1957	1994			4	171	118.4	4	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	8	6	42.3	-83.174774	2025-08-18T00:00:00	POINT (-83.174774 42.3)	Taylor	NBI	NHS	20246.4	104	4704975	0.22	2024-12-13T00:00:00	24	A	6	7	6	N
660	MDOT	Metro	13313	82194-S30	SB I-75 EXIT RAMP	EB I-96	AMBASSADOR GATEWAY	1 Highway	1 Highway	2007			2007	2	227.5	31.5	2	4 Steel Continuous	82 Pl Girder Comp	0	""	""	2 Integral Concrete	9 MS22.5(HS25)or greater	2	4	42.32	-83.08282	2025-08-18T00:00:00	POINT (-83.08282 42.32)	Detroit	NBI	NHS	7166.25	28	4718927	0.2	2024-06-27T00:00:00	24	A	8	8	7	N
661	MDOT	Metro	8035	63173-S05	RATTALEE LAKE RD	I-75	4.8 MI NW OF M-10	1 Highway	1 Highway	1963	2023		2023	4	281.8	32.42	4	3 Steel	02 Multi Str Non Comp	0	""	""	0 None	2 M 13.5 (H 15)	2	6	42.77	-83.52379	2025-08-18T00:00:00	POINT (-83.52379 42.77)	Oakland	NBI	Non-NHS	9135.96	30	649405	6.82	2024-08-01T00:00:00	24	A	9	7	7	N
662	MDOT	Metro	11768	82195-S11-1	I-75 NB	M-10	IN DETROIT OVER US-10	1 Highway	1 Highway	1970	1999	1999	2005	2	240.4	61.4	2	3 Steel	82 Pl Girder Comp	0	""	""	1 Monolithic Concrete	9 MS22.5(HS25)or greater	3	8	42.34	-83.064	2025-08-18T00:00:00	POINT (-83.064 42.34)	Detroit	NBI	NHS	14760.56	45.9	1592010	23.15	2025-05-29T00:00:00	24	A	6	7	7	N
663	Wayne County	Metro	12118	""	NORTHVILLE ROAD	MIDDLE ROUGE RIVER	NORTHVILE    N/SEVEN MILE	5 Highway-pedestrian	5 Waterway	1928		1981		2	32.8	56.1	2	1 Concrete	19 Culvert	0	""	""	N N/A (no deck (NBI))	4 M 18 (H 20)	4		42.43	-83.47603	2025-08-18T00:00:00	POINT (-83.47603 42.43)	Taylor	NBI	Non-NHS	1840.08	40	1680704	1.87	2025-05-27T00:00:00	24	A	N	N	N	5
664	Wayne County	Metro	12098	""	OUTER DRIVE	MT OLIVET CEMETERY DR	DETROIT        N/SIX MILE	5 Highway-pedestrian	1 Highway	1946		1990		1	34.8	154.9	1	1 Concrete	07 Frame- Rigid exc Culv	0	""	""	N N/A (no deck (NBI))	5 MS 18 (HS 20)	7	2	42.42	-83.013695	2025-08-18T00:00:00	POINT (-83.013695 42.42)	Detroit	NBI	NHS	5390.52	44	4705082	0.02	2025-06-19T00:00:00	24	A	5	5	6	N
665	Wayne County	Metro	12045	""	GEDDES ROAD	FOWLER DRAIN	CANTON             W/BARR	5 Highway-pedestrian	5 Waterway	2001				1	26.4	40	1	1 Concrete	19 Culvert	0	""	""	N N/A (no deck (NBI))	1 M 9 (H 10)	2		42.28	-83.538765	2025-08-18T00:00:00	POINT (-83.538765 42.28)	Taylor	NBI	Non-NHS	1056	31.8	4603888	0.77	2025-06-17T00:00:00	24	A	N	N	N	6
666	Macomb County	Metro	6394	""	WEBER ROAD	BEAVER CREEK	660 FT WEST OF M-19	1 Highway	5 Waterway	1970				2	29.9	23	2	3 Steel	19 Culvert	0	""	""	N N/A (no deck (NBI))	4 M 18 (H 20)	2		42.88	-82.771126	2025-08-18T00:00:00	POINT (-82.771126 42.88)	Macomb	NBI	Non-NHS	687.7	0	829610	2.6	2025-06-25T00:00:00	24	A	N	N	N	6
667	MDOT	Metro	11803	82251-S05	BRUSH ST ENT RAMP	I-75 EB I-375 SB TRN RDY	IN DETROIT OVER E N TURN	1 Highway	1 Highway	1970	1998		2000	3	163.8	27.6	3	3 Steel	32 Multi Str Comp	0	""	""	6 Bituminous	5 MS 18 (HS 20)	1	2	42.34	-83.04682	2025-08-18T00:00:00	POINT (-83.04682 42.34)	Detroit	NBI	NHS	4520.88	23.6	1591206	0.05	2024-03-15T00:00:00	24	A	7	5	5	N
668	Macomb County	Metro	6339	""	BATES ROAD	DEER CREEK	0.2 MI SOUTH OF 29 MILE	1 Highway	5 Waterway	1964			2024	1	33.8	32.8	1	3 Steel	32 Multi Str Comp	0	""	""	3 Latex Concrete/Similar	4 M 18 (H 20)	2		42.76	-82.82308	2025-08-18T00:00:00	POINT (-82.82308 42.76)	Macomb	NBI	Non-NHS	1108.64	29.5	817201	2.85	2023-07-28T00:00:00	24	A	6	6	7	N
669	MDOT	Metro	6097	50061-S31	FAIRFIELD AVE	I-696	IN WARREN	5 Highway-pedestrian	1 Highway	1973	2008		2000	2	196	45.2	2	4 Steel Continuous	82 Pl Girder Comp	0	""	""	1 Monolithic Concrete	2 M 13.5 (H 15)	2	8	42.49	-82.9938	2025-08-18T00:00:00	POINT (-82.9938 42.49)	Macomb	NBI	Non-NHS	8859.2	30	805705	0.49	2025-03-11T00:00:00	24	A	7	6	7	N
670	MDOT	Metro	8093	63174-S24	JOHN R	I-75	IN HAZEL PARK	5 Highway-pedestrian	1 Highway	2020				2	251.6	90.7	2	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	B Greater than HL 93	6	10	42.46	-83.10377	2025-08-18T00:00:00	POINT (-83.10377 42.46)	Oakland	NBI	Non-NHS	22820.12	76	646806	0.83	2025-04-17T00:00:00	24	A	8	8	8	N
671	MDOT	Metro	8128	63191-S18	I-96 RAMP	RAMP FROM M-102	AT I-696	1 Highway	1 Highway	1972			1998	3	193.9	44.4	3	3 Steel	02 Multi Str Non Comp	0	""	""	5 Epoxy Overlay	6 MS18(HS20)+mod	2	1	42.48	-83.42643	2025-08-18T00:00:00	POINT (-83.42643 42.48)	Oakland	NBI	NHS	8609.16	40.5	634208	1.11	2024-12-17T00:00:00	24	A	6	7	6	N
672	Macomb County	Metro	6373	""	29 MILE ROAD	COON CREEK	0.6 MI EAST OF NORTH AVE	1 Highway	5 Waterway	1972				1	30.8	30.2	1	5 Prestressed Concrete	05 Box Bm/Gird- Multiple	0	""	""	6 Bituminous	4 M 18 (H 20)	2		42.76	-82.8687	2025-08-18T00:00:00	POINT (-82.8687 42.76)	Macomb	NBI	Non-NHS	930.16	29.9	815710	9.63	2024-04-10T00:00:00	24	A	5	5	5	N
673	Oakland County	Metro	8200	""	TWELVE MILE	NOVI-LYON DRAIN	EAST OF MARTINDALE	1 Highway	5 Waterway	1961				2	24.9	17.7	2	3 Steel	19 Culvert	0	""	""	N N/A (no deck (NBI))	6 MS18(HS20)+mod	2		42.49	-83.63197	2025-08-18T00:00:00	POINT (-83.63197 42.49)	Oakland	NBI	Non-NHS	440.73	0	657110	0.31	2025-06-24T00:00:00	6	P	N	N	N	3
674	MDOT	Metro	8021	63172-S16	I-75 NB	CLARKSTON RD	1.1 MI SE OF M-15	1 Highway	1 Highway	1962	1988	1983	1988	3	108.7	62	3	3 Steel	02 Multi Str Non Comp	0	""	""	5 Epoxy Overlay	6 MS18(HS20)+mod	3	2	42.75	-83.399796	2025-08-18T00:00:00	POINT (-83.399796 42.75)	Oakland	NBI	NHS	6739.4	59	647308	31.03	2025-03-14T00:00:00	24	A	4	6	5	N
675	Wayne County	Metro	12016	""	SIBLEY ROAD	FRANK & POET DRAIN	RIVERVIEW          W/FORT	1 Highway	5 Waterway	1938				1	22	45.3	1	1 Concrete	01 Slab	0	0 Other	00 Other	6 Bituminous	0 Unknown	2		42.17	-83.20643	2025-08-18T00:00:00	POINT (-83.20643 42.17)	Taylor	NBI	Non-NHS	996.6	41	1607308	10.14	2024-11-12T00:00:00	12	A	3	3	4	N
676	Macomb County	Metro	6235	""	ARMADA CENTER RD	COON CREEK	0.1 MI WEST OF COON CREEK	1 Highway	5 Waterway	1927				1	27.9	25.9	1	1 Concrete	04 Tee Beam	0	""	""	6 Bituminous	2 M 13.5 (H 15)	2		42.85	-82.92645	2025-08-18T00:00:00	POINT (-82.92645 42.85)	Macomb	NBI	Non-NHS	722.61	23	824306	3.13	2024-11-28T00:00:00	12	P	5	4	6	N
677	Oakland County	Metro	8153	""	CROOKS ROAD	CLINTON RIVER	BET HAMLIN AND AVON RDS	5 Highway-pedestrian	5 Waterway	1987				1	52	81	1	5 Prestressed Concrete	05 Box Bm/Gird- Multiple	0	""	""	1 Monolithic Concrete	6 MS18(HS20)+mod	3		42.65	-83.17381	2025-08-18T00:00:00	POINT (-83.17381 42.65)	Oakland	NBI	Non-NHS	4212	64	659810	10.96	2024-09-26T00:00:00	24	A	6	7	6	N
678	MDOT	Metro	11598	82123-S50	SCOTTEN AVE	I-96	IN DETROIT	5 Highway-pedestrian	1 Highway	1972		1992	1992	2	176.3	66.3	2	3 Steel	32 Multi Str Comp	0	""	""	3 Latex Concrete/Similar	5 MS 18 (HS 20)	4	8	42.36	-83.112114	2025-08-18T00:00:00	POINT (-83.112114 42.36)	Detroit	NBI	Non-NHS	11688.69	47.9	1581901	0.66	2023-09-19T00:00:00	24	A	5	7	5	N
679	MDOT	Metro	11188	82023-S20	12TH ST	I-94	IN DETROIT	5 Highway-pedestrian	1 Highway	1953	1999			2	120.2	58.4	2	5 Prestressed Concrete	06 Box Bms- Single/Sprd	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	4	7	42.35	-83.08511	2025-08-18T00:00:00	POINT (-83.08511 42.35)	Detroit	NBI	NHS	7019.68	43.9	1577504	0.72	2023-11-14T00:00:00	24	A	7	7	7	N
680	MDOT	Metro	11914	82291-S17	I-94 EB	I-275 SB TO I-94 EB RAMP	IN ROMULUS	1 Highway	1 Highway	1972	2011		1992	1	127.5	63.5	1	3 Steel	82 Pl Girder Comp	0	""	""	1 Monolithic Concrete	6 MS18(HS20)+mod	3	1	42.22	-83.4149	2025-08-18T00:00:00	POINT (-83.4149 42.22)	Taylor	NBI	NHS	8096.25	60.2	1576405	6.61	2024-08-30T00:00:00	24	A	7	7	7	N
681	MDOT	Metro	8056	63174-S01	GARDENIA RD	I-75	IN ROYAL OAK	5 Highway-pedestrian	1 Highway	2022				2	177.5	66.7	2	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	B Greater than HL 93	4	9	42.5	-83.117226	2025-08-18T00:00:00	POINT (-83.117226 42.5)	Oakland	NBI	Non-NHS	11839.25	48	671806	1.4	2025-04-14T00:00:00	24	A	8	8	8	N
682	MDOT	Metro	6084	50061-S14	SHERWOOD AVE	I-696 &RAMPS B,C,H,&F	CITY OF WARREN	5 Highway-pedestrian	1 Highway	1975	2008		2008	6	569.6	66.3	6	3 Steel	82 Pl Girder Comp	0	""	""	1 Monolithic Concrete	4 M 18 (H 20)	4	13	42.49	-83.04167	2025-08-18T00:00:00	POINT (-83.04167 42.49)	Macomb	NBI	Non-NHS	37764.48	52	804507	2.81	2025-04-09T00:00:00	24	A	7	7	7	N
683	Macomb County	Metro	6191	""	15 MILE RD	HARRINGTON DRAIN	300FT EAST OF GARFIELD RD	5 Highway-pedestrian	5 Waterway	2003				1	20	60	1	1 Concrete	19 Culvert	0	""	""	N N/A (no deck (NBI))	4 M 18 (H 20)	5		42.55	-82.948975	2025-08-18T00:00:00	POINT (-82.948975 42.55)	Macomb	NBI	Non-NHS	1200	0	803605	7.11	2025-05-14T00:00:00	24	A	N	N	N	7
684	Macomb County	Metro	6269	""	NORTH AVE	E B COON CREEK	0.8 MI NORTH OF 33 MILE	1 Highway	5 Waterway	1994				1	44.5	43.9	1	5 Prestressed Concrete	05 Box Bm/Gird- Multiple	0	""	""	5 Epoxy Overlay	9 MS22.5(HS25)or greater	2		42.83	-82.88465	2025-08-18T00:00:00	POINT (-82.88465 42.83)	Macomb	NBI	Non-NHS	1953.55	40.6	1817105	14.38	2025-06-25T00:00:00	24	A	6	6	7	N
685	MDOT	Metro	13532	50011-C01	M-53	STERLING RELIEF DRAIN	0.5 MI N OF 15 MILE RD	1 Highway	5 Waterway	1964				3	40	136	3	3 Steel	19 Culvert	0	""	""	N N/A (no deck (NBI))	0 Unknown	6		42.56	-83.029335	2025-08-18T00:00:00	POINT (-83.029335 42.56)	Macomb	NBI	NHS	5440	0	4210208	0.83	2024-10-18T00:00:00	24	A	N	N	N	5
686	MDOT	Metro	13196	63172-S04-2	I-75 SB	PONTIAC ROAD	2.0 MI N OF M-59	1 Highway	1 Highway	1963	1989	1989		3	129.8	101.9	3	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	0 None	6 MS18(HS20)+mod	5	2	42.67	-83.24134	2025-08-18T00:00:00	POINT (-83.24134 42.67)	Oakland	NBI	NHS	13226.62	96.5	646106	20.62	2024-09-18T00:00:00	24	A	7	7	6	N
687	MDOT	Metro	11123	82022-S13	I-94 EB	US-24 (TELEGRAPH RD)	IN TAYLOR,US-24	1 Highway	1 Highway	2004			2005	1	246	75.6	1	3 Steel	12 Arch- Thru	0	""	""	5 Epoxy Overlay	9 MS22.5(HS25)or greater	3	8	42.26	-83.27025278	2025-08-18T00:00:00	POINT (-83.27025278 42.26)	Taylor	NBI	NHS	18597.6	72.2	1576405	14.74	2025-06-12T00:00:00	24	A	7	7	7	N
688	MDOT	Metro	6137	50092-B04	M-19	SALT RIVER	2.7 MI SW OF ST CLAIR COL	5 Highway-pedestrian	5 Waterway	1991			1992	1	35	51.3	1	5 Prestressed Concrete	05 Box Bm/Gird- Multiple	0	""	""	6 Bituminous	9 MS22.5(HS25)or greater	2		42.76	-82.764565	2025-08-18T00:00:00	POINT (-82.764565 42.76)	Macomb	NBI	Non-NHS	1795.5	48	832010	12.31	2024-04-09T00:00:00	24	A	5	7	7	N
689	Oakland County	Metro	8207	""	GUNN	PAINT CREEK	BET ADAMS AND ORION	1 Highway	5 Waterway	1958				1	34.8	27.9	1	5 Prestressed Concrete	05 Box Bm/Gird- Multiple	0	""	""	8 Gravel	6 MS18(HS20)+mod	2		42.74	-83.169426	2025-08-18T00:00:00	POINT (-83.169426 42.74)	Oakland	NBI	Non-NHS	970.92	24.9	609405	2.32	2025-03-25T00:00:00	12	P	4	4	3	N
690	Wayne County	Metro	12004	""	VAN HORN ROAD	FRANK & POET DRAIN	TRENTON            W/FORT	5 Highway-pedestrian	5 Waterway	1982				2	74.8	75.5	2	5 Prestressed Concrete	05 Box Bm/Gird- Multiple	0	0 Other	00 Other	1 Monolithic Concrete	9 MS22.5(HS25)or greater	5		42.13	-83.20319	2025-08-18T00:00:00	POINT (-83.20319 42.13)	Taylor	NBI	Non-NHS	5647.4	62	1674101	7.6	2024-11-13T00:00:00	24	A	5	5	5	N
691	Macomb County	Metro	6320	""	NORTH RIVER ROAD	CATFISH CHANNEL	0.2 MI E OF CONGER BAY	1 Highway	5 Waterway	1966				4	124.38	30	4	5 Prestressed Concrete	05 Box Bm/Gird- Multiple	0	""	""	6 Bituminous	2 M 13.5 (H 15)	2		42.6	-82.78926	2025-08-18T00:00:00	POINT (-82.78926 42.6)	Macomb	NBI	Non-NHS	3731.4	23	831807	4.97	2024-10-04T00:00:00	12	P	5	3	6	N
692	Macomb County	Metro	6286	""	33 MILE ROAD	COON CREEK	0.5 MI EAST OF WOLCOTT RD	1 Highway	5 Waterway	1965				2	34.8	23	2	3 Steel	19 Culvert	0	""	""	N N/A (no deck (NBI))	4 M 18 (H 20)	2		42.82	-82.93335	2025-08-18T00:00:00	POINT (-82.93335 42.82)	Macomb	NBI	Non-NHS	800.4	0	4210214	3.92	2023-07-14T00:00:00	24	A	N	N	N	7
693	MDOT	Metro	6019	50011-S11	M-53 NB	CANAL RD	0.4 MI S OF M-59	1 Highway	1 Highway	1966		2001	1994	3	142	42.9	3	3 Steel	32 Multi Str Comp	0	""	""	5 Epoxy Overlay	5 MS 18 (HS 20)	2	3	42.62	-83.01221	2025-08-18T00:00:00	POINT (-83.01221 42.62)	Macomb	NBI	NHS	6091.8	39.5	4210208	5.41	2025-02-13T00:00:00	13	A	7	6	7	N
694	MDOT	Metro	11441	82112-S16	NB TO WB DAVISON	M-10 SB	IN DETROIT	1 Highway	1 Highway	1957	2006		1971	3	175.5	32	3	3 Steel	82 Pl Girder Comp	0	""	""	1 Monolithic Concrete	9 MS22.5(HS25)or greater	1	4	42.4	-83.11146	2025-08-18T00:00:00	POINT (-83.11146 42.4)	Detroit	NBI	NHS	5616	28.9	4710289	0.07	2025-04-29T00:00:00	24	A	7	6	6	N
695	Armada	Metro	6413	""	BURK STREET	EAST BR OF COON CREEK	SEC 23 ARMADA TWP	5 Highway-pedestrian	5 Waterway	1982				1	36.1	39.4	1	5 Prestressed Concrete	05 Box Bm/Gird- Multiple	0	""	""	6 Bituminous	5 MS 18 (HS 20)	2		42.85	-82.88352	2025-08-18T00:00:00	POINT (-82.88352 42.85)	Macomb	NBI	Non-NHS	1422.34	25.9	824105	0.79	2023-10-18T00:00:00	24	A	5	5	7	N
696	MDOT	Metro	8073	63174-S11-1	I-75 NB	EAST LONG LAKE RD	IN TROY	1 Highway	1 Highway	2019				1	138.5	73.8	1	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	B Greater than HL 93	4	4	42.59	-83.15927	2025-08-18T00:00:00	POINT (-83.15927 42.59)	Oakland	NBI	NHS	10221.3	70.4	647308	12.17	2025-07-24T00:00:00	24	A	8	8	7	N
697	MDOT	Metro	12654	50022-B06	M-59 EB	N BR CLINTON RIVER	0.7 MILES W OF M-97	1 Highway	5 Waterway	1996		1996		3	230	64.4	3	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	5 Epoxy Overlay	9 MS22.5(HS25)or greater	3		42.63	-82.888824	2025-08-18T00:00:00	POINT (-82.888824 42.63)	Macomb	NBI	NHS	14812	55.7	820202	7.35	2023-12-20T00:00:00	24	A	8	8	8	N
698	Oakland County	Metro	13596	""	INDIAN TRAIL	POLLY ANN TRAIL	IN SUBDIVISION  SEC 3	1 Highway	3 Pedestrian-bicycle	1999				1	27.4	27	1	7 Timber	01 Slab	0	""	""	6 Bituminous	5 MS 18 (HS 20)	2		42.8	-83.28139	2025-08-18T00:00:00	POINT (-83.28139 42.8)	Oakland	NBI	Non-NHS	739.8	25	4412788	0.69	2024-07-11T00:00:00	24	A	7	7	7	N
699	Wayne County	Metro	12194	""	ALLEN ROAD	ECORSE CREEK	ALLEN PARK    S/OUTER DRV	5 Highway-pedestrian	5 Waterway	2021				1	56.79	62	1	1 Concrete	19 Culvert	0	""	""	N N/A (no deck (NBI))	B Greater than HL 93	5		42.27	-83.196724	2025-08-18T00:00:00	POINT (-83.196724 42.27)	Taylor	NBI	Non-NHS	3520.98	62	1594605	0.93	2025-06-05T00:00:00	24	A	N	N	N	8
700	MDOT	Metro	7798	63022-S02-4	I-96WB	MILFORD RD	1.9 MI E OF LIVINGSTON CO	1 Highway	1 Highway	1957	2011		1994	3	170.2	79.7	3	3 Steel	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	4	4	42.52	-83.61613	2025-08-18T00:00:00	POINT (-83.61613 42.52)	Oakland	NBI	NHS	13564.94	76.4	657304	2.85	2024-11-18T00:00:00	24	A	7	6	7	N
701	MDOT	Metro	13499	82112-S13-5	M-10 WB	M-8 RAMP TO M-10 SB	IN DETROIT	1 Highway	1 Highway	1956	1987		1990	3	171.3	72.8	3	3 Steel	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	4	1	42.4	-83.109146	2025-08-18T00:00:00	POINT (-83.109146 42.4)	Detroit	NBI	NHS	12470.64	69	1577510	6.32	2023-11-30T00:00:00	24	A	5	6	6	N
702	MDOT	Metro	11266	82025-S20-3	M-102 EB	I-94	IN HARPER WOODS	5 Highway-pedestrian	1 Highway	1959	2000			4	174.8	82.3	4	5 Prestressed Concrete	05 Box Bm/Gird- Multiple	0	""	""	2 Integral Concrete	6 MS18(HS20)+mod	5	6	42.45	-82.917206	2025-08-18T00:00:00	POINT (-82.917206 42.45)	Detroit	NBI	NHS	14386.04	66.1	4706143	0.02	2024-06-27T00:00:00	24	A	6	7	7	N
703	Oakland County	Metro	14037	""	SHADOW CREEK BLVD	SASHABAW CREEK	ORION TWP SEC 19	5 Highway-pedestrian	5 Waterway	1996				2	22.5	44	2	3 Steel	19 Culvert	0	""	""	6 Bituminous	0 Unknown	4		42.74	-83.31656	2025-08-18T00:00:00	POINT (-83.31656 42.74)	Oakland	NBI	Non-NHS	990	44	6701703	0.38	2023-10-04T00:00:00	24	A	N	N	N	7
704	Wayne County	Metro	12123	""	NORTHVILLE ROAD	MIDDLE ROUGE RIVER	NORTHVILE T    S/SIX MILE	5 Highway-pedestrian	5 Waterway	1922	1976	1995		2	64	62	2	2 Concrete Continuous	01 Slab	0	0 Other	00 Other	6 Bituminous	5 MS 18 (HS 20)	2		42.4	-83.46925	2025-08-18T00:00:00	POINT (-83.46925 42.4)	Taylor	NBI	Non-NHS	3968	47.9	1679402	1.43	2025-03-31T00:00:00	12	A	4	4	5	N
705	MDOT	Metro	7961	63102-Z03	PLAZA & CHURCH ST	I-696	0.5 MI E OF GREENFIELD	5 Highway-pedestrian	1 Highway	1984		2016		2	178.1	701.4	2	5 Prestressed Concrete	05 Box Bm/Gird- Multiple	0	""	""	6 Bituminous	0 Unknown	2	10	42.48	-83.190735	2025-08-18T00:00:00	POINT (-83.190735 42.48)	Oakland	NBI	Non-NHS	124919.34	28	664908	0.84	2025-06-03T00:00:00	24	K	5	5	6	N
706	MDOT	Metro	11397	82111-S11	M-85 (FORT ST,)	M-10	IN DETROIT	5 Highway-pedestrian	1 Highway	1958	1994		1994	2	110.3	101.3	2	4 Steel Continuous	32 Multi Str Comp	0	""	""	5 Epoxy Overlay	5 MS 18 (HS 20)	6	6	42.33	-83.05556	2025-08-18T00:00:00	POINT (-83.05556 42.33)	Detroit	NBI	NHS	11173.39	72.5	1585010	5.15	2023-11-14T00:00:00	24	A	6	7	6	N
707	MDOT	Metro	11973	82293-S10-1	I-275 NB	M-14	0.3 MI W OF LIVONIA	1 Highway	1 Highway	1971		2001	2001	4	455	56.8	4	3 Steel	82 Pl Girder Comp	0	""	""	3 Latex Concrete/Similar	5 MS 18 (HS 20)	3	8	42.39	-83.43613	2025-08-18T00:00:00	POINT (-83.43613 42.39)	Taylor	NBI	NHS	25844	53.8	1607208	21.73	2024-10-30T00:00:00	24	A	6	6	6	N
708	MDOT	Metro	11763	82195-S04	ROSA PARKS EXT RMP	I-75 N COLLECTOR-DIST RD	IN DETROIT	1 Highway	1 Highway	1970	2003		2003	1	124.2	26.9	1	3 Steel	82 Pl Girder Comp	0	""	""	1 Monolithic Concrete	6 MS18(HS20)+mod	1	2	42.33	-83.071014	2025-08-18T00:00:00	POINT (-83.071014 42.33)	Detroit	NBI	NHS	3340.98	24.3	4705635	0.11	2025-05-23T00:00:00	24	A	7	7	5	N
709	Macomb County	Metro	14545	""	30 MI RD	SALT RIVER	0.41 MI W OF LOW PLANK RD	1 Highway	5 Waterway	1983				1	25.5	28	1	3 Steel	19 Culvert	0	""	""	8 Gravel	0 Unknown	2		42.78	-82.78099	2025-08-18T00:00:00	POINT (-82.78099 42.78)	Macomb	NBI	Non-NHS	714		5500978	7.74	2024-08-29T00:00:00	24	A	N	N	N	5
710	MDOT	Metro	11549	82123-S03	TURN RDWY 3RD LEVL	I-96 ROADWAYS	IN DETROIT	7 3d level interchg	1 Highway	1972			1992	18	1399.7	28.5	18	4 Steel Continuous	02 Multi Str Non Comp	0	""	""	5 Epoxy Overlay	5 MS 18 (HS 20)	2	14	42.38	-83.216736	2025-08-18T00:00:00	POINT (-83.216736 42.38)	Detroit	NBI	NHS	39891.45	26.9	1590508	0	2023-08-25T00:00:00	24	A	5	5	7	N
711	MDOT	Metro	11265	82025-S19	LOCHMORE AVE	I-94	IN HARPER WOODS	1 Highway	1 Highway	1959	2001		2000	2	110.5	57.1	2	4 Steel Continuous	02 Multi Str Non Comp	0	""	""	5 Epoxy Overlay	6 MS18(HS20)+mod	2	6	42.44	-82.91933	2025-08-18T00:00:00	POINT (-82.91933 42.44)	Detroit	NBI	Non-NHS	6309.55	44	4706144	0.01	2024-06-27T00:00:00	24	A	7	6	7	N
712	Wayne County	Metro	12181	""	OUTER DRIVE	JOY ROAD	DETROIT       E/TELEGRAPH	5 Highway-pedestrian	1 Highway	1927				1	74.8	64	1	1 Concrete	11 Arch- Deck, Filled Sp	0	""	""	N N/A (no deck (NBI))	6 MS18(HS20)+mod	4	4	42.36	-83.261795	2025-08-18T00:00:00	POINT (-83.261795 42.36)	Detroit	NBI	Non-NHS	4787.2	40	1596803	2.73	2025-04-15T00:00:00	12	P	N	4	5	N
713	MDOT	Metro	11779	82195-S24	CLIFFORD ST	I-75	IN DETROIT	5 Highway-pedestrian	1 Highway	1967	1998		1998	2	154.9	63.6	2	4 Steel Continuous	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	3	8	42.34	-83.055916	2025-08-18T00:00:00	POINT (-83.055916 42.34)	Detroit	NBI	Non-NHS	9851.64	35.8	6802251	0.05	2024-05-28T00:00:00	24	A	7	6	6	N
714	Sterling Heights	Metro	6432	""	18.5 MILE RD	PLUM BROOK DRAIN	EAST OF RYAN RD	5 Highway-pedestrian	5 Waterway	2000				1	46	33.1	1	1 Concrete	19 Culvert	0	""	""	6 Bituminous	9 MS22.5(HS25)or greater	3		42.6	-83.05792	2025-08-18T00:00:00	POINT (-83.05792 42.6)	Macomb	NBI	Non-NHS	1522.6	0	805208	0.69	2024-09-04T00:00:00	24	A	N	N	N	8
715	MDOT	Metro	11712	82193-S09	PEMBROKE AVE	M-39	IN DETROIT	5 Highway-pedestrian	1 Highway	1962	2010			2	108.6	67.5	2	5 Prestressed Concrete	05 Box Bm/Gird- Multiple	0	""	""	1 Monolithic Concrete	B Greater than HL 93	2	6	42.44	-83.219536	2025-08-18T00:00:00	POINT (-83.219536 42.44)	Detroit	NBI	Non-NHS	7330.5	44	1584502	0.42	2025-06-12T00:00:00	24	A	7	8	7	N
716	Wayne County	Metro	12260	""	DENTON ROAD	LOWER ROUGE RIVER	CANTON          N/PROCTOR	5 Highway-pedestrian	5 Waterway	1976	2001	2001		1	34	40	1	5 Prestressed Concrete	05 Box Bm/Gird- Multiple	0	""	""	5 Epoxy Overlay	6 MS18(HS20)+mod	2		42.3	-83.52576	2025-08-18T00:00:00	POINT (-83.52576 42.3)	Taylor	NBI	Non-NHS	1360	36.5	1599103	3.44	2025-06-10T00:00:00	24	A	6	7	5	N
717	MDOT	Metro	11646	82191-S05	VREELAND RD	I-75	S LTS OF WOODHAVEN	5 Highway-pedestrian	1 Highway	2002				2	185	44	2	5 Prestressed Concrete	05 Box Bm/Gird- Multiple	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	2	6	42.11	-83.24138	2025-08-18T00:00:00	POINT (-83.24138 42.11)	Taylor	NBI	Non-NHS	8140	40.7	1606105	2.24	2024-05-23T00:00:00	24	A	7	6	7	N
718	Other Local Agencies	Metro	13375	""	DINGELL RD	FRANK AND POET DRAIN	875 FT N OF EUREKA	1 Highway	5 Waterway	1991				2	21.8	128.9	2	1 Concrete	19 Culvert	0	""	""	N N/A (no deck (NBI))	9 MS22.5(HS25)or greater	4		42.19	-83.36368	2025-08-18T00:00:00	POINT (-83.36368 42.19)	Taylor	NBI	Non-NHS	2810.02	132	4711337	0.17	2025-05-29T00:00:00	24	A	N	N	N	6
719	Dearborn	Metro	12321	""	SCHAEFER ROAD	ROUGE RIVER CHANNEL	IN DEARBORN	5 Highway-pedestrian	5 Waterway	1969	1981		1969	5	387.4	86.4	5	4 Steel Continuous	32 Multi Str Comp	0	""	""	5 Epoxy Overlay	9 MS22.5(HS25)or greater	4		42.29	-83.167305	2025-08-18T00:00:00	POINT (-83.167305 42.29)	Taylor	NBI	NHS	33471.36	68	4706528	0.95	2025-07-18T00:00:00	24	A	5	6	6	N
720	MDOT	Metro	14028	63174-B02-6	I-75 SB OFF RAMP	RED RUN DRAIN PATH	IN MADISON HEIGHTS	1 Highway	3 Pedestrian-bicycle	2022				1	31.7	27	1	1 Concrete	19 Culvert	0	""	""	4 Low Slump Concrete	B Greater than HL 93	1		42.51	-83.11601	2025-08-18T00:00:00	POINT (-83.11601 42.51)	Oakland	NBI	NHS	855.9	27	664209	0.21	2025-04-16T00:00:00	24	A	N	N	N	8
721	MDOT	Metro	6116	50062-S03-1	M-3 NB GRATIOT AVE	I-696	IN ROSEVILLE	5 Highway-pedestrian	1 Highway	1972	2006		2000	2	190	65.7	2	3 Steel	82 Pl Girder Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	3	6	42.49	-82.938255	2025-08-18T00:00:00	POINT (-82.938255 42.49)	Macomb	NBI	NHS	12483	53.3	804806	3.41	2023-09-22T00:00:00	24	A	7	6	6	N
722	MDOT	Metro	11462	82112-S32-7	GREENFIELD RD TURN	M-10	IN DETROIT	1 Highway	1 Highway	1964		1964	1979	2	110.8	20.3	2	3 Steel	32 Multi Str Comp	0	""	""	6 Bituminous	5 MS 18 (HS 20)	1	6	42.44	-83.19996	2025-08-18T00:00:00	POINT (-83.19996 42.44)	Detroit	NBI	Non-NHS	2249.24	14.8	1803802	0	2024-08-27T00:00:00	24	A	6	7	5	N
723	MDOT	Metro	7983	63111-S01-1	I-75 BL NB	OPDYKE ROAD	S LTS OF PONTIAC	1 Highway	1 Highway	1966	2004		2004	3	154.2	64.3	3	3 Steel	32 Multi Str Comp	0	""	""	5 Epoxy Overlay	9 MS22.5(HS25)or greater	3	5	42.6	-83.24788	2025-08-18T00:00:00	POINT (-83.24788 42.6)	Oakland	NBI	NHS	9915.06	61.1	625903	1.58	2025-05-08T00:00:00	24	A	7	7	7	N
724	Oakland County	Metro	8185	""	ANDERSONVILLE RD	CLINTON RIVER	BET AIRPORT AND CLEMENT R	1 Highway	5 Waterway	1990				1	27.9	49.9	1	5 Prestressed Concrete	05 Box Bm/Gird- Multiple	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	2		42.71	-83.427704	2025-08-18T00:00:00	POINT (-83.427704 42.71)	Oakland	NBI	Non-NHS	1392.21	46	650409	0.87	2024-07-18T00:00:00	24	A	6	6	7	N
725	MDOT	Metro	11402	82111-S14-5	BAGLEY AV RAMPS	M-10	IN DETROIT	1 Highway	1 Highway	1954	1997	1997	1997	1	77.6	80.7	1	3 Steel	32 Multi Str Comp	0	""	""	5 Epoxy Overlay	5 MS 18 (HS 20)	4	3	42.33	-83.06148	2025-08-18T00:00:00	POINT (-83.06148 42.33)	Detroit	NBI	NHS	6262.32	77.8	1585404	0.12	2024-05-15T00:00:00	24	A	5	6	6	N
726	Wayne County	Metro	12138	""	WALTZ ROAD	SWAN CREEK	HURON T          S/WILLOW	1 Highway	5 Waterway	1983				1	37.7	46.9	1	5 Prestressed Concrete	05 Box Bm/Gird- Multiple	0	0 Other	00 Other	1 Monolithic Concrete	6 MS18(HS20)+mod	2		42.11	-83.40157	2025-08-18T00:00:00	POINT (-83.40157 42.11)	Taylor	NBI	Non-NHS	1768.13	43	1673810	1.47	2024-08-15T00:00:00	24	A	5	6	5	N
727	MDOT	Metro	11755	82194-S26	RMP I-96E TO I-75N	I-75 NB AND EXIT RAMP	IN DETROIT	1 Highway	1 Highway	1970		1998	1998	3	266.6	27.9	3	3 Steel	82 Pl Girder Comp	0	""	""	3 Latex Concrete/Similar	6 MS18(HS20)+mod	1	3	42.33	-83.08383	2025-08-18T00:00:00	POINT (-83.08383 42.33)	Detroit	NBI	NHS	7438.14	24.9	1590406	0.39	2024-06-10T00:00:00	24	A	6	6	6	N
728	Macomb County	Metro	6281	""	CLINTON RIVER RD	KUKUK DRAIN	0.1 MI NORTH OF 17 MILE	5 Highway-pedestrian	5 Waterway	1977				2	23	39.4	2	1 Concrete	19 Culvert	0	""	""	N N/A (no deck (NBI))	4 M 18 (H 20)	2		42.59	-82.9405	2025-08-18T00:00:00	POINT (-82.9405 42.59)	Macomb	NBI	Non-NHS	906.2	0	820606	3.15	2025-05-14T00:00:00	24	A	N	N	N	6
729	Macomb County	Metro	13399	""	MT VERNON RD	TRIBUTARY OF STONEY CRK	0.3 MI S OF 31 MI RD	1 Highway	5 Waterway	2007				1	35	43.9	1	5 Prestressed Concrete	05 Box Bm/Gird- Multiple	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	2		42.78	-83.088165	2025-08-18T00:00:00	POINT (-83.088165 42.78)	Macomb	NBI	Non-NHS	1536.5	40	816905	0.31	2023-08-01T00:00:00	24	A	7	8	7	N
730	Detroit	Metro	12448	""	ASHLAND AVE	FOX CREEK	SOUTH OF JEFFERSON	5 Highway-pedestrian	5 Waterway	2006				1	42.3	42	1	1 Concrete	11 Arch- Deck, Filled Sp	0	""	""	1 Monolithic Concrete	0 Unknown	2		42.37	-82.939445	2025-08-18T00:00:00	POINT (-82.939445 42.37)	Detroit	NBI	Non-NHS	1776.6	27.9	1635002	0.92	2024-06-27T00:00:00	24	A	7	7	7	N
731	MDOT	Metro	11972	82293-S09	I-275 SB	M-14	0.3 MI W OF LIVONIA	1 Highway	1 Highway	1971		2001	1971	4	437	64.8	4	3 Steel	02 Multi Str Non Comp	0	""	""	5 Epoxy Overlay	5 MS 18 (HS 20)	4	8	42.39	-83.43703	2025-08-18T00:00:00	POINT (-83.43703 42.39)	Taylor	NBI	NHS	28317.6	60.5	1607610	21.75	2023-10-10T00:00:00	24	A	5	7	6	N
732	Other Local Agencies	Metro	12734	""	SB RMP/TERMINAL DR	LOWER ACC'S RD&ROGELL DR	DETROIT METRO AIRPORT	1 Highway	1 Highway	1997			1997	5	199.9	34.8	5	3 Steel	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	6 MS18(HS20)+mod	2	5	42.22	-83.34884	2025-08-18T00:00:00	POINT (-83.34884 42.22)	Taylor	NBI	Non-NHS	6956.52	24.6	4711491	0.03	2025-05-30T00:00:00	24	A	6	6	6	N
733	MDOT	Metro	11653	82191-S11	SIBLEY RD	I-75	0.8 MI S OF TAYLOR	1 Highway	1 Highway	2006				2	200	83.3	2	3 Steel	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	9 MS22.5(HS25)or greater	5	6	42.17	-83.243095	2025-08-18T00:00:00	POINT (-83.243095 42.17)	Taylor	NBI	Non-NHS	16660	80	1607308	8.22	2024-07-09T00:00:00	24	A	7	7	8	N
734	MDOT	Metro	11694	82192-S16	EB FULLERTON AVE	M-39	IN DETROIT	5 Highway-pedestrian	1 Highway	1964	2010			4	166.7	54.7	4	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	6 MS18(HS20)+mod	1	8	42.38	-83.2169	2025-08-18T00:00:00	POINT (-83.2169 42.38)	Detroit	NBI	Non-NHS	9118.49	46.2	4710521	0.02	2023-08-17T00:00:00	24	A	8	7	7	N
735	Southfield	Metro	8296	""	FRANKLIN RD	PERNICK CREEK	IN SOUTHFIELD	1 Highway	5 Waterway	1992				1	22	62	1	1 Concrete	19 Culvert	0	""	""	N N/A (no deck (NBI))	6 MS18(HS20)+mod	5		42.48	-83.28886667	2025-08-18T00:00:00	POINT (-83.28886667 42.48)	Oakland	NBI	Non-NHS	1364	0	638109	1.46	2023-09-20T00:00:00	24	A	N	N	N	7
736	Wayne County	Metro	12103	""	RIDGE ROAD	LOWER ROUGE RIVER	CANTON          N/PROCTOR	1 Highway	5 Waterway	1979				1	30.8	35.8	1	0 Other	19 Culvert	0	0 Other	00 Other	N N/A (no deck (NBI))	6 MS18(HS20)+mod	2		42.3	-83.54199	2025-08-18T00:00:00	POINT (-83.54199 42.3)	Taylor	NBI	Non-NHS	1102.64	36.1	4603889	1.48	2025-06-10T00:00:00	24	A	N	N	N	5
737	MDOT	Metro	11177	82023-S09	JUNCTION ST	I-94	IN DETROIT	5 Highway-pedestrian	1 Highway	1950	1996		2012	4	171.1	57.8	4	3 Steel	02 Multi Str Non Comp	0	""	""	5 Epoxy Overlay	5 MS 18 (HS 20)	4	6	42.34	-83.118355	2025-08-18T00:00:00	POINT (-83.118355 42.34)	Detroit	NBI	Non-NHS	9889.58	44	1577210	0.71	2024-06-07T00:00:00	24	A	7	6	6	N
738	Macomb County	Metro	6212	""	24 MILE ROAD	MIDDLE BRANCH CLINTON R	0.5 MI EAST OF MOUND RD	5 Highway-pedestrian	5 Waterway	1964				1	22	39.4	1	3 Steel	19 Culvert	0	""	""	N N/A (no deck (NBI))	4 M 18 (H 20)	2		42.68	-83.04381	2025-08-18T00:00:00	POINT (-83.04381 42.68)	Macomb	NBI	Non-NHS	866.8	0	815510	2.56	2023-07-26T00:00:00	24	A	N	N	N	6
739	MDOT	Metro	6059	50023-S04-3	M-59 EB	RYAN RD	1.5 MI W OF UTICA	1 Highway	1 Highway	1972	2009		2005	1	116.8	68.6	1	3 Steel	82 Pl Girder Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	2	2	42.62	-83.07177	2025-08-18T00:00:00	POINT (-83.07177 42.62)	Macomb	NBI	NHS	8012.48	65.3	807710	1	2025-05-14T00:00:00	24	A	7	7	7	N
740	MDOT	Metro	7862	63052-B01-2	US-24 SB	CLINTON RIVER	IN PONTIAC	1 Highway	5 Waterway	1957		2005		2	48.5	74.1	2	2 Concrete Continuous	01 Slab	0	""	""	3 Latex Concrete/Similar	5 MS 18 (HS 20)	4		42.62	-83.32493	2025-08-18T00:00:00	POINT (-83.32493 42.62)	Oakland	NBI	NHS	3593.85	65.9	4412692	0.08	2025-03-06T00:00:00	24	A	6	6	7	N
741	MDOT	Metro	11802	82251-S04	I-75 S E TURN RD	I-375	IN DETROIT OVER I-375	1 Highway	1 Highway	1964	1998		2007	5	391.2	30.8	5	3 Steel	82 Pl Girder Comp	0	""	""	1 Monolithic Concrete	6 MS18(HS20)+mod	1	10	42.34	-83.0434	2025-08-18T00:00:00	POINT (-83.0434 42.34)	Detroit	NBI	NHS	12048.96	27.6	1585606	0.29	2025-02-06T00:00:00	24	A	7	7	4	N
742	MDOT	Metro	6106	50061-S40	NB SERVICE RD	RAMPS C&E OFF I-696	CITY OF WARREN	5 Highway-pedestrian	1 Highway	1976		2008		1	167.6	49.7	1	3 Steel	82 Pl Girder Comp	0	""	""	5 Epoxy Overlay	9 MS22.5(HS25)or greater	2	3	42.49	-83.04491	2025-08-18T00:00:00	POINT (-83.04491 42.49)	Macomb	NBI	Non-NHS	8329.72	40.7	1740304	0.79	2025-04-09T00:00:00	24	A	6	7	6	N
743	Wayne County	Metro	12147	""	FARMINGTON ROAD	TARABUSI DRAIN	LIVONIA      N/SEVEN MILE	5 Highway-pedestrian	5 Waterway	1922	1967	1994		1	34	74	1	1 Concrete	04 Tee Beam	0	""	""	5 Epoxy Overlay	6 MS18(HS20)+mod	5		42.43	-83.375145	2025-08-18T00:00:00	POINT (-83.375145 42.43)	Taylor	NBI	NHS	2516	60	1690602	5.61	2025-06-17T00:00:00	24	A	5	6	5	N
744	MDOT	Metro	11625	82191-B01	I-75 SB	BLAKELY DRAIN	0.2 MI S OF TAYLOR	1 Highway	5 Waterway	1964	2018		2018	1	41.5	80.8	1	3 Steel	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	6 MS18(HS20)+mod	4		42.18	-83.2439	2025-08-18T00:00:00	POINT (-83.2439 42.18)	Taylor	NBI	NHS	3353.2	77.5	1595106	8.07	2024-07-26T00:00:00	24	A	7	8	6	N
745	MDOT	Metro	11493	82122-S07	BROOKFIELD AVE	I-96	IN LIVONIA	5 Highway-pedestrian	1 Highway	1974	2014		2001	2	176	46.8	2	3 Steel	02 Multi Str Non Comp	0	""	""	1 Monolithic Concrete	4 M 18 (H 20)	2	9	42.38	-83.36571	2025-08-18T00:00:00	POINT (-83.36571 42.38)	Taylor	NBI	Non-NHS	8236.8	34	1606305	0.01	2024-11-11T00:00:00	24	A	7	7	7	N
746	Macomb County	Metro	6227	""	32 MILE ROAD	N BR CLINTON RIVER	0.4 MI W OF ROMEO PLANK	1 Highway	5 Waterway	2016				1	91.9	42.4	1	5 Prestressed Concrete	06 Box Bms- Single/Sprd	0	""	""	1 Monolithic Concrete	B Greater than HL 93	2		42.81	-82.96832222	2025-08-18T00:00:00	POINT (-82.96832222 42.81)	Macomb	NBI	Non-NHS	3896.56	40	815804	6.72	2024-10-13T00:00:00	24	A	7	8	8	N
747	MDOT	Metro	6115	50062-S02	GROVELAND AVE	I-696	IN ROSEVILLE	5 Highway-pedestrian	1 Highway	1972	2005		2005	2	200	66.4	2	4 Steel Continuous	82 Pl Girder Comp	0	""	""	1 Monolithic Concrete	2 M 13.5 (H 15)	4	8	42.49	-82.947685	2025-08-18T00:00:00	POINT (-82.947685 42.49)	Macomb	NBI	Non-NHS	13280	52	4208737	0.86	2023-09-22T00:00:00	24	A	7	7	6	N
748	MDOT	Metro	11831	82251-S30	I-75S TO I-94E RMP	I-94	IN DETROIT	7 3d level interchg	1 Highway	1962		1979	1983	3	274	29.2	3	3 Steel	82 Pl Girder Comp	0	""	""	3 Latex Concrete/Similar	6 MS18(HS20)+mod	1	8	42.37	-83.05735556	2025-08-18T00:00:00	POINT (-83.05735556 42.37)	Detroit	NBI	NHS	8000.8	26.2	1577708	0.06	2024-04-11T00:00:00	24	A	5	7	6	N
749	MDOT	Metro	11826	82251-S25	I-75NB&I-94WB RAMP	I-75 & RAMP	IN DETROIT	6 2d level interchg	1 Highway	1964	2002		1983	9	771.6	29.2	9	3 Steel	82 Pl Girder Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	1	7	42.37	-83.05736	2025-08-18T00:00:00	POINT (-83.05736 42.37)	Detroit	NBI	NHS	22530.72	25.9	1577704	0.03	2025-01-15T00:00:00	24	A	7	6	5	N
750	Pontiac	Metro	8261	""	SANDERSON AVE	AUGUSTA DRAIN	0.15 MI SW OF CASS AVE	5 Highway-pedestrian	5 Waterway	1969				1	27.9	100	1	1 Concrete	06 Box Bms- Single/Sprd	0	""	""	6 Bituminous	6 MS18(HS20)+mod	2		42.64	-83.30171	2025-08-18T00:00:00	POINT (-83.30171 42.64)	Oakland	NBI	Non-NHS	2790	35.5	673002	0.17	2024-07-23T00:00:00	24	A	7	7	6	N
751	MDOT	Metro	7948	63102-S35	MEADOWLARK U EAST	I-696	0.1 M W OF EVERGREEN	1 Highway	1 Highway	1986				2	130	34.8	2	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	9 MS22.5(HS25)or greater	2	6	42.49	-83.242874	2025-08-18T00:00:00	POINT (-83.242874 42.49)	Oakland	NBI	Non-NHS	4524	30.5	4401067	0.01	2024-07-19T00:00:00	24	A	6	7	7	N
752	MDOT	Metro	6149	50111-S03	9 MI RD NB TURN RD	I-94	W LTS OF ST CLAIR SHORES	1 Highway	1 Highway	1967		2002	1967	4	184	28.6	4	3 Steel	32 Multi Str Comp	0	""	""	0 None	6 MS18(HS20)+mod	1	6	42.47	-82.92035	2025-08-18T00:00:00	POINT (-82.92035 42.47)	Macomb	NBI	Non-NHS	5262.4	25.4	800908	0.02	2025-07-09T00:00:00	24	A	6	6	5	N
753	Grosse Isle Toll Bridge	Metro	12306	""	GROSSE ILE TOLL BR	TRENTON CHANNEL	BET.RIVERVIEW & GROSS-ILE	1 Highway	5 Waterway	1913				5	1030.2	24.7	1	4 Steel Continuous	17 Movable- Swing	4	3 Steel	10 Truss- Thru and Pony	0 None	6 MS18(HS20)+mod	2		42.17	-83.16017	2025-08-18T00:00:00	POINT (-83.16017 42.17)	Taylor	NBI	Non-NHS	25445.94	21.3	4705855	0.25	2024-05-23T00:00:00	24	P	4	4	4	N
754	MDOT	Metro	8120	63191-S05-4	I-96 WB	I-696	@ I-96/I-696 INTERCHANGE	6 2d level interchg	1 Highway	1971			2006	4	287.3	44.4	4	3 Steel	02 Multi Str Non Comp	0	""	""	5 Epoxy Overlay	6 MS18(HS20)+mod	2	4	42.49	-83.43172	2025-08-18T00:00:00	POINT (-83.43172 42.49)	Oakland	NBI	NHS	12756.12	42	639107	0.78	2024-11-22T00:00:00	24	A	6	7	7	N
755	MDOT	Metro	11480	82122-B02	I-96	ROUGE RIVER	IN DETROIT	1 Highway	5 Waterway	1970	2003			3	270	175.8	3	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	6 MS18(HS20)+mod	10		42.39	-83.26679	2025-08-18T00:00:00	POINT (-83.26679 42.39)	Detroit	NBI	NHS	47466	169.2	1606201	9.35	2024-04-25T00:00:00	24	A	7	8	8	N
756	MDOT	Metro	8007	63172-S06-2	I-75 SB	M-24 & I-75 BL	@ I-75 , M-24	1 Highway	1 Highway	1962	1988	1988		4	193.8	71.3	4	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	3 Latex Concrete/Similar	6 MS18(HS20)+mod	4	4	42.68	-83.24355	2025-08-18T00:00:00	POINT (-83.24355 42.68)	Oakland	NBI	NHS	13817.94	67.3	646106	21.51	2023-12-19T00:00:00	24	A	7	7	7	N
757	MDOT	Metro	8030	63173-B01	I-75	DEERLAKE CREEK	1.4 MI W OF M-15	1 Highway	5 Waterway	1962		1962		2	24.5	53.8	2	1 Concrete	19 Culvert	0	""	""	6 Bituminous	6 MS18(HS20)+mod	6		42.74	-83.44587	2025-08-18T00:00:00	POINT (-83.44587 42.74)	Oakland	NBI	NHS	1318.1	155.5	647308	33.49	2024-12-26T00:00:00	24	A	N	N	N	7
758	MDOT	Metro	11898	82291-S02	WILLOW RD	I-275	0.8 MI E OF WILLOW	1 Highway	1 Highway	1974			2009	2	286	48.4	2	3 Steel	82 Pl Girder Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	2	6	42.12	-83.377655	2025-08-18T00:00:00	POINT (-83.377655 42.12)	Taylor	NBI	Non-NHS	13842.4	44.5	1670406	8.35	2024-05-29T00:00:00	24	A	5	7	7	N
759	MDOT	Metro	11522	82122-S34	LFT TRN BEECH DALY	I-96	IN REDFORD TWP	1 Highway	1 Highway	1974		2001		2	176.5	23.7	2	3 Steel	02 Multi Str Non Comp	0	""	""	5 Epoxy Overlay	5 MS 18 (HS 20)	2	8	42.39	-83.29642	2025-08-18T00:00:00	POINT (-83.29642 42.39)	Taylor	NBI	Non-NHS	4183.05	20	1803910	0.02	2024-09-27T00:00:00	24	A	6	6	7	N
760	Pontiac	Metro	13772	""	JOHNSON STREET	PONTIAC CREEK	SW OF N CASS AVE	1 Highway	5 Waterway	1969				1	26	48	1	1 Concrete	04 Tee Beam	0	""	""	4 Low Slump Concrete	0 Unknown	2		42.64	-83.3051	2025-08-18T00:00:00	POINT (-83.3051 42.64)	Oakland	NBI	Non-NHS	1248	24	673005	0.62	2024-07-23T00:00:00	24	A	6	7	5	N
761	MDOT	Metro	11515	82122-S27	MERRIMAN ROAD LT T	I-96	IN LIVONIA	1 Highway	1 Highway	1973	2014		2001	2	176	22.4	2	3 Steel	02 Multi Str Non Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	2	8	42.38	-83.354614	2025-08-18T00:00:00	POINT (-83.354614 42.38)	Taylor	NBI	Non-NHS	3942.4	20	1803808	0.02	2024-11-12T00:00:00	24	A	8	6	7	N
762	Wayne County	Metro	12212	""	EAST RIVER ROAD	N HICKORY CANAL	GROSSE ILE T       S/GROH	5 Highway-pedestrian	5 Waterway	2020				1	65	41.17	1	5 Prestressed Concrete	06 Box Bms- Single/Sprd	0	""	""	1 Monolithic Concrete	B Greater than HL 93	2		42.1	-83.15072	2025-08-18T00:00:00	POINT (-83.15072 42.1)	Taylor	NBI	Non-NHS	2676.05	26	1690910	0.96	2025-03-03T00:00:00	24	A	8	8	8	N
763	Macomb County	Metro	6301	""	GATES ROAD	EAST MILL LAKE OUTLET	1.1 MI WEST OF VAN DYKE	1 Highway	5 Waterway	2003				1	58	43.9	1	5 Prestressed Concrete	05 Box Bm/Gird- Multiple	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	2		42.81	-83.04395	2025-08-18T00:00:00	POINT (-83.04395 42.81)	Macomb	NBI	Non-NHS	2546.2	40	822607	1.84	2024-05-01T00:00:00	24	A	7	8	8	N
764	Macomb County	Metro	6405	""	INWOOD ROAD	STONY CREEK	0.6 MI EAST OF MT VERNON	1 Highway	5 Waterway	1960				2	28.9	32.8	2	3 Steel	19 Culvert	0	""	""	N N/A (no deck (NBI))	4 M 18 (H 20)	2		42.76	-83.07445	2025-08-18T00:00:00	POINT (-83.07445 42.76)	Macomb	NBI	Non-NHS	947.92	0	815801	1.17	2025-07-25T00:00:00	12	K	N	N	N	2
765	MDOT	Metro	13318	82194-S35	RMP TO SB I-75	I-75 AND I-96	AMBASSADOR GATEWAY	1 Highway	1 Highway	2007			2007	4	530.8	49.5	4	4 Steel Continuous	82 Pl Girder Comp	0	""	""	2 Integral Concrete	9 MS22.5(HS25)or greater	2		42.32	-83.0827	2025-08-18T00:00:00	POINT (-83.0827 42.32)	Detroit	NBI	NHS	26274.6	46	4718923	0.11	2024-06-14T00:00:00	24	A	7	7	8	N
766	Macomb County	Metro	6312	""	SASS ROAD	FISH CREEK	0.5 MI NORTH OF 23 MILE	1 Highway	5 Waterway	1999				1	20	36.1	1	1 Concrete	19 Culvert	0	""	""	N N/A (no deck (NBI))	9 MS22.5(HS25)or greater	2		42.68	-82.78743	2025-08-18T00:00:00	POINT (-82.78743 42.68)	Macomb	NBI	Non-NHS	722	39.4	814708	0.99	2023-08-16T00:00:00	24	A	N	N	N	8
767	MDOT	Metro	11764	82195-S05	TRUMBULL AVE	I-75	IN DETROIT	5 Highway-pedestrian	1 Highway	1970	1995		1995	6	330.4	102.4	6	3 Steel	82 Pl Girder Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	6	12	42.33	-83.06848	2025-08-18T00:00:00	POINT (-83.06848 42.33)	Detroit	NBI	Non-NHS	33832.96	70	1577506	0.74	2024-10-07T00:00:00	24	A	6	7	7	N
768	Wayne County	Metro	12109	""	BELLEVILLE ROAD	HURON RIVER	BELLEVILLE         S/I-94	5 Highway-pedestrian	5 Waterway	1924	1995			3	177.8	74.5	3	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	2 Integral Concrete	0 Unknown	4		42.21	-83.49265	2025-08-18T00:00:00	POINT (-83.49265 42.21)	Taylor	NBI	Non-NHS	13246.1	52.2	4705580	0.05	2025-03-11T00:00:00	24	A	7	8	7	N
769	MDOT	Metro	11582	82123-S34	MAPLEWOOD AVE	I-96	IN DETROIT	5 Highway-pedestrian	1 Highway	1972	2007		2007	2	199.2	56.5	2	3 Steel	82 Pl Girder Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	2	8	42.36	-83.12222	2025-08-18T00:00:00	POINT (-83.12222 42.36)	Detroit	NBI	Non-NHS	11254.8	40	1581808	0.54	2023-09-26T00:00:00	24	A	7	6	6	N
770	Macomb County	Metro	6261	""	ROMEO PLANK RD	HEALY BROOK DRAIN	0.6MI NORTH OF 26 MILE RD	1 Highway	5 Waterway	1978				2	30.8	36.1	2	3 Steel	19 Culvert	0	""	""	N N/A (no deck (NBI))	4 M 18 (H 20)	2		42.73	-82.95986	2025-08-18T00:00:00	POINT (-82.95986 42.73)	Macomb	NBI	Non-NHS	1111.88	0	816509	1.69	2025-06-17T00:00:00	24	A	N	N	N	6
771	MDOT	Metro	7989	63132-R01	M-150	GTW RR,CLIN R,1ST&2ST	IN ROCHESTER (S MAIN ST)	5 Highway-pedestrian	8 Hwy-waterway-RR	1989				8	810	70.2	8	5 Prestressed Concrete	05 Box Bm/Gird- Multiple	0	""	""	3 Latex Concrete/Similar	9 MS22.5(HS25)or greater	4	4	42.67	-83.13348	2025-08-18T00:00:00	POINT (-83.13348 42.67)	Oakland	NBI	Non-NHS	56862	51.8	4413538	8.24	2025-05-15T00:00:00	24	A	6	6	5	N
772	Oakland County	Metro	8168	""	12 MILE RD	PEBBLE CREEK	BET MIDDLEBELT AND INKSTE	1 Highway	5 Waterway	1987				1	51.8	74.8	1	5 Prestressed Concrete	05 Box Bm/Gird- Multiple	0	""	""	6 Bituminous	6 MS18(HS20)+mod	3		42.5	-83.321396	2025-08-18T00:00:00	POINT (-83.321396 42.5)	Oakland	NBI	NHS	3874.64	44	4462980	9.96	2024-07-30T00:00:00	24	A	7	7	7	N
773	MDOT	Metro	7928	63102-S12	U-TURN W.OF GRNFLD	I-696	CITY OF SOUTHFIELD	5 Highway-pedestrian	1 Highway	1987				2	154.9	34.7	2	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	2	8	42.48	-83.20315	2025-08-18T00:00:00	POINT (-83.20315 42.48)	Oakland	NBI	Non-NHS	5375.03	30.5	4413508	0.01	2024-07-09T00:00:00	24	A	6	6	7	N
774	MDOT	Metro	11337	82081-S05	M-153 WB	HINES DRIVE	DEARBORN HG OVER HINES DR	1 Highway	1 Highway	1971	2022		2005	2	167.8	65.9	2	3 Steel	82 Pl Girder Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	4	5	42.33	-83.24514	2025-08-18T00:00:00	POINT (-83.24514 42.33)	Taylor	NBI	NHS	11058.02	63.5	1924107	1.07	2024-05-14T00:00:00	24	A	8	7	8	N
775	Novi	Metro	8247	""	WILLOWBROOK ST	COURTER DITCH	0.3 MI S OF TEN MILE RD	5 Highway-pedestrian	5 Waterway	1974		2001		1	46.9	39.4	1	5 Prestressed Concrete	04 Tee Beam	0	""	""	6 Bituminous	6 MS18(HS20)+mod	2		42.46	-83.44522	2025-08-18T00:00:00	POINT (-83.44522 42.46)	Oakland	NBI	Non-NHS	1847.86	25.9	657903	0.21	2024-09-27T00:00:00	24	A	6	6	6	N
776	Oakland County	Metro	14038	""	EDGEORGE STREET	CLINTON RIVER	0.25 MI S OF M-59	1 Highway	5 Waterway	1956				2	26	22.5	2	3 Steel	19 Culvert	0	""	""	6 Bituminous	5 MS 18 (HS 20)	2		42.65	-83.396385	2025-08-18T00:00:00	POINT (-83.396385 42.65)	Oakland	NBI	Non-NHS	585	22.5	697302	0.13	2024-10-15T00:00:00	24	K	N	N	N	2
777	MDOT	Metro	7837	63043-R02	M-59 EB	CLINTON RIVER TRAIL	2.5 MI E OF I-75	1 Highway	3 Pedestrian-bicycle	1966	2010	2010	2010	3	201.3	68.1	3	3 Steel	32 Multi Str Comp	0	""	""	3 Latex Concrete/Similar	9 MS22.5(HS25)or greater	3		42.64	-83.18934	2025-08-18T00:00:00	POINT (-83.18934 42.64)	Oakland	NBI	NHS	13708.53	65.1	648906	26.37	2025-05-20T00:00:00	24	A	5	6	6	N
778	MDOT	Metro	7887	63081-S14	LAHSER RD	M-10	IN SOUTHFIELD	5 Highway-pedestrian	1 Highway	1963	1998		1998	2	134.8	100.4	2	3 Steel	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	2 M 13.5 (H 15)	7	6	42.48	-83.26121	2025-08-18T00:00:00	POINT (-83.26121 42.48)	Oakland	NBI	Non-NHS	13533.92	87.9	685510	2.76	2025-06-17T00:00:00	24	A	7	6	6	N
779	MDOT	Metro	12664	82022-S56	VINING RD	I-94	CITY OF ROMULUS	5 Highway-pedestrian	1 Highway	1996		1996	1996	4	549.9	71.2	4	3 Steel	82 Pl Girder Comp	0	""	""	5 Epoxy Overlay	5 MS 18 (HS 20)	4	6	42.23	-83.36789	2025-08-18T00:00:00	POINT (-83.36789 42.23)	Taylor	NBI	Non-NHS	39152.88	68	4711341	1.31	2023-08-22T00:00:00	24	A	7	7	7	N
780	MDOT	Metro	7984	63111-S01-2	I-75 BL SB	OPDYKE ROAD	S LTS OF PONTIAC	1 Highway	1 Highway	1966	2004		2004	3	153.9	64.3	3	3 Steel	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	9 MS22.5(HS25)or greater	3	5	42.6	-83.24787	2025-08-18T00:00:00	POINT (-83.24787 42.6)	Oakland	NBI	NHS	9895.77	61	625912	1.2	2025-05-08T00:00:00	24	A	7	6	7	N
781	MDOT	Metro	7889	63081-S15-4	NORTHLAND DR WB	M-10	IN SOUTHFIELD	1 Highway	1 Highway	1965	2000		2001	3	162.3	59.4	3	3 Steel	32 Multi Str Comp	0	""	""	3 Latex Concrete/Similar	4 M 18 (H 20)	3	10	42.45	-83.20531	2025-08-18T00:00:00	POINT (-83.20531 42.45)	Oakland	NBI	Non-NHS	9640.62	53.8	4406956	0.33	2024-08-08T00:00:00	24	A	6	7	7	N
782	MDOT	Metro	11488	82122-S02	NEWBURGH RD	I-96	IN LIVONIA	5 Highway-pedestrian	1 Highway	1974	2014		2001	2	178.5	76.8	2	3 Steel	02 Multi Str Non Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	4	8	42.38	-83.41201	2025-08-18T00:00:00	POINT (-83.41201 42.38)	Taylor	NBI	Non-NHS	13708.8	64	4710394	7.02	2024-10-17T00:00:00	24	A	7	7	7	N
783	MDOT	Metro	11525	82122-S37	LFT TRN E OF LEVAN	I-96	IN LIVONIA	1 Highway	1 Highway	1974	2014		2014	2	176	26.4	2	3 Steel	02 Multi Str Non Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	1	8	42.38	-83.40073	2025-08-18T00:00:00	POINT (-83.40073 42.38)	Taylor	NBI	Non-NHS	4646.4	24	1804003	0.02	2024-10-04T00:00:00	24	A	7	8	8	N
784	Westland	Metro	12523	""	ANN ARBOR TRAIL	MIDDLE RIVER ROUGE	IN WESTLAND	5 Highway-pedestrian	5 Waterway	1996				3	67.9	49.9	3	5 Prestressed Concrete	05 Box Bm/Gird- Multiple	0	""	""	5 Epoxy Overlay	5 MS 18 (HS 20)	2		42.35	-83.37286	2025-08-18T00:00:00	POINT (-83.37286 42.35)	Taylor	NBI	Non-NHS	3388.21	37.8	1604508	3.15	2025-04-14T00:00:00	24	A	7	7	6	N
785	MDOT	Metro	11632	82191-C02	M-85 SB	SMITH CREEK	1.5 MI N OF N HURON RI DR	1 Highway	5 Waterway	2008				1	22.6	33.5	1	1 Concrete	19 Culvert	0	""	""	1 Monolithic Concrete	B Greater than HL 93	2		42.08	-83.2431	2025-08-18T00:00:00	POINT (-83.2431 42.08)	Taylor	NBI	NHS	757.1	0	1592106	0.24	2024-07-26T00:00:00	24	A	N	N	N	7
786	MDOT	Metro	14268	63174-B05-2	I-75 SB	BARNARD DRAIN	0.3 MI S OF MAPLE ROAD	1 Highway	5 Waterway	2020				1	41	67.4	1	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	B Greater than HL 93	4		42.55	-83.1167	2025-08-18T00:00:00	POINT (-83.1167 42.55)	Oakland	NBI	NHS	2763.4	64	646106	7.19	2023-12-19T00:00:00	24	A	8	8	8	N
787	MDOT	Metro	11809	82251-S08-2	M-3 SB CONN	I-75 & I-375	IN DETROIT OVER I-375	1 Highway	1 Highway	1964	1998		2007	7	361.6	44.7	7	3 Steel	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	6 MS18(HS20)+mod	2	10	42.34	-83.04361	2025-08-18T00:00:00	POINT (-83.04361 42.34)	Detroit	NBI	NHS	16163.52	41	1595106	24.36	2024-10-21T00:00:00	24	A	7	7	7	N
788	MDOT	Metro	8124	63191-S09	GRAND RIVER AVE	I-275, I-96	S OF I-96/I-696 INTECHNG	1 Highway	1 Highway	1972			1998	5	400.5	62.4	5	3 Steel	02 Multi Str Non Comp	0	""	""	5 Epoxy Overlay	5 MS 18 (HS 20)	3	10	42.47	-83.43115	2025-08-18T00:00:00	POINT (-83.43115 42.47)	Oakland	NBI	Non-NHS	24991.2	58.5	4104142	13.67	2024-12-19T00:00:00	24	A	6	7	7	N
789	MDOT	Metro	11287	82053-B01	US-24	ROUGE RIVER	IN DEARBORN	5 Highway-pedestrian	5 Waterway	1937	2006			1	60.7	124.8	1	5 Prestressed Concrete	06 Box Bms- Single/Sprd	0	""	""	1 Monolithic Concrete	9 MS22.5(HS25)or greater	8		42.3	-83.27183	2025-08-18T00:00:00	POINT (-83.27183 42.3)	Taylor	NBI	NHS	7575.36	107	4700038	14.66	2024-08-12T00:00:00	24	A	7	8	7	N
790	Wayne County	Metro	12036	""	GODDARD ROAD EXT	MERRIMAN ROAD	ROMULUS            S/I-94	1 Highway	1 Highway	1964	2010		2010	4	167.6	37.2	4	4 Steel Continuous	32 Multi Str Comp	0	3 Steel	32 Multi Str Comp	1 Monolithic Concrete	5 MS 18 (HS 20)	2	6	42.24	-83.34058	2025-08-18T00:00:00	POINT (-83.34058 42.24)	Taylor	NBI	Non-NHS	6234.72	28	4711342	1.7	2024-09-13T00:00:00	24	A	5	7	6	N
791	MDOT	Metro	11192	82023-S24	M-10 EB	I-94	IN DETROIT	5 Highway-pedestrian	1 Highway	1953	2004		2004	6	297.5	53.8	6	3 Steel	02 Multi Str Non Comp	0	""	""	3 Latex Concrete/Similar	5 MS 18 (HS 20)	3	6	42.36	-83.07651	2025-08-18T00:00:00	POINT (-83.07651 42.36)	Detroit	NBI	NHS	16005.5	50.5	1577509	9.51	2024-04-22T00:00:00	24	A	8	8	6	N
792	MDOT	Metro	6094	50061-S28	M-97 GROESBECK HWY	I-696	IN WARREN	5 Highway-pedestrian	1 Highway	1973	2010		2000	2	240	106.4	2	4 Steel Continuous	82 Pl Girder Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	7	8	42.49	-82.96918	2025-08-18T00:00:00	POINT (-82.96918 42.49)	Macomb	NBI	NHS	25536	88	803009	3.52	2024-10-08T00:00:00	24	A	7	6	7	N
793	Oakland County	Metro	8157	""	JOHN R	BARNARD DRAIN	BET FOURTEEN AND MAPLE	5 Highway-pedestrian	5 Waterway	1976				2	34.8	64	2	1 Concrete	19 Culvert	0	""	""	6 Bituminous	6 MS18(HS20)+mod	5		42.55	-83.10753	2025-08-18T00:00:00	POINT (-83.10753 42.55)	Oakland	NBI	Non-NHS	2227.2	64	646806	6.79	2024-08-23T00:00:00	24	A	N	N	N	6
794	Macomb County	Metro	6381	""	31 MILE ROAD	TUPPER BROOK DRAIN	0.5 MI WEST OF NORTH AVE	1 Highway	5 Waterway	1964	2022		2022	1	32.5	30.4	1	3 Steel	06 Box Bms- Single/Sprd	0	""	""	1 Monolithic Concrete	B Greater than HL 93	2		42.79	-82.89143	2025-08-18T00:00:00	POINT (-82.89143 42.79)	Macomb	NBI	Non-NHS	988	28	4408230	10.88	2024-07-31T00:00:00	24	A	8	9	7	N
795	Macomb County	Metro	6323	""	LAKESHORE DRIVE	CHANNEL TO LAKE ST CLAIR	0.1 MI NORTH OF RIVERDALE	1 Highway	5 Waterway	2016				1	60	34.3	1	5 Prestressed Concrete	05 Box Bm/Gird- Multiple	0	""	""	1 Monolithic Concrete	B Greater than HL 93	2		42.59	-82.78972	2025-08-18T00:00:00	POINT (-82.78972 42.59)	Macomb	NBI	Non-NHS	2058	31.2	832302	1.11	2024-06-14T00:00:00	24	A	8	8	8	N
796	MDOT	Metro	11451	82112-S25-7	MYERS RD TURNAROUN	M-10	IN DETROIT	1 Highway	1 Highway	1963	2006		2006	2	111	22.4	2	3 Steel	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	1	6	42.41	-83.16956	2025-08-18T00:00:00	POINT (-83.16956 42.41)	Detroit	NBI	Non-NHS	2486.4	20	1803803	0	2024-08-27T00:00:00	24	A	7	7	7	N
797	MDOT	Metro	11445	82112-S20	DEXTER-BELDEN AVE	M-10 JOHN LODGE FRWY	IN DETROIT	5 Highway-pedestrian	1 Highway	1955	1994		1994	4	173.1	68	4	4 Steel Continuous	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	4	6	42.41	-83.13552	2025-08-18T00:00:00	POINT (-83.13552 42.41)	Detroit	NBI	Non-NHS	11770.8	44	1584607	0.14	2024-12-23T00:00:00	24	A	6	6	7	N
798	MDOT	Metro	11434	82112-S09	CALVERT AVE	M-10	IN DETROIT	5 Highway-pedestrian	1 Highway	1955	1991		1991	4	170.7	68	4	4 Steel Continuous	02 Multi Str Non Comp	0	""	""	3 Latex Concrete/Similar	5 MS 18 (HS 20)	2	6	42.38	-83.09955	2025-08-18T00:00:00	POINT (-83.09955 42.38)	Detroit	NBI	Non-NHS	11607.6	44	1584802	1.35	2023-12-13T00:00:00	24	A	5	6	5	N
799	Farmington	Metro	8237	""	POWER ROAD	UPPER ROUGE RIVER	0.1 MI N OF GRAND RIVER	5 Highway-pedestrian	5 Waterway	1940	1957			1	28.9	29.9	1	1 Concrete	19 Culvert	0	""	""	6 Bituminous	0 Unknown	2		42.46	-83.36656	2025-08-18T00:00:00	POINT (-83.36656 42.46)	Oakland	NBI	Non-NHS	864.11	38.1	4410108	0.43	2024-04-22T00:00:00	24	A	N	N	N	6
800	Oakland County	Metro	13647	""	SEYMOUR LAKE ROAD	PAINT CREEK	BRADON TWP SEC 26/35	1 Highway	5 Waterway	1962				2	21	52	2	3 Steel	19 Culvert	0	""	""	6 Bituminous	5 MS 18 (HS 20)	2		42.81	-83.35364	2025-08-18T00:00:00	POINT (-83.35364 42.81)	Oakland	NBI	Non-NHS	1092		627107	3.56	2025-07-23T00:00:00	6	P	N	N	N	3
801	Macomb County	Metro	6195	""	EB METRO PARKWAY	RED RUN DRAIN	0.1 MI WEST OF UTICA RD	5 Highway-pedestrian	5 Waterway	1958	2005			4	190	57.1	4	5 Prestressed Concrete	05 Box Bm/Gird- Multiple	0	""	""	1 Monolithic Concrete	9 MS22.5(HS25)or greater	3		42.57	-82.970856	2025-08-18T00:00:00	POINT (-82.970856 42.57)	Macomb	NBI	NHS	10849	42	803608	6	2025-04-18T00:00:00	24	A	7	6	6	N
802	MDOT	Metro	11127	82022-S17	I-94 EB	PELHAM RD	W LTS OF ALLEN PARK	1 Highway	1 Highway	1975	2004			1	125.4	61.7	1	3 Steel	82 Pl Girder Comp	0	""	""	1 Monolithic Concrete	9 MS22.5(HS25)or greater	3	4	42.27	-83.231705	2025-08-18T00:00:00	POINT (-83.231705 42.27)	Taylor	NBI	NHS	7737.18	59.7	1576405	16.74	2024-11-26T00:00:00	24	A	7	7	6	N
803	Macomb County	Metro	14318	""	28 MILE RD	DEER CREEK	1000' E OF PLACE RD	1 Highway	5 Waterway	1968				2	20.7	22	2	3 Steel	19 Culvert	0	""	""	8 Gravel	5 MS 18 (HS 20)	2		42.75	-82.8287	2025-08-18T00:00:00	POINT (-82.8287 42.75)	Macomb	NBI	Non-NHS	455.4	22	822109	0.61	2023-07-28T00:00:00	24	K	N	N	N	1
804	Oakland County	Metro	8211	""	MALONEY STREET	CLEAR-LONG LAKE CHANNEL	NORTH OF DRAHNER RD	1 Highway	5 Waterway	2022				1	23	20	1	1 Concrete	19 Culvert	0	""	""	6 Bituminous	B Greater than HL 93	2		42.81	-83.294044	2025-08-18T00:00:00	POINT (-83.294044 42.81)	Oakland	NBI	Non-NHS	460	27	671308	0.36	2024-07-11T00:00:00	24	A	N	N	N	8
805	Oakland County	Metro	13592	""	ORCHARD LAKE ROAD	UPPER ROUGE RIVER	BTWN M-5 & GRAND RIV AVE	1 Highway	5 Waterway	1955				4	52.1	27	4	1 Concrete	19 Culvert	0	""	""	6 Bituminous	0 Unknown	2		42.45	-83.35486	2025-08-18T00:00:00	POINT (-83.35486 42.45)	Oakland	NBI	Non-NHS	1406.7		633806	0.87	2024-07-30T00:00:00	24	A	N	N	N	6
806	MDOT	Metro	11377	82104-S05	EB M-8 RMP TO I-75	S SERVICE DRIVE, M-8	IN DETROIT O S SERVICE RD	1 Highway	1 Highway	1971		2003	2003	3	210	47.9	3	3 Steel	82 Pl Girder Comp	0	""	""	3 Latex Concrete/Similar	5 MS 18 (HS 20)	3	2	42.41	-83.083916	2025-08-18T00:00:00	POINT (-83.083916 42.41)	Detroit	NBI	NHS	10059	40.2	1591103	0.2	2023-10-24T00:00:00	24	A	4	7	7	N
807	MDOT	Metro	6179	50112-B01-3	I-94 EB	SALT RIVER	0.4 MI NE OF M-19	1 Highway	5 Waterway	1963		1996	2023	2	124	42.9	2	3 Steel	32 Multi Str Comp	0	""	""	5 Epoxy Overlay	6 MS18(HS20)+mod	2		42.71	-82.769936	2025-08-18T00:00:00	POINT (-82.769936 42.71)	Macomb	NBI	NHS	5319.6	39.5	798501	21.28	2025-06-10T00:00:00	24	A	6	7	7	N
808	MDOT	Metro	11611	82125-S01	I-96 EB	EIGHT MILE RD	IN LIVONIA	1 Highway	1 Highway	1974		1998	1998	2	166.9	81.7	2	3 Steel	32 Multi Str Comp	0	""	""	3 Latex Concrete/Similar	9 MS22.5(HS25)or greater	5	4	42.44	-83.43186	2025-08-18T00:00:00	POINT (-83.43186 42.44)	Taylor	NBI	NHS	13635.73	79.7	639202	3.99	2024-12-26T00:00:00	24	A	7	7	6	N
809	Oakland County	Metro	8193	""	WINKLER MILL	STONY CREEK	NORTH OF WASHINGTON RD	1 Highway	5 Waterway	1967				1	22	29.9	1	7 Timber	71 Slab-Timb Comp	0	""	""	6 Bituminous	6 MS18(HS20)+mod	2		42.71	-83.10296	2025-08-18T00:00:00	POINT (-83.10296 42.71)	Oakland	NBI	Non-NHS	657.8	26.6	667801	0.13	2024-09-26T00:00:00	12	P	4	4	3	N
810	Macomb County	Metro	6282	""	36 MILE RD	SECORD LAKE OUTLET	3.5 MILES WEST OF M-53	1 Highway	5 Waterway	1966				1	34.8	33.1	1	5 Prestressed Concrete	05 Box Bm/Gird- Multiple	0	""	""	6 Bituminous	5 MS 18 (HS 20)	2		42.86	-83.09255	2025-08-18T00:00:00	POINT (-83.09255 42.86)	Macomb	NBI	Non-NHS	1151.88	29.5	822708	0.46	2024-07-08T00:00:00	24	A	5	6	7	N
811	Dearborn Height	Metro	12329	""	HANOVER RD	ECORSE CREEK	DBN HGT CLIPPERT-CAMPBELL	5 Highway-pedestrian	5 Waterway	1977				1	41	43	1	5 Prestressed Concrete	05 Box Bm/Gird- Multiple	0	""	""	2 Integral Concrete	6 MS18(HS20)+mod	2		42.27	-83.24499	2025-08-18T00:00:00	POINT (-83.24499 42.27)	Taylor	NBI	Non-NHS	1763	24.9	1646505	0.29	2023-10-17T00:00:00	24	A	7	7	6	N
812	Wayne County	Metro	12127	""	LILLEY ROAD	TONQUISH CREEK	CANTON           N/WARREN	1 Highway	5 Waterway	1946		1986		1	25.9	46.3	1	1 Concrete	01 Slab	0	0 Other	00 Other	6 Bituminous	6 MS18(HS20)+mod	2		42.34	-83.45961	2025-08-18T00:00:00	POINT (-83.45961 42.34)	Taylor	NBI	Non-NHS	1199.17	44.3	4710390	4.47	2025-05-30T00:00:00	12	A	4	4	3	N
813	MDOT	Metro	13756	63201-C03	I-75 BR	CLINTON RIVER	AT ORCHARD LAKE RD	5 Highway-pedestrian	5 Waterway	1964				2	35	50	2	1 Concrete	19 Culvert	0	""	""	1 Monolithic Concrete	6 MS18(HS20)+mod	4		42.63	-83.293	2025-08-18T00:00:00	POINT (-83.293 42.63)	Oakland	NBI	NHS	1750	50	641407	0.82	2024-10-29T00:00:00	20	A	N	N	N	6
814	MDOT	Metro	11961	82293-R03	I-275 SB	CSX RR	1.0 MI W OF LIVONIA	1 Highway	2 Railroad	1972	2012		2012	3	206	61.2	3	3 Steel	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	3		42.34	-83.44124	2025-08-18T00:00:00	POINT (-83.44124 42.34)	Taylor	NBI	NHS	12607.2	58	1607610	18.78	2024-10-31T00:00:00	24	A	8	7	7	N
815	MDOT	Metro	7796	63022-S01	I-96	KENT LAKE RD	0.7 MI E OF LIVINGSTON CO	1 Highway	1 Highway	1948	2011		2011	4	178.2	125.2	4	3 Steel	32 Multi Str Comp	0	""	""	5 Epoxy Overlay	6 MS18(HS20)+mod	7	4	42.52	-83.65419	2025-08-18T00:00:00	POINT (-83.65419 42.52)	Oakland	NBI	NHS	22310.64	118.7	657303	0.84	2024-11-15T00:00:00	24	D	6	6	7	N
816	MDOT	Metro	11925	82292-B08	I-275 SB	MCCLAUGHREY DRAIN	1 MI SW OF WAYNE	1 Highway	5 Waterway	1974		2012	2021	1	54	56.5	1	3 Steel	32 Multi Str Comp	0	""	""	5 Epoxy Overlay	9 MS22.5(HS25)or greater	3		42.25	-83.44024	2025-08-18T00:00:00	POINT (-83.44024 42.25)	Taylor	NBI	NHS	3051	53.2	1607610	12.18	2024-10-09T00:00:00	24	A	7	7	7	N
817	MDOT	Metro	11717	82194-B01-5	I-75 NB OFF RAMP	RR AND MAINT RD	IN DETROIT	1 Highway	4 Highway-railroad	1967	2018		2003	12	533.1	28.2	12	3 Steel	82 Pl Girder Comp	0	""	""	1 Monolithic Concrete	6 MS18(HS20)+mod	1	2	42.29	-83.13047	2025-08-18T00:00:00	POINT (-83.13047 42.29)	Detroit	NBI	NHS	15033.42	25	1592505	0.05	2024-05-05T00:00:00	24	A	7	5	6	N
818	Troy	Metro	8313	""	NORTHFIELD PARKWAY	ROUGE RIVER	0.5 MI E OF COOLIDGE	5 Highway-pedestrian	5 Waterway	1972				2	36.1	75.1	2	2 Concrete Continuous	19 Culvert	0	""	""	1 Monolithic Concrete	6 MS18(HS20)+mod	2		42.6	-83.180016	2025-08-18T00:00:00	POINT (-83.180016 42.6)	Oakland	NBI	Non-NHS	2711.11	33.1	668406	1.08	2025-04-01T00:00:00	24	A	N	N	N	5
819	MDOT	Metro	11193	82023-S25	I-94EB RMP TO M-10	I-94 WB & M-10 SB	IN DETROIT RAMP B-G	1 Highway	1 Highway	1953		2020	1976	11	1134	42.1	11	3 Steel	52 Pl Girder Non Comp	0	""	""	3 Latex Concrete/Similar	5 MS 18 (HS 20)	2	13	42.36	-83.077095	2025-08-18T00:00:00	POINT (-83.077095 42.36)	Detroit	NBI	NHS	47741.4	39.4	1577508	0.06	2024-10-24T00:00:00	24	A	4	5	7	N
820	MDOT	Metro	11553	82123-S07	I-96 WB COLLECTOR	M-39 (SOUTHFIELD EXPR)	IN DETROIT	6 2d level interchg	1 Highway	1970		2005	1989	4	196.2	72.2	4	3 Steel	32 Multi Str Comp	0	""	""	3 Latex Concrete/Similar	5 MS 18 (HS 20)	3	8	42.38	-83.216774	2025-08-18T00:00:00	POINT (-83.216774 42.38)	Detroit	NBI	NHS	14165.64	57.7	1583106	1.84	2023-08-22T00:00:00	24	A	6	7	7	N
821	Wayne County	Metro	12176	""	BEECH-DALY ROAD	WESTERN GOLF CLUB PATH	REDFORD   S/FIVE MILE	1 Highway	3 Pedestrian-bicycle	1961				1	20	60	1	3 Steel	19 Culvert	0	""	""	N N/A (no deck (NBI))	6 MS18(HS20)+mod	4		42.39	-83.2956	2025-08-18T00:00:00	POINT (-83.2956 42.39)	Taylor	NBI	Non-NHS	1200	47.9	1600802	2.52	2025-06-10T00:00:00	24	A	N	N	N	5
822	MDOT	Metro	11786	82211-B01-2	M-85 SB	MARSH CREEK	.5 MI SW OF TRENTON	5 Highway-pedestrian	5 Waterway	1958		2017		1	38	46.5	1	1 Concrete	01 Slab	0	5 Prestressed Concrete	05 Box Bm/Gird- Multiple	3 Latex Concrete/Similar	6 MS18(HS20)+mod	2		42.11	-83.219536	2025-08-18T00:00:00	POINT (-83.219536 42.11)	Taylor	NBI	NHS	1767	42.9	1592106	2.26	2024-05-15T00:00:00	24	A	6	5	6	N
823	MDOT	Metro	6089	50061-S21	LFT TRN LANE	I-696	IN WARREN W OF HOOVER	1 Highway	1 Highway	1972	2010		2000	2	196	33.2	2	4 Steel Continuous	82 Pl Girder Comp	0	""	""	1 Monolithic Concrete	4 M 18 (H 20)	2	8	42.49	-83.00823	2025-08-18T00:00:00	POINT (-83.00823 42.49)	Macomb	NBI	Non-NHS	6507.2	30	1803410	0.02	2023-09-22T00:00:00	24	A	8	6	7	N
824	MDOT	Metro	13015	50015-S03	28 MILE RD	M-53	WASHINGTON SEC TWP 22-27	1 Highway	1 Highway	2002				4	327.1	46.6	4	5 Prestressed Concrete	05 Box Bm/Gird- Multiple	0	""	""	1 Monolithic Concrete	9 MS22.5(HS25)or greater	2	4	42.74	-83.02145	2025-08-18T00:00:00	POINT (-83.02145 42.74)	Macomb	NBI	Non-NHS	15242.86	43.3	4208920	3.8	2023-12-21T00:00:00	24	A	6	7	7	N
825	MDOT	Metro	11566	82123-S18	WYOMING AVE	I-96 (JEFFRIES FRWY)	IN DETROIT	5 Highway-pedestrian	1 Highway	1971		2005	2005	4	303	100	4	4 Steel Continuous	32 Multi Str Comp	0	""	""	5 Epoxy Overlay	5 MS 18 (HS 20)	5	14	42.39	-83.158966	2025-08-18T00:00:00	POINT (-83.158966 42.39)	Detroit	NBI	NHS	30300	76.7	4700001	3.8	2023-08-18T00:00:00	24	A	5	7	6	N
826	Macomb County	Metro	13061	""	EAST VIEW DRIVE	GLODE DRAIN	0.1 M W OF GARFIELD RD	1 Highway	5 Waterway	2001				3	47.9	49.9	3	7 Timber	01 Slab	0	""	""	6 Bituminous	5 MS 18 (HS 20)	2		42.64	-82.95849	2025-08-18T00:00:00	POINT (-82.95849 42.64)	Macomb	NBI	Non-NHS	2390.21	36.1	4211011	0.11	2025-05-14T00:00:00	24	A	7	7	7	N
827	Detroit	Metro	12427	""	CHESTNUT	DEQUINDRE CUT GREENWAY	BETWN ORLEANS & ST AUBIN	5 Highway-pedestrian	2 Railroad	1929			1929	2	65.9	50.2	2	3 Steel	42 Multi Str Encsd	0	""	""	6 Bituminous	2 M 13.5 (H 15)	2		42.34	-83.03415	2025-08-18T00:00:00	POINT (-83.03415 42.34)	Detroit	NBI	Non-NHS	3308.18	29.9	1629109	0.06	2025-06-03T00:00:00	12	P	3	4	3	N
828	Wayne County	Metro	12274	""	ELBA DRIVE	ELBA CANAL	GROSSE ILE   E/E RIVER RD	1 Highway	5 Waterway	1934				3	59.7	28.2	3	2 Concrete Continuous	01 Slab	0	""	""	6 Bituminous	6 MS18(HS20)+mod	2		42.11	-83.14761	2025-08-18T00:00:00	POINT (-83.14761 42.11)	Taylor	NBI	Non-NHS	1683.54	20	1691002	0.11	2025-03-31T00:00:00	12	A	4	4	4	N
829	MDOT	Metro	11775	82195-S18	THIRD AVE	I-75	IN DETROIT	5 Highway-pedestrian	1 Highway	1967	1998		1998	2	170.1	71.5	2	4 Steel Continuous	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	4	8	42.34	-83.060074	2025-08-18T00:00:00	POINT (-83.060074 42.34)	Detroit	NBI	Non-NHS	12162.15	44	1581602	0.72	2024-05-28T00:00:00	24	A	7	7	6	N
830	MDOT	Metro	11122	82022-S12	I-94 WB	BEECH-DALY RD	IN TAYLOR,OVER BEECH-DALY	1 Highway	1 Highway	1962	1998			3	196.3	58.5	3	5 Prestressed Concrete	06 Box Bms- Single/Sprd	0	""	""	5 Epoxy Overlay	9 MS22.5(HS25)or greater	3	2	42.26	-83.289406	2025-08-18T00:00:00	POINT (-83.289406 42.26)	Taylor	NBI	NHS	11483.55	55.2	1588802	13.72	2023-08-29T00:00:00	24	A	7	7	7	N
831	Macomb County	Metro	6364	""	27 MILE ROAD	TUPPER BROOK DRAIN	0.1 MI E OF INDIAN TRAIL	1 Highway	5 Waterway	2004				1	32	43.8	1	5 Prestressed Concrete	05 Box Bm/Gird- Multiple	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	2		42.73	-82.882484	2025-08-18T00:00:00	POINT (-82.882484 42.73)	Macomb	NBI	Non-NHS	1401.6	42	4208049	0.89	2025-06-17T00:00:00	24	A	7	8	7	N
832	Macomb County	Metro	6265	""	NORTH AVENUE	DEER CREEK	0.2 MI NO OF 24 MILE RD	1 Highway	5 Waterway	1976				2	34.8	39.4	2	3 Steel	19 Culvert	0	""	""	N N/A (no deck (NBI))	4 M 18 (H 20)	2		42.69	-82.878456	2025-08-18T00:00:00	POINT (-82.878456 42.69)	Macomb	NBI	Non-NHS	1371.12	0	1817105	4.35	2025-05-20T00:00:00	24	A	N	N	N	6
833	Wayne County	Metro	12069	""	E N HINES DRIVE	MIDDLE ROUGE RIVER	PLYMOUTH TWP   W/HAGGERTY	5 Highway-pedestrian	5 Waterway	1932	1977	2013		3	99.7	51.8	3	2 Concrete Continuous	04 Tee Beam	0	""	""	2 Integral Concrete	4 M 18 (H 20)	2		42.37	-83.44738	2025-08-18T00:00:00	POINT (-83.44738 42.37)	Taylor	NBI	NHS	5164.46	35.1	1689409	2.51	2025-04-25T00:00:00	12	D	4	4	6	N
834	MDOT	Metro	11749	82194-S20	US-12	I-75 SB	IN DETROIT	5 Highway-pedestrian	1 Highway	1970	1998		1998	3	187.5	112.2	3	3 Steel	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	6 MS18(HS20)+mod	8	3	42.33	-83.08579	2025-08-18T00:00:00	POINT (-83.08579 42.33)	Detroit	NBI	NHS	21037.5	93.8	1577103	5.51	2024-05-23T00:00:00	24	A	7	7	6	N
835	MDOT	Metro	11762	82195-S03	ROSA PARKS ENT RMP	I-75 S COLLECTOR-DIST RD	IN DETROIT	1 Highway	1 Highway	1970	2003		2003	1	115.6	26.9	1	3 Steel	82 Pl Girder Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	1	2	42.33	-83.07128	2025-08-18T00:00:00	POINT (-83.07128 42.33)	Detroit	NBI	NHS	3109.64	24.3	1592607	0.05	2025-05-20T00:00:00	24	A	7	7	7	N
836	Oakland County	Metro	8189	""	TIENKEN ROAD	PAINT CREEK	BET LIVERNOIS AND ROCHEST	1 Highway	5 Waterway	2006				1	78.2	82.2	1	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	2 Integral Concrete	6 MS18(HS20)+mod	4		42.7	-83.14659	2025-08-18T00:00:00	POINT (-83.14659 42.7)	Oakland	NBI	Non-NHS	6428.04	67.9	626010	3.85	2024-09-12T00:00:00	24	A	7	8	7	N
837	Wayne County	Metro	12134	""	HAGGERTY ROAD	WILLOW CREEK	CANTONN/FORD	1 Highway	5 Waterway	1986				2	27.9	40	2	3 Steel	19 Culvert	0	0 Other	00 Other	N N/A (no deck (NBI))	5 MS 18 (HS 20)	2		42.33	-83.44911	2025-08-18T00:00:00	POINT (-83.44911 42.33)	Taylor	NBI	Non-NHS	1116	0	4706524	8.14	2025-05-27T00:00:00	24	A	N	N	N	6
838	Lincoln Park	Metro	12501	""	HOWARD STREET	SEXTON KILFOIL DRAIN	IN LINCOLN PARK	5 Highway-pedestrian	5 Waterway	1956		1994		2	48.9	42	2	2 Concrete Continuous	01 Slab	0	""	""	1 Monolithic Concrete	6 MS18(HS20)+mod	2		42.23	-83.18644	2025-08-18T00:00:00	POINT (-83.18644 42.23)	Taylor	NBI	Non-NHS	2053.8	28.9	1660201	0.05	2024-08-20T00:00:00	12	P	4	4	7	N
839	MDOT	Metro	6048	50022-B02	M-59 EB	MIDDLE BR CLINTON RIVER	4.2 MI E OF M-53	1 Highway	5 Waterway	1996		2021		3	135	62.8	3	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	5 Epoxy Overlay	9 MS22.5(HS25)or greater	3		42.63	-82.93111	2025-08-18T00:00:00	POINT (-82.93111 42.63)	Macomb	NBI	NHS	8478	54	820202	5.2	2023-12-20T00:00:00	24	A	7	8	8	N
840	MDOT	Metro	11862	82252-S26	DEQUINDRE U-TURN	I-75	IN DETROIT	5 Highway-pedestrian	1 Highway	1969	2007		1998	2	156	27.4	2	3 Steel	82 Pl Girder Comp	0	""	""	1 Monolithic Concrete	6 MS18(HS20)+mod	1	8	42.39	-83.06823	2025-08-18T00:00:00	POINT (-83.06823 42.39)	Detroit	NBI	Non-NHS	4274.4	19.6	1630904	0.01	2024-04-09T00:00:00	24	A	7	7	7	N
841	Wayne County	Metro	12188	""	TOLEDO ROAD	BLAKELY DRAIN	BROWNSTOWN       N/SIBLEY	1 Highway	5 Waterway	1926	1959			2	24	87.9	2	2 Concrete Continuous	01 Slab	0	""	""	6 Bituminous	5 MS 18 (HS 20)	4		42.18	-83.23564	2025-08-18T00:00:00	POINT (-83.23564 42.18)	Taylor	NBI	NHS	2109.6	71.9	1688707	0.48	2024-11-12T00:00:00	12	A	4	4	5	N
842	MDOT	Metro	11458	82112-S29	7 MI RD	M-10	IN DETROIT	5 Highway-pedestrian	1 Highway	1964	2006		2006	2	136.3	128.4	2	3 Steel	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	8	6	42.43	-83.18694	2025-08-18T00:00:00	POINT (-83.18694 42.43)	Detroit	NBI	NHS	17500.92	106	1700106	12.57	2025-04-18T00:00:00	24	A	6	6	7	N
843	Macomb County	Metro	6293	""	MCPHALL ROAD	EAST BRANCH COON CREEK	0.2 MI WEST OF NORTH AVE	1 Highway	5 Waterway	2000				1	24.6	39.4	1	1 Concrete	19 Culvert	0	""	""	N N/A (no deck (NBI))	5 MS 18 (HS 20)	2		42.88	-82.88535	2025-08-18T00:00:00	POINT (-82.88535 42.88)	Macomb	NBI	Non-NHS	969.24	39.4	822810	1.77	2023-08-01T00:00:00	24	A	N	N	N	8
844	Macomb County	Metro	6216	""	26 MILE ROAD	NORTH BRANCH CLINTON R	1.2 MI WEST OF NORTH AVE	1 Highway	5 Waterway	1968	2022		2022	2	92.5	38.4	2	3 Steel	06 Box Bms- Single/Sprd	0	""	""	1 Monolithic Concrete	B Greater than HL 93	2		42.72	-82.90455	2025-08-18T00:00:00	POINT (-82.90455 42.72)	Macomb	NBI	Non-NHS	3552	36	816702	9.53	2024-11-28T00:00:00	24	A	9	9	7	N
845	MDOT	Metro	11867	82252-S31	I-75 & RAMPS C&D	M-8 DAVISON & SERVIC RDS	IN DETROIT	6 2d level interchg	1 Highway	1969		2003	2003	4	260.8	212.9	4	4 Steel Continuous	32 Multi Str Comp	0	""	""	5 Epoxy Overlay	6 MS18(HS20)+mod	9	8	42.41	-83.07909	2025-08-18T00:00:00	POINT (-83.07909 42.41)	Detroit	NBI	NHS	55524.32	209.6	1577706	6.21	2025-04-18T00:00:00	24	A	5	6	7	N
846	MDOT	Metro	13022	50015-S09	M-53 SB	31 MILE RD	WASHINGTON TWP SEC 2-11	1 Highway	1 Highway	2002				3	136.5	48.6	3	5 Prestressed Concrete	05 Box Bm/Gird- Multiple	0	""	""	1 Monolithic Concrete	9 MS22.5(HS25)or greater	2	2	42.79	-83.005714	2025-08-18T00:00:00	POINT (-83.005714 42.79)	Macomb	NBI	NHS	6633.9	45.3	813706	17.31	2023-12-22T00:00:00	24	A	6	7	7	N
847	Detroit	Metro	12457	""	RIVERSIDE AVE	FOX CREEK	AT END OF ALTER ROAD	1 Highway	5 Waterway	1991				3	64	42	3	1 Concrete	01 Slab	0	""	""	3 Latex Concrete/Similar	5 MS 18 (HS 20)	2		42.36	-82.930016	2025-08-18T00:00:00	POINT (-82.930016 42.36)	Detroit	NBI	Non-NHS	2688	29.9	1714603	0.28	2024-06-27T00:00:00	24	A	6	6	7	N
848	Oakland County	Metro	13170	""	SILVER LAKE RD	SILVER LAKE CANAL	SOUTH OF WALTON BLVD	1 Highway	5 Waterway	2003				1	20	34	1	1 Concrete	19 Culvert	0	""	""	6 Bituminous	5 MS 18 (HS 20)	2		42.68	-83.33404	2025-08-18T00:00:00	POINT (-83.33404 42.68)	Oakland	NBI	Non-NHS	680	45.5	700108	0.51	2024-07-23T00:00:00	24	A	N	N	N	6
849	MDOT	Metro	13958	63174-S41	NB I-75	NORTH TO WEST RAMP	SQUARE LAKE INTERCHANGE	1 Highway	1 Highway	2017				1	155	73.6	1	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	B Greater than HL 93	4	2	42.61	-83.23317	2025-08-18T00:00:00	POINT (-83.23317 42.61)	Oakland	NBI	NHS	11408	70.3	647308	16.57	2025-07-15T00:00:00	24	A	8	8	8	N
850	MDOT	Metro	7858	63051-S01	M-1	M-102 (8 MI RD) & RAMPS	N LTS OF DETROIT	7 3d level interchg	1 Highway	1956	2006			4	754.1	89.7	4	3 Steel	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	9 MS22.5(HS25)or greater	6	12	42.45	-83.12474	2025-08-18T00:00:00	POINT (-83.12474 42.45)	Oakland	NBI	NHS	67642.77	83	614101	13.01	2023-09-26T00:00:00	23	A	6	7	7	N
851	Other Local Agencies	Metro	13365	""	MIDFIELD RMP A, A2	MIDFIELD RAMP B2	MIDFIELD TERMINIAL	1 Highway	1 Highway	2002				39	2503.8	33	39	3 Steel	03 Gir-Flr Bm Non Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	3		42.21	-83.35761	2025-08-18T00:00:00	POINT (-83.35761 42.21)	Taylor	NBI	Non-NHS	82625.4	29.5	4711997	0.02	2025-05-12T00:00:00	12	P	6	6	3	N
852	MDOT	Metro	11657	82191-S14-2	I-75 SB	EUREKA RD	IN TAYLOR OVER EUREKA RD	1 Highway	1 Highway	1966	2018		2018	4	228.4	63.2	4	3 Steel	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	6 MS18(HS20)+mod	3	8	42.2	-83.239525	2025-08-18T00:00:00	POINT (-83.239525 42.2)	Taylor	NBI	NHS	14434.88	60	1595106	9.17	2024-09-27T00:00:00	24	A	8	7	8	N
853	MDOT	Metro	6154	50111-S08	FRAZHO RD	I-94	W LTS OF ST CLAIR SHORES	5 Highway-pedestrian	1 Highway	1967	1996		1996	4	209.5	42.3	4	3 Steel	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	2	8	42.49	-82.91718	2025-08-18T00:00:00	POINT (-82.91718 42.49)	Macomb	NBI	Non-NHS	8861.85	28	803110	4.55	2025-06-27T00:00:00	24	A	7	6	6	N
854	Macomb County	Metro	6370	""	28 MILE ROAD	N B CLINTON RIVER	1.3 MI WEST OF NORTH AVE	1 Highway	5 Waterway	2018				1	75	39	1	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	B Greater than HL 93	2		42.75	-82.9065	2025-08-18T00:00:00	POINT (-82.9065 42.75)	Macomb	NBI	Non-NHS	2925	36	4208920	9.68	2024-07-08T00:00:00	24	A	8	9	9	N
855	Macomb County	Metro	6199	""	EB METRO PARKWAY	CLINTON RIVER SPILLWAY	0.02 MI E OF UNION LAKE	5 Highway-pedestrian	5 Waterway	1964		2013	2013	5	303.8	38.1	5	3 Steel	32 Multi Str Comp	0	""	""	5 Epoxy Overlay	5 MS 18 (HS 20)	2		42.57	-82.86174	2025-08-18T00:00:00	POINT (-82.86174 42.57)	Macomb	NBI	NHS	11574.78	30	803608	11.57	2024-04-10T00:00:00	24	A	7	7	7	N
856	MDOT	Metro	7881	63081-S09	M-39 SB	M-10 RAMP C	IN SOUTHFIELD (RAMP C)	1 Highway	1 Highway	1964	2006		1996	3	110.4	47.2	3	3 Steel	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	3	2	42.46	-83.221275	2025-08-18T00:00:00	POINT (-83.221275 42.46)	Oakland	NBI	NHS	5210.88	44	710003	1.09	2023-10-30T00:00:00	24	A	7	6	6	N
857	MDOT	Metro	11852	82252-S10-8	M-102 WB SERV RD	I-75	IN DETROIT	5 Highway-pedestrian	1 Highway	1969		2007	2007	2	127.3	54.1	2	3 Steel	32 Multi Str Comp	0	""	""	3 Latex Concrete/Similar	5 MS 18 (HS 20)	3	6	42.45	-83.0947	2025-08-18T00:00:00	POINT (-83.0947 42.45)	Detroit	NBI	NHS	6886.93	41.7	1586007	0.33	2024-03-06T00:00:00	24	A	5	6	6	N
858	Novi	Metro	13828	""	ASHBURY DRIVE	MIDDLE BR ROUGE RIVER	CHASE FARMS SUBDIVISION	5 Highway-pedestrian	5 Waterway	1991				1	46.1	44.4	1	5 Prestressed Concrete	05 Box Bm/Gird- Multiple	0	""	""	6 Bituminous	4 M 18 (H 20)	2		42.44	-83.472775	2025-08-18T00:00:00	POINT (-83.472775 42.44)	Oakland	NBI	Non-NHS	2046.84	28	4401742	0.66	2024-09-27T00:00:00	12	A	6	7	4	N
859	MDOT	Metro	11573	82123-S25-4	OAKMAN BLVD WB	I-96 (JEFFRIES FRWY)	IN DETROIT	5 Highway-pedestrian	1 Highway	1971			2009	2	233	50.9	2	3 Steel	02 Multi Str Non Comp	0	""	""	5 Epoxy Overlay	5 MS 18 (HS 20)	2	8	42.38	-83.14612	2025-08-18T00:00:00	POINT (-83.14612 42.38)	Detroit	NBI	Non-NHS	11859.7	37.9	4701478	0.93	2025-08-12T00:00:00	24	A	6	7	7	N
860	Wayne County	Metro	12151	""	MERRIMAN ROAD	MIDDLE ROUGE RIVER	WESTLAND         N/WARREN	5 Highway-pedestrian	5 Waterway	2024				1	73.8	56.6	1	5 Prestressed Concrete	06 Box Bms- Single/Sprd	0	""	""	1 Monolithic Concrete	B Greater than HL 93	4		42.34	-83.34931	2025-08-18T00:00:00	POINT (-83.34931 42.34)	Taylor	NBI	NHS	4177.08	48	4700000	8.73	2025-01-30T00:00:00	24	A	9	9	9	N
861	MDOT	Metro	6125	50062-S14	BARKMAN AVE	I-696	IN ROSEVILLE	5 Highway-pedestrian	1 Highway	1972			2005	2	202	58.4	2	4 Steel Continuous	82 Pl Girder Comp	0	""	""	1 Monolithic Concrete	2 M 13.5 (H 15)	3	8	42.49	-82.952675	2025-08-18T00:00:00	POINT (-82.952675 42.49)	Macomb	NBI	Non-NHS	11796.8	40	805903	0.61	2023-09-22T00:00:00	24	A	5	6	6	N
862	Wayne County	Metro	12239	""	MILLER ROAD	CONRAIL	DEARBORN       S/MICHIGAN	5 Highway-pedestrian	2 Railroad	1931	1982		1978	48	1460.3	71.9	48	3 Steel	02 Multi Str Non Comp	0	""	""	1 Monolithic Concrete	6 MS18(HS20)+mod	6		42.32	-83.16257	2025-08-18T00:00:00	POINT (-83.16257 42.32)	Taylor	NBI	Non-NHS	104995.57	62	1589801	1.97	2024-10-17T00:00:00	12	K	4	2	2	N
863	Other Local Agencies	Metro	12300	""	RIVERVIEW DRIVE	MIDDLE ROUGE RIVER	LIVONIA S/E N HINES DRIVE	1 Highway	5 Waterway	1931	1961			1	35.8	15.7	1	3 Steel	02 Multi Str Non Comp	0	""	""	1 Monolithic Concrete	4 M 18 (H 20)	1		42.36	-83.400795	2025-08-18T00:00:00	POINT (-83.400795 42.36)	Taylor	NBI	Non-NHS	562.06	13.8	1695905	0.11	2025-06-05T00:00:00	12	K	5	5	3	N
864	MDOT	Metro	13312	82194-S29	SB I-75 RMP TO TP	I-75 AND I-96	AMBASSADOR GATEWAY	1 Highway	1 Highway	2007			2007	3	432.7	53.5	3	4 Steel Continuous	82 Pl Girder Comp	0	""	""	2 Integral Concrete	9 MS22.5(HS25)or greater	2		42.32	-83.081985	2025-08-18T00:00:00	POINT (-83.081985 42.32)	Detroit	NBI	NHS	23149.45	50	4718926	0.27	2024-06-27T00:00:00	24	A	7	8	7	N
865	MDOT	Metro	11857	82252-S21	I-75	MODERN AVE	IN DETROIT OVER MODERN AV	1 Highway	1 Highway	1969	2003		2006	3	134.3	173.4	3	3 Steel	32 Multi Str Comp	0	""	""	5 Epoxy Overlay	6 MS18(HS20)+mod	10	2	42.41	-83.08385	2025-08-18T00:00:00	POINT (-83.08385 42.41)	Detroit	NBI	NHS	23287.62	170.8	1577706	6.65	2025-04-18T00:00:00	24	A	8	7	7	N
866	MDOT	Metro	7807	63022-S12-3	M-5 EB	FARMINGTON RD	IN FARMINGTON	1 Highway	1 Highway	1956	1997		1997	3	128.7	48.2	3	3 Steel	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	9 MS22.5(HS25)or greater	2	5	42.46	-83.37597	2025-08-18T00:00:00	POINT (-83.37597 42.46)	Oakland	NBI	NHS	6203.34	42	657303	16.21	2024-11-07T00:00:00	24	A	7	6	6	N
867	MDOT	Metro	13513	63022-V01	I-96	HURON VALLEY TRAIL	3.4 MI E OF LIVINGSTON CO	1 Highway	3 Pedestrian-bicycle	2011				1	26.9	64.8	1	1 Concrete	19 Culvert	0	""	""	6 Bituminous	A HL 93	6		42.52	-83.60572	2025-08-18T00:00:00	POINT (-83.60572 42.52)	Oakland	NBI	NHS	1743.12	132	657303	3.42	2024-11-05T00:00:00	24	A	N	N	N	8
868	MDOT	Metro	11982	82293-S18-5	I-275 NB COLLECTOR	SCHOOLCRAFT RD	0.2 MI W OF LIVONIA	1 Highway	1 Highway	1971	2001			4	293.6	30.8	4	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	1	4	42.38	-83.43642	2025-08-18T00:00:00	POINT (-83.43642 42.38)	Taylor	NBI	NHS	9042.88	27.5	1607504	0.28	2024-09-11T00:00:00	24	A	7	7	6	N
869	MDOT	Metro	11154	82022-S51	VAN BORN RD	M-39	AT I-94 & M-39 INTRCHG	1 Highway	1 Highway	1985				7	325.1	66.3	3	5 Prestressed Concrete	02 Multi Str Non Comp	4	1 Concrete	01 Slab	5 Epoxy Overlay	9 MS22.5(HS25)or greater	3	7	42.27	-83.22376944	2025-08-18T00:00:00	POINT (-83.22376944 42.27)	Taylor	NBI	NHS	21554.13	62	1670203	10.38	2024-11-27T00:00:00	24	A	5	7	7	N
870	MDOT	Metro	11541	82123-R02	TURN RDWY 3RD LEVL	I-96 & CSX RR	IN DETROIT	7 3d level interchg	4 Highway-railroad	1973		2005	1993	16	1496.5	39	16	4 Steel Continuous	82 Pl Girder Comp	0	""	""	3 Latex Concrete/Similar	5 MS 18 (HS 20)	2	14	42.38	-83.21631	2025-08-18T00:00:00	POINT (-83.21631 42.38)	Detroit	NBI	NHS	58363.5	37.4	1591902	0.18	2023-08-16T00:00:00	24	A	5	5	7	N
871	Southfield	Metro	8292	""	ELEVEN MILE RD	PEBBLE CREEK	IN SOUTHFIELD	1 Highway	5 Waterway	1972				2	26.9	68.9	2	1 Concrete	19 Culvert	0	""	""	N N/A (no deck (NBI))	6 MS18(HS20)+mod	2		42.49	-83.3086	2025-08-18T00:00:00	POINT (-83.3086 42.49)	Oakland	NBI	Non-NHS	1853.41	0	634509	3.51	2023-09-21T00:00:00	24	A	N	N	N	7
872	MDOT	Metro	11300	82061-B02	US-12 WB	APPLE RUN DRAIN	2.5 MI E OF WASHTENAW COL	1 Highway	5 Waterway	2003				1	40.7	40	1	1 Concrete	19 Culvert	0	""	""	6 Bituminous	0 Unknown	2		42.27	-83.49884	2025-08-18T00:00:00	POINT (-83.49884 42.27)	Taylor	NBI	NHS	1628	0	4705565	2.7	2024-10-28T00:00:00	24	A	N	N	N	8
873	MDOT	Metro	11900	82291-S04	HURON RIVER DRIVE	I-275	1.0 MI SE OF NEW BOSTON	1 Highway	1 Highway	1974	2010		2010	4	420.4	49.7	4	3 Steel	82 Pl Girder Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	2	6	42.15	-83.383484	2025-08-18T00:00:00	POINT (-83.383484 42.15)	Taylor	NBI	Non-NHS	20893.88	47.3	1607306	1.28	2024-05-29T00:00:00	24	A	7	7	7	N
874	Other Local Agencies	Metro	13370	""	SB DINGELL RD	NB ROGELL RD	0.8 MI S OF I-94	5 Highway-pedestrian	1 Highway	2000				1	169.9	42.7	1	3 Steel	52 Pl Girder Non Comp	0	""	""	1 Monolithic Concrete	9 MS22.5(HS25)or greater	2	3	42.23	-83.34365	2025-08-18T00:00:00	POINT (-83.34365 42.23)	Taylor	NBI	NHS	7254.73	30.8	4711337	2.66	2025-05-27T00:00:00	24	A	6	6	6	N
875	MDOT	Metro	8116	63191-S02	HAGGERTY RD	I-96 EB	E LTS OF NOVI	1 Highway	1 Highway	1972		2001	2001	3	232	44.4	3	3 Steel	02 Multi Str Non Comp	0	""	""	5 Epoxy Overlay	4 M 18 (H 20)	2	3	42.48	-83.435425	2025-08-18T00:00:00	POINT (-83.435425 42.48)	Oakland	NBI	NHS	10300.8	40.5	639005	2.76	2024-11-22T00:00:00	24	A	6	6	7	N
876	Gibraltar	Metro	12495	""	HORSE ISLAND DRIVE	HORSE ISL & ADAMS DR BYU	EAST OF ADAMS	1 Highway	5 Waterway	1925		1999		1	45.9	23	1	1 Concrete	11 Arch- Deck, Filled Sp	0	""	""	6 Bituminous	2 M 13.5 (H 15)	1		42.09	-83.18614	2025-08-18T00:00:00	POINT (-83.18614 42.09)	Taylor	NBI	Non-NHS	1055.7	19.7	1698310	0.28	2025-08-05T00:00:00	12	P	N	4	4	N
877	Beverly Hills	Metro	8221	""	EVERGREEN RD	ROUGE RIVER	0.6 MI N OF 13 MILE RD	1 Highway	5 Waterway	1987		2012		1	63.6	44	1	5 Prestressed Concrete	05 Box Bm/Gird- Multiple	0	""	""	6 Bituminous	5 MS 18 (HS 20)	2		42.52	-83.24472	2025-08-18T00:00:00	POINT (-83.24472 42.52)	Oakland	NBI	Non-NHS	2798.4	28.9	666003	5.63	2024-09-26T00:00:00	24	A	7	6	5	N
878	MDOT	Metro	7947	63102-S34	CENTRAL PARK BLVD	I-696	IN SOUTHFIELD	1 Highway	1 Highway	1986				2	130	83.7	2	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	9 MS22.5(HS25)or greater	2	4	42.49	-83.24466389	2025-08-18T00:00:00	POINT (-83.24466389 42.49)	Oakland	NBI	Non-NHS	10881	65	686105	0.49	2024-07-19T00:00:00	24	A	5	7	6	N
879	MDOT	Metro	8012	63172-S09	GIDDINGS RD	I-75	0.8 MI NW OF M-24	1 Highway	1 Highway	1962				4	265.8	30.5	4	5 Prestressed Concrete	02 Multi Str Non Comp	0	""	""	5 Epoxy Overlay	2 M 13.5 (H 15)	2	8	42.7	-83.26185	2025-08-18T00:00:00	POINT (-83.26185 42.7)	Oakland	NBI	Non-NHS	8106.9	27.5	676006	1.89	2025-03-14T00:00:00	24	A	5	7	7	N
880	MDOT	Metro	11949	82292-S07	CHERRY HILL RD	I-275	2 MI NW OF WAYNE	1 Highway	1 Highway	1974			2012	2	290	48.4	2	3 Steel	82 Pl Girder Comp	0	""	""	5 Epoxy Overlay	5 MS 18 (HS 20)	2	6	42.31	-83.44217	2025-08-18T00:00:00	POINT (-83.44217 42.31)	Taylor	NBI	Non-NHS	14036	44.6	1607409	5.25	2024-10-11T00:00:00	24	A	7	7	7	N
881	MDOT	Metro	11215	82024-S09-3	WB E GRAND BLVD	I-94	IN DETROIT	5 Highway-pedestrian	1 Highway	2021				2	197.3	55.4	2	4 Steel Continuous	82 Pl Girder Comp	0	""	""	1 Monolithic Concrete	B Greater than HL 93	2	11	42.38	-83.041504	2025-08-18T00:00:00	POINT (-83.041504 42.38)	Detroit	NBI	Non-NHS	10930.42	26	4701331	0.02	2025-03-07T00:00:00	24	A	8	8	8	N
882	MDOT	Metro	11147	82022-S43	M-39 SB RAMP L	I-94	IN ALLEN PARK	1 Highway	1 Highway	1985		2004		16	1330.8	47.9	13	5 Prestressed Concrete	32 Multi Str Comp	3	1 Concrete	01 Slab	5 Epoxy Overlay	9 MS22.5(HS25)or greater	2	11	42.27	-83.2246	2025-08-18T00:00:00	POINT (-83.2246 42.27)	Taylor	NBI	NHS	63745.32	44	1576902	0.06	2024-08-13T00:00:00	24	A	7	6	6	N
883	MDOT	Metro	11149	82022-S46	I-94 EB RMP	M-39	IN ALLEN PARK	1 Highway	1 Highway	1984				11	275	47.9	4	5 Prestressed Concrete	02 Multi Str Non Comp	7	1 Concrete	01 Slab	5 Epoxy Overlay	9 MS22.5(HS25)or greater	2	8	42.27	-83.22312	2025-08-18T00:00:00	POINT (-83.22312 42.27)	Taylor	NBI	NHS	13172.5	44	1576907	0.25	2024-11-27T00:00:00	24	A	5	6	5	N
884	MDOT	Metro	8068	63174-S09-1	I-75 NB	BIG BEAVER RD	IN TROY	1 Highway	1 Highway	2019				2	231.3	67.5	2	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	B Greater than HL 93	4	7	42.56	-83.15803	2025-08-18T00:00:00	POINT (-83.15803 42.56)	Oakland	NBI	NHS	15612.75	64	647308	10.15	2025-07-07T00:00:00	24	A	8	8	8	N
885	MDOT	Metro	13853	82071-V01	M-85	WEST RIVERWALK	N SIDE OF ROSA PARK BLVD	5 Highway-pedestrian	3 Pedestrian-bicycle	2019				1	27.9	75	1	1 Concrete	19 Culvert	0	""	""	4 Low Slump Concrete	B Greater than HL 93	5		42.32	-83.06548	2025-08-18T00:00:00	POINT (-83.06548 42.32)	Detroit	NBI	NHS	2092.5	74	1585010	4.59	2025-07-24T00:00:00	24	A	N	N	N	8
886	Oakland County	Metro	8161	""	LIVERNOIS ROAD	CLINTON RIVER	BET AVON AND HAMLIN	1 Highway	5 Waterway	2012				1	69.3	88.5	1	5 Prestressed Concrete	06 Box Bms- Single/Sprd	0	""	""	1 Monolithic Concrete	A HL 93	5		42.67	-83.15338	2025-08-18T00:00:00	POINT (-83.15338 42.67)	Oakland	NBI	Non-NHS	6133.05	64	625408	8.08	2024-09-26T00:00:00	24	A	8	8	7	N
887	Macomb County	Metro	6257	""	GARFIELD RD	UTICA DRAIN	0.3 MI SOUTH OF M-59	1 Highway	5 Waterway	1975	1982			2	28.9	56.1	2	3 Steel	19 Culvert	0	""	""	N N/A (no deck (NBI))	4 M 18 (H 20)	5		42.62	-82.95332	2025-08-18T00:00:00	POINT (-82.95332 42.62)	Macomb	NBI	NHS	1621.29	0	798703	6.28	2024-05-01T00:00:00	24	A	N	N	N	6
888	MDOT	Metro	11333	82081-S01	M-153	M-39	IN DEARBORN	5 Highway-pedestrian	1 Highway	1998				4	235.5	129.9	4	5 Prestressed Concrete	06 Box Bms- Single/Sprd	0	""	""	1 Monolithic Concrete	9 MS22.5(HS25)or greater	8	10	42.33	-83.21535	2025-08-18T00:00:00	POINT (-83.21535 42.33)	Taylor	NBI	NHS	30591.45	104.7	1595510	16.93	2024-05-31T00:00:00	24	A	7	7	7	N
889	MDOT	Metro	7969	63103-S08	I-696	N SERVICE RD	IN MADISON HTS	1 Highway	1 Highway	1971	2007	2007	2007	1	75.1	160.1	1	3 Steel	32 Multi Str Comp	0	""	""	3 Latex Concrete/Similar	5 MS 18 (HS 20)	8	2	42.48	-83.10848	2025-08-18T00:00:00	POINT (-83.10848 42.48)	Oakland	NBI	NHS	12023.51	157.8	1903903	4.75	2025-07-15T00:00:00	24	A	6	7	7	N
890	Gibraltar	Metro	11993	""	S GIBRALTAR	BLAKELY DRAIN	GIBRALTAR     E/JEFFERSON	5 Highway-pedestrian	5 Waterway	1992		1995		1	34.1	27.9	1	1 Concrete	19 Culvert	0	""	""	6 Bituminous	6 MS18(HS20)+mod	2		42.09	-83.2057	2025-08-18T00:00:00	POINT (-83.2057 42.09)	Taylor	NBI	Non-NHS	951.39	27.9	1692303	4.07	2025-08-05T00:00:00	24	A	N	N	N	6
891	Wayne County	Metro	12168	""	INKSTER ROAD	MIDDLE ROUGE RIVER	DBN HTS/WESTLAND S/AA TR	1 Highway	5 Waterway	1930				2	86.9	55.8	2	1 Concrete	04 Tee Beam	0	""	""	2 Integral Concrete	0 Unknown	4		42.35	-83.31251	2025-08-18T00:00:00	POINT (-83.31251 42.35)	Taylor	NBI	NHS	4849.02	45.9	1674404	16.62	2024-09-18T00:00:00	24	A	5	5	6	N
892	Wayne	Metro	12519	""	SECOND AVE	LOWER ROUGE RIVER	IN CITY OF WAYNE	5 Highway-pedestrian	5 Waterway	1976		1996		1	59.7	60.7	1	5 Prestressed Concrete	05 Box Bm/Gird- Multiple	0	""	""	3 Latex Concrete/Similar	6 MS18(HS20)+mod	2		42.28	-83.38118	2025-08-18T00:00:00	POINT (-83.38118 42.28)	Taylor	NBI	Non-NHS	3623.79	40	1599309	0.74	2024-05-29T00:00:00	24	P	5	5	6	N
893	MDOT	Metro	11146	82022-S42	I-94 EB RMP	PELHAM ROAD	E OF PELHAM S OF I-94	7 3d level interchg	1 Highway	1984				12	279	47.9	3	5 Prestressed Concrete	02 Multi Str Non Comp	9	1 Concrete	01 Slab	5 Epoxy Overlay	9 MS22.5(HS25)or greater	2	1	42.27	-83.22938	2025-08-18T00:00:00	POINT (-83.22938 42.27)	Taylor	NBI	NHS	13364.1	44	1576901	0.53	2024-11-26T00:00:00	24	A	6	6	7	N
894	Macomb County	Metro	6246	""	VAN DYKE AVE	CLINTON RIVER	0.3 MI SOUTH OF M-59	5 Highway-pedestrian	5 Waterway	1971	2012		2012	2	100	74.4	2	3 Steel	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	5		42.62	-83.03214	2025-08-18T00:00:00	POINT (-83.03214 42.62)	Macomb	NBI	Non-NHS	7440	59.1	4211016	1.31	2024-07-31T00:00:00	24	A	7	8	7	N
895	MDOT	Metro	11943	82292-S01	HANNAN RD	I-275	IN ROMULUS	1 Highway	1 Highway	1974	2012	2012	2012	2	298	48.4	2	3 Steel	82 Pl Girder Comp	0	""	""	3 Latex Concrete/Similar	5 MS 18 (HS 20)	2	6	42.23	-83.424736	2025-08-18T00:00:00	POINT (-83.424736 42.23)	Taylor	NBI	Non-NHS	14423.2	44.5	1710309	4.95	2024-08-28T00:00:00	24	A	7	8	7	N
896	Macomb County	Metro	6353	""	24 MILE ROAD	MCBRIDE DRAIN	0.6 MI WEST OF FOSS ROAD	1 Highway	5 Waterway	2014				2	26.1	36	2	3 Steel	19 Culvert	0	""	""	N N/A (no deck (NBI))	4 M 18 (H 20)	2		42.69	-82.92065833	2025-08-18T00:00:00	POINT (-82.92065833 42.69)	Macomb	NBI	Non-NHS	939.6	0	815510	8.84	2023-09-14T00:00:00	24	A	N	N	N	8
897	MDOT	Metro	11115	82022-S05	I-94 EB	MIDDLEBELT RD	1.2 MI W OF TAYLOR	1 Highway	1 Highway	1993				2	145.9	109.8	2	5 Prestressed Concrete	05 Box Bm/Gird- Multiple	0	""	""	5 Epoxy Overlay	9 MS22.5(HS25)or greater	5	4	42.24	-83.32793	2025-08-18T00:00:00	POINT (-83.32793 42.24)	Taylor	NBI	NHS	16019.82	103.7	1576405	11.29	2025-08-06T00:00:00	24	A	7	6	7	N
898	Macomb County	Metro	6297	""	MC FADDEN ROAD	NEWLAND DRAIN	0.2 MI N OF 34 MILE ROAD	1 Highway	5 Waterway	1953				2	20	19.7	2	3 Steel	19 Culvert	0	""	""	N N/A (no deck (NBI))	4 M 18 (H 20)	2		42.84	-82.97395	2025-08-18T00:00:00	POINT (-82.97395 42.84)	Macomb	NBI	Non-NHS	394	0	820003	1.26	2024-11-28T00:00:00	12	A	N	N	N	3
899	MDOT	Metro	6168	50111-S25	SHOOK RD	I-94	N OF ST CLAIR SHORES	1 Highway	1 Highway	1963	1998		1998	4	219	44	4	3 Steel	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	3	7	42.56	-82.86006	2025-08-18T00:00:00	POINT (-82.86006 42.56)	Macomb	NBI	NHS	9636	40.7	4211898	0.51	2025-06-26T00:00:00	24	A	6	7	7	N
900	Sylvan Lake	Metro	8306	""	PONTIAC RD	SYLVAN LAKE	0.6 MI N OF ORCHARD LAKE	1 Highway	5 Waterway	1900				1	27.9	21	1	1 Concrete	11 Arch- Deck, Filled Sp	0	""	""	N N/A (no deck (NBI))	5 MS 18 (HS 20)	2		42.62	-83.334435	2025-08-18T00:00:00	POINT (-83.334435 42.62)	Oakland	NBI	Non-NHS	585.9	18	689605	0.18	2024-06-06T00:00:00	24	P	7	7	6	N
901	MDOT	Metro	11117	82022-S07	I-94 EB	INKSTER RD	W LTS OF TAYLOR	1 Highway	1 Highway	2002				1	92.1	67.6	1	5 Prestressed Concrete	05 Box Bm/Gird- Multiple	0	""	""	5 Epoxy Overlay	9 MS22.5(HS25)or greater	3	2	42.25	-83.30828	2025-08-18T00:00:00	POINT (-83.30828 42.25)	Taylor	NBI	NHS	6225.96	64.3	1576405	12.36	2023-08-30T00:00:00	24	A	8	6	7	N
902	Wayne County	Metro	12269	""	SHELDON ROAD	MOTT DRAIN	CANTON           S/PALMER	1 Highway	5 Waterway	1970				2	23	35.8	2	1 Concrete	19 Culvert	0	""	""	N N/A (no deck (NBI))	0 Unknown	2		42.29	-83.47658	2025-08-18T00:00:00	POINT (-83.47658 42.29)	Taylor	NBI	Non-NHS	823.4	0	1670201	2.4	2025-05-12T00:00:00	24	A	N	N	N	6
903	MDOT	Metro	11690	82192-S12	JOY RD	M-39	IN DETROIT	5 Highway-pedestrian	1 Highway	1962	2010			2	108.8	135.1	2	5 Prestressed Concrete	06 Box Bms- Single/Sprd	0	""	""	1 Monolithic Concrete	B Greater than HL 93	8	6	42.36	-83.21639	2025-08-18T00:00:00	POINT (-83.21639 42.36)	Detroit	NBI	Non-NHS	14698.88	116	1677810	7.96	2023-12-14T00:00:00	24	A	7	7	8	N
904	MDOT	Metro	11247	82025-S03	FRENCH ROAD	I-94	IN DETROIT	5 Highway-pedestrian	1 Highway	2019				2	198.1	61.8	2	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	B Greater than HL 93	2	6	42.39	-82.99584	2025-08-18T00:00:00	POINT (-82.99584 42.39)	Detroit	NBI	Non-NHS	12242.58	38	1578003	1.23	2024-04-17T00:00:00	24	A	8	8	8	N
905	MDOT	Metro	6008	50011-B04-2	M-53 SB	PLUM CREEK	3.2 MI S OF M-59	1 Highway	5 Waterway	1988		2015		1	56.96	53.13	1	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	5 Epoxy Overlay	9 MS22.5(HS25)or greater	3		42.58	-83.0306	2025-08-18T00:00:00	POINT (-83.0306 42.58)	Macomb	NBI	NHS	3026.28	44	813706	2.52	2023-11-28T00:00:00	24	A	6	7	6	N
906	Other Local Agencies	Metro	14723	""	ATWATER ST	LAND	W OF RENAISSANCE DR	5 Highway-pedestrian	0 Other	1977	2004			8	163	48	8	2 Concrete Continuous	03 Gir-Flr Bm Non Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	3				2025-08-18T00:00:00	""	Detroit	NBI	Non-NHS	7824	40	4708755	0.29	2024-07-18T00:00:00	24	A	7	7	7	N
907	MDOT	Metro	11638	82191-R01-1	I-75 NB	GTW RR	IN WOODHAVEN	1 Highway	2 Railroad	2006				1	147.2	63.3	1	3 Steel	82 Pl Girder Comp	0	""	""	2 Integral Concrete	9 MS22.5(HS25)or greater	3		42.12	-83.2412	2025-08-18T00:00:00	POINT (-83.2412 42.12)	Taylor	NBI	NHS	9317.76	60	1592010	3.95	2024-07-12T00:00:00	24	A	8	7	7	N
908	MDOT	Metro	13900	82191-B09	I-75 SB	SEXTON AND KILFOIL DRAIN	ALLEN PARK	1 Highway	5 Waterway	2017				1	140	63.3	1	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	B Greater than HL 93	3		42.23	-83.2088	2025-08-18T00:00:00	POINT (-83.2088 42.23)	Taylor	NBI	NHS	8862	60	1595106	2.4	2023-11-27T00:00:00	24	A	8	8	8	N
909	MDOT	Metro	11280	82052-B03-2	US-24 SB	ECORSE CREEK	IN DEARBORN HTS	5 Highway-pedestrian	5 Waterway	1958	1990	2003		1	30.6	64.9	1	1 Concrete	04 Tee Beam	0	""	""	5 Epoxy Overlay	5 MS 18 (HS 20)	4		42.27	-83.27059	2025-08-18T00:00:00	POINT (-83.27059 42.27)	Taylor	NBI	NHS	1985.94	54	1576806	5.7	2024-08-12T00:00:00	24	A	7	7	7	N
910	MDOT	Metro	7831	63043-B03	M-59 EB	CLINTON RIVER	1.2 MI E OF I-75	1 Highway	5 Waterway	1966	1999	1999		1	57.1	88.3	1	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	3 Latex Concrete/Similar	9 MS22.5(HS25)or greater	3		42.64	-83.214005	2025-08-18T00:00:00	POINT (-83.214005 42.64)	Oakland	NBI	NHS	5041.93	85	648906	25.09	2025-05-22T00:00:00	24	A	6	8	6	N
911	Troy	Metro	14273	""	BASSWOOD DRIVE	SPRAGUE DRAIN	0.5 MI W OF CROOKS RD	1 Highway	5 Waterway	1988				1	30	46.3	1	7 Timber	01 Slab	0	""	""	6 Bituminous	6 MS18(HS20)+mod	2		42.61	-83.1797	2025-08-18T00:00:00	POINT (-83.1797 42.61)	Oakland	NBI	Non-NHS	1389	28.3	1895902	0.32	2025-04-01T00:00:00	24	A	7	7	7	N
912	MDOT	Metro	7872	63081-S01	J L HUDSON DRIVE	M-10	0.75 MILES N OF M-102	1 Highway	1 Highway	1964	1997		1997	2	113.8	71.2	2	3 Steel	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	4 M 18 (H 20)	4	6	42.45	-83.21108	2025-08-18T00:00:00	POINT (-83.21108 42.45)	Oakland	NBI	Non-NHS	8102.56	57.7	688602	0.01	2024-08-27T00:00:00	24	A	7	6	7	N
913	MDOT	Metro	11668	82191-S24	I-75 RAMP C NB	TOLEDO DIX HWY RAMP D	IN LINCOLN PARK	1 Highway	1 Highway	1966	2002		2002	5	438	33.8	5	4 Steel Continuous	82 Pl Girder Comp	0	""	""	1 Monolithic Concrete	9 MS22.5(HS25)or greater	1	7	42.24	-83.194824	2025-08-18T00:00:00	POINT (-83.194824 42.24)	Taylor	NBI	NHS	14804.4	30.5	1592401	0.08	2024-07-02T00:00:00	24	A	7	7	7	N
914	MDOT	Metro	11589	82123-S41	I-96EB TO I-94EB	I-96	IN DETROIT	7 3d level interchg	1 Highway	1971	2004		2004	13	1044.1	28.2	13	4 Steel Continuous	82 Pl Girder Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	1	18	42.35	-83.09725	2025-08-18T00:00:00	POINT (-83.09725 42.35)	Detroit	NBI	NHS	29443.62	25.9	1577409	0.09	2023-10-24T00:00:00	24	A	7	7	5	N
915	MDOT	Metro	11258	82025-S13	CADIEUX AVE	I-94	IN DETROIT	5 Highway-pedestrian	1 Highway	1959	2000		2000	4	168.6	71.9	4	3 Steel	02 Multi Str Non Comp	0	""	""	5 Epoxy Overlay	5 MS 18 (HS 20)	4	6	42.42	-82.93714	2025-08-18T00:00:00	POINT (-82.93714 42.42)	Detroit	NBI	Non-NHS	12122.34	49.9	1715405	2.73	2024-06-17T00:00:00	24	A	6	6	5	N
916	MDOT	Metro	8001	63172-S02-3	FEATHERSTONE RD EB	I-75	0.4 MI N.OF M-59	5 Highway-pedestrian	1 Highway	1990				4	440	44.1	4	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	2	9	42.65	-83.2381	2025-08-18T00:00:00	POINT (-83.2381 42.65)	Oakland	NBI	Non-NHS	19404	32	616508	0.56	2025-07-22T00:00:00	24	A	7	7	6	N
917	Macomb County	Metro	6391	""	34 MILE ROAD	CEMETERY CREEK	AT OMO ROAD INTERSECTION	1 Highway	5 Waterway	2010				1	40	40	1	1 Concrete	19 Culvert	0	""	""	6 Bituminous	5 MS 18 (HS 20)	2		42.84	-82.86338	2025-08-18T00:00:00	POINT (-82.86338 42.84)	Macomb	NBI	Non-NHS	1600	40.4	818502	0.03	2024-08-07T00:00:00	24	A	N	N	N	7
918	MDOT	Metro	11910	82291-S14-8	I-94 WB COLLECTOR	I-275	IN ROMULUS	1 Highway	1 Highway	1972	2010		1992	4	360	41.5	4	3 Steel	82 Pl Girder Comp	0	""	""	1 Monolithic Concrete	6 MS18(HS20)+mod	2	9	42.22	-83.41212	2025-08-18T00:00:00	POINT (-83.41212 42.22)	Taylor	NBI	NHS	14940	38.2	1578310	0.36	2024-08-13T00:00:00	24	A	7	6	6	N
919	Oakland County	Metro	14137	""	11 MILE RD	NOVI-LYON DRAIN	LYON TWP SEC 14/23	1 Highway	5 Waterway	2021				1	22.2	22	1	1 Concrete	19 Culvert	0	""	""	8 Gravel	B Greater than HL 93	2		42.48	-83.59289	2025-08-18T00:00:00	POINT (-83.59289 42.48)	Oakland	NBI	Non-NHS	488.4	22	656603	0.92	2024-06-20T00:00:00	24	A	N	N	N	8
920	MDOT	Metro	7844	63043-S07	LIVERNOIS RD	M-59	4.4 MI E OF I-75	1 Highway	1 Highway	1966		2009	2009	4	279.8	35	4	3 Steel	82 Pl Girder Comp	0	""	""	3 Latex Concrete/Similar	4 M 18 (H 20)	2	4	42.64	-83.15235	2025-08-18T00:00:00	POINT (-83.15235 42.64)	Oakland	NBI	Non-NHS	9793	31.7	625408	6.45	2025-05-14T00:00:00	24	A	6	6	7	N
921	MDOT	Metro	11512	82122-S24	GLENDALE AVE	I-96	IN DETROIT	5 Highway-pedestrian	1 Highway	1970	1995		1995	4	252.7	41.7	4	3 Steel	02 Multi Str Non Comp	0	""	""	5 Epoxy Overlay	5 MS 18 (HS 20)	2	10	42.38	-83.23866	2025-08-18T00:00:00	POINT (-83.23866 42.38)	Detroit	NBI	Non-NHS	10537.59	28.9	1590506	0.38	2023-11-14T00:00:00	24	A	6	7	7	N
922	MDOT	Metro	11438	82112-S13	M-10 WB	M-8 DAVISON	IN DETROIT	1 Highway	1 Highway	1956	1987		1990	8	301.6	72.8	8	3 Steel	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	4	7	42.4	-83.109695	2025-08-18T00:00:00	POINT (-83.109695 42.4)	Detroit	NBI	NHS	21956.48	69	1577510	6.25	2023-11-14T00:00:00	24	A	6	7	7	N
923	Oakland County	Metro	12683	""	SOUTH COMMERCE RD	HAYES CREEK	BET COMMERCE AND OAKLEY	1 Highway	5 Waterway	1993				1	22	57.1	1	1 Concrete	19 Culvert	0	""	""	8 Gravel	0 Unknown	4		42.59	-83.4811	2025-08-18T00:00:00	POINT (-83.4811 42.59)	Oakland	NBI	Non-NHS	1256.2	57.1	630006	1.38	2024-06-12T00:00:00	24	A	N	N	N	7
924	MDOT	Metro	11965	82293-S02	JOY RD	I-275	0.5 MI W OF LIVONIA LTS	1 Highway	1 Highway	1972			2012	4	325.5	48.4	4	3 Steel	82 Pl Girder Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	2	6	42.35	-83.43689	2025-08-18T00:00:00	POINT (-83.43689 42.35)	Taylor	NBI	Non-NHS	15754.2	44.5	1672705	5.24	2024-10-11T00:00:00	24	A	7	7	6	N
925	MDOT	Metro	11252	82025-S08	CHALMERS AVE	I-94	IN DETROIT	5 Highway-pedestrian	1 Highway	1958	2000		2000	4	164.6	65.9	4	3 Steel	02 Multi Str Non Comp	0	""	""	5 Epoxy Overlay	5 MS 18 (HS 20)	4	6	42.4	-82.96421	2025-08-18T00:00:00	POINT (-82.96421 42.4)	Detroit	NBI	Non-NHS	10847.14	44	1578102	2.35	2024-06-27T00:00:00	24	A	7	7	7	N
926	MDOT	Metro	11845	82252-S05	HOLBROOK AVE	I-75	IN DETROIT	5 Highway-pedestrian	1 Highway	1969	2007	2007	1998	2	156	100.9	2	4 Steel Continuous	32 Multi Str Comp	0	""	""	5 Epoxy Overlay	5 MS 18 (HS 20)	6	8	42.39	-83.06809	2025-08-18T00:00:00	POINT (-83.06809 42.39)	Detroit	NBI	Non-NHS	15740.4	75	1585801	0.72	2024-04-30T00:00:00	24	A	6	6	7	N
927	Birmingham	Metro	8234	""	LAKESIDE ST NORTH	QUARTON LK BR-ROUGE RIVR	0.2 MI S OF QUARTON RD	5 Highway-pedestrian	5 Waterway	1994				1	24	25.9	1	1 Concrete	19 Culvert	0	""	""	6 Bituminous	5 MS 18 (HS 20)	2		42.56	-83.226105	2025-08-18T00:00:00	POINT (-83.226105 42.56)	Oakland	NBI	Non-NHS	621.6	25.9	614609	0.69	2024-10-24T00:00:00	24	A	N	N	N	7
928	MDOT	Metro	6184	50112-S03	26 MI RD	I-94	1.5 MI SW OF ST CLAIR COL	1 Highway	1 Highway	1963		2002	2002	4	355.5	35.4	4	3 Steel	82 Pl Girder Comp	0	""	""	5 Epoxy Overlay	4 M 18 (H 20)	2	4	42.72	-82.75327	2025-08-18T00:00:00	POINT (-82.75327 42.72)	Macomb	NBI	Non-NHS	12584.7	28	816702	17.2	2025-06-10T00:00:00	24	A	5	6	6	N
929	MDOT	Metro	7974	63103-S13	10 MI RD CONNECTOR	I-696	IN MADISON HTS	5 Highway-pedestrian	1 Highway	1972	1997		1997	2	241.5	38.1	2	4 Steel Continuous	82 Pl Girder Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	2	8	42.48	-83.09063611	2025-08-18T00:00:00	POINT (-83.09063611 42.48)	Oakland	NBI	Non-NHS	9201.15	29.2	660108	0.14	2025-07-18T00:00:00	24	A	6	5	6	N
930	Sterling Heights	Metro	6429	""	DODGE PARK RD	STERLING RELIEF DRAIN	0.5 MILE N OF 15 MILE RD	5 Highway-pedestrian	5 Waterway	1978				4	64	23	4	3 Steel	19 Culvert	0	""	""	N N/A (no deck (NBI))	6 MS18(HS20)+mod	2		42.56	-83.00999	2025-08-18T00:00:00	POINT (-83.00999 42.56)	Macomb	NBI	Non-NHS	1472	0	812702	0.63	2024-09-19T00:00:00	24	A	N	N	N	6
931	MDOT	Metro	11615	82131-S01	M-1 WOODARD AVE	M-8 DAVISON FWY	IN HIGHLAND PARK	5 Highway-pedestrian	1 Highway	1996				2	192.5	104	2	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	9 MS22.5(HS25)or greater	8	6	42.4	-83.09556	2025-08-18T00:00:00	POINT (-83.09556 42.4)	Detroit	NBI	NHS	20020	81	1591001	1.09	2023-11-30T00:00:00	24	A	7	7	7	N
932	MDOT	Metro	11381	82104-S09	NB OAKLAND AVENUE	M-8, DAVISON FWY	IN HIGHLAND PARK	5 Highway-pedestrian	1 Highway	1971	2000		2015	5	263.8	62.9	5	4 Steel Continuous	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	4	10	42.41	-83.08642	2025-08-18T00:00:00	POINT (-83.08642 42.41)	Detroit	NBI	Non-NHS	16593.02	50	4708768	2.52	2023-10-23T00:00:00	24	A	7	7	7	N
933	MDOT	Metro	7914	63102-B01-4	I-696 WB	ROUGE RIVER	IN SOUTHFIELD	1 Highway	5 Waterway	2024				1	162.8	63.4	1	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	B Greater than HL 93	3		42.49	-83.278366	2025-08-18T00:00:00	POINT (-83.278366 42.49)	Oakland	NBI	NHS	10321.52	60	710702	8.93	2024-10-15T00:00:00	17	A	9	9	9	N
934	MDOT	Metro	8081	63174-S16-1	I-75 NB	ADAMS RD	IN TROY (OVER ADAMS RD)	1 Highway	1 Highway	2017				3	153.2	82.3	3	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	B Greater than HL 93	4	4	42.61	-83.20855	2025-08-18T00:00:00	POINT (-83.20855 42.61)	Oakland	NBI	NHS	12608.36	78.9	647308	15.32	2023-12-08T00:00:00	24	A	8	8	7	N
935	Wayne County	Metro	12032	""	HURON RIVER DRIVE	HURON RIVER	VAN BUREN   W/HAGGERTY(N)	5 Highway-pedestrian	5 Waterway	1960	2020		2021	3	221.8	38.08	3	4 Steel Continuous	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	2		42.21	-83.43451	2025-08-18T00:00:00	POINT (-83.43451 42.21)	Taylor	NBI	Non-NHS	8446.14	28	4705582	2.82	2025-03-11T00:00:00	24	A	8	7	6	N
936	MDOT	Metro	11195	82023-S27	M-10 WB	I-94	IN DETROIT	5 Highway-pedestrian	1 Highway	1953	2004		2004	6	297.5	53.8	6	3 Steel	02 Multi Str Non Comp	0	""	""	3 Latex Concrete/Similar	5 MS 18 (HS 20)	3	6	42.36	-83.07603	2025-08-18T00:00:00	POINT (-83.07603 42.36)	Detroit	NBI	NHS	16005.5	50.9	1577510	9.51	2024-04-22T00:00:00	24	A	8	8	5	N
937	MDOT	Metro	11884	82291-B01	I-275 SB	HURON R & METROPARK PATH	NEW BOSTON VILLAGE	1 Highway	5 Waterway	1974	1998	1998	1998	4	295.8	70.5	4	3 Steel	32 Multi Str Comp	0	""	""	3 Latex Concrete/Similar	9 MS22.5(HS25)or greater	4		42.14	-83.3823	2025-08-18T00:00:00	POINT (-83.3823 42.14)	Taylor	NBI	NHS	20853.9	67.2	1607610	3.41	2024-05-29T00:00:00	24	A	6	6	6	N
938	Wayne County	Metro	12184	""	ALLEN ROAD	BROWNSTOWN CREEK	BROWNSTOWN     S/VREELAND	1 Highway	5 Waterway	2020				1	25.5	40	1	1 Concrete	19 Culvert	0	""	""	4 Low Slump Concrete	B Greater than HL 93	2		42.1	-83.22484	2025-08-18T00:00:00	POINT (-83.22484 42.1)	Taylor	NBI	NHS	1020	40	4705756	0.29	2024-08-26T00:00:00	24	A	N	N	N	8
939	Macomb County	Metro	6329	""	28 MILE ROAD	SALT RIVER	0.4 MI WEST OF GRATIOT	1 Highway	5 Waterway	2003				1	57.1	40.8	1	5 Prestressed Concrete	05 Box Bm/Gird- Multiple	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	2		42.75	-82.77816	2025-08-18T00:00:00	POINT (-82.77816 42.75)	Macomb	NBI	Non-NHS	2329.68	38.7	822109	3.17	2023-07-28T00:00:00	24	A	7	8	7	N
940	Dearborn Height	Metro	12333	""	ANN ARBOR TRAIL	NORTH BRANCH ROUGE RIVER	IN DEARBORN HEIGHTS	5 Highway-pedestrian	5 Waterway	1943	1985	1985	1986	2	107	56.4	2	4 Steel Continuous	02 Multi Str Non Comp	0	""	""	2 Integral Concrete	6 MS18(HS20)+mod	2		42.34	-83.24715	2025-08-18T00:00:00	POINT (-83.24715 42.34)	Taylor	NBI	Non-NHS	6034.8	42	1604508	10.33	2023-10-11T00:00:00	24	A	6	7	5	N
941	MDOT	Metro	11713	82193-S10	M-102 LEFT TRN RMP	M-39	N LIMITS OF DETROIT	5 Highway-pedestrian	1 Highway	1964	2010		1996	2	126.7	34.9	2	3 Steel	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	2	6	42.44	-83.21964	2025-08-18T00:00:00	POINT (-83.21964 42.44)	Detroit	NBI	NHS	4421.83	32.5	1592003	0.23	2025-06-16T00:00:00	24	A	7	6	7	N
942	Macomb County	Metro	6278	""	NEW HAVEN RD	DEER CREEK	0.1 MILE EAST OF PLACE RD	1 Highway	5 Waterway	2014				1	65	42.4	1	5 Prestressed Concrete	06 Box Bms- Single/Sprd	0	""	""	1 Monolithic Concrete	B Greater than HL 93	2		42.74	-82.83093889	2025-08-18T00:00:00	POINT (-82.83093889 42.74)	Macomb	NBI	Non-NHS	2756	40	814905	6.74	2024-07-08T00:00:00	24	A	7	8	8	N
943	MDOT	Metro	11093	82011-S01	ECORSE RD WB	US-12 EB	4.8 MI E OF YPSILANTI	1 Highway	1 Highway	2005				1	76.2	45.3	1	5 Prestressed Concrete	06 Box Bms- Single/Sprd	0	""	""	5 Epoxy Overlay	A HL 93	2	2	42.25	-83.54413	2025-08-18T00:00:00	POINT (-83.54413 42.25)	Taylor	NBI	Non-NHS	3451.86	42	4602985	0.07	2024-10-28T00:00:00	24	A	8	8	7	N
944	Lincoln Park	Metro	12505	""	AUSTIN ST	N BR ECORSE RIVER	IN LINCOLN PARK	5 Highway-pedestrian	5 Waterway	1968		1990		3	51.8	45.9	3	1 Concrete	01 Slab	0	""	""	6 Bituminous	6 MS18(HS20)+mod	2		42.26	-83.1663	2025-08-18T00:00:00	POINT (-83.1663 42.26)	Taylor	NBI	Non-NHS	2377.62	29.9	1662201	0.57	2024-08-20T00:00:00	12	P	4	4	6	N
945	MDOT	Metro	7933	63102-S18	COOLIDGE ROAD	I-696	IN OAK PARK	1 Highway	1 Highway	1985				2	154	82.7	2	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	9 MS22.5(HS25)or greater	4	8	42.47	-83.182594	2025-08-18T00:00:00	POINT (-83.182594 42.47)	Oakland	NBI	Non-NHS	12735.8	64	644004	2.01	2024-07-09T00:00:00	24	A	6	5	5	N
946	Oakland County	Metro	8197	""	LEDGEWOOD	LAKE SHERWOOD	BET LEDGE AND PIKEWOOD	1 Highway	5 Waterway	1966		2010		1	62.3	36.1	1	5 Prestressed Concrete	05 Box Bm/Gird- Multiple	0	""	""	6 Bituminous	6 MS18(HS20)+mod	2		42.59	-83.53905	2025-08-18T00:00:00	POINT (-83.53905 42.59)	Oakland	NBI	Non-NHS	2249.03	25.9	631602	0.35	2024-06-06T00:00:00	24	A	5	5	7	N
947	MDOT	Metro	11171	82023-S03	LONYO AVE	I-94	IN DETROIT	5 Highway-pedestrian	1 Highway	1949	2006		1997	4	178	64.4	4	3 Steel	02 Multi Str Non Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	4	6	42.33	-83.14503	2025-08-18T00:00:00	POINT (-83.14503 42.33)	Detroit	NBI	Non-NHS	11463.2	45.9	1577110	1.14	2023-09-25T00:00:00	24	A	7	7	7	N
948	MDOT	Metro	6079	50061-S06	RAMP H AT MOUND RD	I-696	CITY OF WARREN	1 Highway	1 Highway	1975				15	1534.1	44.3	15	4 Steel Continuous	82 Pl Girder Comp	0	""	""	1 Monolithic Concrete	9 MS22.5(HS25)or greater	2	26	42.49	-83.04398611	2025-08-18T00:00:00	POINT (-83.04398611 42.49)	Macomb	NBI	NHS	67960.63	42.7	1740505	0.2	2025-04-09T00:00:00	24	A	5	7	6	N
949	Detroit	Metro	12391	""	E GRAND BOULEVARD	GTW RR & RIVARD ST	W OF ST AUBIN	5 Highway-pedestrian	4 Highway-railroad	1973	2008			6	488	89	6	4 Steel Continuous	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	6 MS18(HS20)+mod	6	7	42.38	-83.055214	2025-08-18T00:00:00	POINT (-83.055214 42.38)	Detroit	NBI	Non-NHS	43432	72.2	4710494	1.99	2023-11-30T00:00:00	24	A	7	6	6	N
950	MDOT	Metro	11741	82194-S13	W GRAND BLVD SB	I-75	IN DETROIT	5 Highway-pedestrian	1 Highway	2003				2	197.4	48.7	2	4 Steel Continuous	82 Pl Girder Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	3	10	42.32	-83.08452	2025-08-18T00:00:00	POINT (-83.08452 42.32)	Detroit	NBI	Non-NHS	9613.38	36.4	4704383	0.29	2024-05-20T00:00:00	24	A	7	8	7	N
951	MDOT	Metro	11905	82291-S09	I-275 SB	S HURON RIVER DRIVE	IN ROMULUS	1 Highway	1 Highway	1974		1974	2009	1	136.5	56.5	1	3 Steel	82 Pl Girder Comp	0	""	""	1 Monolithic Concrete	9 MS22.5(HS25)or greater	3	2	42.21	-83.404755	2025-08-18T00:00:00	POINT (-83.404755 42.21)	Taylor	NBI	NHS	7712.25	53.2	1607610	8.68	2023-09-19T00:00:00	24	A	7	8	7	N
952	Wayne County	Metro	12076	""	FIVE MILE ROAD	BELL CREEK	REDFORD         E/INKSTER	1 Highway	5 Waterway	1925	1935			2	81	60	2	1 Concrete	04 Tee Beam	0	""	""	6 Bituminous	6 MS18(HS20)+mod	4		42.4	-83.30888	2025-08-18T00:00:00	POINT (-83.30888 42.4)	Taylor	NBI	Non-NHS	4860	49.9	1579605	0.3	2025-05-12T00:00:00	12	P	4	4	5	N
953	MDOT	Metro	7787	63022-B01	I-96	HURON RIVER	0.5 MI E OF LIVINGSTON CO	1 Highway	5 Waterway	1948	2011	2011	1990	3	132.5	106.1	3	3 Steel	32 Multi Str Comp	0	""	""	5 Epoxy Overlay	9 MS22.5(HS25)or greater	6		42.52	-83.66135	2025-08-18T00:00:00	POINT (-83.66135 42.52)	Oakland	NBI	NHS	14058.25	100	657303	0.46	2024-11-18T00:00:00	24	D	6	5	6	N
954	MDOT	Metro	11791	82211-B04	M-85 SB	ECORSE CREEK	IN LINCOLN PARK	5 Highway-pedestrian	5 Waterway	1970	2024			2	55.5	61.6	2	4 Steel Continuous	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	B Greater than HL 93	4		42.26	-83.167496	2025-08-18T00:00:00	POINT (-83.167496 42.26)	Taylor	NBI	NHS	3418.8	52.3	1592106	13.85	2024-11-06T00:00:00	18	A	9	9	7	N
955	MDOT	Metro	11500	82122-S14	INKSTER RD	I-96	E LTS OF LIVONIA	5 Highway-pedestrian	1 Highway	2014				2	167	82.4	2	5 Prestressed Concrete	06 Box Bms- Single/Sprd	0	""	""	1 Monolithic Concrete	B Greater than HL 93	4	8	42.38	-83.31421	2025-08-18T00:00:00	POINT (-83.31421 42.38)	Taylor	NBI	NHS	13760.8	64	1674404	19.09	2024-09-27T00:00:00	24	A	7	7	7	N
956	MDOT	Metro	6033	50013-S11	M-53 SB	27 MILE RD	7.1 MI N OF M-59	1 Highway	1 Highway	1966		2001		3	116.7	42.9	3	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	3 Latex Concrete/Similar	5 MS 18 (HS 20)	2	2	42.73	-83.026764	2025-08-18T00:00:00	POINT (-83.026764 42.73)	Macomb	NBI	NHS	5006.43	39.5	813706	13.01	2025-07-08T00:00:00	24	A	6	7	7	N
957	MDOT	Metro	11132	82022-S26	I-94 WB	OAKWOOD BLVD	IN ALLEN PARK	1 Highway	1 Highway	1996		1996		1	101	77.8	1	5 Prestressed Concrete	05 Box Bm/Gird- Multiple	0	""	""	1 Monolithic Concrete	9 MS22.5(HS25)or greater	4	5	42.29	-83.19651	2025-08-18T00:00:00	POINT (-83.19651 42.29)	Taylor	NBI	NHS	7857.8	74.8	1588802	19.1	2023-08-18T00:00:00	24	A	6	7	7	N
958	MDOT	Metro	6134	50092-B01	M-19	S BR SALT RIVER	1.5 MI W OF I-94	5 Highway-pedestrian	5 Waterway	1985				1	23.6	59.5	1	5 Prestressed Concrete	05 Box Bm/Gird- Multiple	0	""	""	1 Monolithic Concrete	9 MS22.5(HS25)or greater	3		42.72	-82.79356	2025-08-18T00:00:00	POINT (-82.79356 42.72)	Macomb	NBI	Non-NHS	1404.2	56.3	832010	9.45	2024-04-09T00:00:00	24	A	5	7	6	N
959	MDOT	Metro	7899	63101-S02	HAGGERTY RD	I-696	0.5 MI NE OF I-96	1 Highway	1 Highway	1961	2001			5	289	32.8	5	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	2 M 13.5 (H 15)	2	4	42.48	-83.43566	2025-08-18T00:00:00	POINT (-83.43566 42.48)	Oakland	NBI	NHS	9479.2	25.9	639005	3.1	2025-05-20T00:00:00	24	A	7	6	6	N
960	MDOT	Metro	11556	82123-S10	I-96 RAMP	OPEN GROUND	IN DETROIT	1 Highway	0 Other	1973			1989	15	1096.1	51.5	13	3 Steel	82 Pl Girder Comp	2	1 Concrete	01 Slab	1 Monolithic Concrete	5 MS 18 (HS 20)	2		42.38	-83.21369444	2025-08-18T00:00:00	POINT (-83.21369444 42.38)	Detroit	NBI	NHS	56449.15	49.5	1590510	0.19	2023-08-14T00:00:00	24	A	4	7	6	N
961	MDOT	Metro	11814	82251-S13	WILKINS ST & RAMP	I-75	IN DETROIT	5 Highway-pedestrian	1 Highway	1961	2007			4	228.8	68	4	3 Steel	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	6 MS18(HS20)+mod	2	10	42.35	-83.045654	2025-08-18T00:00:00	POINT (-83.045654 42.35)	Detroit	NBI	NHS	15558.4	48	1585607	0.3	2024-03-27T00:00:00	24	A	7	7	7	N
962	MDOT	Metro	7813	63031-B03	US-24 SB	ROUGE RIVER	IN SOUTHFIELD	1 Highway	5 Waterway	1966	1999		1999	3	119	58.4	3	3 Steel	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	9 MS22.5(HS25)or greater	4		42.48	-83.28487	2025-08-18T00:00:00	POINT (-83.28487 42.48)	Oakland	NBI	NHS	6949.6	55.1	710009	2.42	2024-12-11T00:00:00	24	A	7	5	6	N
963	Wayne County	Metro	12256	""	LILLEY ROAD	FELLOWS CREEK	CANTON      N/CHERRY HILL	1 Highway	5 Waterway	1978				2	24.9	35.8	2	3 Steel	19 Culvert	0	""	""	4 Low Slump Concrete	6 MS18(HS20)+mod	2		42.31	-83.45822	2025-08-18T00:00:00	POINT (-83.45822 42.31)	Taylor	NBI	Non-NHS	891.42	35.8	4710390	2.51	2025-05-27T00:00:00	12	A	N	N	N	4
964	MDOT	Metro	11816	82251-S15	CANFIELD AVE	I-75	IN DETROIT	5 Highway-pedestrian	1 Highway	1962	2007		2007	4	228.7	67.9	4	3 Steel	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	6 MS18(HS20)+mod	2	10	42.36	-83.05144	2025-08-18T00:00:00	POINT (-83.05144 42.36)	Detroit	NBI	Non-NHS	15528.73	44	1585701	0.71	2024-03-27T00:00:00	24	A	7	7	7	N
965	MDOT	Metro	7953	63102-S41	ROANOKE U-TURN	I-696	0.7 MI W WOODWARD	1 Highway	1 Highway	1985				2	154	56.1	2	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	9 MS22.5(HS25)or greater	2	8	42.47	-83.16011	2025-08-18T00:00:00	POINT (-83.16011 42.47)	Oakland	NBI	Non-NHS	8639.4	42	4412695	0.01	2024-07-24T00:00:00	24	A	6	6	6	N
966	MDOT	Metro	6074	50061-S01	U TURN @ AUGUSTINE	I-696	0.1 MI E OF DEQUINDRE	1 Highway	1 Highway	1972	2002		2002	2	172	25.7	2	3 Steel	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	6 MS18(HS20)+mod	2	8	42.49	-83.08352	2025-08-18T00:00:00	POINT (-83.08352 42.49)	Macomb	NBI	Non-NHS	4420.4	23.3	4210605	0.01	2025-03-10T00:00:00	24	A	7	6	5	N
967	Macomb County	Metro	6289	""	34 MILE ROAD	COON CREEK	0.2 MI WEST OF COON CREEK	1 Highway	5 Waterway	1975				2	28.9	26.2	2	3 Steel	19 Culvert	0	""	""	N N/A (no deck (NBI))	4 M 18 (H 20)	2		42.83	-82.92946	2025-08-18T00:00:00	POINT (-82.92946 42.83)	Macomb	NBI	Non-NHS	757.18	0	821608	8.7	2023-07-14T00:00:00	24	A	N	N	N	6
968	MDOT	Metro	11772	82195-S15	M-10 N-W RAMP	I-75 & EXIT RAMPS	IN DETROIT	1 Highway	1 Highway	1970	1998		1998	6	402.8	30.8	6	3 Steel	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	1	9	42.34	-83.06238	2025-08-18T00:00:00	POINT (-83.06238 42.34)	Detroit	NBI	NHS	12406.24	27.6	1585003	0.1	2025-05-29T00:00:00	24	A	7	7	6	N
969	MDOT	Metro	11514	82122-S26	BERWYN STREET	I-96	IN REDFORD TWP	5 Highway-pedestrian	1 Highway	1973	2014		2001	2	220	46.4	2	3 Steel	02 Multi Str Non Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	2	10	42.38	-83.299484	2025-08-18T00:00:00	POINT (-83.299484 42.38)	Taylor	NBI	Non-NHS	10208	28	4705218	0.01	2024-09-16T00:00:00	24	A	6	6	7	N
970	MDOT	Metro	12494	82710-B09	WOODSIDE DRIVE	CANOE STREAM	BELLE ISLE	5 Highway-pedestrian	5 Waterway	1901	2013			1	35.1	25.9	1	3 Steel	42 Multi Str Encsd	0	""	""	1 Monolithic Concrete	A HL 93	1		42.34	-82.96868611	2025-08-18T00:00:00	POINT (-82.96868611 42.34)	Detroit	NBI	Non-NHS	909.09	22.8	1633305	0.08	2024-08-07T00:00:00	24	A	7	8	8	N
971	MDOT	Metro	6011	50011-S02	M-53 SB	UTICA RD	1.9 MI S OF M-59	1 Highway	1 Highway	1963				3	127.1	42.9	3	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	5 Epoxy Overlay	5 MS 18 (HS 20)	2	2	42.6	-83.02337	2025-08-18T00:00:00	POINT (-83.02337 42.6)	Macomb	NBI	NHS	5452.59	39.5	813706	4	2024-10-03T00:00:00	17	A	7	6	7	N
972	Macomb County	Metro	12655	""	21 MILE ROAD	NORTH BR CLINTON RIVER	0.1 MI WEST OF NORTH AVE	5 Highway-pedestrian	5 Waterway	1996				4	224	78.4	4	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	5 Epoxy Overlay	9 MS22.5(HS25)or greater	5		42.64	-82.87823	2025-08-18T00:00:00	POINT (-82.87823 42.64)	Macomb	NBI	Non-NHS	17561.6	64	817708	8.15	2024-07-31T00:00:00	24	A	7	6	7	N
973	Gibraltar	Metro	11998	""	GIBRALTAR ROAD	WATERWAY CANAL	GIBRALTAR  E/N GIBRALTAR	5 Highway-pedestrian	5 Waterway	2021				1	70	48	1	5 Prestressed Concrete	05 Box Bm/Gird- Multiple	0	""	""	1 Monolithic Concrete	B Greater than HL 93	2		42.09	-83.19066	2025-08-18T00:00:00	POINT (-83.19066 42.09)	Taylor	NBI	Non-NHS	3360	30	1692303	5.12	2025-08-04T00:00:00	24	A	8	8	8	N
974	MDOT	Metro	7786	63821-C01	OLD I-96 (BL)	ROUGE RIVER	.2 MI E OF POWER RD	5 Highway-pedestrian	5 Waterway	2006				1	32.2	50	1	1 Concrete	19 Culvert	0	""	""	2 Integral Concrete	9 MS22.5(HS25)or greater	5		42.46	-83.36298	2025-08-18T00:00:00	POINT (-83.36298 42.46)	Oakland	NBI	Non-NHS	1610	55	4104142	17.42	2024-11-27T00:00:00	24	A	N	N	N	7
975	MDOT	Metro	7816	63041-B01	M-59	CLINTON RIVER	4.0 MI W OF PONTIAC	1 Highway	5 Waterway	1965		1999		1	39	71.2	1	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	3 Latex Concrete/Similar	5 MS 18 (HS 20)	5		42.66	-83.39022	2025-08-18T00:00:00	POINT (-83.39022 42.66)	Oakland	NBI	NHS	2776.8	63	648906	15.34	2025-05-08T00:00:00	24	A	7	8	7	N
976	Troy	Metro	8307	""	COOLIDGE ROAD	ROUGE RIVER	0.1 MI N OF LONG LAKE RD	5 Highway-pedestrian	5 Waterway	1972				2	38	91.9	2	2 Concrete Continuous	19 Culvert	0	""	""	1 Monolithic Concrete	6 MS18(HS20)+mod	5		42.59	-83.188286	2025-08-18T00:00:00	POINT (-83.188286 42.59)	Oakland	NBI	Non-NHS	3492.2	59.1	693006	4.15	2025-04-01T00:00:00	24	A	N	N	N	6
977	MDOT	Metro	11120	82022-S10	I-94 WB	ECORSE RD	IN TAYLOR,OVER ECORSE RD	1 Highway	1 Highway	1962		1977	1997	4	237	61.5	4	3 Steel	32 Multi Str Comp	0	""	""	3 Latex Concrete/Similar	5 MS 18 (HS 20)	4	5	42.25	-83.30356	2025-08-18T00:00:00	POINT (-83.30356 42.25)	Taylor	NBI	NHS	14575.5	58.2	1588802	12.79	2024-12-13T00:00:00	12	D	4	5	4	N
978	MDOT	Metro	7976	63103-S15	DEQUINDRE AVE	I-696	IN WARREN & MADISON HTS	5 Highway-pedestrian	1 Highway	1972		2002	2002	2	311	78.4	2	3 Steel	82 Pl Girder Comp	0	""	""	3 Latex Concrete/Similar	5 MS 18 (HS 20)	5	8	42.48	-83.08483	2025-08-18T00:00:00	POINT (-83.08483 42.48)	Oakland	NBI	NHS	24382.4	64	799402	2.53	2025-07-18T00:00:00	24	A	6	7	5	N
979	MDOT	Metro	7847	63043-S10	M-59 EB	JOHN R RD	4.0 MI W OF UTICA	1 Highway	1 Highway	1972	2009		2009	1	117.5	68.6	1	3 Steel	82 Pl Girder Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	2	2	42.62	-83.11114	2025-08-18T00:00:00	POINT (-83.11114 42.62)	Oakland	NBI	NHS	8060.5	65.3	648906	30.83	2025-05-15T00:00:00	24	A	8	8	7	N
980	Oakland County	Metro	12725	""	BEACHLAND BLVD	OTTER SYLVAN LAKE CANAL	0.5 MI NE OF CASS LAKE RD	1 Highway	5 Waterway	1997				1	64	34.1	1	5 Prestressed Concrete	05 Box Bm/Gird- Multiple	0	""	""	6 Bituminous	5 MS 18 (HS 20)	2		42.62	-83.34522	2025-08-18T00:00:00	POINT (-83.34522 42.62)	Oakland	NBI	Non-NHS	2182.4	32.2	654708	0.5	2024-07-24T00:00:00	24	A	6	6	7	N
981	MDOT	Metro	6096	50061-S30	WAGNER DRIVE	I-696	IN WARREN	5 Highway-pedestrian	1 Highway	1972	2005		1999	4	257	42.4	4	3 Steel	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	6 MS18(HS20)+mod	2	10	42.49	-83.00111	2025-08-18T00:00:00	POINT (-83.00111 42.49)	Macomb	NBI	Non-NHS	10896.8	30	805702	1.45	2025-03-10T00:00:00	24	A	7	5	5	N
982	MDOT	Metro	11754	82194-S25	RMP I-96E TO I-75N	I-75 SB & ENTRANCE RAMP	IN DETROIT	1 Highway	1 Highway	1970		1998	1998	3	179.1	40.7	3	3 Steel	82 Pl Girder Comp	0	""	""	2 Integral Concrete	6 MS18(HS20)+mod	2	3	42.33	-83.085304	2025-08-18T00:00:00	POINT (-83.085304 42.33)	Detroit	NBI	NHS	7289.37	38.4	1590406	0.33	2024-06-10T00:00:00	24	D	5	6	5	N
983	MDOT	Metro	11919	82292-B02	I-275 SB	LOWER ROUGE R/BIKE PATH	2.5 MI W OF WAYNE	1 Highway	5 Waterway	1974		2012		4	238.3	55.7	4	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	3 Latex Concrete/Similar	9 MS22.5(HS25)or greater	3		42.28	-83.44235	2025-08-18T00:00:00	POINT (-83.44235 42.28)	Taylor	NBI	NHS	13273.31	52.5	1607610	14.55	2024-10-29T00:00:00	24	A	7	7	7	N
984	Wayne County	Metro	12281	""	OTTER ROAD	SWAN CREEK	HURON            N/WILLOW	1 Highway	5 Waterway	1996				1	30.5	43	1	5 Prestressed Concrete	05 Box Bm/Gird- Multiple	0	""	""	1 Monolithic Concrete	9 MS22.5(HS25)or greater	2		42.12	-83.41134	2025-08-18T00:00:00	POINT (-83.41134 42.12)	Taylor	NBI	Non-NHS	1311.5	40	1670901	0.03	2024-06-28T00:00:00	24	A	6	6	7	N
985	MDOT	Metro	6098	50061-S32	SB SERVICE RD	RAMPS A&F OFF I-696	CITY OF WARREN	5 Highway-pedestrian	1 Highway	1976		2008	2008	1	157	49.9	1	3 Steel	82 Pl Girder Comp	0	""	""	5 Epoxy Overlay	5 MS 18 (HS 20)	3	3	42.49	-83.0467	2025-08-18T00:00:00	POINT (-83.0467 42.49)	Macomb	NBI	Non-NHS	7834.3	40.7	1740303	0.44	2025-04-14T00:00:00	24	A	6	7	7	N
986	MDOT	Metro	6163	50111-S21	I-94	MASONIC BLVD	E LTS OF ROSEVILLE	1 Highway	1 Highway	1965	2002		1965	3	134.5	126.6	3	3 Steel	32 Multi Str Comp	0	""	""	3 Latex Concrete/Similar	6 MS18(HS20)+mod	6	4	42.53	-82.905365	2025-08-18T00:00:00	POINT (-82.905365 42.53)	Macomb	NBI	NHS	17027.7	124.3	798501	6.04	2025-06-07T00:00:00	24	A	7	6	6	N
987	MDOT	Metro	11666	82191-S23-1	I-75 NB	M-39	IN LINCOLN PARK	1 Highway	1 Highway	1966	2002		2002	2	204.3	73.5	2	4 Steel Continuous	82 Pl Girder Comp	0	""	""	1 Monolithic Concrete	9 MS22.5(HS25)or greater	4	8	42.25	-83.18497	2025-08-18T00:00:00	POINT (-83.18497 42.25)	Taylor	NBI	NHS	15016.05	70.2	1592010	13.91	2024-05-15T00:00:00	24	A	7	7	7	N
988	MDOT	Metro	11135	82022-S29	SCHAEFER HWY	I-94	IN DEARBORN	5 Highway-pedestrian	1 Highway	1978		1978	2005	2	337	79.7	2	3 Steel	82 Pl Girder Comp	0	""	""	3 Latex Concrete/Similar	5 MS 18 (HS 20)	5	6	42.31	-83.17535	2025-08-18T00:00:00	POINT (-83.17535 42.31)	Taylor	NBI	NHS	26858.9	59.7	4706528	2.31	2023-09-15T00:00:00	24	A	6	7	7	N
989	MDOT	Metro	7936	63102-S23	WOODWARD U TURN W	I-696	IN ROYAL OAK	1 Highway	1 Highway	1986				2	154.5	76.4	2	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	9 MS22.5(HS25)or greater	4	8	42.48	-83.14715	2025-08-18T00:00:00	POINT (-83.14715 42.48)	Oakland	NBI	NHS	11803.8	72.2	1903610	0.13	2024-07-25T00:00:00	24	A	6	7	7	N
990	MDOT	Metro	11881	82271-S01	US-24-I-75 CONN SB	RACHO RD	IN TAYLOR OVER RACHO RD	1 Highway	1 Highway	1964	2001		2001	3	143.4	43.3	3	3 Steel	32 Multi Str Comp	0	""	""	3 Latex Concrete/Similar	6 MS18(HS20)+mod	2	2	42.19	-83.24782	2025-08-18T00:00:00	POINT (-83.24782 42.19)	Taylor	NBI	NHS	6209.22	39.9	1578409	0.36	2024-11-06T00:00:00	12	A	6	6	7	N
991	MDOT	Metro	11576	82123-S28	GRAND RIVER AVE	I-96	IN DETROIT	5 Highway-pedestrian	1 Highway	1972	2009		2009	2	306.9	106.4	2	3 Steel	82 Pl Girder Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	7	8	42.37	-83.144966	2025-08-18T00:00:00	POINT (-83.144966 42.37)	Detroit	NBI	NHS	32654.16	81	1577408	6.98	2024-09-20T00:00:00	24	A	7	6	5	N
992	MDOT	Metro	11654	82191-S12	PENNSYLVANIA RD	I-75	S LTS OF TAYLOR	1 Highway	1 Highway	1964		1991	1991	6	350.8	35.2	6	3 Steel	02 Multi Str Non Comp	0	""	""	5 Epoxy Overlay	4 M 18 (H 20)	2	8	42.18	-83.24326	2025-08-18T00:00:00	POINT (-83.24326 42.18)	Taylor	NBI	Non-NHS	12348.16	32	1674307	8.84	2024-07-02T00:00:00	24	A	5	5	7	N
993	MDOT	Metro	11903	82291-S07	EUREKA RD	I-275	IN ROMULUS	6 2d level interchg	1 Highway	1974		2022		2	288	78	2	3 Steel	82 Pl Girder Comp	0	""	""	3 Latex Concrete/Similar	5 MS 18 (HS 20)	4	8	42.19	-83.388336	2025-08-18T00:00:00	POINT (-83.388336 42.19)	Taylor	NBI	NHS	22464	75	1578308	0.76	2023-09-14T00:00:00	24	A	7	7	6	N
994	MDOT	Metro	11346	82101-C01	M-14 (OLD)	TONQUISH CREEK	0.3 MI E MAIN ST,PLYMOUTH	1 Highway	5 Waterway	1926	1974			1	22.5	60	1	1 Concrete	19 Culvert	0	""	""	6 Bituminous	5 MS 18 (HS 20)	4		42.36	-83.465515	2025-08-18T00:00:00	POINT (-83.465515 42.36)	Taylor	NBI	NHS	1350	60	1604102	4.37	2023-10-09T00:00:00	24	A	N	N	N	5
995	MDOT	Metro	12788	50111-S33	M-59 WB	I-94	CHESTERFIELD/HARRISON TWP	1 Highway	1 Highway	1996			1996	2	276	63.3	2	4 Steel Continuous	82 Pl Girder Comp	0	""	""	5 Epoxy Overlay	9 MS22.5(HS25)or greater	3	8	42.63	-82.84945	2025-08-18T00:00:00	POINT (-82.84945 42.63)	Macomb	NBI	NHS	17470.8	60	807801	12.34	2025-06-26T00:00:00	24	A	6	7	6	N
996	MDOT	Metro	6081	50061-S09	10.5 MI ROAD	MND RD &RMPS A&B O I-696	CITY OF WARREN	5 Highway-pedestrian	1 Highway	1977				5	425.3	46.4	5	3 Steel	82 Pl Girder Comp	0	""	""	1 Monolithic Concrete	4 M 18 (H 20)	2	11	42.48	-83.045	2025-08-18T00:00:00	POINT (-83.045 42.48)	Macomb	NBI	Non-NHS	19733.92	32	4200036	1.04	2025-04-10T00:00:00	24	A	5	7	5	N
997	MDOT	Metro	6139	50111-B01	I-94	CLINTON RIVER SPILLWAY	2.1 MI SE OF MT CLEMENS	1 Highway	5 Waterway	1959	1984	1984	1998	4	276	110.6	4	3 Steel	32 Multi Str Comp	0	""	""	3 Latex Concrete/Similar	5 MS 18 (HS 20)	6		42.57	-82.858635	2025-08-18T00:00:00	POINT (-82.858635 42.57)	Macomb	NBI	NHS	30525.6	106	798501	9.99	2025-06-17T00:00:00	24	A	6	5	5	N
998	MDOT	Metro	11180	82023-S12	SCOTTEN AVE	I-94	IN DETROIT	5 Highway-pedestrian	1 Highway	1953	1997			6	264.9	67.6	6	5 Prestressed Concrete	02 Multi Str Non Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	4	8	42.35	-83.11162	2025-08-18T00:00:00	POINT (-83.11162 42.35)	Detroit	NBI	Non-NHS	17907.24	43.3	1577306	2.41	2024-04-15T00:00:00	24	A	7	7	7	N
999	MDOT	Metro	11642	82191-S01-1	I-75 NB	NORTH HURON RIVER DRIVE	IN ROCKWOOD	1 Highway	1 Highway	2008				3	154.3	73.5	3	3 Steel	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	B Greater than HL 93	4	4	42.07	-83.25229	2025-08-18T00:00:00	POINT (-83.25229 42.07)	Taylor	NBI	NHS	11341.05	70	1592010	0.17	2024-07-24T00:00:00	24	A	7	8	8	N
1000	MDOT	Metro	6136	50092-B03	M-19	SALT RIVER	3.3 MI SW OF ST CLAIR COL	5 Highway-pedestrian	5 Waterway	1991			1992	1	35	51.3	1	5 Prestressed Concrete	05 Box Bm/Gird- Multiple	0	""	""	6 Bituminous	9 MS22.5(HS25)or greater	2		42.75	-82.77005	2025-08-18T00:00:00	POINT (-82.77005 42.75)	Macomb	NBI	Non-NHS	1795.5	48	832010	11.76	2024-04-09T00:00:00	24	A	6	6	6	N
1001	MDOT	Metro	11827	82251-S26	I-75NB&I-94EB RAMP	RUSSELL ST CONN	IN DETROIT	1 Highway	1 Highway	1964	2000		2000	9	585.2	27.6	3	3 Steel	52 Pl Girder Non Comp	6	3 Steel	32 Multi Str Comp	0 None	6 MS18(HS20)+mod	1	1	42.37	-83.05674	2025-08-18T00:00:00	POINT (-83.05674 42.37)	Detroit	NBI	NHS	16151.52	23.6	4705723	0.48	2024-04-16T00:00:00	24	A	7	7	5	N
1002	Macomb County	Metro	6321	""	SEAWAY DRIVE	CANAL TO SEAWAY ISLAND	EAST END OF SEAWAY DRIVE	1 Highway	5 Waterway	1965				1	35.8	35.8	1	5 Prestressed Concrete	05 Box Bm/Gird- Multiple	0	""	""	6 Bituminous	4 M 18 (H 20)	2		42.57	-82.8141	2025-08-18T00:00:00	POINT (-82.8141 42.57)	Macomb	NBI	Non-NHS	1281.64	29.5	830703	0.02	2025-05-13T00:00:00	24	A	6	6	6	N
1003	St Clair Shores	Metro	6420	""	JEFFERSON AVE	MILK RIVER	S OF NINE MILE ROAD	5 Highway-pedestrian	5 Waterway	2001				3	80.6	98.1	3	5 Prestressed Concrete	05 Box Bm/Gird- Multiple	0	""	""	1 Monolithic Concrete	9 MS22.5(HS25)or greater	4		42.45	-82.87657	2025-08-18T00:00:00	POINT (-82.87657 42.45)	Macomb	NBI	NHS	7906.86	56.4	4718264	0.47	2025-03-27T00:00:00	24	A	7	7	6	N
1004	MDOT	Metro	7964	63103-S03	I-696 TO I-75 RAMP	N-S SERVICE ROAD	AT I-696 & I-75	1 Highway	1 Highway	1982			2007	1	82.3	60.6	1	3 Steel	02 Multi Str Non Comp	0	""	""	5 Epoxy Overlay	9 MS22.5(HS25)or greater	2	2	42.48	-83.11496	2025-08-18T00:00:00	POINT (-83.11496 42.48)	Oakland	NBI	NHS	4987.38	56.7	1738907	0.31	2025-07-10T00:00:00	24	A	7	7	7	N
1005	Macomb County	Metro	6287	""	33 MILE ROAD	EAST BRANCH COON CREEK	0.2 MI EAST OF NORTH AVE	1 Highway	5 Waterway	1983	2022		2022	1	42.5	28.4	1	3 Steel	06 Box Bms- Single/Sprd	0	""	""	1 Monolithic Concrete	B Greater than HL 93	2		42.82	-82.87794	2025-08-18T00:00:00	POINT (-82.87794 42.82)	Macomb	NBI	Non-NHS	1207	26	4210214	6.73	2024-07-22T00:00:00	24	A	8	9	7	N
1006	MDOT	Metro	11730	82194-S02-1	I-75 NB	OUTER DRIVE	IN MELVINDALE	1 Highway	1 Highway	1966	2002		2002	4	290.3	60.4	2	4 Steel Continuous	32 Multi Str Comp	2	3 Steel	32 Multi Str Comp	1 Monolithic Concrete	9 MS22.5(HS25)or greater	3	8	42.26	-83.17091	2025-08-18T00:00:00	POINT (-83.17091 42.26)	Taylor	NBI	NHS	17534.12	57.1	1592010	15.06	2025-06-12T00:00:00	24	A	7	7	7	N
1007	Wayne County	Metro	12075	""	FIVE MILE ROAD	JOHNSON DRAIN	PLYMTH T/NORTHV T W/RIDGE	5 Highway-pedestrian	5 Waterway	1956		1986		3	64	37.7	3	2 Concrete Continuous	01 Slab	0	0 Other	00 Other	6 Bituminous	4 M 18 (H 20)	2		42.39	-83.53458	2025-08-18T00:00:00	POINT (-83.53458 42.39)	Taylor	NBI	Non-NHS	2412.8	27.9	1708705	0.77	2025-06-30T00:00:00	24	A	5	5	5	N
1008	MDOT	Metro	11408	82111-S21	M-10 SB	WB JEFFERSON AVE	IN CITY OF DETROIT	1 Highway	1 Highway	1987			1987	1	82.3	43	1	5 Prestressed Concrete	01 Slab	0	""	""	1 Monolithic Concrete	9 MS22.5(HS25)or greater	2	2	42.33	-83.05214	2025-08-18T00:00:00	POINT (-83.05214 42.33)	Detroit	NBI	NHS	3538.9	24	1577509	12.21	2024-06-11T00:00:00	24	A	5	5	7	N
1009	Wayne County	Metro	12022	""	EUREKA ROAD	FRANK & POET DRAIN	TAYLOR             W/I-75	1 Highway	5 Waterway	1977				1	40	120.7	1	1 Concrete	07 Frame- Rigid exc Culv	0	""	""	1 Monolithic Concrete	6 MS18(HS20)+mod	6		42.2	-83.247086	2025-08-18T00:00:00	POINT (-83.247086 42.2)	Taylor	NBI	NHS	4828	37.7	4707874	0.04	2024-09-19T00:00:00	24	A	5	6	5	N
1010	Oakland County	Metro	8179	""	COOLEY LAKE ROAD	CLINTON RIVER	BET CASS ELIZABETH & HILL	1 Highway	5 Waterway	1994				1	47.9	77	1	5 Prestressed Concrete	05 Box Bm/Gird- Multiple	0	""	""	1 Monolithic Concrete	6 MS18(HS20)+mod	4		42.63	-83.394844	2025-08-18T00:00:00	POINT (-83.394844 42.63)	Oakland	NBI	NHS	3688.3	68	630603	3	2024-07-23T00:00:00	24	A	6	7	6	N
1011	Wayne County	Metro	12206	""	GREENFIELD ROAD	CSX RR & FULLERTON RD	DETROIT            N/I-96	5 Highway-pedestrian	4 Highway-railroad	1970	1993	1993	1993	8	545.5	103	8	3 Steel	32 Multi Str Comp	0	0 Other	00 Other	2 Integral Concrete	6 MS18(HS20)+mod	7	2	42.38	-83.198044	2025-08-18T00:00:00	POINT (-83.198044 42.38)	Detroit	NBI	NHS	56186.5	81	1651002	7.8	2025-04-14T00:00:00	12	A	5	6	7	N
1012	MDOT	Metro	6043	50021-B01	M-59	CLINTON RIVER	IN UTICA	5 Highway-pedestrian	5 Waterway	1994				2	90	155.3	2	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	9 MS22.5(HS25)or greater	8		42.63	-83.03785	2025-08-18T00:00:00	POINT (-83.03785 42.63)	Macomb	NBI	NHS	13977	149.7	807710	2.72	2024-11-06T00:00:00	24	A	7	8	6	N
1013	MDOT	Metro	8088	63174-S20-2	I-75 SB	OLD M-59 (AUBURN RD)	0.5 MI S OF M-59	1 Highway	1 Highway	1964	2001	2001		3	132.9	71.5	3	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	3 Latex Concrete/Similar	6 MS18(HS20)+mod	4	4	42.63	-83.23882	2025-08-18T00:00:00	POINT (-83.23882 42.63)	Oakland	NBI	NHS	9502.35	66	646106	18.1	2025-07-10T00:00:00	24	A	6	5	6	N
1014	MDOT	Metro	11782	82195-S27	BRUSH ST	I-75	IN DETROIT	5 Highway-pedestrian	1 Highway	1970		1994	1994	3	203.2	57	3	3 Steel	32 Multi Str Comp	0	""	""	5 Epoxy Overlay	5 MS 18 (HS 20)	3	8	42.34	-83.04851	2025-08-18T00:00:00	POINT (-83.04851 42.34)	Detroit	NBI	Non-NHS	11582.4	33	4718307	0.86	2024-11-07T00:00:00	12	D	5	5	6	N
1015	MDOT	Metro	12392	82700-B01	BELLE ISLE TRAFFIC	DETROIT RIVER	DETROIT RIV AT BELLE ISLE	5 Highway-pedestrian	5 Waterway	1929	1998			20	2193.5	88	19	1 Concrete	00 Other	1	1 Concrete	""	5 Epoxy Overlay	6 MS18(HS20)+mod	5		42.34	-82.99666	2025-08-18T00:00:00	POINT (-82.99666 42.34)	Detroit	NBI	Non-NHS	193028	61.5	4705761	0.16	2023-10-19T00:00:00	24	P	5	6	5	N
1016	Macomb County	Metro	6231	""	ARMADA RIDGE RD	COON CREEK	0.8 MI EAST OF WOLCOTT RD	1 Highway	5 Waterway	1986				1	31.8	49.9	1	1 Concrete	11 Arch- Deck, Filled Sp	0	""	""	N N/A (no deck (NBI))	9 MS22.5(HS25)or greater	2		42.82	-82.92745	2025-08-18T00:00:00	POINT (-82.92745 42.82)	Macomb	NBI	Non-NHS	1586.82	39.4	817602	0.84	2023-08-09T00:00:00	24	A	N	8	7	N
1017	MDOT	Metro	6069	50051-B01	M-3 SB	CLINTON RIVER	IN MT CLEMENS	5 Highway-pedestrian	5 Waterway	2011				3	250	73.6	3	5 Prestressed Concrete	06 Box Bms- Single/Sprd	0	""	""	1 Monolithic Concrete	A HL 93	4		42.59	-82.8835	2025-08-18T00:00:00	POINT (-82.8835 42.59)	Macomb	NBI	NHS	18400	52	4208203	10.23	2023-12-20T00:00:00	24	A	7	8	8	N
1018	Wayne County	Metro	12180	""	OUTER DRIVE	MIDDLE ROUGE RIVER	DBN HTS S/E N HINES DRIVE	5 Highway-pedestrian	5 Waterway	1928		1982		2	95.8	81	2	1 Concrete	04 Tee Beam	0	""	""	2 Integral Concrete	6 MS18(HS20)+mod	6		42.34	-83.26038	2025-08-18T00:00:00	POINT (-83.26038 42.34)	Taylor	NBI	Non-NHS	7759.8	59.7	1596803	0.77	2024-09-18T00:00:00	24	A	5	5	5	N
1019	Wayne County	Metro	12268	""	SHELDON ROAD	LOWER ROUGE RIVER	CANTON           S/PALMER	1 Highway	5 Waterway	1946	1985	1990		3	63	29.9	3	2 Concrete Continuous	01 Slab	0	""	""	2 Integral Concrete	4 M 18 (H 20)	2		42.29	-83.47636	2025-08-18T00:00:00	POINT (-83.47636 42.29)	Taylor	NBI	Non-NHS	1883.7	24	1670201	2.08	2025-03-03T00:00:00	12	P	3	3	4	N
1020	MDOT	Metro	11334	82081-S02	MILLER RD	M-153	IN DEARBORN	5 Highway-pedestrian	1 Highway	1940		1983	1940	2	111.3	54.2	2	4 Steel Continuous	02 Multi Str Non Comp	0	""	""	5 Epoxy Overlay	4 M 18 (H 20)	2	6	42.33	-83.16645	2025-08-18T00:00:00	POINT (-83.16645 42.33)	Taylor	NBI	Non-NHS	6032.46	42	1589801	3.05	2024-07-26T00:00:00	24	A	5	7	7	N
1021	MDOT	Metro	11211	82024-S04	JOHN R ST	I-94	IN DETROIT	5 Highway-pedestrian	1 Highway	1955	1995		1995	4	172.3	61.7	4	3 Steel	02 Multi Str Non Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	4	6	42.36	-83.066765	2025-08-18T00:00:00	POINT (-83.066765 42.36)	Detroit	NBI	Non-NHS	10630.91	44	4705731	1.9	2025-04-28T00:00:00	24	A	6	5	5	N
1022	MDOT	Metro	11732	82194-S04	I-75	SCHAEFER RD	IN DETROIT	1 Highway	1 Highway	1966	2002		2002	4	212.1	140.4	4	4 Steel Continuous	82 Pl Girder Comp	0	""	""	1 Monolithic Concrete	9 MS22.5(HS25)or greater	8	8	42.28	-83.15629	2025-08-18T00:00:00	POINT (-83.15629 42.28)	Detroit	NBI	NHS	29778.84	132.5	1592010	16.23	2025-06-12T00:00:00	24	A	6	7	7	N
1023	MDOT	Metro	6061	50023-S05	U TRN W/MOUND RD	M-59	0.5 MI. WEST OF UTICA	1 Highway	1 Highway	1994				2	129.7	73.1	2	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	4	6	42.62	-83.05436	2025-08-18T00:00:00	POINT (-83.05436 42.62)	Macomb	NBI	Non-NHS	9481.07	70	4205540	0.02	2023-11-30T00:00:00	24	A	7	6	7	N
1024	MDOT	Metro	11800	82251-S02	MADISON AVE RAMPS	I-375	IN DETROIT	1 Highway	1 Highway	1964		2001	1998	6	362	69.9	6	3 Steel	82 Pl Girder Comp	0	""	""	5 Epoxy Overlay	6 MS18(HS20)+mod	4	3	42.34	-83.04198	2025-08-18T00:00:00	POINT (-83.04198 42.34)	Detroit	NBI	NHS	25303.8	67.6	1586010	0.1	2024-02-08T00:00:00	24	A	5	7	6	N
1025	Dearborn Height	Metro	12337	""	JACKSON AVE	ECORSE CREEK	IN DEARBORN HEIGHTS	1 Highway	5 Waterway	1992				1	30	25.9	1	1 Concrete	19 Culvert	0	""	""	N N/A (no deck (NBI))	5 MS 18 (HS 20)	2		42.27	-83.23359	2025-08-18T00:00:00	POINT (-83.23359 42.27)	Taylor	NBI	Non-NHS	777	26	1646705	0.06	2023-10-24T00:00:00	24	A	N	N	N	7
1026	MDOT	Metro	11101	82021-S03	I-94 WB	HANNAN RD	3 MI E OF BELLEVILLE	1 Highway	1 Highway	1972			1992	1	101.8	64.7	1	3 Steel	82 Pl Girder Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	3	2	42.22	-83.42428	2025-08-18T00:00:00	POINT (-83.42428 42.22)	Taylor	NBI	NHS	6586.46	61.5	1588802	6.12	2024-08-09T00:00:00	24	A	6	5	6	N
1027	MDOT	Metro	6160	50111-S17	M-3 TO I-94 EB CON	I-94 WB	IN ROSEVILLE (NB GRATIOT)	5 Highway-pedestrian	1 Highway	1965		2003	1997	3	199.2	45.6	3	3 Steel	82 Pl Girder Comp	0	""	""	3 Latex Concrete/Similar	6 MS18(HS20)+mod	2	3	42.52	-82.916435	2025-08-18T00:00:00	POINT (-82.916435 42.52)	Macomb	NBI	NHS	9083.52	43	801102	0.21	2025-06-07T00:00:00	24	A	6	6	7	N
1028	Utica	Metro	6433	""	AUBURN RD	CLINTON RIVER	WEST OF VAN DYKE	5 Highway-pedestrian	5 Waterway	1928	1988	2008		2	101.4	41	2	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	6 Bituminous	6 MS18(HS20)+mod	2		42.63	-83.037605	2025-08-18T00:00:00	POINT (-83.037605 42.63)	Macomb	NBI	Non-NHS	4157.4	27.9	6704389	0.95	2024-09-20T00:00:00	24	A	5	7	6	N
1029	MDOT	Metro	11823	82251-S22	I-94 W-S RAMP	I-94EB TO I-75NB RAMP	IN DETROIT	1 Highway	1 Highway	1964	2007		1964	3	165	38.1	3	3 Steel	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	6 MS18(HS20)+mod	2	1	42.37	-83.0596	2025-08-18T00:00:00	POINT (-83.0596 42.37)	Detroit	NBI	NHS	6286.5	34.4	1577703	0.33	2023-12-15T00:00:00	24	A	7	6	6	N
1030	MDOT	Metro	6028	50013-S02	M-53 SB	24 MILE RD	4.0 MI N OF M-59	1 Highway	1 Highway	1965		2001	2001	3	107.6	42.9	3	3 Steel	32 Multi Str Comp	0	""	""	3 Latex Concrete/Similar	5 MS 18 (HS 20)	2	2	42.68	-83.01635	2025-08-18T00:00:00	POINT (-83.01635 42.68)	Macomb	NBI	NHS	4616.04	39.5	813706	9.87	2025-07-08T00:00:00	24	A	7	6	6	N
1031	MDOT	Metro	8036	63173-S06	EAST HOLLY RD	I-75	5.4 MI NW OF M-15	1 Highway	1 Highway	1962		2004	2004	4	341.25	36.5	4	3 Steel	82 Pl Girder Comp	0	""	""	5 Epoxy Overlay	6 MS18(HS20)+mod	2	8	42.78	-83.53449	2025-08-18T00:00:00	POINT (-83.53449 42.78)	Oakland	NBI	Non-NHS	12455.63	33.25	651609	4.15	2024-12-12T00:00:00	24	A	6	7	7	N
1032	Macomb County	Metro	10113	""	BORDMAN ROAD	NEWLAND DRAIN	SEC 5 ARMADA TWP	1 Highway	5 Waterway	1978				1	24	21	1	5 Prestressed Concrete	05 Box Bm/Gird- Multiple	0	""	""	8 Gravel	3 MS 13.5 (HS 15)	2		42.89	-82.958664	2025-08-18T00:00:00	POINT (-82.958664 42.89)	Macomb	NBI	Non-NHS	504	20.3	972004	1.26	2024-11-28T00:00:00	12	P	3	3	3	N
1033	Northville	Metro	12510	""	BEAL STREET	MIDDLE RIVER ROUGE	0.01 MI W OF RIVER STREET	5 Highway-pedestrian	5 Waterway	2008				1	30.3	29.9	1	1 Concrete	19 Culvert	0	""	""	N N/A (no deck (NBI))	6 MS18(HS20)+mod	2		42.43	-83.4782	2025-08-18T00:00:00	POINT (-83.4782 42.43)	Taylor	NBI	Non-NHS	905.97	28.9	4710245	0.01	2024-04-22T00:00:00	24	A	N	N	N	8
1034	MDOT	Metro	8042	63174-B02-2	I-75 SB	RED RUN DRAIN PATH	IN MADISON HTS	1 Highway	3 Pedestrian-bicycle	2023			2023	1	225	73.7	1	3 Steel	82 Pl Girder Comp	0	""	""	1 Monolithic Concrete	B Greater than HL 93	4		42.51	-83.115074	2025-08-18T00:00:00	POINT (-83.115074 42.51)	Oakland	NBI	NHS	16582.5	70.5	646106	4.48	2025-04-16T00:00:00	24	A	8	8	8	N
1035	MDOT	Metro	11622	82141-S01-3	M-102 EB	US-24	@ US-24, TELEGRAPH RD	1 Highway	1 Highway	1967	2002			4	225.5	73.4	4	5 Prestressed Concrete	06 Box Bms- Single/Sprd	0	""	""	1 Monolithic Concrete	9 MS22.5(HS25)or greater	5	10	42.44	-83.2783	2025-08-18T00:00:00	POINT (-83.2783 42.44)	Detroit	NBI	NHS	16551.7	70.2	1817406	2.17	2023-11-15T00:00:00	24	A	7	7	6	N
1036	MDOT	Metro	7880	63081-S08-6	M-39 SB	9 MILE RD	SOUTHFIELD  (TOP LEVEL)	7 3d level interchg	1 Highway	1964	1998		1964	3	368.3	46.9	3	3 Steel	82 Pl Girder Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	3	4	42.46	-83.2214	2025-08-18T00:00:00	POINT (-83.2214 42.46)	Oakland	NBI	NHS	17273.27	42.7	710003	1.01	2023-10-30T00:00:00	24	A	7	6	5	N
1037	MDOT	Metro	11855	82252-S13	COMMER AVE	I-75	IN HAMTRAMCK	5 Highway-pedestrian	1 Highway	1969	2007		2007	2	175.8	70.4	2	4 Steel Continuous	82 Pl Girder Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	4	10	42.4	-83.07103	2025-08-18T00:00:00	POINT (-83.07103 42.4)	Detroit	NBI	Non-NHS	12376.32	48	1585806	0.16	2024-04-09T00:00:00	24	A	7	6	6	N
1038	Macomb County	Metro	6398	""	25 MILE ROAD	MIDDLE BRANCH CLINTON R	0.25 MI E OF EARL MEM HWY	1 Highway	5 Waterway	1950				1	20	25.9	1	3 Steel	19 Culvert	0	""	""	N N/A (no deck (NBI))	2 M 13.5 (H 15)	2		42.7	-83.03039	2025-08-18T00:00:00	POINT (-83.03039 42.7)	Macomb	NBI	Non-NHS	518	0	4211019	3.27	2024-06-07T00:00:00	24	A	N	N	N	5
1039	Macomb County	Metro	6334	""	30 MILE ROAD	EAST BRANCH COON CREEK	0.3 MILES EAST OF OMO RD	5 Highway-pedestrian	5 Waterway	1980				3	105	34.4	3	5 Prestressed Concrete	05 Box Bm/Gird- Multiple	0	""	""	6 Bituminous	5 MS 18 (HS 20)	2		42.78	-82.85137	2025-08-18T00:00:00	POINT (-82.85137 42.78)	Macomb	NBI	Non-NHS	3612	26.2	5500978	4.16	2023-07-26T00:00:00	24	A	6	7	7	N
1040	MDOT	Metro	11156	82022-S55	RAMP J TO M-39	I-94  EB RAMPS B & G	AT VAN BORN IN ALLEN PARK	1 Highway	1 Highway	1985				2	166	39.7	2	5 Prestressed Concrete	02 Multi Str Non Comp	0	""	""	5 Epoxy Overlay	9 MS22.5(HS25)or greater	2	3	42.27	-83.22189	2025-08-18T00:00:00	POINT (-83.22189 42.27)	Taylor	NBI	NHS	6590.2	35.8	1670203	10.5	2024-11-13T00:00:00	24	A	7	7	7	N
1041	Oakland County	Metro	8199	""	GAGE RD	SWARTZ CREEK	SOUTH OF KURTZ	1 Highway	5 Waterway	1979				2	26.9	25.9	2	3 Steel	19 Culvert	0	""	""	N N/A (no deck (NBI))	6 MS18(HS20)+mod	2		42.84	-83.688576	2025-08-18T00:00:00	POINT (-83.688576 42.84)	Oakland	NBI	Non-NHS	696.71	0	1511403	0.03	2024-06-28T00:00:00	24	A	N	N	N	5
1042	Detroit	Metro	12446	""	ADELAIDE	DEQUINDRE CUT PATHWAY	BETWN ORLEANS & ST AUBIN	5 Highway-pedestrian	3 Pedestrian-bicycle	2014				2	68.5	34	2	1 Concrete	19 Culvert	0	""	""	2 Integral Concrete	B Greater than HL 93	2		42.35	-83.03641	2025-08-18T00:00:00	POINT (-83.03641 42.35)	Detroit	NBI	Non-NHS	2329	34	1587406	0.23	2024-11-21T00:00:00	24	A	N	N	N	8
1043	MDOT	Metro	6121	50062-S08	I-696 RAMP E TO N	I-94, 11 MI RD & RAMPS	@ ROSEVILLE & ST CLAIR SH	1 Highway	1 Highway	1972	2010		1997	13	1122.7	46	13	3 Steel	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	6 MS18(HS20)+mod	2	15	42.5	-82.9177	2025-08-18T00:00:00	POINT (-82.9177 42.5)	Macomb	NBI	NHS	51644.2	42.8	1740306	0.08	2025-06-25T00:00:00	24	A	7	7	7	N
1044	Macomb County	Metro	6194	""	METROPOLITAN PKWY	CONRAIL RAILROAD	0.5 MI WEST OF VAN DYKE	1 Highway	2 Railroad	1982	1997			3	245.1	112.5	3	5 Prestressed Concrete	05 Box Bm/Gird- Multiple	0	""	""	6 Bituminous	9 MS22.5(HS25)or greater	6		42.57	-83.03936	2025-08-18T00:00:00	POINT (-83.03936 42.57)	Macomb	NBI	NHS	27573.75	105	803608	2.5	2023-10-02T00:00:00	24	A	5	5	5	N
1045	MDOT	Metro	11661	82191-S17-2	I-75 SB	NORTH LINE RD	IN SOUTHGATE	1 Highway	1 Highway	1966	2018		1991	4	207.1	63.3	4	4 Steel Continuous	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	6 MS18(HS20)+mod	3	4	42.21	-83.22254	2025-08-18T00:00:00	POINT (-83.22254 42.21)	Taylor	NBI	NHS	13109.43	60	1595106	10.54	2024-09-27T00:00:00	24	A	8	7	8	N
1046	MDOT	Metro	8014	63172-S10-2	I-75 SB	JOSLYN RD	2.0 MI NW OF M-24 (JOSLYN	1 Highway	1 Highway	1962	2008	2008	1988	3	214	55.9	3	3 Steel	32 Multi Str Comp	0	""	""	5 Epoxy Overlay	5 MS 18 (HS 20)	3	4	42.7	-83.28398	2025-08-18T00:00:00	POINT (-83.28398 42.7)	Oakland	NBI	NHS	11962.6	52.6	646106	24.11	2025-03-14T00:00:00	24	A	5	6	6	N
1047	MDOT	Metro	11976	82293-S12	FIVE MI RD	I-96	LIVONIA	5 Highway-pedestrian	1 Highway	1971	2021		1998	6	594.4	74.1	6	3 Steel	82 Pl Girder Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	5	10	42.4	-83.43085	2025-08-18T00:00:00	POINT (-83.43085 42.4)	Taylor	NBI	Non-NHS	44045.04	59.7	1606203	1.93	2024-10-21T00:00:00	24	A	8	6	6	N
1048	Macomb County	Metro	6236	""	ARMADA CENTER RD	EAST BRANCH COON CREEK	0.2 MI EAST OF NORTH AVE	1 Highway	5 Waterway	2002				1	38.1	52.8	1	5 Prestressed Concrete	05 Box Bm/Gird- Multiple	0	""	""	1 Monolithic Concrete	9 MS22.5(HS25)or greater	2		42.85	-82.88138	2025-08-18T00:00:00	POINT (-82.88138 42.85)	Macomb	NBI	Non-NHS	2011.68	39.4	824306	5.42	2025-05-20T00:00:00	24	A	7	8	7	N
1049	Macomb County	Metro	6255	""	HAYES RD	CLINTON RIVER	0.1 MI NORTH OF UTICA RD	5 Highway-pedestrian	5 Waterway	1989				2	159.8	76.1	2	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	9 MS22.5(HS25)or greater	5		42.57	-82.97104	2025-08-18T00:00:00	POINT (-82.97104 42.57)	Macomb	NBI	Non-NHS	12160.78	65.9	4208921	0.04	2025-05-14T00:00:00	24	A	7	6	6	N
1050	Macomb County	Metro	6378	""	30 MILE ROAD	TUPPER BROOK DRAIN	0.4 MI EAST OF HARTWAY RD	1 Highway	5 Waterway	1969				2	23	20	2	3 Steel	19 Culvert	0	""	""	N N/A (no deck (NBI))	4 M 18 (H 20)	2		42.78	-82.89219	2025-08-18T00:00:00	POINT (-82.89219 42.78)	Macomb	NBI	Non-NHS	460	0	5500978	2.07	2024-06-14T00:00:00	24	A	N	N	N	7
1051	MDOT	Metro	8002	63172-S02-4	FEATHERSTONE RD WB	I-75	0.4 MI N. OF M-59	5 Highway-pedestrian	1 Highway	1990				4	440	35.3	4	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	2	9	42.65	-83.23845	2025-08-18T00:00:00	POINT (-83.23845 42.65)	Oakland	NBI	Non-NHS	15532	32	4463325	0.45	2025-07-22T00:00:00	24	A	6	6	7	N
1052	MDOT	Metro	11683	82192-S05	ROTUNDA DRIVE	M-39	IN DEARBORN	5 Highway-pedestrian	1 Highway	1964	2005			4	179.8	140.2	4	5 Prestressed Concrete	06 Box Bms- Single/Sprd	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	8	6	42.3	-83.206024	2025-08-18T00:00:00	POINT (-83.206024 42.3)	Taylor	NBI	Non-NHS	25207.96	117.7	1577009	1.89	2024-05-29T00:00:00	24	A	7	7	7	N
1053	MDOT	Metro	11607	82124-S02	BUCHANAN ST	I-96	IN DETROIT	5 Highway-pedestrian	1 Highway	1971	1992		1992	4	237	66.3	4	3 Steel	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	4	10	42.34	-83.094025	2025-08-18T00:00:00	POINT (-83.094025 42.34)	Detroit	NBI	Non-NHS	15713.1	47.9	1581905	0.66	2023-10-18T00:00:00	24	A	6	7	6	N
1054	MDOT	Metro	8000	63172-S01-2	I-75 SB	M-59	EAST OF PONTIAC (M-59)	1 Highway	1 Highway	1963		2019	1963	4	230.8	75.5	4	3 Steel	82 Pl Girder Comp	0	""	""	3 Latex Concrete/Similar	6 MS18(HS20)+mod	5	8	42.64	-83.238594	2025-08-18T00:00:00	POINT (-83.238594 42.64)	Oakland	NBI	NHS	17425.4	72.2	646106	18.58	2025-07-10T00:00:00	24	A	6	7	7	N
1055	Wayne County	Metro	12008	""	WEST ROAD	SILVER CREEK	HURON           W/INKSTER	1 Highway	5 Waterway	2001				1	22	27.9	1	1 Concrete	19 Culvert	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	2		42.14	-83.31329	2025-08-18T00:00:00	POINT (-83.31329 42.14)	Taylor	NBI	Non-NHS	613.8		1674210	2.56	2025-06-10T00:00:00	24	A	N	N	N	8
1056	MDOT	Metro	11913	82291-S16-8	I-94 WB COLLECTOR	I-275 SB TO I-94 EB RAMP	IN ROMULUS	1 Highway	1 Highway	1972	2010		1992	1	122.4	31.2	1	3 Steel	82 Pl Girder Comp	0	""	""	1 Monolithic Concrete	6 MS18(HS20)+mod	1	2	42.22	-83.415306	2025-08-18T00:00:00	POINT (-83.415306 42.22)	Taylor	NBI	NHS	3818.88	28	1578310	0.23	2024-08-13T00:00:00	24	A	7	6	5	N
1057	MDOT	Metro	11339	82081-S06-2	EVERGREEN RD SB	M-153	IN DEARBORN	1 Highway	1 Highway	1972	2008		2008	2	234.3	62.3	2	3 Steel	82 Pl Girder Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	4	8	42.33	-83.234764	2025-08-18T00:00:00	POINT (-83.234764 42.33)	Taylor	NBI	NHS	14596.89	59.7	1804103	1.46	2024-05-28T00:00:00	24	A	7	8	7	N
1058	Dearborn Height	Metro	12327	""	PARDEE ROAD	ECORSE CREEK	IN DEARBORN HEIGHTS	1 Highway	5 Waterway	1989				1	25.9	41	1	5 Prestressed Concrete	05 Box Bm/Gird- Multiple	0	""	""	2 Integral Concrete	6 MS18(HS20)+mod	2		42.27	-83.255974	2025-08-18T00:00:00	POINT (-83.255974 42.27)	Taylor	NBI	Non-NHS	1061.9	26.9	1644201	0.18	2023-10-17T00:00:00	24	A	7	7	7	N
1059	MDOT	Metro	11849	82252-S09	STATE FAIR AVE	I-75	IN DETROIT	5 Highway-pedestrian	1 Highway	1967	1997		1997	4	225.8	70.4	4	3 Steel	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	4	10	42.44	-83.094775	2025-08-18T00:00:00	POINT (-83.094775 42.44)	Detroit	NBI	Non-NHS	15896.32	51.2	1586002	1.27	2024-04-19T00:00:00	24	A	6	7	6	N
1060	Macomb County	Metro	6204	""	18 MILE RD	PLUMBROOK DRAIN	0.3 MI EAST OF MOUND RD	5 Highway-pedestrian	5 Waterway	1965		2001	1965	1	48.9	61.4	1	3 Steel	02 Multi Str Non Comp	0	""	""	6 Bituminous	5 MS 18 (HS 20)	4		42.59	-83.04375	2025-08-18T00:00:00	POINT (-83.04375 42.59)	Macomb	NBI	NHS	3002.46	52.5	805207	2.35	2025-07-11T00:00:00	24	A	9	7	7	N
1061	MDOT	Metro	7902	63101-S06	FARMINGTON RD	I-696	3.7 MI E OF I-96	1 Highway	1 Highway	1962	1997			4	257.2	34.9	4	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	5 Epoxy Overlay	5 MS 18 (HS 20)	2	8	42.5	-83.37806	2025-08-18T00:00:00	POINT (-83.37806 42.5)	Oakland	NBI	Non-NHS	8976.28	30.8	634005	2.1	2025-05-06T00:00:00	24	A	7	7	6	N
1062	Wayne County	Metro	12003	""	VAN HORN ROAD	BLAKELY DRAIN	WOODHAVEN         E/ALLEN	1 Highway	5 Waterway	2022				1	35.4	52	1	1 Concrete	19 Culvert	0	""	""	1 Monolithic Concrete	0 Unknown	3		42.13	-83.2219	2025-08-18T00:00:00	POINT (-83.2219 42.13)	Taylor	NBI	Non-NHS	1840.8	52	1674101	6.64	2024-05-29T00:00:00	24	A	N	N	N	9
1063	Oakland County	Metro	8162	""	KENSINGTON	ROUGE RIVER	NORTH OF BIG BEAVER	1 Highway	5 Waterway	1974				3	32.8	26.9	3	3 Steel	19 Culvert	0	""	""	6 Bituminous	6 MS18(HS20)+mod	2		42.56	-83.212456	2025-08-18T00:00:00	POINT (-83.212456 42.56)	Oakland	NBI	Non-NHS	882.32	26.9	616302	3.05	2024-08-23T00:00:00	24	A	N	N	N	6
1064	MDOT	Metro	11440	82112-S15	M-8 WB DAVISON	M-10 SB	IN DETROIT	1 Highway	1 Highway	1956	1996		2006	4	213.2	47.9	4	3 Steel	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	2	4	42.4	-83.11036	2025-08-18T00:00:00	POINT (-83.11036 42.4)	Detroit	NBI	NHS	10212.28	44.3	4702011	0.18	2025-04-29T00:00:00	24	A	7	7	7	N
1065	Oakland County	Metro	12684	""	MANOR ROAD	ROUGE RIVER	E OF HUNTER BLOOMFIELD TS	1 Highway	5 Waterway	1987		2018		1	23	23	1	5 Prestressed Concrete	05 Box Bm/Gird- Multiple	0	""	""	6 Bituminous	5 MS 18 (HS 20)	2		42.56	-83.21642	2025-08-18T00:00:00	POINT (-83.21642 42.56)	Oakland	NBI	Non-NHS	529	19.7	615109	0.32	2024-10-15T00:00:00	24	A	7	6	7	N
1066	MDOT	Metro	11282	82052-C01	US-24 NB	FRANK & POET DRAIN	4.3 MI SW OF ALLEN PARK	1 Highway	5 Waterway	2024				1	32	35.8	1	1 Concrete	19 Culvert	0	""	""	1 Monolithic Concrete	0 Unknown	4		42.2	-83.267845	2025-08-18T00:00:00	POINT (-83.267845 42.2)	Taylor	NBI	NHS	1145.6	50	4700038	7.58	2025-03-07T00:00:00	17	A	N	N	N	9
1067	Rochester Hills	Metro	13163	""	BUTLER RD	GALLOWAY CREEK	0.38 MILES W OF ADAMS RD	1 Highway	5 Waterway	2001				1	25.7	24.9	1	1 Concrete	19 Culvert	0	""	""	6 Bituminous	5 MS 18 (HS 20)	2		42.66	-83.20059	2025-08-18T00:00:00	POINT (-83.20059 42.66)	Oakland	NBI	Non-NHS	639.93	24.9	626004	1.07	2024-11-06T00:00:00	24	A	N	N	N	7
1068	MDOT	Metro	11362	82102-S09	NORTHVILLE RD	M-14	0.2 MI W OF PLYMOUTH	1 Highway	1 Highway	1976		1976	2006	4	208.1	78.4	4	3 Steel	32 Multi Str Comp	0	""	""	3 Latex Concrete/Similar	5 MS 18 (HS 20)	4	6	42.39	-83.46555	2025-08-18T00:00:00	POINT (-83.46555 42.39)	Taylor	NBI	Non-NHS	16315.04	64	1679402	0.5	2023-10-23T00:00:00	24	A	6	7	6	N
1069	MDOT	Metro	11588	82123-S40	I-96	RAMP TO I-94	IN DETROIT	1 Highway	1 Highway	1971	2005		2005	1	38.7	145.7	1	3 Steel	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	8	1	42.35	-83.100044	2025-08-18T00:00:00	POINT (-83.100044 42.35)	Detroit	NBI	NHS	5638.59	143.4	1577404	3.4	2023-10-20T00:00:00	24	A	7	8	6	N
1070	MDOT	Metro	11544	82123-R05	GREENFIELD RD	I-96 & CSX RR	IN DETROIT	5 Highway-pedestrian	4 Highway-railroad	1972		1993	1993	5	328.6	103.3	5	3 Steel	32 Multi Str Comp	0	""	""	3 Latex Concrete/Similar	5 MS 18 (HS 20)	7	16	42.38	-83.19803	2025-08-18T00:00:00	POINT (-83.19803 42.38)	Detroit	NBI	NHS	33944.38	81	4704392	0.12	2023-08-11T00:00:00	24	A	7	7	7	N
1071	MDOT	Metro	11269	82025-S22	8 MI RD	I-94	AT MACOMB CO LINE	5 Highway-pedestrian	1 Highway	1963		1986	1963	4	193	65.9	4	4 Steel Continuous	02 Multi Str Non Comp	0	""	""	3 Latex Concrete/Similar	5 MS 18 (HS 20)	2	6	42.45	-82.91718	2025-08-18T00:00:00	POINT (-82.91718 42.45)	Detroit	NBI	Non-NHS	12718.7	44	802804	8.48	2024-06-27T00:00:00	24	A	5	6	5	N
1072	Wayne County	Metro	12249	""	RACHO ROAD	BLAKELY DRAIN	BRNTWNS/PENNSYLVANIA	1 Highway	5 Waterway	1935			1983	1	29.9	31.5	1	3 Steel	42 Multi Str Encsd	0	""	""	6 Bituminous	0 Unknown	2		42.18	-83.247604	2025-08-18T00:00:00	POINT (-83.247604 42.18)	Taylor	NBI	Non-NHS	941.85	28.9	1692908	0.88	2025-05-15T00:00:00	12	P	3	3	4	N
1073	MDOT	Metro	12455	82708-B05	INSELRUHE AVE	NASHUA CANAL	BELLE ISLE	5 Highway-pedestrian	5 Waterway	1999				1	44.7	43.6	1	5 Prestressed Concrete	05 Box Bm/Gird- Multiple	0	""	""	0 None	5 MS 18 (HS 20)	2		42.34	-82.984276	2025-08-18T00:00:00	POINT (-82.984276 42.34)	Detroit	NBI	Non-NHS	1948.92	29.9	5494512	0.01	2024-08-07T00:00:00	24	A	7	7	8	N
1074	MDOT	Metro	11838	82252-R08	I-75	CONRAIL RR	IN DETROIT	1 Highway	2 Railroad	1969	2003			4	220.3	173.4	4	5 Prestressed Concrete	06 Box Bms- Single/Sprd	0	""	""	5 Epoxy Overlay	6 MS18(HS20)+mod	10		42.41	-83.08496	2025-08-18T00:00:00	POINT (-83.08496 42.41)	Detroit	NBI	NHS	38200.02	166.8	1577706	6.73	2025-04-15T00:00:00	24	A	7	7	7	N
1075	Wayne County	Metro	12053	""	ROTUNDA DRIVE	OPEN AREA	DEARBORN S / MICHIGAN AVE	5 Highway-pedestrian	0 Other	1931	1983		1983	19	478	79.7	19	3 Steel	02 Multi Str Non Comp	0	0 Other	00 Other	1 Monolithic Concrete	6 MS18(HS20)+mod	5		42.32	-83.16311	2025-08-18T00:00:00	POINT (-83.16311 42.32)	Taylor	NBI	Non-NHS	38096.6	64	1577009	4.51	2024-10-17T00:00:00	12	K	4	2	2	N
1076	MDOT	Metro	11245	82025-S01	M-3 (GRATIOT)	I-94	IN DETROIT	5 Highway-pedestrian	1 Highway	2018				2	236.3	128.8	2	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	B Greater than HL 93	8	8	42.39	-83.00627	2025-08-18T00:00:00	POINT (-83.00627 42.39)	Detroit	NBI	NHS	30435.44	90	4711788	4.9	2024-04-17T00:00:00	24	A	8	8	8	N
1077	MDOT	Metro	7873	63081-S02	M-39 (RAMP H)	M-10 WB (RAMP G)	IN SOUTHFIELD (RAMP G)	1 Highway	1 Highway	1964	2006	2006	1989	3	160.2	46.9	3	3 Steel	32 Multi Str Comp	0	""	""	3 Latex Concrete/Similar	5 MS 18 (HS 20)	3	1	42.46	-83.218605	2025-08-18T00:00:00	POINT (-83.218605 42.46)	Oakland	NBI	NHS	7513.38	42.9	710605	0.2	2025-06-11T00:00:00	24	A	5	5	6	N
1078	Detroit	Metro	11486	""	S SERVICE RD	LAND	IN DET,CONN TO EVERGREEN	5 Highway-pedestrian	0 Other	1971				5	250	39.7	5	3 Steel	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	2		42.38	-83.23729	2025-08-18T00:00:00	POINT (-83.23729 42.38)	Detroit	NBI	Non-NHS	9925	28.9	4700002	0.59	2024-06-05T00:00:00	24	A	7	8	7	N
1079	Macomb County	Metro	14360	""	GARFIELD RD	HARRINGTON DRAIN	1000 FT N OF KLEIN RD	1 Highway	5 Waterway	2025				1	28.3	40	1	1 Concrete	19 Culvert	0	""	""	N N/A (no deck (NBI))	0 Unknown	2		42.55	-82.95009	2025-08-18T00:00:00	POINT (-82.95009 42.55)	Macomb	NBI	NHS	1132	40	798703	0.17	2025-04-18T00:00:00	24	A	N	N	N	9
1080	MDOT	Metro	7940	63102-S27	NB WOODWARD SERV	I-696	AT I-696 & WOODWARD	5 Highway-pedestrian	1 Highway	1986				2	187.5	55.4	2	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	9 MS22.5(HS25)or greater	3	8	42.48	-83.145	2025-08-18T00:00:00	POINT (-83.145 42.48)	Oakland	NBI	NHS	10387.5	36.7	1903703	0.44	2023-07-12T00:00:00	24	A	5	7	7	N
1081	MDOT	Metro	7799	63022-S03	SOUTH HILL RD	I-96	4.0 MI E OF LIVINGSTON CO	1 Highway	1 Highway	1999				2	240	45.5	2	5 Prestressed Concrete	05 Box Bm/Gird- Multiple	0	""	""	5 Epoxy Overlay	9 MS22.5(HS25)or greater	2	6	42.51	-83.59612	2025-08-18T00:00:00	POINT (-83.59612 42.51)	Oakland	NBI	Non-NHS	10920	42.2	656805	2.49	2024-11-25T00:00:00	24	A	7	7	7	N
1082	MDOT	Metro	11264	82025-S18	ALLARD AVE	I-94	IN HARPER WOODS	5 Highway-pedestrian	1 Highway	1959	2001			4	167	58.1	4	5 Prestressed Concrete	05 Box Bm/Gird- Multiple	0	""	""	5 Epoxy Overlay	6 MS18(HS20)+mod	2	6	42.43	-82.92274	2025-08-18T00:00:00	POINT (-82.92274 42.43)	Detroit	NBI	Non-NHS	9702.7	44	1636610	0.76	2024-06-28T00:00:00	24	A	7	8	6	N
1083	MDOT	Metro	11688	82192-S10	WARREN AVE	M-39	IN DETROIT	5 Highway-pedestrian	1 Highway	1961	2005			2	108.6	135.2	2	5 Prestressed Concrete	06 Box Bms- Single/Sprd	0	""	""	1 Monolithic Concrete	6 MS18(HS20)+mod	8	6	42.34	-83.21603889	2025-08-18T00:00:00	POINT (-83.21603889 42.34)	Detroit	NBI	NHS	14682.72	72.7	1591804	2.35	2024-05-29T00:00:00	24	A	7	7	7	N
1084	MDOT	Metro	11430	82112-S05	EUCLID AVENUE	M-10	IN DETROIT	5 Highway-pedestrian	1 Highway	1954	2000		2000	2	143.6	71.6	2	4 Steel Continuous	02 Multi Str Non Comp	0	""	""	2 Integral Concrete	5 MS 18 (HS 20)	4	8	42.37	-83.08636	2025-08-18T00:00:00	POINT (-83.08636 42.37)	Detroit	NBI	Non-NHS	10281.76	44	1583804	1.94	2024-09-26T00:00:00	24	A	7	7	5	N
1085	MDOT	Metro	11778	82195-S23	CASS AVE	I-75	IN DETROIT	5 Highway-pedestrian	1 Highway	1967	2007		1967	2	171.9	78	2	3 Steel	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	4	8	42.34	-83.05645	2025-08-18T00:00:00	POINT (-83.05645 42.34)	Detroit	NBI	Non-NHS	13408.2	54	1577605	0.74	2024-03-21T00:00:00	24	A	7	7	7	N
1086	Oakland County	Metro	8147	""	LAHSER RD	ROUGE RIVER	BET 9 AND 10 MILE RDS	1 Highway	5 Waterway	1983				1	71.9	80.4	1	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	6 MS18(HS20)+mod	5		42.47	-83.26053	2025-08-18T00:00:00	POINT (-83.26053 42.47)	Oakland	NBI	Non-NHS	5780.76	63	685510	1.68	2024-07-30T00:00:00	24	A	6	7	7	N
1087	MDOT	Metro	6102	50061-S33-5	NB SERVICE RD	I-696	IN THE CITY OF WARREN	6 2d level interchg	1 Highway	1976	2008		2008	2	174.8	37.9	2	3 Steel	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	6 MS18(HS20)+mod	2	8	42.49	-83.04507	2025-08-18T00:00:00	POINT (-83.04507 42.49)	Macomb	NBI	Non-NHS	6624.92	29.5	1740304	0.6	2025-04-24T00:00:00	24	A	7	7	7	N
1088	Trenton	Metro	12517	""	HARRISON AVENUE	FRANK AND POET DRAIN	IN TRENTON	5 Highway-pedestrian	5 Waterway	1964		2019		1	58.7	55.4	1	5 Prestressed Concrete	05 Box Bm/Gird- Multiple	0	""	""	6 Bituminous	6 MS18(HS20)+mod	2		42.15	-83.20696	2025-08-18T00:00:00	POINT (-83.20696 42.15)	Taylor	NBI	Non-NHS	3251.98	41	1592804	0.5	2025-06-06T00:00:00	12	A	7	5	4	N
1089	MDOT	Metro	11711	82193-S08	7 MI RD	M-39	IN DETROIT	5 Highway-pedestrian	1 Highway	1963	2010		1996	2	108.5	135.1	2	4 Steel Continuous	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	8	6	42.43	-83.21923	2025-08-18T00:00:00	POINT (-83.21923 42.43)	Detroit	NBI	NHS	14658.35	114	1700106	10.92	2025-06-18T00:00:00	24	A	7	6	7	N
1090	MDOT	Metro	11518	82122-S30	LFT TRN W MIDLBELT	I-96	IN LIVONIA	1 Highway	1 Highway	1971	2014		2001	2	166.5	26.5	2	3 Steel	02 Multi Str Non Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	2	8	42.38	-83.33501	2025-08-18T00:00:00	POINT (-83.33501 42.38)	Taylor	NBI	Non-NHS	4412.25	24	1803810	0.02	2024-09-16T00:00:00	24	A	7	7	7	N
1091	Macomb County	Metro	6189	""	QUINN ROAD	CLINTON HARRISON DRAIN	100 FT WEST OF I-94	1 Highway	5 Waterway	2016				1	55	41.4	1	5 Prestressed Concrete	06 Box Bms- Single/Sprd	0	""	""	1 Monolithic Concrete	B Greater than HL 93	2		42.55	-82.88028056	2025-08-18T00:00:00	POINT (-82.88028056 42.55)	Macomb	NBI	Non-NHS	2277	28	4211435	1.2	2024-10-04T00:00:00	24	A	8	8	8	N
1092	Oakland County	Metro	13814	00996-C01	DRAHNER ROAD	LONG LAKE OUTLET	SECT 28/33 OXFORD TWP	1 Highway	5 Waterway	1960				2	20	28	2	3 Steel	19 Culvert	0	""	""	8 Gravel	0 Unknown	2		42.81	-83.2845	2025-08-18T00:00:00	POINT (-83.2845 42.81)	Oakland	NBI	Non-NHS	560	31	626708	2.63	2024-07-11T00:00:00	24	A	N	N	N	6
1093	Macomb County	Metro	6260	""	ROMEO PLANK RD	HEALY BROOK DRAIN	0.1 MI NORTH OF 27 MILE	1 Highway	5 Waterway	1978				2	30.8	36.1	2	3 Steel	19 Culvert	0	""	""	N N/A (no deck (NBI))	4 M 18 (H 20)	2		42.73	-82.960106	2025-08-18T00:00:00	POINT (-82.960106 42.73)	Macomb	NBI	Non-NHS	1111.88	0	816509	2.19	2024-04-10T00:00:00	24	A	N	N	N	7
1094	MDOT	Metro	7927	63102-S11	LINCOLN DRIVE	I-696	CITY OF SOUTHFIELD	5 Highway-pedestrian	1 Highway	1987				2	184	50.7	2	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	9 MS22.5(HS25)or greater	2	10	42.48	-83.20708	2025-08-18T00:00:00	POINT (-83.20708 42.48)	Oakland	NBI	Non-NHS	9328.8	32	684507	1.22	2024-07-24T00:00:00	24	A	7	7	7	N
1095	Oakland County	Metro	8184	""	PARKDALE RD	STONY CREEK	BET ROCHESTER AND DEQUIND	1 Highway	5 Waterway	2011				1	52	44.1	1	5 Prestressed Concrete	05 Box Bm/Gird- Multiple	0	""	""	2 Integral Concrete	B Greater than HL 93	2		42.69	-83.10751	2025-08-18T00:00:00	POINT (-83.10751 42.69)	Oakland	NBI	Non-NHS	2293.2	40.4	678507	1.26	2024-09-26T00:00:00	24	A	7	7	7	N
1096	Pontiac	Metro	13765	""	E PIKE STREET	CLINTON RIVER	W OF WOODWARD	5 Highway-pedestrian	5 Waterway	1963				2	24	38	2	1 Concrete	19 Culvert	0	""	""	N N/A (no deck (NBI))	0 Unknown	1		42.64	-83.28946	2025-08-18T00:00:00	POINT (-83.28946 42.64)	Oakland	NBI	Non-NHS	912		625107	0.12	2024-06-28T00:00:00	24	A	N	N	N	6
1097	MDOT	Metro	7972	63103-S11	U-TURN @ BATTELLE	I-696	IN MADISON HTS	1 Highway	1 Highway	1972	1997		1997	2	196	23.3	2	3 Steel	82 Pl Girder Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	1	10	42.48	-83.1034	2025-08-18T00:00:00	POINT (-83.1034 42.48)	Oakland	NBI	Non-NHS	4566.8	20	1813203	0.01	2025-07-18T00:00:00	24	A	6	5	7	N
1098	MDOT	Metro	11435	82112-S10	WEBB AVE	M-10	IN DETROIT	5 Highway-pedestrian	1 Highway	1955	1991		2006	4	166.4	76	4	4 Steel Continuous	02 Multi Str Non Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	5	6	42.39	-83.10211	2025-08-18T00:00:00	POINT (-83.10211 42.39)	Detroit	NBI	Non-NHS	12646.4	52	1584710	0.22	2025-04-22T00:00:00	24	D	6	5	6	N
1099	MDOT	Metro	11738	82194-S10	LIVERNOIS AVE	I-75	IN DETROIT	5 Highway-pedestrian	1 Highway	2021				2	209.8	105.3	2	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	B Greater than HL 93	4	10	42.31	-83.10414	2025-08-18T00:00:00	POINT (-83.10414 42.31)	Detroit	NBI	NHS	22091.94	49.5	1581701	0.25	2025-06-24T00:00:00	24	A	8	8	8	N
1100	MDOT	Metro	11461	82112-S32	GREENFIELD RD	M-10	IN DETROIT	5 Highway-pedestrian	1 Highway	1964		1964	1996	2	162.1	94.2	2	3 Steel	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	0 Unknown	4	6	42.44	-83.20038	2025-08-18T00:00:00	POINT (-83.20038 42.44)	Detroit	NBI	NHS	15269.82	69.9	1651002	12.12	2024-08-27T00:00:00	24	A	6	6	6	N
1101	MDOT	Metro	11559	82123-S11-5	I-96 RAMP	W B SERVICE RD	IN DETROIT	1 Highway	1 Highway	1973		2005	1989	6	626	27.9	6	3 Steel	82 Pl Girder Comp	0	""	""	3 Latex Concrete/Similar	5 MS 18 (HS 20)	1	1	42.38	-83.21159	2025-08-18T00:00:00	POINT (-83.21159 42.38)	Detroit	NBI	NHS	17465.4	25.9	1590604	0.13	2023-08-18T00:00:00	24	A	5	6	6	N
1102	MDOT	Metro	11369	82103-S12	THIRD AVENUE	M-8, DAVISON FWY	HIGHLAND PARK  E/HAMILTON	5 Highway-pedestrian	1 Highway	1996				2	212.5	50.1	2	5 Prestressed Concrete	02 Multi Str Non Comp	0	""	""	5 Epoxy Overlay	5 MS 18 (HS 20)	5	6	42.4	-83.10146	2025-08-18T00:00:00	POINT (-83.10146 42.4)	Detroit	NBI	Non-NHS	10646.25	37	1625110	2.54	2023-10-23T00:00:00	24	A	7	7	7	N
1103	MDOT	Metro	11139	82022-S33	US-12 (MICHIGAN AV	I-94 RAMP	IN DEARBORN	5 Highway-pedestrian	1 Highway	1944	1968	2003	1975	1	50.3	117.8	1	3 Steel	32 Multi Str Comp	0	""	""	3 Latex Concrete/Similar	5 MS 18 (HS 20)	9	2	42.33	-83.16191	2025-08-18T00:00:00	POINT (-83.16191 42.33)	Taylor	NBI	NHS	5925.34	89.9	1577103	1.57	2023-09-26T00:00:00	24	A	7	7	5	N
1104	Macomb County	Metro	6292	""	IRWIN ROAD	EAST BRANCH COON CREEK	0.1 MI WEST OF NORTH AVE	1 Highway	5 Waterway	2007				1	40	43.9	1	5 Prestressed Concrete	05 Box Bm/Gird- Multiple	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	2		42.86	-82.88704	2025-08-18T00:00:00	POINT (-82.88704 42.86)	Macomb	NBI	Non-NHS	1756	42	819907	3.96	2023-08-01T00:00:00	24	A	8	8	8	N
1105	Wayne County	Metro	12097	""	SEVEN MILE ROAD	UPPER ROUGE RIVER	DETROIT       E/TELEGRAPH	5 Highway-pedestrian	5 Waterway	1930	1984			1	79.7	78.4	1	5 Prestressed Concrete	32 Multi Str Comp	0	0 Other	00 Other	1 Monolithic Concrete	0 Unknown	6		42.43	-83.2691	2025-08-18T00:00:00	POINT (-83.2691 42.43)	Detroit	NBI	NHS	6248.48	65.9	1700106	8.38	2024-05-28T00:00:00	24	P	7	8	5	N
1106	MDOT	Metro	6145	50111-R01-3	I-94 EB	MICHIGAN TRANSIT MUSEUM	1.3 MI SW OF M-59	1 Highway	2 Railroad	1963	2006	2006	2006	3	165	54.9	3	3 Steel	32 Multi Str Comp	0	""	""	3 Latex Concrete/Similar	6 MS18(HS20)+mod	3		42.61	-82.85574	2025-08-18T00:00:00	POINT (-82.85574 42.61)	Macomb	NBI	NHS	9058.5	51.5	798501	12.98	2025-06-17T00:00:00	24	A	6	6	7	N
1107	MDOT	Metro	11769	82195-S11-2	I-75 SB	M-10	IN DETROIT	1 Highway	1 Highway	1953	1999		2005	2	236.3	82	2	3 Steel	82 Pl Girder Comp	0	""	""	1 Monolithic Concrete	9 MS22.5(HS25)or greater	4	8	42.34	-83.064125	2025-08-18T00:00:00	POINT (-83.064125 42.34)	Detroit	NBI	NHS	19376.6	62.7	1595106	23.17	2025-05-29T00:00:00	24	A	7	7	7	N
1108	Macomb County	Metro	6389	""	33 MILE ROAD	CEMETERY CREEK	0.5 MI EAST OF OMO ROAD	1 Highway	5 Waterway	2014				1	29.3	24	1	1 Concrete	19 Culvert	0	""	""	6 Bituminous	A HL 93	2		42.82	-82.84900278	2025-08-18T00:00:00	POINT (-82.84900278 42.82)	Macomb	NBI	Non-NHS	703.2	34	4204881	0.73	2024-07-22T00:00:00	24	A	N	N	N	8
1109	Southfield	Metro	12736	""	NINE MILE ROAD	RAVINES BRANCH OF ROUGE	IN SOUTHFIELD	1 Highway	5 Waterway	1930				1	27.9	40	1	1 Concrete	19 Culvert	0	""	""	N N/A (no deck (NBI))	6 MS18(HS20)+mod	2		42.46	-83.31527	2025-08-18T00:00:00	POINT (-83.31527 42.46)	Oakland	NBI	Non-NHS	1116	0	684404	0.11	2023-09-20T00:00:00	24	A	N	N	N	5
1110	MDOT	Metro	11463	82112-S33	NEWJERSEY TRN(M10)	M-10	IN DETROIT @ FORRER AVE	1 Highway	1 Highway	1963	2000		2000	2	156.5	35.1	2	3 Steel	32 Multi Str Comp	0	""	""	0 None	5 MS 18 (HS 20)	2	6	42.44	-83.20228	2025-08-18T00:00:00	POINT (-83.20228 42.44)	Detroit	NBI	NHS	5493.15	27.9	4700040	0.01	2024-08-08T00:00:00	24	A	5	6	7	N
1111	Wayne County	Metro	12137	""	HANNAN ROAD	LOWER ROUGE RIVER	CANTON/WAYNE   N/MICHIGAN	5 Highway-pedestrian	5 Waterway	1955				3	90.9	40	3	2 Concrete Continuous	01 Slab	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	2		42.28	-83.42731	2025-08-18T00:00:00	POINT (-83.42731 42.28)	Taylor	NBI	Non-NHS	3636	27.9	1710309	8.74	2024-10-25T00:00:00	12	A	4	4	4	N
1112	Detroit	Metro	12483	""	RIDGE RD	ROUGE RIVER	RIDGE S OF MCNICHOLS	1 Highway	5 Waterway	2009				1	74	35.6	1	5 Prestressed Concrete	05 Box Bm/Gird- Multiple	0	""	""	1 Monolithic Concrete	6 MS18(HS20)+mod	1		42.41	-83.26987	2025-08-18T00:00:00	POINT (-83.26987 42.41)	Detroit	NBI	Non-NHS	2634.4	23	4710141	0.23	2023-11-30T00:00:00	24	A	7	8	8	N
1113	MDOT	Metro	7834	63043-B06	M-59 WB	CLINTON RIVER	1.2 MI E OF I-75	1 Highway	5 Waterway	1966	1999	1999		1	56.9	103.7	1	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	3 Latex Concrete/Similar	9 MS22.5(HS25)or greater	3		42.64	-83.213905	2025-08-18T00:00:00	POINT (-83.213905 42.64)	Oakland	NBI	NHS	5900.53	100.4	677208	3.5	2025-05-22T00:00:00	24	A	6	7	7	N
1114	Beverly Hills	Metro	8224	""	RIVERVIEW DR	ROUGE RIVER	0.1 MI E OF LAHSER RD	1 Highway	5 Waterway	1963				4	63	25.9	4	3 Steel	19 Culvert	0	""	""	N N/A (no deck (NBI))	5 MS 18 (HS 20)	2		42.51	-83.26173	2025-08-18T00:00:00	POINT (-83.26173 42.51)	Oakland	NBI	Non-NHS	1631.7	0	612504	0.02	2024-09-26T00:00:00	24	A	N	N	N	6
1115	Wayne County	Metro	12061	""	JOY ROAD	UPPER ROUGE RIVER	DETROIT       E/TELEGRAPH	5 Highway-pedestrian	5 Waterway	1927	1971	1995		2	96.8	62.3	2	1 Concrete	04 Tee Beam	0	""	""	6 Bituminous	6 MS18(HS20)+mod	4		42.36	-83.259026	2025-08-18T00:00:00	POINT (-83.259026 42.36)	Detroit	NBI	Non-NHS	6030.64	47.9	1677810	5.78	2024-09-19T00:00:00	12	A	4	4	5	N
1116	Southfield	Metro	8302	""	HICKORY LEAF RD	NORTH CREEK	IN SOUTHFIELD	1 Highway	5 Waterway	1925	2004			1	24	59.9	1	5 Prestressed Concrete	01 Slab	0	""	""	1 Monolithic Concrete	9 MS22.5(HS25)or greater	2		42.51	-83.23602	2025-08-18T00:00:00	POINT (-83.23602 42.51)	Oakland	NBI	Non-NHS	1437.6	20	687301	0.31	2023-09-18T00:00:00	24	A	9	8	8	N
1117	MDOT	Metro	11971	82293-S08	I-275NB TO I-96EB	SCHOOLCRAFT RD	0.3 MI W OF LIVONIA	1 Highway	1 Highway	1971	2001			4	296.4	30.8	4	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	1	4	42.38	-83.43583	2025-08-18T00:00:00	POINT (-83.43583 42.38)	Taylor	NBI	NHS	9129.12	27.6	1607708	0.08	2024-09-11T00:00:00	24	A	7	7	6	N
1118	MDOT	Metro	11391	82111-S02	LAFAYETTE AVE	I-375	IN DETROIT	5 Highway-pedestrian	1 Highway	1960	1990			4	184.6	113.9	4	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	9 MS22.5(HS25)or greater	6	6	42.34	-83.037735	2025-08-18T00:00:00	POINT (-83.037735 42.34)	Detroit	NBI	Non-NHS	21025.94	89.9	1585507	0.23	2024-06-07T00:00:00	24	A	7	6	5	N
1119	Macomb County	Metro	6361	""	TILCH RD	DUNN-BANISTER DRAIN	0.5 MILE N OF M-59	5 Highway-pedestrian	5 Waterway	1979				3	55.3	36.1	3	3 Steel	19 Culvert	0	""	""	N N/A (no deck (NBI))	4 M 18 (H 20)	2		42.63	-82.9659	2025-08-18T00:00:00	POINT (-82.9659 42.63)	Macomb	NBI	Non-NHS	1996.33	0	4200028	0.79	2025-05-14T00:00:00	24	A	N	N	N	6
1120	Wayne County	Metro	12285	""	RIDGE ROAD	MIDDLE ROUGE JOHNSON DR.	NORTHVILLE T  N/FIVE MILE	1 Highway	5 Waterway	2018				1	33.33	33.8	1	1 Concrete	19 Culvert	0	1 Concrete	""	8 Gravel	A HL 93	2		42.4	-83.52995	2025-08-18T00:00:00	POINT (-83.52995 42.4)	Taylor	NBI	Non-NHS	1126.55	24	1595602	6.34	2025-01-14T00:00:00	24	A	N	N	N	8
1121	Wayne County	Metro	13239	""	LILLEY ROAD	WILLOW CREEK	NORTH OF FORD RD(M-153)	1 Highway	5 Waterway	2007				1	22	38.1	1	1 Concrete	19 Culvert	0	""	""	1 Monolithic Concrete	0 Unknown	3		42.33	-83.458786	2025-08-18T00:00:00	POINT (-83.458786 42.33)	Taylor	NBI	Non-NHS	838.2	38.1	4710390	3.38	2025-05-12T00:00:00	24	A	N	N	N	7
1122	MDOT	Metro	11175	82023-S07	LIVERNOIS AVE	I-94	IN DETROIT	5 Highway-pedestrian	1 Highway	1950	1997			4	209	121.7	4	5 Prestressed Concrete	02 Multi Str Non Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	6	8	42.34	-83.12485	2025-08-18T00:00:00	POINT (-83.12485 42.34)	Detroit	NBI	NHS	25435.3	89.9	1581701	2.57	2025-03-13T00:00:00	24	A	7	7	6	N
1123	Wayne County	Metro	12161	""	MIDDLE BELT ROAD	BELL CREEK	LIVONIA       N/FIVE MILE	5 Highway-pedestrian	5 Waterway	2022				1	73.5	78.42	1	5 Prestressed Concrete	05 Box Bm/Gird- Multiple	0	""	""	0 None	B Greater than HL 93	5		42.41	-83.33503	2025-08-18T00:00:00	POINT (-83.33503 42.41)	Taylor	NBI	NHS	5763.87	76	1674403	20.13	2024-12-10T00:00:00	24	A	9	8	9	N
1124	MDOT	Metro	14304	63174-C06	I-75	LANE DRAIN	I-75	1 Highway	5 Waterway	2020				1	20	141.8	1	1 Concrete	19 Culvert	0	""	""	4 Low Slump Concrete	B Greater than HL 93	8		42.57	-83.15921	2025-08-18T00:00:00	POINT (-83.15921 42.57)	Oakland	NBI	NHS	2836	0	647308	10.36	2024-11-27T00:00:00	24	A	N	N	N	8
1125	Milford	Metro	8242	""	HURON RD	HURON RIVER	EAST OF MILFORD RD	5 Highway-pedestrian	5 Waterway	1977		2014		3	85	43.3	3	5 Prestressed Concrete	05 Box Bm/Gird- Multiple	0	""	""	6 Bituminous	6 MS18(HS20)+mod	2		42.59	-83.59673889	2025-08-18T00:00:00	POINT (-83.59673889 42.59)	Oakland	NBI	Non-NHS	3680.5	31.8	660605	0.44	2023-10-25T00:00:00	24	A	5	5	6	N
1126	MDOT	Metro	6085	50061-S16	EB 11 MILE RD	I-696	IN CENTERLINE	5 Highway-pedestrian	1 Highway	1972		2008	2000	2	337	37.9	2	3 Steel	82 Pl Girder Comp	0	""	""	5 Epoxy Overlay	4 M 18 (H 20)	2	10	42.49	-83.03604	2025-08-18T00:00:00	POINT (-83.03604 42.49)	Macomb	NBI	Non-NHS	12772.3	28.7	803208	2.72	2024-09-24T00:00:00	12	A	4	6	6	N
1127	Detroit	Metro	12345	""	MT ELLIOTT - MOUND	GTW RR AND CANIFF	MT ELLIOTT - MOUND RD	5 Highway-pedestrian	4 Highway-railroad	1969	1996	1996	1996	16	1575.5	60.1	16	3 Steel	82 Pl Girder Comp	0	""	""	1 Monolithic Concrete	6 MS18(HS20)+mod	4	4	42.4	-83.03806	2025-08-18T00:00:00	POINT (-83.03806 42.4)	Detroit	NBI	NHS	94687.55	50	4707516	0.09	2024-07-25T00:00:00	24	A	6	6	5	N
1128	Macomb County	Metro	6270	""	NORTH AVE	E B COON CREEK	0.5MI N OF ARMADA CENTER	5 Highway-pedestrian	5 Waterway	1931	1964	1996	1964	1	38.7	36.7	1	3 Steel	02 Multi Str Non Comp	0	""	""	1 Monolithic Concrete	2 M 13.5 (H 15)	2		42.86	-82.88483	2025-08-18T00:00:00	POINT (-82.88483 42.86)	Macomb	NBI	Non-NHS	1420.29	29.5	1817105	16	2023-10-02T00:00:00	24	P	6	6	6	N
1129	MDOT	Metro	11706	82193-S03	FENKELL AVE	M-39	IN DETROIT	5 Highway-pedestrian	1 Highway	1962	2010		2010	2	108.6	99.1	2	4 Steel Continuous	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	6 MS18(HS20)+mod	7	6	42.4	-83.2182	2025-08-18T00:00:00	POINT (-83.2182 42.4)	Detroit	NBI	Non-NHS	10762.26	89.2	1579605	4.94	2023-11-16T00:00:00	24	A	8	8	7	N
1130	MDOT	Metro	11907	82291-S11	I-94 EB	I-275	IN ROMULUS	1 Highway	1 Highway	1972	2011	1992	1992	4	360	71.5	4	3 Steel	82 Pl Girder Comp	0	""	""	3 Latex Concrete/Similar	6 MS18(HS20)+mod	4	8	42.22	-83.41196	2025-08-18T00:00:00	POINT (-83.41196 42.22)	Taylor	NBI	NHS	25740	68.2	1576405	6.73	2024-08-30T00:00:00	24	A	7	7	7	N
1131	MDOT	Metro	11870	82252-S36	I-75	RAMP D TO DAVISON(M-8)	IN DETROIT OVER N-W RAMPT	1 Highway	1 Highway	1969	2003		2003	1	49.9	149.6	1	3 Steel	32 Multi Str Comp	0	""	""	5 Epoxy Overlay	6 MS18(HS20)+mod	7	1	42.41	-83.08042	2025-08-18T00:00:00	POINT (-83.08042 42.41)	Detroit	NBI	NHS	7465.04	143	1577706	6.34	2025-05-23T00:00:00	24	A	7	7	7	N
1132	MDOT	Metro	11124	82022-S14	I-94 WB	US-24(TELEGRAPH RD)	IN TAYLOR,US-24	1 Highway	1 Highway	2004			2004	1	246	75.6	1	3 Steel	12 Arch- Thru	0	""	""	5 Epoxy Overlay	9 MS22.5(HS25)or greater	3	8	42.27	-83.27023889	2025-08-18T00:00:00	POINT (-83.27023889 42.27)	Taylor	NBI	NHS	18597.6	72.2	1588802	14.72	2025-06-12T00:00:00	24	A	7	7	7	N
1133	Mt Clemens	Metro	6414	""	CROCKER BLVD	CLINTON RIVER	E OF M3 NB	5 Highway-pedestrian	5 Waterway	1960		2015		3	201.8	57.8	3	5 Prestressed Concrete	05 Box Bm/Gird- Multiple	0	""	""	6 Bituminous	4 M 18 (H 20)	4		42.6	-82.876656	2025-08-18T00:00:00	POINT (-82.876656 42.6)	Macomb	NBI	NHS	11664.04	45.9	819209	3.06	2025-04-23T00:00:00	12	P	3	3	6	N
1134	MDOT	Metro	6128	50072-B03	M-29	MARSAC CREEK	IN NEW BALTIMORE	1 Highway	5 Waterway	1952		1979		1	30	60.9	1	1 Concrete	04 Tee Beam	0	""	""	2 Integral Concrete	5 MS 18 (HS 20)	5		42.69	-82.71205	2025-08-18T00:00:00	POINT (-82.71205 42.69)	Macomb	NBI	Non-NHS	1827	55	807106	19.95	2023-12-19T00:00:00	24	A	6	6	5	N
1135	Dearborn	Metro	12313	""	MILITARY RD	LOW BRANCH ROUGE RIVER	IN DEARBORN	5 Highway-pedestrian	5 Waterway	1937	1995			1	78.3	58.5	1	1 Concrete	01 Slab	0	""	""	5 Epoxy Overlay	2 M 13.5 (H 15)	2		42.31	-83.25265	2025-08-18T00:00:00	POINT (-83.25265 42.31)	Taylor	NBI	Non-NHS	4580.55	40	4706543	0.99	2025-07-18T00:00:00	24	A	8	6	6	N
1136	Macomb County	Metro	13569	""	MONTE RD	FULLER DRAIN	0.4 MI N OF SUGARBUSH RD	1 Highway	5 Waterway	1998				1	20	28	1	1 Concrete	19 Culvert	0	""	""	2 Integral Concrete	5 MS 18 (HS 20)	2		42.65	-82.828224	2025-08-18T00:00:00	POINT (-82.828224 42.65)	Macomb	NBI	Non-NHS	560		817906	1.5	2024-09-16T00:00:00	24	A	N	N	N	8
1137	MDOT	Metro	7962	63103-S01	EB I-696	N-S SERVICE ROAD	IN FERNDALE	1 Highway	1 Highway	1982			2007	1	80.3	52.2	1	3 Steel	02 Multi Str Non Comp	0	""	""	5 Epoxy Overlay	9 MS22.5(HS25)or greater	2	2	42.48	-83.11488	2025-08-18T00:00:00	POINT (-83.11488 42.48)	Oakland	NBI	NHS	4191.66	48.3	710402	0.12	2025-07-10T00:00:00	24	K	4	7	5	N
1138	Wayne County	Metro	11989	""	HURON RIVER DRIVE	SILVER CREEK	ROCKWOOD      E/STREICHER	1 Highway	5 Waterway	1981		1981		1	25.9	49.9	1	5 Prestressed Concrete	05 Box Bm/Gird- Multiple	0	0 Other	00 Other	1 Monolithic Concrete	9 MS22.5(HS25)or greater	2		42.07	-83.23407	2025-08-18T00:00:00	POINT (-83.23407 42.07)	Taylor	NBI	Non-NHS	1292.41	45.9	1606009	3.95	2024-09-19T00:00:00	24	A	7	7	6	N
1139	Oakland County	Metro	8142	""	NOVI RD	ROUGE RIVER	BET 8 AND 9 MILE RDS	1 Highway	5 Waterway	1959				3	52.8	37.7	1	2 Concrete Continuous	01 Slab	2	2 Concrete Continous	01 Slab	1 Monolithic Concrete	6 MS18(HS20)+mod	2		42.44	-83.4742	2025-08-18T00:00:00	POINT (-83.4742 42.44)	Oakland	NBI	NHS	1990.56	25.9	621910	4.88	2024-06-26T00:00:00	24	A	6	6	6	N
1140	MDOT	Metro	11596	82123-S48	WARREN AV EXIT RMP	I-96 RAMP	IN DETROIT	1 Highway	1 Highway	1971	2005		2005	2	148.1	27.1	2	3 Steel	82 Pl Girder Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	1	2	42.35	-83.09842	2025-08-18T00:00:00	POINT (-83.09842 42.35)	Detroit	NBI	NHS	4013.51	24.1	1581706	0.1	2023-10-25T00:00:00	24	A	7	7	7	N
1141	Wayne County	Metro	12124	""	NORTHVILLE ROAD	MIDDLE ROUGE RIVER	NORTHVILE T    S/SIX MILE	5 Highway-pedestrian	5 Waterway	1922	1976	1995	1997	2	64	62	2	4 Steel Continuous	02 Multi Str Non Comp	0	""	""	6 Bituminous	5 MS 18 (HS 20)	2		42.41	-83.46917	2025-08-18T00:00:00	POINT (-83.46917 42.41)	Taylor	NBI	Non-NHS	3968	47.9	1679402	1.64	2025-03-31T00:00:00	12	K	3	3	5	N
1142	Bloomfield Hill	Metro	13438	""	BLMFLD HILLS PKWY	ROUGE RIVER TRIB /S CULV	IN BLOOMFIELD HILLS	1 Highway	5 Waterway	1987				4	59.2	41	4	9 Aluminum, WI, CI	19 Culvert	0	""	""	N N/A (no deck (NBI))	5 MS 18 (HS 20)	2		42.58	-83.241196	2025-08-18T00:00:00	POINT (-83.241196 42.58)	Oakland	NBI	Non-NHS	2427.2	41	1890603	0.13	2024-01-22T00:00:00	24	A	N	N	N	8
1143	MDOT	Metro	11897	82291-S01	WILL CARLETON RD	I-275	WAYNE MONROE CO LINE	1 Highway	1 Highway	1974		2009	2009	2	286	48.4	2	3 Steel	82 Pl Girder Comp	0	""	""	3 Latex Concrete/Similar	5 MS 18 (HS 20)	2	6	42.09	-83.37715	2025-08-18T00:00:00	POINT (-83.37715 42.09)	Taylor	NBI	Non-NHS	13842.4	44.5	1228108	2.21	2024-05-23T00:00:00	24	A	6	8	7	N
1144	Macomb County	Metro	6316	""	HEYDENREICH ROAD	MIDDLE BRANCH CLINTON R	0.1 MI NORTH OF CASS AVE	5 Highway-pedestrian	5 Waterway	1988				1	85	52.2	1	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	5 Epoxy Overlay	5 MS 18 (HS 20)	3		42.61	-82.917534	2025-08-18T00:00:00	POINT (-82.917534 42.61)	Macomb	NBI	Non-NHS	4437	39	819502	0.04	2024-05-01T00:00:00	24	A	7	8	7	N
1145	Oakland County	Metro	8194	""	DUTTON RD	PAINT CREEK	WEST OF LIVERNOIS	1 Highway	5 Waterway	2023				1	45	47.42	1	3 Steel	06 Box Bms- Single/Sprd	0	""	""	0 None	B Greater than HL 93	2		42.71	-83.15751	2025-08-18T00:00:00	POINT (-83.15751 42.71)	Oakland	NBI	Non-NHS	2133.9	44	626101	3.82	2023-12-12T00:00:00	21	A	9	9	9	N
1146	MDOT	Metro	11503	82122-S17	GARFIELD ST U-TRN	I-96	IN REDFORD TWP	1 Highway	1 Highway	1974	2014		2001	2	200	49.5	2	3 Steel	02 Multi Str Non Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	2	10	42.38	-83.28871	2025-08-18T00:00:00	POINT (-83.28871 42.38)	Taylor	NBI	Non-NHS	9900	40	4706057	0.02	2024-09-16T00:00:00	24	A	7	7	7	N
1147	Wayne County	Metro	12175	""	BEECH-DALY ROAD	ROUGE RIVER	REDFORD       N/FIVE MILE	5 Highway-pedestrian	5 Waterway	1932	1961	1995		1	33.8	61.7	1	5 Prestressed Concrete	05 Box Bm/Gird- Multiple	0	""	""	6 Bituminous	6 MS18(HS20)+mod	4		42.41	-83.2962	2025-08-18T00:00:00	POINT (-83.2962 42.41)	Taylor	NBI	Non-NHS	2085.46	47.9	1600802	3.51	2025-06-17T00:00:00	12	P	5	3	5	N
1148	MDOT	Metro	11356	82102-S03	N TERRITORIAL RD	M-14	2.5 MI W OF PLYMOUTH	1 Highway	1 Highway	1976			2006	4	361.5	48.4	4	3 Steel	82 Pl Girder Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	2	4	42.38	-83.5343	2025-08-18T00:00:00	POINT (-83.5343 42.38)	Taylor	NBI	Non-NHS	17496.6	44.5	1673609	0.7	2023-10-09T00:00:00	24	A	6	7	7	N
1149	Milford	Metro	8244	""	PETERS ST	HURON RIVER (MILL POND)	W OF MILFORD RD	5 Highway-pedestrian	5 Waterway	2008				1	44.3	27.3	1	1 Concrete	19 Culvert	0	""	""	N N/A (no deck (NBI))	6 MS18(HS20)+mod	2		42.59	-83.60805278	2025-08-18T00:00:00	POINT (-83.60805278 42.59)	Oakland	NBI	Non-NHS	1209.39	26.9	660807	0.15	2023-10-25T00:00:00	24	A	N	N	N	8
1150	MDOT	Metro	6156	50111-S13	MARTIN RD	I-94	W LTS OF ST CLAIR SHORES	6 2d level interchg	1 Highway	1967	1996		1996	4	215.2	42.4	4	3 Steel	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	2	8	42.5	-82.91787	2025-08-18T00:00:00	POINT (-82.91787 42.5)	Macomb	NBI	Non-NHS	9124.48	28	803308	3.53	2025-06-30T00:00:00	24	A	7	7	5	N
1151	Oakland County	Metro	8174	""	JACKSONBLVD	WHITE LAKE CANAL	WEST OF ORMOND RD	1 Highway	5 Waterway	1981		2014		1	37.8	37.4	1	5 Prestressed Concrete	05 Box Bm/Gird- Multiple	0	""	""	6 Bituminous	6 MS18(HS20)+mod	2		42.68	-83.56015	2025-08-18T00:00:00	POINT (-83.56015 42.68)	Oakland	NBI	Non-NHS	1413.72	36.8	649302	1.49	2024-06-12T00:00:00	24	A	7	7	7	N
1152	MDOT	Metro	11956	82293-B03	I-275 NB	MIDDLE ROUGE RIVER	0.3 MI W OF LIVONIA LTS	1 Highway	5 Waterway	1972		2012	2012	2	170	55.8	2	3 Steel	32 Multi Str Comp	0	""	""	3 Latex Concrete/Similar	6 MS18(HS20)+mod	3		42.37	-83.4362	2025-08-18T00:00:00	POINT (-83.4362 42.37)	Taylor	NBI	NHS	9486	52.5	1607208	20.73	2024-10-31T00:00:00	24	A	7	7	7	N
1153	MDOT	Metro	11207	82024-R01	I-94	GTW,NS,CR RR & RUSSEL	IN DETROIT	1 Highway	4 Highway-railroad	2000				29	2184	132.6	29	5 Prestressed Concrete	05 Box Bm/Gird- Multiple	0	""	""	1 Monolithic Concrete	9 MS22.5(HS25)or greater	8	6	42.37	-83.05007	2025-08-18T00:00:00	POINT (-83.05007 42.37)	Detroit	NBI	NHS	289598.4	126	1576405	28.75	2025-05-21T00:00:00	24	A	7	7	6	N
1154	MDOT	Metro	11105	82022-B03-3	I-94 EB	ROUGE RIVER	S LTS OF DEARBORN	1 Highway	5 Waterway	1943	1997			7	400	63.3	7	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	9 MS22.5(HS25)or greater	3		42.3	-83.18726	2025-08-18T00:00:00	POINT (-83.18726 42.3)	Taylor	NBI	NHS	25320	60	1576405	19.94	2025-07-24T00:00:00	24	A	7	7	6	N
1155	MDOT	Metro	6063	50023-S07	NB MOUND RD	M-59	0.5 MI. WEST UTICA	1 Highway	1 Highway	1994				2	130	52.5	2	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	9 MS22.5(HS25)or greater	3	6	42.62	-83.05187	2025-08-18T00:00:00	POINT (-83.05187 42.62)	Macomb	NBI	NHS	6825	44	799110	12.21	2023-11-30T00:00:00	24	A	6	6	8	N
1156	Macomb County	Metro	6250	""	SB SCHOENHERR RD	PLUM BROOK DRAIN	0.6 MI N OF METRO PKWY	5 Highway-pedestrian	5 Waterway	1991				2	129.9	38.7	2	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	9 MS22.5(HS25)or greater	2		42.57	-82.9901	2025-08-18T00:00:00	POINT (-82.9901 42.57)	Macomb	NBI	NHS	5027.13	29.9	1922901	4.43	2024-05-07T00:00:00	24	A	7	7	6	N
1157	Wayne County	Metro	12085	""	SIX MILE ROAD	JOHNSON DRAIN	NORTHVILLE TWP     W/BECK	1 Highway	5 Waterway	1935	2003			1	32	35.8	1	1 Concrete	19 Culvert	0	0 Other	00 Other	0 None	9 MS22.5(HS25)or greater	2		42.41	-83.51685	2025-08-18T00:00:00	POINT (-83.51685 42.41)	Taylor	NBI	Non-NHS	1145.6	40	1680701	1.71	2025-05-12T00:00:00	24	A	N	N	N	8
1158	MDOT	Metro	13319	82194-S36-1	PLAZA TO I-75 NB	I-75 NB&SB RMP TO VERNOR	AMBASSADOR GATEWAY	1 Highway	1 Highway	2007			2007	1	132.4	33.5	1	3 Steel	82 Pl Girder Comp	0	""	""	2 Integral Concrete	9 MS22.5(HS25)or greater	1		42.32	-83.08212	2025-08-18T00:00:00	POINT (-83.08212 42.32)	Detroit	NBI	NHS	4435.4	30	4718924	0.08	2024-06-14T00:00:00	24	A	7	8	8	N
1159	Novi	Metro	13861	""	ISLAND LAKE DRIVE	NOVI LYONS DRAIN	W END OF ISLAND LAKE	5 Highway-pedestrian	5 Waterway	1968				1	26	28	1	1 Concrete	19 Culvert	0	""	""	6 Bituminous	8 Railroad	2		42.48	-83.55369444	2025-08-18T00:00:00	POINT (-83.55369444 42.48)	Oakland	NBI	Non-NHS	728	28.2	4414107	1.39	2024-09-27T00:00:00	24	A	N	N	N	8
1160	Wayne County	Metro	12122	""	NORTHVILLE ROAD	MIDDLE ROUGE RIVER	NORTHVILE T   N/FIVE MILE	5 Highway-pedestrian	5 Waterway	1922	1964	1979		2	64	62	2	2 Concrete Continuous	01 Slab	0	0 Other	00 Other	6 Bituminous	5 MS 18 (HS 20)	4		42.4	-83.46918	2025-08-18T00:00:00	POINT (-83.46918 42.4)	Taylor	NBI	Non-NHS	3968	47.9	1679402	1.19	2025-05-27T00:00:00	12	A	5	5	5	N
1161	MDOT	Metro	11819	82251-S18	I-75 SB EXIT RAMP	I-75 E&W TO SB TURN RDWY	IN DETROIT	1 Highway	1 Highway	1964		2007	2007	1	110.6	26.9	1	3 Steel	82 Pl Girder Comp	0	""	""	3 Latex Concrete/Similar	6 MS18(HS20)+mod	1	2	42.36	-83.05627	2025-08-18T00:00:00	POINT (-83.05627 42.36)	Detroit	NBI	NHS	2975.14	21.5	1585501	0.09	2024-10-07T00:00:00	24	A	4	7	7	N
1162	MDOT	Metro	6117	50062-S03-2	M-3 SB GRATIOT AVE	I-696	IN ROSEVILLE	5 Highway-pedestrian	1 Highway	1972	2006		2000	2	190	65.7	2	3 Steel	82 Pl Girder Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	3	6	42.49	-82.93869	2025-08-18T00:00:00	POINT (-82.93869 42.49)	Macomb	NBI	NHS	12483	53.3	4208203	3.38	2023-09-22T00:00:00	24	A	7	6	7	N
1163	Auburn Hills	Metro	12687	""	HAMLIN ROAD WBOUND	CLINTON RIVER	BET SQUIRREL AND ADAMS	1 Highway	5 Waterway	1989				1	64	40	1	5 Prestressed Concrete	05 Box Bm/Gird- Multiple	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	2		42.65	-83.21245	2025-08-18T00:00:00	POINT (-83.21245 42.65)	Oakland	NBI	Non-NHS	2560	26.9	4462959	0.35	2024-10-16T00:00:00	24	A	7	7	7	N
1164	MDOT	Metro	11152	82022-S50	I-94 WB RAMP F	M-39	RAMP TO SB M-39	1 Highway	1 Highway	1985				25	926.9	35.8	4	5 Prestressed Concrete	02 Multi Str Non Comp	21	1 Concrete	01 Slab	5 Epoxy Overlay	9 MS22.5(HS25)or greater	1	6	42.27	-83.22397222	2025-08-18T00:00:00	POINT (-83.22397222 42.27)	Taylor	NBI	NHS	33183.02	31.8	1580309	0.24	2024-11-27T00:00:00	24	A	7	7	6	N
1165	MDOT	Metro	11314	82062-S02-4	US-12 WB	M-39	IN DEARBORN OVER M-39	5 Highway-pedestrian	1 Highway	1970	2020		1970	4	243.5	76.2	4	3 Steel	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	5	10	42.31	-83.21466	2025-08-18T00:00:00	POINT (-83.21466 42.31)	Taylor	NBI	NHS	18554.7	68	4704788	1.14	2024-09-30T00:00:00	24	A	8	7	7	N
1166	Pontiac	Metro	8269	""	MARTIN LUTHER KING	GRAND TRUNK WESTERN RR	1/4 MI E EAST BLVD & BL75	5 Highway-pedestrian	2 Railroad	1976				3	188	70.2	3	3 Steel	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	6 MS18(HS20)+mod	4		42.62	-83.26983	2025-08-18T00:00:00	POINT (-83.26983 42.62)	Oakland	NBI	NHS	13197.6	58.1	672807	0.26	2024-07-21T00:00:00	24	K	5	2	5	N
1167	Macomb County	Metro	6221	""	26 MILE ROAD	BRANCH OF KIRKHAM DRAIN	1.7 MI E OF NEW HAVEN RD	1 Highway	5 Waterway	2010				1	22	40	1	1 Concrete	19 Culvert	0	""	""	N N/A (no deck (NBI))	B Greater than HL 93	2		42.72	-82.75947	2025-08-18T00:00:00	POINT (-82.75947 42.72)	Macomb	NBI	Non-NHS	880	40	816702	16.92	2025-04-18T00:00:00	24	A	N	N	N	6
1168	Wayne County	Metro	12046	""	GEDDES ROAD	SINES DRAIN	CANTON    W/CANTON CENTER	1 Highway	5 Waterway	1997				1	24	44	1	5 Prestressed Concrete	05 Box Bm/Gird- Multiple	0	""	""	2 Integral Concrete	9 MS22.5(HS25)or greater	2		42.28	-83.49262	2025-08-18T00:00:00	POINT (-83.49262 42.28)	Taylor	NBI	Non-NHS	1056	30.2	4603888	3.14	2024-05-21T00:00:00	24	A	5	6	7	N
1169	MDOT	Metro	11805	82251-S07-1	I-75 NB	I-75 SB TO EB RAMP	I-75 & I-375 INTCHG	1 Highway	1 Highway	1970	1998		1998	1	33.8	45.6	1	3 Steel	02 Multi Str Non Comp	0	""	""	1 Monolithic Concrete	6 MS18(HS20)+mod	3	1	42.34	-83.04615	2025-08-18T00:00:00	POINT (-83.04615 42.34)	Detroit	NBI	NHS	1541.28	42.3	1592010	24.19	2024-03-06T00:00:00	24	A	7	7	6	N
1170	MDOT	Metro	11859	82252-S23	NEVADA AVE	I-75	IN DETROIT	5 Highway-pedestrian	1 Highway	1969	2003		1988	4	241	70.2	4	3 Steel	32 Multi Str Comp	0	""	""	5 Epoxy Overlay	5 MS 18 (HS 20)	4	8	42.42	-83.09318	2025-08-18T00:00:00	POINT (-83.09318 42.42)	Detroit	NBI	Non-NHS	16918.2	50	1585907	0.83	2023-10-25T00:00:00	24	A	7	6	7	N
1171	MDOT	Metro	8096	63174-S27	NINE MI RD	I-75	IN HAZEL PARK	5 Highway-pedestrian	1 Highway	2009			2009	2	197.3	73.4	2	4 Steel Continuous	82 Pl Girder Comp	0	""	""	1 Monolithic Concrete	B Greater than HL 93	5	8	42.46	-83.10603	2025-08-18T00:00:00	POINT (-83.10603 42.46)	Oakland	NBI	Non-NHS	14481.82	59	607709	1.12	2025-04-17T00:00:00	24	A	7	7	7	N
1172	Wayne County	Metro	12291	""	MARTINSVILLE ROAD	BIG SWAN CREEK	SUMPTER            N/JUDD	1 Highway	5 Waterway	1987				3	34.8	29.9	3	3 Steel	19 Culvert	0	""	""	N N/A (no deck (NBI))	9 MS22.5(HS25)or greater	2		42.15	-83.46107	2025-08-18T00:00:00	POINT (-83.46107 42.15)	Taylor	NBI	Non-NHS	1040.52	0	1670702	4.27	2025-02-11T00:00:00	24	A	N	N	N	5
1173	Oakland County	Metro	8206	""	SILVER BELL	PAINT CREEK	WEST OF ORION RD	1 Highway	5 Waterway	1961				1	40	33.1	1	5 Prestressed Concrete	05 Box Bm/Gird- Multiple	0	""	""	8 Gravel	6 MS18(HS20)+mod	2		42.73	-83.15856	2025-08-18T00:00:00	POINT (-83.15856 42.73)	Oakland	NBI	Non-NHS	1324	26.9	626102	6.69	2024-09-13T00:00:00	12	P	5	6	4	N
1174	Macomb County	Metro	6402	""	BELLMAN ROAD	MIDDLE BRANCH CLINTON R	0.3 MI E OF EARL MEM HWY	1 Highway	5 Waterway	1950				1	21	19.7	1	3 Steel	19 Culvert	0	""	""	N N/A (no deck (NBI))	2 M 13.5 (H 15)	2		42.7	-83.02908	2025-08-18T00:00:00	POINT (-83.02908 42.7)	Macomb	NBI	Non-NHS	413.7	0	820501	0.29	2024-09-16T00:00:00	24	A	N	N	N	6
1175	MDOT	Metro	8125	63191-S10	TEN MILE RD	I-96	1 MI NW OF FARMINGTON	1 Highway	1 Highway	1971			1997	5	398.1	72.4	5	3 Steel	02 Multi Str Non Comp	0	""	""	5 Epoxy Overlay	4 M 18 (H 20)	4	9	42.47	-83.43114	2025-08-18T00:00:00	POINT (-83.43114 42.47)	Oakland	NBI	Non-NHS	28822.44	68	656510	12.01	2024-12-19T00:00:00	24	A	6	6	6	N
1176	MDOT	Metro	11290	82053-B03-1	US-24 NB	ROUGE RIVER	2.1 MI S OF M-5	1 Highway	5 Waterway	1960	1996			2	124	73.5	2	5 Prestressed Concrete	05 Box Bm/Gird- Multiple	0	""	""	5 Epoxy Overlay	9 MS22.5(HS25)or greater	4		42.39	-83.276215	2025-08-18T00:00:00	POINT (-83.276215 42.39)	Taylor	NBI	NHS	9114	64.8	4700038	20.96	2023-11-15T00:00:00	24	A	7	6	7	N
1177	Macomb County	Metro	6340	""	BATES ROAD	DEER CREEK	0.6 MI NORTH OF 29 MILE	1 Highway	5 Waterway	1972				4	40	23	4	3 Steel	19 Culvert	0	""	""	N N/A (no deck (NBI))	4 M 18 (H 20)	2		42.77	-82.82366	2025-08-18T00:00:00	POINT (-82.82366 42.77)	Macomb	NBI	Non-NHS	920	0	817201	3.67	2024-08-30T00:00:00	12	A	N	N	N	4
1178	MDOT	Metro	8010	63172-S08-3	I-75 CONN EB	M-24	@ M-24(I-75 CONN TO M-24)	1 Highway	1 Highway	1962		1994		4	183	47.9	4	5 Prestressed Concrete	02 Multi Str Non Comp	0	""	""	5 Epoxy Overlay	9 MS22.5(HS25)or greater	2	6	42.69	-83.241684	2025-08-18T00:00:00	POINT (-83.241684 42.69)	Oakland	NBI	NHS	8765.7	44.9	1849508	0	2025-07-16T00:00:00	24	A	6	6	6	N
1179	MDOT	Metro	11955	82293-B02	I-275 SB	MIDDLE ROUGE RIVER	0.3 MI W OF LIVONIA LTS	1 Highway	5 Waterway	1972	2012	2012	2012	2	170	55.8	2	3 Steel	32 Multi Str Comp	0	""	""	3 Latex Concrete/Similar	6 MS18(HS20)+mod	3		42.37	-83.43659	2025-08-18T00:00:00	POINT (-83.43659 42.37)	Taylor	NBI	NHS	9486	52.5	1607610	20.74	2024-10-29T00:00:00	24	A	6	7	7	N
1180	MDOT	Metro	11592	82123-S44	I94EB RAMP TO I96W	I-94	IN DETROIT	1 Highway	1 Highway	1971		2005	2005	3	225.2	29.2	3	3 Steel	82 Pl Girder Comp	0	""	""	3 Latex Concrete/Similar	5 MS 18 (HS 20)	1	6	42.35	-83.10052	2025-08-18T00:00:00	POINT (-83.10052 42.35)	Detroit	NBI	NHS	6575.84	26.9	1577310	0.06	2023-10-20T00:00:00	24	A	6	7	6	N
1181	MDOT	Metro	11681	82192-S03	FERN AVE	M-39	IN ALLEN PARK	5 Highway-pedestrian	1 Highway	1964	2001	1964	1997	4	184.5	56	4	4 Steel Continuous	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	4	6	42.28	-83.211464	2025-08-18T00:00:00	POINT (-83.211464 42.28)	Taylor	NBI	Non-NHS	10332	44	1594706	0.02	2023-11-16T00:00:00	24	A	7	6	7	N
1182	MDOT	Metro	11328	82081-B04	M-153 WB	ROUGE RIVER	IN DEARBORN	1 Highway	5 Waterway	1971		1993	1971	3	290	65.9	3	3 Steel	82 Pl Girder Comp	0	""	""	3 Latex Concrete/Similar	5 MS 18 (HS 20)	4		42.33	-83.2411	2025-08-18T00:00:00	POINT (-83.2411 42.33)	Taylor	NBI	NHS	19111	56.5	1924107	1.26	2025-05-22T00:00:00	12	A	6	4	6	N
1183	Oakland County	Metro	8152	""	ADAMS ROAD	PAINT CREEK	SOUTH OF ORION	1 Highway	5 Waterway	1986				1	68.9	43.3	1	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	6 MS18(HS20)+mod	2		42.75	-83.19728	2025-08-18T00:00:00	POINT (-83.19728 42.75)	Oakland	NBI	Non-NHS	2983.37	40	4415861	15.34	2024-09-13T00:00:00	24	A	7	8	7	N
1184	MDOT	Metro	8058	63174-S03-1	I-75 NB	12 MILE RD	IN MADISON HTS	1 Highway	1 Highway	2022				2	170	76.7	2	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	A HL 93	4	6	42.5	-83.11466	2025-08-18T00:00:00	POINT (-83.11466 42.5)	Oakland	NBI	NHS	13039	73.4	647308	4.36	2025-04-14T00:00:00	24	A	8	8	8	N
1185	Macomb County	Metro	6382	""	31 MILE ROAD	COON CREEK	200 FT EAST OF NORTH AVE	1 Highway	5 Waterway	1977				3	36.7	36.1	3	3 Steel	19 Culvert	0	""	""	N N/A (no deck (NBI))	4 M 18 (H 20)	2		42.79	-82.882126	2025-08-18T00:00:00	POINT (-82.882126 42.79)	Macomb	NBI	Non-NHS	1324.87	0	4408230	11.36	2024-04-10T00:00:00	24	A	N	N	N	6
1186	Birmingham	Metro	8227	""	LINCOLN DRIVE	ROUGE RIVER	0.2 MI W OF SOUTHFIELD RD	5 Highway-pedestrian	5 Waterway	2007				1	34.2	32.2	1	1 Concrete	19 Culvert	0	""	""	N N/A (no deck (NBI))	9 MS22.5(HS25)or greater	2		42.54	-83.22781	2025-08-18T00:00:00	POINT (-83.22781 42.54)	Oakland	NBI	Non-NHS	1101.24	32.2	611106	0.92	2024-10-24T00:00:00	24	A	N	N	N	7
1187	Wayne County	Metro	12091	""	SIX MILE ROAD	UPPER ROUGE RIVER	DETROIT       E/TELEGRAPH	5 Highway-pedestrian	5 Waterway	1927	1995	1995		2	97.8	83	2	5 Prestressed Concrete	05 Box Bm/Gird- Multiple	0	0 Other	00 Other	2 Integral Concrete	9 MS22.5(HS25)or greater	5		42.41	-83.26684	2025-08-18T00:00:00	POINT (-83.26684 42.41)	Detroit	NBI	NHS	8117.4	65.9	1680701	14.53	2025-06-17T00:00:00	24	A	5	7	5	N
1188	Wayne County	Metro	12139	""	WALTZ ROAD	HURON RIVER	HURON T S/HURON RIVER DR	5 Highway-pedestrian	5 Waterway	2019				2	220	47.16	2	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	A HL 93	2		42.16	-83.40259	2025-08-18T00:00:00	POINT (-83.40259 42.16)	Taylor	NBI	Non-NHS	10375.2	28	1673810	4.76	2025-06-10T00:00:00	24	A	8	8	8	N
1189	Macomb County	Metro	6226	""	29 MILE ROAD	SALT RIVER	0.3 MI W OF GRATIOT US-25	1 Highway	5 Waterway	1987				1	32	43.3	1	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	5 Epoxy Overlay	9 MS22.5(HS25)or greater	2		42.76	-82.765686	2025-08-18T00:00:00	POINT (-82.765686 42.76)	Macomb	NBI	Non-NHS	1385.6	39.4	815710	14.87	2023-11-16T00:00:00	24	A	7	8	7	N
1190	Pontiac	Metro	8266	""	JOSLYN ROAD	GRAND TRUNK WESTERN RR	2 MI S INT JOSLYN & I-75	5 Highway-pedestrian	2 Railroad	1932	1972	2013		3	97.3	61.9	3	4 Steel Continuous	02 Multi Str Non Comp	0	""	""	3 Latex Concrete/Similar	6 MS18(HS20)+mod	4		42.67	-83.28068	2025-08-18T00:00:00	POINT (-83.28068 42.67)	Oakland	NBI	NHS	6022.87	52.7	674110	1.45	2024-07-18T00:00:00	24	A	6	7	6	N
1191	MDOT	Metro	11630	82191-B07	I-75  & RAMP A	FRANK & POET DRAIN	IN TAYLOR	1 Highway	5 Waterway	1966				2	24.9	54.1	2	1 Concrete	19 Culvert	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	7		42.2	-83.24028	2025-08-18T00:00:00	POINT (-83.24028 42.2)	Taylor	NBI	NHS	1347.09	54.1	1592010	9	2024-07-26T00:00:00	24	A	N	N	N	6
1192	Oakland County	Metro	8208	""	GUNN ROAD	PENN CENTRAL RAILROAD	BET ADAMS & ORION RD	1 Highway	0 Other	1989				3	89.9	31.2	1	7 Timber	01 Slab	2	7 Timber	01 Slab	8 Gravel	6 MS18(HS20)+mod	2		42.74	-83.175446	2025-08-18T00:00:00	POINT (-83.175446 42.74)	Oakland	NBI	Non-NHS	2804.88	30.8	609405	2.02	2024-09-13T00:00:00	24	A	6	6	6	N
1193	MDOT	Metro	11649	82191-S07	WEST RD	I-75	IN WOODHAVEN	5 Highway-pedestrian	1 Highway	1986			2017	4	231	121.4	4	3 Steel	32 Multi Str Comp	0	""	""	5 Epoxy Overlay	9 MS22.5(HS25)or greater	5	8	42.14	-83.24144	2025-08-18T00:00:00	POINT (-83.24144 42.14)	Taylor	NBI	NHS	28043.4	95.8	1674210	6.23	2024-07-16T00:00:00	24	A	6	7	7	N
1194	MDOT	Metro	11842	82252-S02	MILWAUKEE AVE	I-75	IN DETROIT	5 Highway-pedestrian	1 Highway	2021				2	175.3	60.4	2	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	B Greater than HL 93	2	8	42.37	-83.05971	2025-08-18T00:00:00	POINT (-83.05971 42.37)	Detroit	NBI	Non-NHS	10588.12	38	1585705	1.5	2024-04-16T00:00:00	24	A	8	8	8	N
1195	MDOT	Metro	6006	50011-B03	M-53	BEAVER CREEK	IN WARREN	1 Highway	5 Waterway	1964	1998			1	63	98.9	1	5 Prestressed Concrete	06 Box Bms- Single/Sprd	0	""	""	5 Epoxy Overlay	9 MS22.5(HS25)or greater	7		42.53	-83.02926	2025-08-18T00:00:00	POINT (-83.02926 42.53)	Macomb	NBI	NHS	6230.7	86.6	799108	5.85	2024-03-28T00:00:00	24	A	7	7	7	N
1196	Macomb County	Metro	6020	""	VAN DYKE(OLD M-53)	EAST POND CREEK	1.6 MI N OF ROMEO	1 Highway	5 Waterway	1926	1971	1971		1	30.8	43.3	1	1 Concrete	04 Tee Beam	0	""	""	6 Bituminous	2 M 13.5 (H 15)	2		42.82	-83.01995	2025-08-18T00:00:00	POINT (-83.01995 42.82)	Macomb	NBI	Non-NHS	1333.64	42.7	4208310	1.29	2024-08-07T00:00:00	12	A	5	4	6	N
1197	MDOT	Metro	11249	82025-S05	NB CONNER AVE	I-94	IN DETROIT	5 Highway-pedestrian	1 Highway	1958	2000		2000	4	170.9	57.1	4	3 Steel	02 Multi Str Non Comp	0	""	""	6 Bituminous	5 MS 18 (HS 20)	4	6	42.4	-82.98759	2025-08-18T00:00:00	POINT (-82.98759 42.4)	Detroit	NBI	NHS	9758.39	44	1588005	2.42	2024-06-27T00:00:00	24	A	7	7	7	N
1198	MDOT	Metro	7906	63101-S09-4	I-696 WB	INKSTER RD	IN SOUTHFIELD	1 Highway	1 Highway	1988		1988	1988	1	122.5	72.5	1	3 Steel	82 Pl Girder Comp	0	""	""	5 Epoxy Overlay	9 MS22.5(HS25)or greater	4	2	42.49	-83.31904	2025-08-18T00:00:00	POINT (-83.31904 42.49)	Oakland	NBI	NHS	8881.25	69.4	710702	6.68	2024-12-26T00:00:00	19	A	6	8	6	N
1199	MDOT	Metro	7923	63102-S07	SOUTHFIELD U TURN	I-696	IN LATHRUP VILLAGE	1 Highway	1 Highway	1987				2	130	63.7	2	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	9 MS22.5(HS25)or greater	4	3	42.49	-83.22332	2025-08-18T00:00:00	POINT (-83.22332 42.49)	Oakland	NBI	Non-NHS	8281	50.2	4413527	0.01	2024-07-22T00:00:00	24	A	6	6	7	N
1200	MDOT	Metro	8074	63174-S11-2	I-75 SB	EAST LONG LAKE RD	IN TROY	1 Highway	1 Highway	2020				1	138.5	73.8	1	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	B Greater than HL 93	4	4	42.59	-83.159584	2025-08-18T00:00:00	POINT (-83.159584 42.59)	Oakland	NBI	NHS	10221.3	70.4	646106	12.16	2025-07-24T00:00:00	24	A	8	8	8	N
1201	Wayne County	Metro	12290	""	ELWELL ROAD	SWAN CREEK	SUMPTER   300 FT N/WILLIS	1 Highway	5 Waterway	1986				3	24	25.9	3	3 Steel	19 Culvert	0	""	""	N N/A (no deck (NBI))	9 MS22.5(HS25)or greater	2		42.16	-83.50037	2025-08-18T00:00:00	POINT (-83.50037 42.16)	Taylor	NBI	Non-NHS	621.6	0	1670505	5.09	2024-08-15T00:00:00	24	A	N	N	N	6
1202	Oakland County	Metro	14036	""	COOLEY LAKE ROAD	HURON RIVER	COMMERCE TWP SEC 3	1 Highway	5 Waterway	2023				1	27.79	30	1	1 Concrete	19 Culvert	0	""	""	6 Bituminous	B Greater than HL 93	2		42.61	-83.4846	2025-08-18T00:00:00	POINT (-83.4846 42.61)	Oakland	NBI	Non-NHS	833.7	40.5	4416312	0.47	2024-06-12T00:00:00	24	A	N	N	N	8
1203	Oakland County	Metro	13597	""	DEER PATH TRAIL	INDIAN LAKE CANAL	IN SUBDIVISION  SEC 34	1 Highway	5 Waterway	1999				5	120	29	5	7 Timber	01 Slab	0	""	""	6 Bituminous	5 MS 18 (HS 20)	2		42.8	-83.273056	2025-08-18T00:00:00	POINT (-83.273056 42.8)	Oakland	NBI	Non-NHS	3480	28	4412774	0.65	2024-07-11T00:00:00	24	A	7	7	7	N
1204	MDOT	Metro	8025	63172-S20	SB BALDWIN RD	I-75	3.1 MI NW OF M-24	1 Highway	1 Highway	1993				2	230	59.3	2	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	5 Epoxy Overlay	5 MS 18 (HS 20)	4	8	42.71	-83.30705	2025-08-18T00:00:00	POINT (-83.30705 42.71)	Oakland	NBI	NHS	13639	56	4414691	0.58	2025-03-25T00:00:00	24	A	7	5	6	N
1205	MDOT	Metro	11396	82111-S10	LARNED ST RAMP	M-10 NB	IN DETROIT	1 Highway	1 Highway	1959	1987	1987		1	102	40.7	1	5 Prestressed Concrete	01 Slab	0	""	""	3 Latex Concrete/Similar	6 MS18(HS20)+mod	1	2	42.33	-83.05197	2025-08-18T00:00:00	POINT (-83.05197 42.33)	Detroit	NBI	NHS	4151.4	36.8	1585101	0.07	2024-06-11T00:00:00	24	A	5	5	7	N
1206	Wayne County	Metro	12104	""	BECK ROAD	FOWLER CREEK	CANTON           N/GEDDES	5 Highway-pedestrian	5 Waterway	1967	1996	1996	1996	1	24	42	1	3 Steel	32 Multi Str Comp	0	0 Other	00 Other	2 Integral Concrete	0 Unknown	2		42.28	-83.505424	2025-08-18T00:00:00	POINT (-83.505424 42.28)	Taylor	NBI	Non-NHS	1008	38.7	1595603	1.02	2025-05-30T00:00:00	24	A	7	7	6	N
1207	Farmington Hill	Metro	14367	""	TUCK RD	UPPER ROUGE RIVER	0.21 MI N OF SALISBURY ST	1 Highway	5 Waterway	1925				1	23	30	1	1 Concrete	19 Culvert	0	""	""	6 Bituminous	0 Unknown	2		42.45	-83.3464	2025-08-18T00:00:00	POINT (-83.3464 42.45)	Oakland	NBI	Non-NHS	690	31.6	634108	0.08	2025-03-11T00:00:00	12	P	N	N	N	3
1208	MDOT	Metro	7944	63102-S31	CAMPBELL AVE	I-696	IN ROYAL OAK	5 Highway-pedestrian	1 Highway	1983				2	180.8	129.9	2	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	9 MS22.5(HS25)or greater	8	10	42.48	-83.123764	2025-08-18T00:00:00	POINT (-83.123764 42.48)	Oakland	NBI	Non-NHS	23485.92	125.8	652509	0.01	2024-07-17T00:00:00	24	A	6	7	6	N
1209	Oakland County	Metro	13598	""	DEER PATH TRAIL	PAINT CREEK DRAIN	IN SUBDIVISION  SEC 33	1 Highway	5 Waterway	1999				1	22	23	1	1 Concrete	19 Culvert	0	""	""	6 Bituminous	5 MS 18 (HS 20)	2		42.8	-83.28011	2025-08-18T00:00:00	POINT (-83.28011 42.8)	Oakland	NBI	Non-NHS	506	23	4412774	1.31	2024-07-11T00:00:00	24	A	N	N	N	7
1210	Macomb County	Metro	6408	""	JEWELL ROAD	YATES DRAIN	0.2 MI SOUTH OF 27 MILE	1 Highway	5 Waterway	1970				1	44.9	33.8	1	5 Prestressed Concrete	05 Box Bm/Gird- Multiple	0	""	""	6 Bituminous	5 MS 18 (HS 20)	2		42.73	-83.01678	2025-08-18T00:00:00	POINT (-83.01678 42.73)	Macomb	NBI	Non-NHS	1517.62	29.9	4208421	0.82	2024-06-07T00:00:00	24	A	7	7	7	N
1211	MDOT	Metro	11765	82195-S06	M-10 SB TO EB RAMP	I-75 & RAMP TO SB	IN DETROIT	1 Highway	1 Highway	1970			1998	5	242.4	29.2	5	3 Steel	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	6 MS18(HS20)+mod	1	7	42.33	-83.06574	2025-08-18T00:00:00	POINT (-83.06574 42.33)	Detroit	NBI	NHS	7078.08	26.9	1585002	0.09	2025-05-29T00:00:00	24	A	6	7	6	N
1212	Other Local Agencies	Metro	13374	""	DINGELL RD	EUREKA RD	1.4 MI E OF I-275	1 Highway	1 Highway	1993				2	167.9	79.2	2	6 Prestr Conc Contin	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	9 MS22.5(HS25)or greater	2	4	42.19	-83.36515	2025-08-18T00:00:00	POINT (-83.36515 42.19)	Taylor	NBI	NHS	13297.68	32.2	4711337	0	2025-05-30T00:00:00	24	A	6	6	7	N
1213	MDOT	Metro	6088	50061-S19	LFT TRN LANE	I-696	IN WARREN & CENTERLINE	1 Highway	1 Highway	1972	2007	2007	2007	2	196	44.9	2	4 Steel Continuous	82 Pl Girder Comp	0	""	""	3 Latex Concrete/Similar	5 MS 18 (HS 20)	2	8	42.49	-83.02643	2025-08-18T00:00:00	POINT (-83.02643 42.49)	Macomb	NBI	Non-NHS	8800.4	41.9	4208280	0.02	2023-09-13T00:00:00	24	A	5	6	6	N
1214	Macomb County	Metro	14544	""	RUANN DR	MIDDLE BR CLINTON RIVER	0.14 MI N OF 24 MI RD	1 Highway	5 Waterway	1950				1	22	22	1	3 Steel	19 Culvert	0	""	""	6 Bituminous	0 Unknown	2		42.69	-83.03975	2025-08-18T00:00:00	POINT (-83.03975 42.69)	Macomb	NBI	Non-NHS	484		816302	0.15	2024-08-29T00:00:00	24	A	N	N	N	5
1215	MDOT	Metro	7929	63102-S13	GREENFIELD ROAD	I-696	1/4 MI.N. OF 10 MILE	5 Highway-pedestrian	1 Highway	1987				2	156	116.7	2	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	6	8	42.48	-83.20187	2025-08-18T00:00:00	POINT (-83.20187 42.48)	Oakland	NBI	NHS	18205.2	74	4416853	0.46	2024-07-09T00:00:00	24	A	6	7	7	N
1216	Macomb County	Metro	6302	""	33 MILE ROAD	EAST MILL LAKE OUTLET	JUST WEST OF CAMP GROUND	1 Highway	5 Waterway	1969				2	24	19.7	2	3 Steel	19 Culvert	0	""	""	N N/A (no deck (NBI))	4 M 18 (H 20)	2		42.82	-83.04044	2025-08-18T00:00:00	POINT (-83.04044 42.82)	Macomb	NBI	Non-NHS	472.8	0	821606	0.68	2025-07-25T00:00:00	24	A	N	N	N	5
1217	Beverly Hills	Metro	8220	""	13 MILE RD	ROUGE RIVER	0.3 MI E OF LAHSER RD	1 Highway	5 Waterway	1999				1	42	40	1	1 Concrete	19 Culvert	0	""	""	6 Bituminous	9 MS22.5(HS25)or greater	2		42.52	-83.2575	2025-08-18T00:00:00	POINT (-83.2575 42.52)	Oakland	NBI	Non-NHS	1680	0	607408	8.74	2024-09-26T00:00:00	24	A	N	N	N	7
1218	MDOT	Metro	11950	82292-S08	I-275 SB	M-153 (FORD RD)	5 MI W OF GARDEN CITY	1 Highway	1 Highway	1972			1995	2	180	64.5	2	3 Steel	32 Multi Str Comp	0	""	""	5 Epoxy Overlay	5 MS 18 (HS 20)	4	6	42.32	-83.44353	2025-08-18T00:00:00	POINT (-83.44353 42.32)	Taylor	NBI	NHS	11610	61.2	1607610	17.34	2024-10-17T00:00:00	24	A	7	6	7	N
1219	MDOT	Metro	11774	82195-S17	I-75 SB ENT RMP	I-75 NB ENT RAMP	IN DETROIT OVER LODGE	1 Highway	1 Highway	1970	1998		1998	1	90.5	28.5	1	3 Steel	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	1	1	42.34	-83.06165	2025-08-18T00:00:00	POINT (-83.06165 42.34)	Detroit	NBI	NHS	2579.25	25.3	4707198	0.16	2025-05-23T00:00:00	24	A	7	6	6	N
1220	MDOT	Metro	11121	82022-S11	I-94 EB	BEECH-DALY RD	IN TAYLOR,OVER BEECH-DALY	1 Highway	1 Highway	1962	1977	1977	1998	3	156.8	50.4	3	3 Steel	32 Multi Str Comp	0	""	""	3 Latex Concrete/Similar	5 MS 18 (HS 20)	3	2	42.26	-83.2894	2025-08-18T00:00:00	POINT (-83.2894 42.26)	Taylor	NBI	NHS	7902.72	46.9	1576405	13.74	2024-08-09T00:00:00	12	A	5	5	3	N
1221	MDOT	Metro	11583	82123-S35	PACIFIC AVE	I-96	IN DETROIT	5 Highway-pedestrian	1 Highway	1972	2004		2004	2	227.5	46.4	2	4 Steel Continuous	82 Pl Girder Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	2	8	42.36	-83.115906	2025-08-18T00:00:00	POINT (-83.115906 42.36)	Detroit	NBI	Non-NHS	10556	32	1581809	0.82	2023-09-19T00:00:00	24	A	7	8	7	N
1222	MDOT	Metro	8067	63174-S08-2	I-75 SB	LIVERNOIS RD	IN TROY	1 Highway	1 Highway	2020				1	128.5	73.8	1	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	B Greater than HL 93	4	4	42.56	-83.14751	2025-08-18T00:00:00	POINT (-83.14751 42.56)	Oakland	NBI	NHS	9483.3	70.4	646106	9.5	2023-12-12T00:00:00	24	A	8	8	9	N
1223	Macomb County	Metro	6264	""	HARPER AVE	CLINTON RIVER SPILLWAY	0.6 MI NORTH OF 16 MILE	5 Highway-pedestrian	5 Waterway	1951		1980	2022	5	340	48.6	5	3 Steel	32 Multi Str Comp	0	""	""	5 Epoxy Overlay	5 MS 18 (HS 20)	3		42.58	-82.87129	2025-08-18T00:00:00	POINT (-82.87129 42.58)	Macomb	NBI	Non-NHS	16524	36	798408	9.27	2024-06-14T00:00:00	24	A	7	7	7	N
1224	MDOT	Metro	7968	63103-S07	I-696 RAMPS AF&EF	N SERVICE RD	IN MADISON HTS	1 Highway	1 Highway	1971		2010		1	82.5	54.7	1	3 Steel	32 Multi Str Comp	0	""	""	3 Latex Concrete/Similar	5 MS 18 (HS 20)	2	2	42.48	-83.108536	2025-08-18T00:00:00	POINT (-83.108536 42.48)	Oakland	NBI	NHS	4512.75	51.8	710501	0.33	2025-07-15T00:00:00	24	A	4	6	7	N
1225	Macomb County	Metro	6245	""	SB MOUND RD	PLUM BROOK DRAIN	0.3 MI N OF 18 MILE RD.	5 Highway-pedestrian	5 Waterway	1991				1	34	70.4	1	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	9 MS22.5(HS25)or greater	4		42.6	-83.05097	2025-08-18T00:00:00	POINT (-83.05097 42.6)	Macomb	NBI	NHS	2393.6	54	812510	10.36	2024-07-31T00:00:00	24	A	7	8	6	N
1226	MDOT	Metro	6132	50091-B01	M-19	ASHERY CREEK	1.0 MI S OF MEMPHIS	1 Highway	5 Waterway	1928	2000			1	46.5	46.6	1	5 Prestressed Concrete	06 Box Bms- Single/Sprd	0	""	""	1 Monolithic Concrete	9 MS22.5(HS25)or greater	2		42.88	-82.76819	2025-08-18T00:00:00	POINT (-82.76819 42.88)	Macomb	NBI	Non-NHS	2166.9	43.3	817204	6.59	2024-04-09T00:00:00	24	A	7	8	6	N
1227	MDOT	Metro	11555	82123-S09	I-96 WB MAIN RDWY	M-39 (SOUTHFIELD EXPR)	IN DETROIT	6 2d level interchg	1 Highway	1970		2005	1989	4	211.1	60	4	3 Steel	32 Multi Str Comp	0	""	""	3 Latex Concrete/Similar	5 MS 18 (HS 20)	3	8	42.38	-83.21673	2025-08-18T00:00:00	POINT (-83.21673 42.38)	Detroit	NBI	NHS	12666	57.7	1606503	11.76	2023-08-22T00:00:00	24	A	4	7	6	N
1228	Macomb County	Metro	6266	""	NORTH AVE	E B COON CREEK	0.3MI NORTH OF 26 MILE RD	1 Highway	5 Waterway	1977				2	52.8	39.4	2	3 Steel	19 Culvert	0	""	""	N N/A (no deck (NBI))	9 MS22.5(HS25)or greater	2		42.72	-82.87484	2025-08-18T00:00:00	POINT (-82.87484 42.72)	Macomb	NBI	Non-NHS	2080.32	38.1	1817105	6.62	2025-06-17T00:00:00	12	P	N	N	N	3
1229	Oakland County	Metro	14658	""	INDIANWOOD RD	PAINT CREEK	0.8 MI W OF M-24	1 Highway	5 Waterway	2024				1	38	31	1	1 Concrete	19 Culvert	0	""	""	6 Bituminous	B Greater than HL 93	2		42.79	-83.26137	2025-08-18T00:00:00	POINT (-83.26137 42.79)	Oakland	NBI	Non-NHS	1178	30	655208	3.12	2025-02-24T00:00:00	17	A	N	N	N	9
1230	MDOT	Metro	11345	82101-B03	M-14 (OLD)	MIDDLE ROUGE RIVER	IN LIVONIA	1 Highway	5 Waterway	1925		1925		1	73	44	1	1 Concrete	11 Arch- Deck, Filled Sp	0	""	""	6 Bituminous	4 M 18 (H 20)	2		42.37	-83.40896	2025-08-18T00:00:00	POINT (-83.40896 42.37)	Taylor	NBI	NHS	3212	27.9	1604102	7.4	2023-10-09T00:00:00	24	A	6	6	6	N
1231	Dearborn	Metro	12314	""	BRADY RD	LOW BRANCH ROUGE RIVER	IN DEARBORN	5 Highway-pedestrian	5 Waterway	1994	2020			1	100	57.8	1	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	B Greater than HL 93	3		42.31	-83.242294	2025-08-18T00:00:00	POINT (-83.242294 42.31)	Taylor	NBI	Non-NHS	5780	39	1600102	0.44	2025-07-18T00:00:00	24	A	8	9	6	N
1232	Troy	Metro	7987	""	ROCHESTER RD	RENSHAW COUNTY DRAIN	2.8 MI N OF BIG BEAVER RD	5 Highway-pedestrian	5 Waterway	1979				2	22.5	36.1	2	1 Concrete	19 Culvert	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	2		42.61	-83.12969167	2025-08-18T00:00:00	POINT (-83.12969167 42.61)	Oakland	NBI	NHS	812.25	36	4413538	3.42	2025-04-01T00:00:00	24	A	N	N	N	6
1233	MDOT	Metro	11927	82292-B10	I-275 RAMP	MCCLAUGHERY DRAIN	1 MI SW OF WAYNE	1 Highway	5 Waterway	1974	2012	2012		1	54	37.7	1	3 Steel	32 Multi Str Comp	0	""	""	3 Latex Concrete/Similar	9 MS22.5(HS25)or greater	2		42.25	-83.43692	2025-08-18T00:00:00	POINT (-83.43692 42.25)	Taylor	NBI	NHS	2035.8	34.5	1600510	0.39	2024-10-09T00:00:00	24	A	7	7	7	N
1234	Wayne County	Metro	12133	""	HAGGERTY ROAD	FELLOWS CREEK	CANTON             S/FORD	1 Highway	5 Waterway	1930	1978			1	23	55.4	1	1 Concrete	04 Tee Beam	0	""	""	6 Bituminous	0 Unknown	2		42.31	-83.44851	2025-08-18T00:00:00	POINT (-83.44851 42.31)	Taylor	NBI	Non-NHS	1274.2	51.5	4706524	7.22	2025-03-01T00:00:00	12	A	5	3	4	N
1235	Oakland County	Metro	8143	""	CASS LAKE ROAD	CLINTON RIVER	BET ORCHARD LK AND CASS-E	1 Highway	5 Waterway	2007				1	35.7	40	1	1 Concrete	19 Culvert	0	""	""	6 Bituminous	6 MS18(HS20)+mod	3		42.62	-83.35046	2025-08-18T00:00:00	POINT (-83.35046 42.62)	Oakland	NBI	NHS	1428	40	4407378	0.99	2024-07-24T00:00:00	24	A	N	N	N	8
1236	MDOT	Metro	11597	82123-S49	WARREN AV ENT RAMP	I-96 RAMP	IN DETROIT	1 Highway	1 Highway	1971		2005	2005	2	166.7	27.6	2	3 Steel	82 Pl Girder Comp	0	""	""	3 Latex Concrete/Similar	6 MS18(HS20)+mod	1	2	42.35	-83.097206	2025-08-18T00:00:00	POINT (-83.097206 42.35)	Detroit	NBI	NHS	4600.92	24.6	1582008	0.06	2023-10-25T00:00:00	24	A	5	6	7	N
1237	Wayne County	Metro	12257	""	SALTZ ROAD	FELLOWS CREEK	CANTONE/SHELDON	5 Highway-pedestrian	5 Waterway	1984				3	35.8	36.7	3	3 Steel	19 Culvert	0	""	""	N N/A (no deck (NBI))	5 MS 18 (HS 20)	2		42.32	-83.47009	2025-08-18T00:00:00	POINT (-83.47009 42.32)	Taylor	NBI	Non-NHS	1313.86	36.7	1680609	3.11	2025-03-01T00:00:00	24	A	N	N	N	6
1238	Lincoln Park	Metro	12502	""	FRANK ST	N BR ECORSE RIVER	IN LINCOLN PARK	5 Highway-pedestrian	5 Waterway	1948	1966			1	27.9	38.7	1	1 Concrete	04 Tee Beam	0	""	""	1 Monolithic Concrete	6 MS18(HS20)+mod	2		42.27	-83.18418	2025-08-18T00:00:00	POINT (-83.18418 42.27)	Taylor	NBI	Non-NHS	1079.73	27.9	4710186	0.06	2024-08-20T00:00:00	12	P	5	3	6	N
1239	Wayne County	Metro	12063	""	PLYMOUTH ROAD	MIDDLE ROUGE RIVER	PLYMOUTH TWP   W/HAGGERTY	5 Highway-pedestrian	5 Waterway	1934				1	63	54.5	1	1 Concrete	11 Arch- Deck, Filled Sp	0	""	""	N N/A (no deck (NBI))	0 Unknown	4		42.38	-83.45434	2025-08-18T00:00:00	POINT (-83.45434 42.38)	Taylor	NBI	Non-NHS	3433.5	40	1680408	0.31	2025-05-16T00:00:00	24	A	N	6	7	N
1240	MDOT	Metro	11272	82041-S02	ECORSE RD	US-24	IN TAYLOR	5 Highway-pedestrian	1 Highway	2004				2	150.2	78.6	2	5 Prestressed Concrete	06 Box Bms- Single/Sprd	0	""	""	1 Monolithic Concrete	9 MS22.5(HS25)or greater	4	8	42.26	-83.26999	2025-08-18T00:00:00	POINT (-83.26999 42.26)	Taylor	NBI	Non-NHS	11805.72	56.6	5495384	10.63	2024-08-27T00:00:00	24	A	7	7	7	N
1241	Oakland County	Metro	8188	""	SEYMOUR LAKE RD	PAINT CREEK	BET COATS AND GRANGER RDS	1 Highway	5 Waterway	2006				1	37	43.9	1	5 Prestressed Concrete	05 Box Bm/Gird- Multiple	0	""	""	2 Integral Concrete	5 MS 18 (HS 20)	2		42.82	-83.300575	2025-08-18T00:00:00	POINT (-83.300575 42.82)	Oakland	NBI	Non-NHS	1624.3	40.7	669104	1.69	2024-07-11T00:00:00	24	A	7	8	7	N
1242	MDOT	Metro	11467	82112-S34-8	M-102 (8 MILE RD)	M-10 & RAMPS	IN DETROIT	7 3d level interchg	1 Highway	1965	2009		1995	15	1838.4	92.5	3	4 Steel Continuous	82 Pl Girder Comp	12	3 Steel	82 Pl Girder Comp	3 Latex Concrete/Similar	5 MS 18 (HS 20)	6	21	42.44	-83.200516	2025-08-18T00:00:00	POINT (-83.200516 42.44)	Detroit	NBI	NHS	170052	88	1817406	5.94	2024-03-28T00:00:00	24	A	7	5	6	N
1243	Oakland County	Metro	14612	""	DAVISBURG RD	SHIAWASSEE RIVER	0.52 MI E OF DILLEY RD	1 Highway	5 Waterway	2023				1	36	30.5	1	1 Concrete	19 Culvert	0	""	""	6 Bituminous	B Greater than HL 93	2		42.75	-83.5384	2025-08-18T00:00:00	POINT (-83.5384 42.75)	Oakland	NBI	Non-NHS	1098	30.5	649404	4.86	2024-04-16T00:00:00	24	A	N	N	N	9
1244	Macomb County	Metro	6296	""	BORDMAN ROAD	EAST BRANCH COON CREEK	0.4 MI WEST OF NORTH AVE	1 Highway	5 Waterway	2014				1	37	26.8	1	1 Concrete	19 Culvert	0	""	""	6 Bituminous	B Greater than HL 93	2		42.9	-82.89293	2025-08-18T00:00:00	POINT (-82.89293 42.9)	Macomb	NBI	Non-NHS	991.6	32	824010	1.3	2024-07-22T00:00:00	24	A	N	N	N	8
1245	MDOT	Metro	11457	82112-S28-8	SCHAEFER NW TURN	M-10	IN DETROIT	1 Highway	1 Highway	1964	2000		2000	2	110.7	22.3	2	3 Steel	32 Multi Str Comp	0	""	""	0 None	5 MS 18 (HS 20)	1	6	42.43	-83.180466	2025-08-18T00:00:00	POINT (-83.180466 42.43)	Detroit	NBI	Non-NHS	2468.61	19.2	4718287	0	2025-04-18T00:00:00	24	A	6	6	6	N
1246	MDOT	Metro	7840	63043-S03-1	SQUIRREL RD NB	M-59	PONTIAC TWP SEC 25	1 Highway	1 Highway	1999		2022		4	259.1	55.2	4	5 Prestressed Concrete	05 Box Bm/Gird- Multiple	0	""	""	3 Latex Concrete/Similar	5 MS 18 (HS 20)	3	6	42.64	-83.21964	2025-08-18T00:00:00	POINT (-83.21964 42.64)	Oakland	NBI	Non-NHS	14302.32	51.8	4414558	0.64	2024-09-19T00:00:00	24	A	8	6	7	N
1247	Bingham Farms	Metro	8226	""	BINGHAM ROAD	FRANKLIN BRANCH	0.3 MI N OF 13 MI RD	1 Highway	5 Waterway	1986				1	43	20	1	3 Steel	19 Culvert	0	""	""	6 Bituminous	6 MS18(HS20)+mod	2		42.52	-83.28105	2025-08-18T00:00:00	POINT (-83.28105 42.52)	Oakland	NBI	Non-NHS	860	0	613007	0.29	2025-05-27T00:00:00	24	A	N	N	N	7
1248	MDOT	Metro	6072	50051-S01-2	I-94 CONN SB GRATI	13 MILE RD	IN ROSEVILLE (13 MI RD)	1 Highway	1 Highway	1964	2003			3	133.5	45.6	3	3 Steel	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	9 MS22.5(HS25)or greater	2	4	42.52	-82.91645	2025-08-18T00:00:00	POINT (-82.91645 42.52)	Macomb	NBI	NHS	6087.6	42.4	801509	0.29	2025-06-07T00:00:00	24	A	7	8	7	N
1249	Wayne County	Metro	12154	""	MERRIMAN ROAD	TARABUSI DRAIN	LIVONIA      S/SEVEN MILE	5 Highway-pedestrian	5 Waterway	2022				1	64	78.4	1	5 Prestressed Concrete	05 Box Bm/Gird- Multiple	0	""	""	0 None	B Greater than HL 93	5		42.42	-83.35507	2025-08-18T00:00:00	POINT (-83.35507 42.42)	Taylor	NBI	NHS	5017.6	76	4700000	14.18	2024-12-10T00:00:00	24	A	8	9	9	N
1250	MDOT	Metro	11189	82023-S21	TRUMBULL AVE	I-94	IN DETROIT	5 Highway-pedestrian	1 Highway	2016				2	238.9	84.8	2	4 Steel Continuous	02 Multi Str Non Comp	0	""	""	1 Monolithic Concrete	B Greater than HL 93	4	7	42.36	-83.080986	2025-08-18T00:00:00	POINT (-83.080986 42.36)	Detroit	NBI	Non-NHS	20258.72	69	1577506	2.38	2024-09-23T00:00:00	24	A	7	8	8	N
1251	MDOT	Metro	8087	63174-S20-1	I-75 NB	OLD M-59 (AUBURN RD)	0.5 MI S OF M-59	1 Highway	1 Highway	1964	2001	2001		3	132.9	98.3	3	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	3 Latex Concrete/Similar	6 MS18(HS20)+mod	5	2	42.63	-83.23847	2025-08-18T00:00:00	POINT (-83.23847 42.63)	Oakland	NBI	NHS	13064.07	95.3	647308	18.1	2025-07-10T00:00:00	24	A	6	7	6	N
1252	MDOT	Metro	11866	82252-S30	DAVISON S SERV RD	I-75 RAMP C	IN DETROIT OVER RAMP C	5 Highway-pedestrian	1 Highway	1969	2003		2022	1	99.6	41.7	1	3 Steel	82 Pl Girder Comp	0	""	""	5 Epoxy Overlay	5 MS 18 (HS 20)	2	2	42.41	-83.07653	2025-08-18T00:00:00	POINT (-83.07653 42.41)	Detroit	NBI	Non-NHS	4153.32	28.8	4705657	1.57	2024-04-17T00:00:00	24	A	7	8	8	N
1253	MDOT	Metro	11452	82112-S26	MCNICHOLS RD	M-10	IN DETROIT	5 Highway-pedestrian	1 Highway	1964	2006		2006	2	134.5	128.4	2	3 Steel	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	8	6	42.42	-83.17206	2025-08-18T00:00:00	POINT (-83.17206 42.42)	Detroit	NBI	NHS	17269.8	106	1680701	19.37	2025-04-18T00:00:00	24	A	6	7	7	N
1254	Detroit	Metro	12474	""	MACK AVE	CONRAIL	BETWN CONNER AND ST JEAN	5 Highway-pedestrian	2 Railroad	1989			1989	5	499.3	83.5	5	3 Steel	32 Multi Str Comp	0	""	""	3 Latex Concrete/Similar	5 MS 18 (HS 20)	6		42.38	-82.973206	2025-08-18T00:00:00	POINT (-82.973206 42.38)	Detroit	NBI	NHS	41691.55	71	1587509	4.06	2024-06-27T00:00:00	24	A	5	7	6	N
1255	Wayne County	Metro	12102	""	RAWSONVILLE ROAD	HURON RIVER	VAN BUREN/WASH CO  S/I-94	5 Highway-pedestrian	5 Waterway	1982				3	152.9	71.9	3	5 Prestressed Concrete	05 Box Bm/Gird- Multiple	0	""	""	2 Integral Concrete	6 MS18(HS20)+mod	2		42.21	-83.543434	2025-08-18T00:00:00	POINT (-83.543434 42.21)	Taylor	NBI	Non-NHS	10993.51	49.9	1439105	8.52	2025-03-11T00:00:00	24	A	6	7	6	N
1256	MDOT	Metro	11143	82022-S37	OZGA RD	I-94	4 MI E OF BELLEVILLE	1 Highway	1 Highway	1972			1999	4	429.8	48.2	4	4 Steel Continuous	82 Pl Girder Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	2	9	42.22	-83.40521	2025-08-18T00:00:00	POINT (-83.40521 42.22)	Taylor	NBI	Non-NHS	20716.36	45.9	1673810	9.05	2023-09-07T00:00:00	24	A	6	7	5	N
1257	MDOT	Metro	11431	82112-S06	CLAIRMOUNT AVENUE	M-10	IN DETROIT	5 Highway-pedestrian	1 Highway	1954	1995		1994	2	135.5	88.6	2	4 Steel Continuous	02 Multi Str Non Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	3	8	42.38	-83.09022	2025-08-18T00:00:00	POINT (-83.09022 42.38)	Detroit	NBI	Non-NHS	12005.3	59	1584807	1.03	2025-04-25T00:00:00	24	A	6	7	6	N
1258	Macomb County	Metro	6357	""	25 MILE ROAD	NORTH BRANCH CLINTON R	0.6 MI WEST OF CARD ROAD	1 Highway	5 Waterway	1964		1990	1964	3	99.7	32.8	3	3 Steel	02 Multi Str Non Comp	0	""	""	6 Bituminous	4 M 18 (H 20)	2		42.7	-82.90785	2025-08-18T00:00:00	POINT (-82.90785 42.7)	Macomb	NBI	Non-NHS	3270.16	23.5	4211019	9.53	2025-03-14T00:00:00	24	K	4	1	5	N
1259	Dearborn Height	Metro	12334	""	KINGSTON AVE	ECORSE CREEK	IN DEARBORN HEIGHTS	1 Highway	5 Waterway	1991				1	31.3	25.9	1	1 Concrete	19 Culvert	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	2		42.27	-83.228745	2025-08-18T00:00:00	POINT (-83.228745 42.27)	Taylor	NBI	Non-NHS	810.67	26.1	1646804	0.23	2023-10-24T00:00:00	24	A	N	N	N	7
1260	Wayne County	Metro	12162	""	MIDDLE BELT ROAD	TARABUSI DRAIN	LIVONIA        N/SIX MILE	5 Highway-pedestrian	5 Waterway	1930	1992	1984	1997	1	38.7	72.2	1	4 Steel Continuous	32 Multi Str Comp	0	""	""	6 Bituminous	6 MS18(HS20)+mod	5		42.42	-83.33531	2025-08-18T00:00:00	POINT (-83.33531 42.42)	Taylor	NBI	NHS	2794.14	60	1674403	20.6	2025-05-14T00:00:00	24	A	5	5	5	N
1261	MDOT	Metro	7973	63103-S12	COUZENS ST	I-696	IN MADISON HTS	5 Highway-pedestrian	1 Highway	1972		2002	2002	2	172.5	66.3	2	3 Steel	32 Multi Str Comp	0	""	""	3 Latex Concrete/Similar	5 MS 18 (HS 20)	4	8	42.48	-83.094666	2025-08-18T00:00:00	POINT (-83.094666 42.48)	Oakland	NBI	Non-NHS	11436.75	51.8	647006	0.56	2025-07-18T00:00:00	24	A	6	6	7	N
1262	MDOT	Metro	11926	82292-B09	I-275 NB	MCCLAUGHREY DRAIN	1 MI SW OF WAYNE	1 Highway	5 Waterway	1974		2012		1	54	56.5	1	3 Steel	32 Multi Str Comp	0	""	""	3 Latex Concrete/Similar	9 MS22.5(HS25)or greater	3		42.25	-83.43975	2025-08-18T00:00:00	POINT (-83.43975 42.25)	Taylor	NBI	NHS	3051	53.2	1607208	12.17	2024-10-09T00:00:00	24	A	7	8	7	N
1263	MDOT	Metro	11494	82122-S08	BERWICK RD LFT TRN	I-96	IN LIVONIA	1 Highway	1 Highway	1974	2014	2014	2001	2	176	49.9	2	3 Steel	02 Multi Str Non Comp	0	""	""	3 Latex Concrete/Similar	5 MS 18 (HS 20)	2	10	42.38	-83.35915	2025-08-18T00:00:00	POINT (-83.35915 42.38)	Taylor	NBI	Non-NHS	8782.4	36	4706085	0.02	2024-11-11T00:00:00	24	A	7	6	7	N
1264	MDOT	Metro	6124	50062-S13	BELANGER AVE	I-696	IN ROSEVILLE	5 Highway-pedestrian	1 Highway	1972			2000	2	196	54.4	2	4 Steel Continuous	82 Pl Girder Comp	0	""	""	1 Monolithic Concrete	2 M 13.5 (H 15)	3	8	42.49	-82.96002	2025-08-18T00:00:00	POINT (-82.96002 42.49)	Macomb	NBI	Non-NHS	10662.4	40	805809	0.01	2023-09-22T00:00:00	24	A	5	6	6	N
1265	Macomb County	Metro	6390	""	33 MILE ROAD	HIGHBANK CREEK	0.6 MI EAST OF OMO ROAD	1 Highway	5 Waterway	2014				1	29.8	24	1	1 Concrete	19 Culvert	0	""	""	6 Bituminous	A HL 93	2		42.82	-82.84725	2025-08-18T00:00:00	POINT (-82.84725 42.82)	Macomb	NBI	Non-NHS	715.2	34	4204881	0.82	2024-07-22T00:00:00	24	A	N	N	N	8
1266	MDOT	Metro	6185	50112-S04	CO LINE RD	I-94	ST CLAIR CO LINE	1 Highway	1 Highway	1963		2002	2002	4	268	33.4	4	3 Steel	32 Multi Str Comp	0	""	""	3 Latex Concrete/Similar	4 M 18 (H 20)	2	4	42.73	-82.730576	2025-08-18T00:00:00	POINT (-82.730576 42.73)	Macomb	NBI	Non-NHS	8951.2	26	970206	1.9	2025-06-10T00:00:00	24	A	6	6	7	N
1267	MDOT	Metro	11128	82022-S18	I-94 WB	PELHAM RD	W LTS OF ALLEN PARK	1 Highway	1 Highway	1975	2004			1	125.2	87.7	1	3 Steel	82 Pl Girder Comp	0	""	""	1 Monolithic Concrete	9 MS22.5(HS25)or greater	4	4	42.27	-83.23172	2025-08-18T00:00:00	POINT (-83.23172 42.27)	Taylor	NBI	NHS	10980.04	84.3	1588802	16.72	2024-11-26T00:00:00	24	A	6	7	6	N
1268	MDOT	Metro	7806	63022-S11	DRAKE RD	M-5	4.0 MI NW OF WAYNE CO LIN	1 Highway	1 Highway	1957	2001		2001	2	136	34.1	2	3 Steel	02 Multi Str Non Comp	0	""	""	1 Monolithic Concrete	2 M 13.5 (H 15)	2	4	42.46	-83.395676	2025-08-18T00:00:00	POINT (-83.395676 42.46)	Oakland	NBI	Non-NHS	4637.6	27.5	633804	0.31	2023-10-19T00:00:00	24	A	7	7	7	N
1269	MDOT	Metro	8080	63174-S15-2	I-75 SB	SQUARE LAKE RD	IN TROY	1 Highway	1 Highway	2017				1	147.9	85.8	1	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	B Greater than HL 93	5	2	42.61	-83.2057	2025-08-18T00:00:00	POINT (-83.2057 42.61)	Oakland	NBI	NHS	12689.82	82.5	646106	15.14	2023-12-08T00:00:00	24	A	8	7	8	N
1270	Wayne County	Metro	12128	""	HAGGERTY ROAD	DESBROWDRAIN	SUMPTER  N/OAKVILLE-WALTZ	1 Highway	5 Waterway	1988	1997		1997	2	21	20	2	1 Concrete	19 Culvert	0	""	""	N N/A (no deck (NBI))	9 MS22.5(HS25)or greater	2		42.09	-83.44079444	2025-08-18T00:00:00	POINT (-83.44079444 42.09)	Taylor	NBI	Non-NHS	420	62	1670604	0.22	2024-07-23T00:00:00	24	A	N	N	N	8
1271	MDOT	Metro	11111	82022-S02	I-94 EB	WAYNE RD	4.3 MI W OF TAYLOR	1 Highway	1 Highway	1962	1996		1996	3	140.5	59.9	3	3 Steel	32 Multi Str Comp	0	""	""	5 Epoxy Overlay	9 MS22.5(HS25)or greater	4	4	42.23	-83.385574	2025-08-18T00:00:00	POINT (-83.385574 42.23)	Taylor	NBI	NHS	8415.95	56.6	1576405	8.18	2024-08-09T00:00:00	24	A	6	6	7	N
1272	MDOT	Metro	11962	82293-R04-1	I-275 NB	CSX RR	S OF SCHOOLCRAFT	1 Highway	2 Railroad	1971		2024	2001	4	296	56.8	4	3 Steel	82 Pl Girder Comp	0	""	""	6 Bituminous	5 MS 18 (HS 20)	3		42.38	-83.436676	2025-08-18T00:00:00	POINT (-83.436676 42.38)	Taylor	NBI	NHS	16812.8	53.3	1607208	21.36	2024-10-31T00:00:00	24	A	6	7	7	N
1273	Oakland County	Metro	8141	""	WIXOM ROAD	HURON RIVER	NORTH OF GARDEN	1 Highway	5 Waterway	2018				1	62	43.3	1	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	B Greater than HL 93	2		42.57	-83.55982	2025-08-18T00:00:00	POINT (-83.55982 42.57)	Oakland	NBI	Non-NHS	2684.6	40	631910	4.48	2024-06-06T00:00:00	24	A	8	8	8	N
1274	MDOT	Metro	11619	82141-B01	M-102 EB	ROUGE RIVER	0.1 MI W OF US-24	5 Highway-pedestrian	5 Waterway	1931	1987			1	70	72.5	1	5 Prestressed Concrete	02 Multi Str Non Comp	0	""	""	5 Epoxy Overlay	6 MS18(HS20)+mod	5		42.44	-83.28131	2025-08-18T00:00:00	POINT (-83.28131 42.44)	Detroit	NBI	NHS	5075	69	1817406	2.03	2024-09-24T00:00:00	24	A	7	7	6	N
1275	Oakland County	Metro	8190	""	OAKWOOD	KEARSLEY DRAIN	EAST OF ORTONVILLE	1 Highway	5 Waterway	1974				2	27.9	27.9	2	3 Steel	19 Culvert	0	""	""	6 Bituminous	6 MS18(HS20)+mod	2		42.86	-83.4516	2025-08-18T00:00:00	POINT (-83.4516 42.86)	Oakland	NBI	Non-NHS	778.41	22	4410182	3.96	2024-07-23T00:00:00	24	A	N	N	N	6
1276	MDOT	Metro	11718	82194-B01-6	I-75 SB ON RAMP	ROUGE RIVER & PLEASANT S	IN DETROIT	1 Highway	1 Highway	1967	2018		2003	10	601	28.2	10	3 Steel	82 Pl Girder Comp	0	""	""	1 Monolithic Concrete	6 MS18(HS20)+mod	1	4	42.29	-83.128365	2025-08-18T00:00:00	POINT (-83.128365 42.29)	Detroit	NBI	NHS	16948.2	25	1592506	0.2	2024-05-05T00:00:00	24	A	7	6	6	N
1277	MDOT	Metro	8133	63192-S04-1	M-5 NB MAINLINE	12 MILE RD	I-96,I-696,M-5 INTRCHG	1 Highway	1 Highway	1993				2	208.8	63.3	2	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	9 MS22.5(HS25)or greater	3	8	42.5	-83.446266	2025-08-18T00:00:00	POINT (-83.446266 42.5)	Oakland	NBI	NHS	13217.04	59.7	4402006	4.08	2025-03-07T00:00:00	24	A	7	7	7	N
1278	MDOT	Metro	7797	63022-S02-3	I-96EB	MILFORD RD	1.9 MI E OF LIVINGSTON CO	1 Highway	1 Highway	1957	2011		1994	3	171.2	85.4	3	3 Steel	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	4	4	42.52	-83.61615	2025-08-18T00:00:00	POINT (-83.61615 42.52)	Oakland	NBI	NHS	14620.48	82.1	657303	2.85	2024-11-18T00:00:00	24	A	7	6	7	N
1279	Wayne County	Metro	12213	""	PARKE LANE ROAD	THOROFARE CH(GROSSE ILE)	GROSSE ILETWP S/BRIDGE ST	5 Highway-pedestrian	5 Waterway	1930		2002		3	96	51.5	3	2 Concrete Continuous	04 Tee Beam	0	""	""	6 Bituminous	5 MS 18 (HS 20)	2		42.17	-83.143745	2025-08-18T00:00:00	POINT (-83.143745 42.17)	Taylor	NBI	Non-NHS	4944	36	1691807	1.6	2025-03-03T00:00:00	12	K	N	3	5	N
1280	Novi	Metro	8248	""	CRANBROOKE DRIVE	COURTER DITCH	0.1 MI S OF TEN MILE RD	5 Highway-pedestrian	5 Waterway	1974				1	42	76	1	5 Prestressed Concrete	04 Tee Beam	0	""	""	9 Other	6 MS18(HS20)+mod	2		42.47	-83.44281	2025-08-18T00:00:00	POINT (-83.44281 42.47)	Oakland	NBI	Non-NHS	3192	40	4403785	0.93	2024-09-27T00:00:00	24	A	6	5	6	N
1281	Oakland County	Metro	8173	""	NOVI	ROUGE RIVER	N OF BASE LINE RELOCATION	1 Highway	5 Waterway	1959				3	40	38.1	3	3 Steel	19 Culvert	0	""	""	N N/A (no deck (NBI))	6 MS18(HS20)+mod	2		42.44	-83.4761	2025-08-18T00:00:00	POINT (-83.4761 42.44)	Oakland	NBI	NHS	1524	237.9	621910	4.67	2024-06-26T00:00:00	24	A	N	N	N	5
1282	MDOT	Metro	13355	82022-S50-5	I-94 WB RAMP	I-94EB RMP B TO M-39 NB	RAMP TO NB M39	1 Highway	1 Highway	1985				1	72.8	47.9	1	5 Prestressed Concrete	02 Multi Str Non Comp	0	""	""	5 Epoxy Overlay	9 MS22.5(HS25)or greater	2	1	42.27	-83.22196	2025-08-18T00:00:00	POINT (-83.22196 42.27)	Taylor	NBI	NHS	3487.12	44	1580309	0.23	2024-11-13T00:00:00	24	A	7	7	7	N
1283	Oakland County	Metro	14345	""	SPRUCE DR	TRIB TO HURON RIVER	2 MI NE OF WALLED LAKE	1 Highway	5 Waterway	1994				3	24.5	29.9	3	1 Concrete	19 Culvert	0	""	""	6 Bituminous	0 Unknown	2		42.56	-83.468	2025-08-18T00:00:00	POINT (-83.468 42.56)	Oakland	NBI	Non-NHS	732.55	29.9	4403000	0.38	2025-06-24T00:00:00	24	A	N	N	N	7
1284	Southfield	Metro	8291	""	NINE MILE RD	EVANS BRANCH OF ROUGE RI	IN SOUTHFIELD	5 Highway-pedestrian	5 Waterway	2019				1	124	63	1	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	B Greater than HL 93	3		42.46	-83.267395	2025-08-18T00:00:00	POINT (-83.267395 42.46)	Oakland	NBI	Non-NHS	7812	42	684404	2.56	2023-09-18T00:00:00	24	A	8	9	8	N
1285	MDOT	Metro	13315	82194-S32	TRK RMP FRM TP	I-75 AND I-96	AMBASSADOR GATEWAY	1 Highway	1 Highway	2007			2007	7	790.9	41.5	7	4 Steel Continuous	82 Pl Girder Comp	0	""	""	2 Integral Concrete	9 MS22.5(HS25)or greater	2		42.32	-83.0816	2025-08-18T00:00:00	POINT (-83.0816 42.32)	Detroit	NBI	NHS	32822.35	38	4718920	0.06	2024-06-27T00:00:00	24	A	6	8	8	N
1286	MDOT	Metro	11746	82194-S17	VERNOR AVE	I-75	IN DETROIT	5 Highway-pedestrian	1 Highway	2007				4	315.5	80.4	4	4 Steel Continuous	32 Multi Str Comp	0	""	""	2 Integral Concrete	5 MS 18 (HS 20)	5	11	42.33	-83.08369	2025-08-18T00:00:00	POINT (-83.08369 42.33)	Detroit	NBI	NHS	25366.2	58	1581909	3.45	2023-11-30T00:00:00	24	A	7	7	8	N
1287	MDOT	Metro	11645	82191-S04	GIBRALTAR RD	I-75	0.7 MI N OF M-85	5 Highway-pedestrian	1 Highway	1971			2006	2	233	93.7	2	3 Steel	02 Multi Str Non Comp	0	""	""	5 Epoxy Overlay	5 MS 18 (HS 20)	4	8	42.1	-83.24155	2025-08-18T00:00:00	POINT (-83.24155 42.1)	Taylor	NBI	Non-NHS	21832.1	80	1692303	2.48	2024-07-12T00:00:00	24	A	5	6	6	N
1288	MDOT	Metro	11148	82022-S43-6	M-39 SB RAMP K	I-94	IN ALLEN PARK	1 Highway	1 Highway	1984		2004		15	1567.3	35.8	5	6 Prestr Conc Contin	21 Segmental Box	10	5 Prestressed Concrete	32 Multi Str Comp	5 Epoxy Overlay	9 MS22.5(HS25)or greater	2	11	42.27	-83.2223	2025-08-18T00:00:00	POINT (-83.2223 42.27)	Taylor	NBI	NHS	56109.34	32	1580306	0.13	2024-08-17T00:00:00	24	A	6	6	6	N
1289	MDOT	Metro	11499	82122-S13	CARDWELL RD	I-96	IN LIVONIA	5 Highway-pedestrian	1 Highway	1971	2014	2014	2001	2	177.5	48.4	2	3 Steel	02 Multi Str Non Comp	0	""	""	3 Latex Concrete/Similar	4 M 18 (H 20)	2	10	42.38	-83.31874	2025-08-18T00:00:00	POINT (-83.31874 42.38)	Taylor	NBI	Non-NHS	8591	34	1606402	0.01	2024-09-16T00:00:00	24	A	7	7	7	N
1290	MDOT	Metro	7888	63081-S15-3	NORTHLAND DR EB	M-10	IN SOUTHFIELD	1 Highway	1 Highway	1965	2000		2001	3	163.3	34.1	3	3 Steel	32 Multi Str Comp	0	""	""	3 Latex Concrete/Similar	4 M 18 (H 20)	2	10	42.45	-83.20509	2025-08-18T00:00:00	POINT (-83.20509 42.45)	Oakland	NBI	Non-NHS	5568.53	27.9	688308	0.34	2024-08-06T00:00:00	24	A	7	7	7	N
1291	MDOT	Metro	11248	82025-S04	SB CONNER AVE	I-94	IN DETROIT	5 Highway-pedestrian	1 Highway	1958	1996		1996	4	217.9	59.7	4	3 Steel	02 Multi Str Non Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	4	8	42.4	-82.98908	2025-08-18T00:00:00	POINT (-82.98908 42.4)	Detroit	NBI	NHS	13008.63	47.6	1578005	0.21	2023-11-28T00:00:00	24	A	6	7	5	N
1292	MDOT	Metro	8041	63174-B02-1	I-75 NB	RED RUN DRAIN PATH	IN MADISON HTS	1 Highway	3 Pedestrian-bicycle	2022			2022	1	225	97.8	1	3 Steel	82 Pl Girder Comp	0	""	""	1 Monolithic Concrete	B Greater than HL 93	5		42.51	-83.11478	2025-08-18T00:00:00	POINT (-83.11478 42.51)	Oakland	NBI	NHS	22005	94.5	647308	4.49	2025-04-16T00:00:00	24	A	8	8	7	N
1293	MDOT	Metro	13533	50011-C02	M-53	MOORES DRAIN	JUST S OF 17 MILE RD	1 Highway	5 Waterway	1988				2	24	100	2	1 Concrete	19 Culvert	0	""	""	1 Monolithic Concrete	0 Unknown	6		42.58	-83.03028	2025-08-18T00:00:00	POINT (-83.03028 42.58)	Macomb	NBI	NHS	2400		4210208	2.28	2024-10-18T00:00:00	24	A	N	N	N	7
1294	MDOT	Metro	11841	82252-S01	PIQUETTE	I-75	IN DETROIT	5 Highway-pedestrian	1 Highway	1966		2007	1998	4	219	68	4	3 Steel	32 Multi Str Comp	0	""	""	6 Bituminous	5 MS 18 (HS 20)	2	10	42.37	-83.05877	2025-08-18T00:00:00	POINT (-83.05877 42.37)	Detroit	NBI	Non-NHS	14892	45.9	1585704	0.65	2024-04-29T00:00:00	24	A	4	4	7	N
1295	MDOT	Metro	7890	63081-S16	LEFT TURN STRUCT	M-10	IN SOUTHFIELD	1 Highway	1 Highway	1965	2006		2006	2	110.1	22.7	2	3 Steel	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	4 M 18 (H 20)	1	6	42.45	-83.21303	2025-08-18T00:00:00	POINT (-83.21303 42.45)	Oakland	NBI	Non-NHS	2499.27	20.3	4409126	0	2025-06-12T00:00:00	24	A	7	6	6	N
1296	MDOT	Metro	11911	82291-S15	I-275 NB	S HURON RIVER DRIVE	IN ROMULUS	1 Highway	1 Highway	1974			2009	1	137.5	56.5	1	3 Steel	82 Pl Girder Comp	0	""	""	1 Monolithic Concrete	9 MS22.5(HS25)or greater	3	2	42.21	-83.40477	2025-08-18T00:00:00	POINT (-83.40477 42.21)	Taylor	NBI	NHS	7768.75	53.2	1607208	8.72	2023-09-19T00:00:00	24	A	7	7	6	N
1297	MDOT	Metro	11403	82111-S16	GRAND RIVER AVE	M-10	IN DETROIT	5 Highway-pedestrian	1 Highway	1953	1996	1996	1996	2	160.4	162.4	2	4 Steel Continuous	02 Multi Str Non Comp	0	""	""	6 Bituminous	5 MS 18 (HS 20)	10	6	42.34	-83.06612	2025-08-18T00:00:00	POINT (-83.06612 42.34)	Detroit	NBI	NHS	26048.96	160.4	1598402	0.03	2024-08-14T00:00:00	24	A	6	5	5	N
1298	MDOT	Metro	6047	50022-B01	M-59 EB	GLOEDE DRAIN	3.1 MI E OF M-53	1 Highway	5 Waterway	1993				1	42	65	1	1 Concrete	19 Culvert	0	""	""	6 Bituminous	9 MS22.5(HS25)or greater	4		42.63	-82.95147	2025-08-18T00:00:00	POINT (-82.95147 42.63)	Macomb	NBI	NHS	2730	0	820202	4.17	2023-12-19T00:00:00	24	A	N	N	N	7
1299	MDOT	Metro	11633	82191-C03	I-75 & M-85 NB	SMITH CREEK	1.5 MI N OF N HURON RI DR	1 Highway	5 Waterway	2008				1	22.4	99.9	1	1 Concrete	19 Culvert	0	""	""	1 Monolithic Concrete	B Greater than HL 93	7		42.08	-83.24221	2025-08-18T00:00:00	POINT (-83.24221 42.08)	Taylor	NBI	NHS	2237.76	0	1592010	1.21	2024-07-26T00:00:00	24	A	N	N	N	7
1300	MDOT	Metro	11691	82192-S13	FITZPATRICK AVE	M-39	IN DETROIT	5 Highway-pedestrian	1 Highway	1963	2010		1996	2	108.5	40.7	2	4 Steel Continuous	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	6 MS18(HS20)+mod	2	6	42.36	-83.21636	2025-08-18T00:00:00	POINT (-83.21636 42.36)	Detroit	NBI	Non-NHS	4415.95	31.8	1594809	0.01	2023-12-14T00:00:00	24	A	7	6	7	N
1301	MDOT	Metro	11284	82052-R01	US-24	CONRAIL	4.5 MI N OF FLAT ROCK	1 Highway	2 Railroad	1935	1983	1983	1983	3	164.7	61.7	3	3 Steel	32 Multi Str Comp	0	""	""	2 Integral Concrete	4 M 18 (H 20)	4		42.18	-83.267044	2025-08-18T00:00:00	POINT (-83.267044 42.18)	Taylor	NBI	NHS	10161.99	57.7	4700038	6.16	2023-08-28T00:00:00	24	A	6	6	5	N
1302	MDOT	Metro	11815	82251-S14	MACK AVE	I-75	IN DETROIT	5 Highway-pedestrian	1 Highway	1961	2007		2007	4	205.5	151	4	3 Steel	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	6 MS18(HS20)+mod	10	8	42.35	-83.04781	2025-08-18T00:00:00	POINT (-83.04781 42.35)	Detroit	NBI	NHS	31030.5	124.6	4707551	0.78	2023-11-18T00:00:00	24	A	7	7	7	N
1303	MDOT	Metro	11526	82122-S38	FARMINGTON LFT TRN	I-96	IN LIVONIA	1 Highway	1 Highway	1974		2001	2001	2	176	23.7	2	3 Steel	02 Multi Str Non Comp	0	""	""	5 Epoxy Overlay	5 MS 18 (HS 20)	2	8	42.38	-83.374176	2025-08-18T00:00:00	POINT (-83.374176 42.38)	Taylor	NBI	Non-NHS	4171.2	18	1606303	0.15	2024-11-11T00:00:00	24	A	7	7	7	N
1304	MDOT	Metro	11863	82252-S27	MEADE ST	I-75	IN DETROIT	5 Highway-pedestrian	1 Highway	1969	2021	2003	2021	2	182.7	48.4	2	4 Steel Continuous	82 Pl Girder Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	2	10	42.41	-83.07523	2025-08-18T00:00:00	POINT (-83.07523 42.41)	Detroit	NBI	Non-NHS	8842.68	30	4700033	0.01	2024-04-09T00:00:00	24	A	9	7	6	N
1305	Wayne County	Metro	12117	""	GRISWOLD STREET	CSX RR	NORTHVILLE    S/BASE LINE	5 Highway-pedestrian	2 Railroad	2001		2001		1	64	48.2	1	5 Prestressed Concrete	05 Box Bm/Gird- Multiple	0	""	""	5 Epoxy Overlay	9 MS22.5(HS25)or greater	2		42.44	-83.47618	2025-08-18T00:00:00	POINT (-83.47618 42.44)	Taylor	NBI	Non-NHS	3084.8	34.2	1680204	0.5	2025-03-01T00:00:00	24	A	6	7	7	N
1306	Wayne County	Metro	12520	""	ELIZABETH STREET	LOWER ROUGE RIVER & PKWY	WAYNE      N/MICHIGAN AVE	5 Highway-pedestrian	5 Waterway	1956				2	145	47.9	2	1 Concrete	07 Frame- Rigid exc Culv	0	""	""	2 Integral Concrete	6 MS18(HS20)+mod	2		42.29	-83.38871	2025-08-18T00:00:00	POINT (-83.38871 42.29)	Taylor	NBI	Non-NHS	6945.5	36.1	1599304	0.85	2024-09-04T00:00:00	12	P	4	6	6	N
1307	MDOT	Metro	8024	63172-S19	I-75 RAMP C	I-75 RAMP C & I-75	I-75 @ CHRYSLER DR.	1 Highway	1 Highway	1990				5	547.2	49.2	3	4 Steel Continuous	82 Pl Girder Comp	2	3 Steel	82 Pl Girder Comp	5 Epoxy Overlay	5 MS 18 (HS 20)	1	9	42.66	-83.23925	2025-08-18T00:00:00	POINT (-83.23925 42.66)	Oakland	NBI	NHS	26922.24	46	1920510	0.16	2025-07-24T00:00:00	24	A	6	6	7	N
1308	Wayne County	Metro	12037	""	GODDARD ROAD	SEXTON KILFOIL DRAIN	ALLEN PARK  E/OLD GODDARD	5 Highway-pedestrian	5 Waterway	2021				1	77.6	64.75	1	5 Prestressed Concrete	32 Multi Str Comp	0	1 Concrete	00 Other	0 None	B Greater than HL 93	2		42.23	-83.20691	2025-08-18T00:00:00	POINT (-83.20691 42.23)	Taylor	NBI	Non-NHS	5024.6	50	1578601	5.52	2023-10-23T00:00:00	24	A	8	8	8	N
1309	MDOT	Metro	11810	82251-S09-3	M-3 EB  CONN	I-375 & I-75 RAMP	IN DETROIT OVER I-375 NW	1 Highway	1 Highway	1964	1998		1998	1	38.7	56.8	1	3 Steel	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	6 MS18(HS20)+mod	3	1	42.34	-83.04223	2025-08-18T00:00:00	POINT (-83.04223 42.34)	Detroit	NBI	NHS	2198.16	53.1	1592010	24.41	2024-03-27T00:00:00	24	A	7	6	6	N
1310	MDOT	Metro	11977	82293-S14	SB TO EB I-96	M-14 WB	W LIMITS OF LIVONIA	1 Highway	1 Highway	1971		2001	2001	3	276	43.6	3	3 Steel	82 Pl Girder Comp	0	""	""	3 Latex Concrete/Similar	5 MS 18 (HS 20)	2	3	42.39	-83.43155	2025-08-18T00:00:00	POINT (-83.43155 42.39)	Taylor	NBI	NHS	12033.6	40.5	1606201	0.76	2024-10-30T00:00:00	24	A	6	6	6	N
1311	Oakland County	Metro	8156	""	ORION RD	PAINT CREEK	AT SNELL RD	1 Highway	5 Waterway	1996				1	41	59.3	1	5 Prestressed Concrete	05 Box Bm/Gird- Multiple	0	""	""	2 Integral Concrete	4 M 18 (H 20)	3		42.73	-83.15944	2025-08-18T00:00:00	POINT (-83.15944 42.73)	Oakland	NBI	Non-NHS	2431.3	56.2	604708	2.58	2024-09-13T00:00:00	24	A	6	7	6	N
1312	Oakland County	Metro	13957	""	PUTNUAM DRIVE	WALNUT LAKE CANAL	0.2 MI N OF WALNUT LK RD	1 Highway	5 Waterway	2017				1	26	22	1	7 Timber	01 Slab	0	""	""	6 Bituminous	B Greater than HL 93	2		42.56	-83.32797	2025-08-18T00:00:00	POINT (-83.32797 42.56)	Oakland	NBI	Non-NHS	572	20	623005	0.71	2024-06-28T00:00:00	24	A	8	8	7	N
1313	MDOT	Metro	11504	82122-S18	FENTON ST	I-96	IN REDFORD TWP	5 Highway-pedestrian	1 Highway	1974	2014		2001	2	206.5	48.4	2	3 Steel	02 Multi Str Non Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	2	10	42.39	-83.280815	2025-08-18T00:00:00	POINT (-83.280815 42.39)	Taylor	NBI	Non-NHS	9994.6	30	1606408	0.29	2024-09-16T00:00:00	24	A	7	7	8	N
1314	Wayne County	Metro	12189	""	TOLEDO ROAD	ALLEN ROAD	BRWNTWNS/PENNSYLVANIA	1 Highway	1 Highway	1959	2019		2019	3	197.8	91.5	3	3 Steel	82 Pl Girder Comp	0	""	""	1 Monolithic Concrete	6 MS18(HS20)+mod	4	4	42.18	-83.22784	2025-08-18T00:00:00	POINT (-83.22784 42.18)	Taylor	NBI	NHS	18098.7	84	1688707	1.08	2025-03-05T00:00:00	24	A	8	5	5	N
1315	MDOT	Metro	11801	82251-S03	I-75 N TO I-375 N	I-375	IN DETROIT OVER I-375	1 Highway	1 Highway	1964			2007	5	397.5	38.4	5	3 Steel	02 Multi Str Non Comp	0	""	""	5 Epoxy Overlay	6 MS18(HS20)+mod	2	9	42.34	-83.04338	2025-08-18T00:00:00	POINT (-83.04338 42.34)	Detroit	NBI	NHS	15264	34.4	1585602	0.13	2024-03-15T00:00:00	24	A	5	7	6	N
1316	Wayne County	Metro	12086	""	SIX MILE ROAD	MIDDLE ROUGE RIVER	NORTHVILLE T W/NORTHV RD	5 Highway-pedestrian	5 Waterway	1933		1994		1	59.7	55.8	1	1 Concrete	07 Frame- Rigid exc Culv	0	0 Other	00 Other	6 Bituminous	4 M 18 (H 20)	2		42.41	-83.470825	2025-08-18T00:00:00	POINT (-83.470825 42.41)	Taylor	NBI	Non-NHS	3331.26	40	1680701	4.07	2025-05-12T00:00:00	24	P	5	5	6	N
1317	MDOT	Metro	11846	82252-S06	7 MI RD NB LEFT TU	I-75	IN DETROIT	1 Highway	1 Highway	2003				4	216.3	24	4	5 Prestressed Concrete	06 Box Bms- Single/Sprd	0	""	""	1 Monolithic Concrete	6 MS18(HS20)+mod	1	8	42.43	-83.0948	2025-08-18T00:00:00	POINT (-83.0948 42.43)	Detroit	NBI	Non-NHS	5191.2	20.7	1585910	0.02	2024-04-19T00:00:00	24	A	7	6	7	N
1318	MDOT	Metro	11820	82251-S19	FERRY AVE	I-94 E&W RMPS TO I-75 S	IN DETROIT	5 Highway-pedestrian	1 Highway	1962	1999	1985	2002	3	107	67.9	3	3 Steel	32 Multi Str Comp	0	""	""	3 Latex Concrete/Similar	6 MS18(HS20)+mod	4	2	42.36	-83.057335	2025-08-18T00:00:00	POINT (-83.057335 42.36)	Detroit	NBI	Non-NHS	7265.3	44	1585703	0.56	2023-12-13T00:00:00	24	A	7	6	5	N
1319	Macomb County	Metro	6211	""	24 MILE ROAD	NEWLAND DRAIN	0.5 MI WEST OF SHELBY RD	1 Highway	5 Waterway	1965				3	31.1	43	3	3 Steel	19 Culvert	0	""	""	N N/A (no deck (NBI))	4 M 18 (H 20)	2		42.68	-83.07715	2025-08-18T00:00:00	POINT (-83.07715 42.68)	Macomb	NBI	Non-NHS	1337.3	43.8	815510	0.86	2024-10-04T00:00:00	12	A	N	N	N	3
1320	MDOT	Metro	7861	63052-B01-1	US-24 NB	CLINTON RIVER	IN PONTIAC	1 Highway	5 Waterway	1957		2005		2	43	62.3	2	2 Concrete Continuous	01 Slab	0	""	""	3 Latex Concrete/Similar	5 MS 18 (HS 20)	3		42.62	-83.324524	2025-08-18T00:00:00	POINT (-83.324524 42.62)	Oakland	NBI	NHS	2678.9	53.8	710110	3.26	2025-03-07T00:00:00	24	A	6	5	7	N
1321	MDOT	Metro	11669	82191-S25	I-75 RAMP D SB	TOLEDO DIX HWY & RAMP C	IN LINCOLN PARK	1 Highway	1 Highway	1966	2002		2002	4	442.9	33.8	4	4 Steel Continuous	82 Pl Girder Comp	0	""	""	1 Monolithic Concrete	9 MS22.5(HS25)or greater	1	7	42.24	-83.19444	2025-08-18T00:00:00	POINT (-83.19444 42.24)	Taylor	NBI	NHS	14970.02	30.5	1595207	0.08	2024-07-02T00:00:00	24	A	7	7	7	N
1322	Rochester	Metro	8276	""	DIVERSION ST	CLINTON RIVER	WEST & BELOW ROCHESTER RD	5 Highway-pedestrian	5 Waterway	1985				1	71.9	40.7	1	5 Prestressed Concrete	05 Box Bm/Gird- Multiple	0	""	""	3 Latex Concrete/Similar	6 MS18(HS20)+mod	2		42.68	-83.13434	2025-08-18T00:00:00	POINT (-83.13434 42.68)	Oakland	NBI	Non-NHS	2926.33	29.9	678604	0.08	2024-09-25T00:00:00	24	A	6	6	8	N
1323	MDOT	Metro	7919	63102-S03	LAHSER ROAD	I-696	CITY OF SOUTHFIELD	5 Highway-pedestrian	1 Highway	1984				3	240.2	106.7	3	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	9 MS22.5(HS25)or greater	5	8	42.49	-83.2613	2025-08-18T00:00:00	POINT (-83.2613 42.49)	Oakland	NBI	Non-NHS	25629.34	88	685510	2.91	2024-07-18T00:00:00	24	A	6	6	5	N
1324	Oakland County	Metro	8212	""	LANSDOWNE RD	WILLIAMS LAKE CANAL	N OF HATCHERY RD	1 Highway	5 Waterway	1990		2018		1	24.9	37.4	1	5 Prestressed Concrete	05 Box Bm/Gird- Multiple	0	""	""	6 Bituminous	6 MS18(HS20)+mod	2		42.68	-83.41675	2025-08-18T00:00:00	POINT (-83.41675 42.68)	Oakland	NBI	Non-NHS	931.26	34	696504	0.07	2024-07-23T00:00:00	24	A	5	5	7	N
1325	Oakland County	Metro	13593	""	SECORD LAKE ROAD	EAST CREEK	0.6 MI N OF LEONARD ROAD	1 Highway	5 Waterway	1990		2018		1	30	21	1	5 Prestressed Concrete	05 Box Bm/Gird- Multiple	0	""	""	6 Bituminous	5 MS 18 (HS 20)	2		42.87	-83.11244	2025-08-18T00:00:00	POINT (-83.11244 42.87)	Oakland	NBI	Non-NHS	630	20	604103	0.56	2024-09-13T00:00:00	24	A	6	5	6	N
1326	MDOT	Metro	11253	82025-S09-1	OUTER DRIVE NB	I-94	IN DETROIT	5 Highway-pedestrian	1 Highway	1959	2001		2000	4	166.2	62.3	4	3 Steel	02 Multi Str Non Comp	0	""	""	5 Epoxy Overlay	5 MS 18 (HS 20)	4	6	42.41	-82.95997	2025-08-18T00:00:00	POINT (-82.95997 42.41)	Detroit	NBI	Non-NHS	10354.26	47.9	1578104	0.24	2024-06-17T00:00:00	24	A	6	7	7	N
1327	Pontiac	Metro	8259	""	UNIVERSITY DRIVE	GRAND TRUNK WESTERN RR	1 1/2 MI W UNIVER & I-75	5 Highway-pedestrian	2 Railroad	1991				3	146	78.7	3	5 Prestressed Concrete	05 Box Bm/Gird- Multiple	0	""	""	5 Epoxy Overlay	5 MS 18 (HS 20)	5		42.66	-83.25984	2025-08-18T00:00:00	POINT (-83.25984 42.66)	Oakland	NBI	NHS	11490.2	64	624301	2.07	2024-10-17T00:00:00	24	A	8	6	6	N
1328	MDOT	Metro	11623	82141-S01-4	M-102 WB	US-24	@ US-24, TELEGRAPH RD	1 Highway	1 Highway	1967	2002			4	225.5	73.4	4	5 Prestressed Concrete	06 Box Bms- Single/Sprd	0	""	""	1 Monolithic Concrete	9 MS22.5(HS25)or greater	5	10	42.44	-83.27822	2025-08-18T00:00:00	POINT (-83.27822 42.44)	Detroit	NBI	NHS	16551.7	70.2	640807	2.2	2023-11-15T00:00:00	24	A	7	7	6	N
1329	Wayne County	Metro	11983	""	WILLOW ROAD	SWAN CREEK	HURON T           W/WALTZ	1 Highway	5 Waterway	1982		1995		1	37.7	46.9	1	5 Prestressed Concrete	05 Box Bm/Gird- Multiple	0	0 Other	00 Other	6 Bituminous	9 MS22.5(HS25)or greater	2		42.12	-83.40526	2025-08-18T00:00:00	POINT (-83.40526 42.12)	Taylor	NBI	Non-NHS	1768.13	43	1670406	9.44	2024-07-23T00:00:00	24	A	7	7	6	N
1330	MDOT	Metro	11315	82062-S03	GREENFIELD RD	US-12	IN DEARBORN	5 Highway-pedestrian	1 Highway	1961	2007			4	170.5	143	4	5 Prestressed Concrete	06 Box Bms- Single/Sprd	0	""	""	1 Monolithic Concrete	9 MS22.5(HS25)or greater	9	6	42.32	-83.19484	2025-08-18T00:00:00	POINT (-83.19484 42.32)	Taylor	NBI	NHS	24381.5	124.6	1651002	3.42	2024-10-28T00:00:00	24	A	7	7	7	N
1331	Birmingham	Metro	8231	""	ADAMS RD	GRAND TRUNK RR	1 MI N OF M-1 (WOODWARD)	5 Highway-pedestrian	2 Railroad	2006				2	166.6	66	2	5 Prestressed Concrete	05 Box Bm/Gird- Multiple	0	""	""	1 Monolithic Concrete	9 MS22.5(HS25)or greater	4		42.56	-83.20629	2025-08-18T00:00:00	POINT (-83.20629 42.56)	Oakland	NBI	NHS	10995.6	52.2	4415861	1.39	2024-10-24T00:00:00	24	A	7	7	7	N
1332	MDOT	Metro	8033	63173-S03	I-75 NB	US-24	@ US-24	1 Highway	1 Highway	1962		2003	2003	3	196.5	65.2	3	3 Steel	82 Pl Girder Comp	0	""	""	5 Epoxy Overlay	6 MS18(HS20)+mod	4	5	42.74	-83.453636	2025-08-18T00:00:00	POINT (-83.453636 42.74)	Oakland	NBI	NHS	12811.8	61.7	647308	33.89	2024-12-26T00:00:00	24	A	6	7	7	N
1333	Sterling Heights	Metro	6428	""	RYAN RD	PLUM BROOK DRAIN	NORTH OF 18.5 MILE RD	5 Highway-pedestrian	5 Waterway	1999				1	32	55.1	1	1 Concrete	19 Culvert	0	""	""	N N/A (no deck (NBI))	9 MS22.5(HS25)or greater	5		42.6	-83.07109	2025-08-18T00:00:00	POINT (-83.07109 42.6)	Macomb	NBI	Non-NHS	1763.2	0	799302	10.64	2024-09-17T00:00:00	24	A	N	N	N	7
1334	MDOT	Metro	6176	50111-S31	COTTON RD	I-94	1.0 MI S OF M-29	1 Highway	1 Highway	1963	2006	2006	1987	4	259.5	33.4	4	3 Steel	32 Multi Str Comp	0	""	""	3 Latex Concrete/Similar	4 M 18 (H 20)	2	6	42.66	-82.82922	2025-08-18T00:00:00	POINT (-82.82922 42.66)	Macomb	NBI	Non-NHS	8667.3	30	801306	1.56	2025-06-17T00:00:00	24	A	5	5	6	N
1335	Allen Park	Metro	12307	""	NB M-39 SERVICE DR	NORTH BR. ECORSE RIVER	IN ALLEN PARK	5 Highway-pedestrian	5 Waterway	1962		2024		1	36.7	47.6	1	3 Steel	02 Multi Str Non Comp	0	""	""	3 Latex Concrete/Similar	B Greater than HL 93	2		42.27	-83.22012	2025-08-18T00:00:00	POINT (-83.22012 42.27)	Taylor	NBI	Non-NHS	1746.92	26	1651008	0.14	2024-11-05T00:00:00	24	A	6	7	7	N
1336	MDOT	Metro	8119	63191-S05-1	I-275 NB & M-5 WB	I-696	@ I-96/I-696 INTERCHANGE	6 2d level interchg	1 Highway	1971		2006	2006	4	287.3	44.4	4	3 Steel	82 Pl Girder Comp	0	""	""	3 Latex Concrete/Similar	6 MS18(HS20)+mod	2	4	42.49	-83.43144	2025-08-18T00:00:00	POINT (-83.43144 42.49)	Oakland	NBI	NHS	12756.12	42	4402006	5.45	2024-11-22T00:00:00	24	A	6	7	6	N
1337	MDOT	Metro	6016	50011-S08	M-53 SB	19 MILE RD	1.0 MI S OF M-59	1 Highway	1 Highway	1966	2001			3	130	45.3	3	5 Prestressed Concrete	05 Box Bm/Gird- Multiple	0	""	""	5 Epoxy Overlay	5 MS 18 (HS 20)	2	2	42.61	-83.01346	2025-08-18T00:00:00	POINT (-83.01346 42.61)	Macomb	NBI	NHS	5889	42	813706	4.73	2024-09-26T00:00:00	18	A	7	6	7	N
1338	MDOT	Metro	11194	82023-S26	I-94WB RMP TO M-10	I-94 EB & M-10 NB	IN DETROIT RAMP F-C	1 Highway	1 Highway	1953	1996	1996	1953	11	1158.1	42	11	3 Steel	52 Pl Girder Non Comp	0	""	""	5 Epoxy Overlay	5 MS 18 (HS 20)	2	10	42.36	-83.074875	2025-08-18T00:00:00	POINT (-83.074875 42.36)	Detroit	NBI	NHS	48640.2	38.7	1584906	0.1	2024-09-23T00:00:00	24	A	5	5	5	N
1339	MDOT	Metro	7910	63101-S13	US-24,TELEGRAPH RD	I-696	IN SOUTHFIELD (I-696)	1 Highway	1 Highway	1967	1975		1999	4	278.8	118.4	4	3 Steel	82 Pl Girder Comp	0	""	""	1 Monolithic Concrete	9 MS22.5(HS25)or greater	6	6	42.49	-83.28458	2025-08-18T00:00:00	POINT (-83.28458 42.49)	Oakland	NBI	NHS	33009.92	111.9	710106	3.29	2025-05-20T00:00:00	24	A	6	5	7	N
1340	MDOT	Metro	8006	63172-S06-1	I-75 NB	I-75 BL & M-24	@ I-75 , M-24	1 Highway	1 Highway	1962	1988	1988		4	193.8	71.3	4	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	3 Latex Concrete/Similar	6 MS18(HS20)+mod	4	6	42.68	-83.24329	2025-08-18T00:00:00	POINT (-83.24329 42.68)	Oakland	NBI	NHS	13817.94	67.3	647308	21.52	2023-12-19T00:00:00	24	A	7	7	7	N
1341	Oakland County	Metro	13506	""	NOVI RD	CSX RR & MID ROUGE RIVER	S OF GRAND RIVER AVE	1 Highway	7 Railroad-waterway	2011				2	217.3	95	2	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	B Greater than HL 93	5		42.48	-83.47527	2025-08-18T00:00:00	POINT (-83.47527 42.48)	Oakland	NBI	NHS	20643.5	64	621910	2.35	2024-06-26T00:00:00	24	A	7	8	7	N
1342	Troy	Metro	8312	""	CHICAGO ROAD	BARNARD DRAIN	0.2 MI S OF MAPLE ROAD	5 Highway-pedestrian	5 Waterway	1971				2	35	48.9	2	2 Concrete Continuous	19 Culvert	0	""	""	6 Bituminous	6 MS18(HS20)+mod	4		42.55	-83.1137	2025-08-18T00:00:00	POINT (-83.1137 42.55)	Oakland	NBI	Non-NHS	1711.5	48.9	692812	0.22	2025-04-01T00:00:00	24	A	N	N	N	5
1343	MDOT	Metro	11378	82104-S06	N SERVICE RD	I-75 RAMP TO WB M-8	IN DETROIT M-8 WB RAMP	1 Highway	1 Highway	1971		2003	2003	1	122.3	38.4	1	3 Steel	82 Pl Girder Comp	0	""	""	3 Latex Concrete/Similar	5 MS 18 (HS 20)	2	2	42.41	-83.08349	2025-08-18T00:00:00	POINT (-83.08349 42.41)	Detroit	NBI	Non-NHS	4696.32	28.2	4705659	1.21	2023-10-24T00:00:00	24	A	5	6	7	N
1344	Other Local Agencies	Metro	13367	""	DINGELL RD	AOA SERVICE RD	2.5 MI N OF EUREKA	5 Highway-pedestrian	1 Highway	2000				1	69.8	102.9	1	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	9 MS22.5(HS25)or greater	5	2	42.22	-83.34239	2025-08-18T00:00:00	POINT (-83.34239 42.22)	Taylor	NBI	NHS	7182.42	76.1	4711337	2.47	2025-05-28T00:00:00	24	A	6	6	7	N
1345	Lincoln Park	Metro	12506	""	HAZEL STREET	SEXTON KILFOIL DRAIN	IN LINCOLN PARK	5 Highway-pedestrian	5 Waterway	2016				1	42	40.8	1	5 Prestressed Concrete	06 Box Bms- Single/Sprd	0	""	""	1 Monolithic Concrete	B Greater than HL 93	2		42.22	-83.19746	2025-08-18T00:00:00	POINT (-83.19746 42.22)	Taylor	NBI	Non-NHS	1713.6	28	1662901	0.21	2023-08-29T00:00:00	24	A	7	8	8	N
1346	MDOT	Metro	11787	82211-B02-1	M-85 NB	FRANK & POET DRAIN	IN TRENTON	5 Highway-pedestrian	5 Waterway	1958		2016		1	55	46	1	1 Concrete	04 Tee Beam	0	""	""	3 Latex Concrete/Similar	6 MS18(HS20)+mod	2		42.12	-83.20336	2025-08-18T00:00:00	POINT (-83.20336 42.12)	Taylor	NBI	NHS	2530	42.9	1592105	3.8	2024-05-15T00:00:00	24	A	6	6	7	N
1347	MDOT	Metro	7932	63102-S17	COOLIDGE ROAD U T	I-696	W OF COOLIDGE HWY	1 Highway	1 Highway	1985				2	155	56.1	2	2 Concrete Continuous	04 Tee Beam	0	""	""	1 Monolithic Concrete	9 MS22.5(HS25)or greater	2	8	42.47	-83.184275	2025-08-18T00:00:00	POINT (-83.184275 42.47)	Oakland	NBI	Non-NHS	8695.5	42	4409824	0.01	2024-07-09T00:00:00	24	A	6	5	7	N
1348	MDOT	Metro	6078	50061-S05	EB 11 MILE RD	I-696	@ CRYSTAL IN WARREN	5 Highway-pedestrian	1 Highway	1972		2008	2008	2	335.3	37.7	2	3 Steel	82 Pl Girder Comp	0	""	""	5 Epoxy Overlay	4 M 18 (H 20)	2	10	42.49	-83.05544	2025-08-18T00:00:00	POINT (-83.05544 42.49)	Macomb	NBI	Non-NHS	12640.81	29.4	803208	1.73	2025-03-24T00:00:00	24	A	5	7	6	N
1349	Macomb County	Metro	6277	""	WASHINGTON RD	SALT RIVER	0.1 MILE WEST OF BAKER RD	1 Highway	5 Waterway	2024				1	92	42.4	1	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	B Greater than HL 93	2		42.7	-82.765656	2025-08-18T00:00:00	POINT (-82.765656 42.7)	Macomb	NBI	Non-NHS	3900.8	40	814905	2.21	2024-09-17T00:00:00	24	A	9	9	9	N
1350	Wayne County	Metro	12111	""	CANTON CENTER ROAD	LOWER ROUGE RIVER	CANTON           S/PALMER	5 Highway-pedestrian	5 Waterway	2003		2003		2	90.8	73.2	2	5 Prestressed Concrete	05 Box Bm/Gird- Multiple	0	""	""	5 Epoxy Overlay	6 MS18(HS20)+mod	2		42.29	-83.48625	2025-08-18T00:00:00	POINT (-83.48625 42.29)	Taylor	NBI	NHS	6646.56	61	4706530	1.16	2024-05-21T00:00:00	24	A	7	7	8	N
1351	MDOT	Metro	13716	63022-C05	M-5	UPPER ROUGE RIVER	0.2 MI E OF ORCHARD LAKE	1 Highway	5 Waterway	1963				2	26	81	2	1 Concrete	19 Culvert	0	""	""	N N/A (no deck (NBI))	5 MS 18 (HS 20)	8		42.45	-83.35184	2025-08-18T00:00:00	POINT (-83.35184 42.45)	Oakland	NBI	NHS	2106		657304	17.49	2024-11-27T00:00:00	24	A	N	N	N	6
1352	Macomb County	Metro	12859	""	FISH CREEK DRIVE	FISH CREEK	0.1 MI  W OF SASS RD	5 Highway-pedestrian	5 Waterway	1999				1	24	44	1	7 Timber	01 Slab	0	""	""	6 Bituminous	5 MS 18 (HS 20)	2		42.68	-82.79036	2025-08-18T00:00:00	POINT (-82.79036 42.68)	Macomb	NBI	Non-NHS	1056	29.5	4208358	0.02	2023-08-16T00:00:00	24	A	7	8	8	N
1353	Gibraltar	Metro	11994	""	S GIBRALTAR	FRANK & POET DRAIN	GIBRALTAR     E/JEFFERSON	5 Highway-pedestrian	5 Waterway	1992				1	27.2	27.9	1	1 Concrete	19 Culvert	0	""	""	6 Bituminous	6 MS18(HS20)+mod	2		42.09	-83.20003	2025-08-18T00:00:00	POINT (-83.20003 42.09)	Taylor	NBI	Non-NHS	758.88	27.9	1698410	0.54	2025-08-04T00:00:00	24	A	N	N	N	7
1354	MDOT	Metro	8063	63174-S05-2	I-75 SB	14 MILE RD	N LTS OF MADISON HTS	1 Highway	1 Highway	2020				1	156	73.8	1	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	B Greater than HL 93	4	6	42.53	-83.11625	2025-08-18T00:00:00	POINT (-83.11625 42.53)	Oakland	NBI	NHS	11512.8	70.4	646106	6.39	2023-12-12T00:00:00	24	A	8	9	9	N
1355	MDOT	Metro	7790	63022-C03	M-5	UPPER ROUGE RIVER	2.0 MI SE OF FARMINGTON	1 Highway	5 Waterway	1956				2	22	68	2	1 Concrete	19 Culvert	0	""	""	N N/A (no deck (NBI))	5 MS 18 (HS 20)	5		42.45	-83.35182	2025-08-18T00:00:00	POINT (-83.35182 42.45)	Oakland	NBI	NHS	1496	0	657303	17.48	2024-11-27T00:00:00	24	A	N	N	N	7
1356	Macomb County	Metro	6352	""	24 MILE ROAD	N B CLINTON RIVER	0.1 MI WEST OF NORTH AVE	5 Highway-pedestrian	5 Waterway	1996				2	199.8	54.1	2	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	3		42.69	-82.879814	2025-08-18T00:00:00	POINT (-82.879814 42.69)	Macomb	NBI	Non-NHS	10809.18	39.4	815510	10.92	2024-09-16T00:00:00	24	A	7	7	7	N
1357	MDOT	Metro	11131	82022-S25	I-94 EB	OAKWOOD BLVD	IN ALLEN PARK	1 Highway	1 Highway	1996		1996		1	98.7	75.8	1	5 Prestressed Concrete	05 Box Bm/Gird- Multiple	0	""	""	1 Monolithic Concrete	9 MS22.5(HS25)or greater	4	5	42.29	-83.19601	2025-08-18T00:00:00	POINT (-83.19601 42.29)	Taylor	NBI	NHS	7481.46	72.5	1576405	19.15	2023-08-18T00:00:00	24	A	7	7	7	N
1358	Wayne County	Metro	12169	""	INKSTER ROAD	E N HINES DRIVE	DBNHTS/WESTLDS/JOY	5 Highway-pedestrian	1 Highway	1953		1988		1	74.1	62	1	1 Concrete	07 Frame- Rigid exc Culv	0	""	""	6 Bituminous	5 MS 18 (HS 20)	4	2	42.35	-83.31256	2025-08-18T00:00:00	POINT (-83.31256 42.35)	Taylor	NBI	NHS	4594.2	48	1674404	16.7	2025-03-28T00:00:00	24	P	5	6	6	N
1359	Wayne County	Metro	12070	""	E N HINES DRIVE	MIDDLE ROUGE RIVER	PLYMOUTH TWP    E/I-275	5 Highway-pedestrian	5 Waterway	1932	1968	1995		3	96	52	3	2 Concrete Continuous	04 Tee Beam	0	""	""	6 Bituminous	4 M 18 (H 20)	2		42.37	-83.43282	2025-08-18T00:00:00	POINT (-83.43282 42.37)	Taylor	NBI	NHS	4992	35.5	1689409	3.26	2025-04-25T00:00:00	12	D	4	4	6	N
1360	Wayne County	Metro	12287	""	GARFIELD STREET	UPPER ROUGE RIVER	REDFORD       N/FIVE MILE	1 Highway	5 Waterway	1948				3	62	33.5	3	4 Steel Continuous	02 Multi Str Non Comp	0	""	""	6 Bituminous	4 M 18 (H 20)	2		42.4	-83.28875	2025-08-18T00:00:00	POINT (-83.28875 42.4)	Taylor	NBI	Non-NHS	2077	24	1641802	0.23	2025-06-10T00:00:00	24	A	5	5	6	N
1361	MDOT	Metro	11761	82195-S02	ROSA PARKS (12TH)	I-75	IN DETROIT	5 Highway-pedestrian	1 Highway	1970	1998		1998	6	284.8	88.9	6	4 Steel Continuous	02 Multi Str Non Comp	0	""	""	5 Epoxy Overlay	5 MS 18 (HS 20)	5	10	42.33	-83.07301	2025-08-18T00:00:00	POINT (-83.07301 42.33)	Detroit	NBI	NHS	25318.72	73.8	4705605	0.86	2025-05-20T00:00:00	24	A	5	6	5	N
1362	MDOT	Metro	11277	82052-B02-1	US-24 NB	SEXTON KILFOIL DRAIN	IN TAYLOR	1 Highway	5 Waterway	1986	2001			1	28.3	64.3	1	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	3 Latex Concrete/Similar	6 MS18(HS20)+mod	4		42.23	-83.26895	2025-08-18T00:00:00	POINT (-83.26895 42.23)	Taylor	NBI	NHS	1819.69	50	4700038	9.54	2024-08-08T00:00:00	24	A	7	8	7	N
1363	MDOT	Metro	11116	82022-S06	I-94 WB	MIDDLEBELT RD	1.2 MI W OF TAYLOR	1 Highway	1 Highway	1993				2	145.9	121.8	2	5 Prestressed Concrete	05 Box Bm/Gird- Multiple	0	""	""	5 Epoxy Overlay	9 MS22.5(HS25)or greater	6	4	42.24	-83.32794	2025-08-18T00:00:00	POINT (-83.32794 42.24)	Taylor	NBI	NHS	17770.62	115.7	1588802	11.29	2025-08-06T00:00:00	24	A	8	6	7	N
1364	Macomb County	Metro	6298	""	COON CREEK ROAD	COON CREEK	100 FT N OF ARMADA RIDGE	1 Highway	5 Waterway	2023				1	24	28	1	1 Concrete	19 Culvert	0	""	""	6 Bituminous	B Greater than HL 93	2		42.82	-82.93181	2025-08-18T00:00:00	POINT (-82.93181 42.82)	Macomb	NBI	Non-NHS	672	26	820001	0.05	2023-11-15T00:00:00	24	A	N	N	N	9
1365	MDOT	Metro	6167	50111-S24-4	I-94 WB	HARPER RD	0.7 MI S OF M-29	1 Highway	1 Highway	1964	2006		1990	3	173.8	74.4	3	3 Steel	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	6 MS18(HS20)+mod	4	4	42.55	-82.8714	2025-08-18T00:00:00	POINT (-82.8714 42.55)	Macomb	NBI	NHS	12930.72	71.3	798502	8.57	2025-06-17T00:00:00	24	A	7	8	7	N
1366	Oakland County	Metro	14039	""	EMBURKE BLVD	CLINTON RIVER	0.25 MI S OF M-59	1 Highway	5 Waterway	1959				2	28	22	2	3 Steel	19 Culvert	0	""	""	6 Bituminous	5 MS 18 (HS 20)	2		42.66	-83.39325	2025-08-18T00:00:00	POINT (-83.39325 42.66)	Oakland	NBI	Non-NHS	616	30.5	700810	0.04	2024-10-15T00:00:00	24	K	N	N	N	2
1367	MDOT	Metro	6153	50111-S07	10 MI RD N INT	I-94	W LTS OF ST CLAIR SHORES	1 Highway	1 Highway	1965	2002		1990	4	184	28.6	4	3 Steel	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	6 MS18(HS20)+mod	1	6	42.48	-82.91666	2025-08-18T00:00:00	POINT (-82.91666 42.48)	Macomb	NBI	Non-NHS	5262.4	25.4	801003	0.02	2025-07-09T00:00:00	24	A	7	7	7	N
1368	Flat Rock	Metro	14735	""	COMMERCE DRIVE	SMITH DRAIN	500' SOUTH OF GIBRALTAR D	1 Highway	5 Waterway	1988				1	52	50.21	1	1 Concrete	05 Box Bm/Gird- Multiple	0	1 Concrete	""	0 None	5 MS 18 (HS 20)	4				2025-08-18T00:00:00	""	Taylor	NBI	Non-NHS	2610.92	50.21	4707152	0.08	2024-11-27T00:00:00	24	A	4	6	7	N
1369	MDOT	Metro	7980	63103-S19	I-696 RAMP WB	I-75 & RAMPS TO I-75 SB	I-75 / I-696 INTRCHG	6 2d level interchg	1 Highway	1971	2007	2007	2007	4	316	29.4	4	3 Steel	82 Pl Girder Comp	0	""	""	3 Latex Concrete/Similar	6 MS18(HS20)+mod	1	6	42.48	-83.11164	2025-08-18T00:00:00	POINT (-83.11164 42.48)	Oakland	NBI	NHS	9290.4	22.5	1738902	0.14	2025-07-16T00:00:00	24	A	6	6	6	N
1370	MDOT	Metro	7952	63102-S40	MANISTEE U-TURN	I-696	0.2 MILES E. OF SCOTIA RD	1 Highway	1 Highway	1985				2	154.2	82.3	2	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	9 MS22.5(HS25)or greater	2	8	42.47	-83.16635	2025-08-18T00:00:00	POINT (-83.16635 42.47)	Oakland	NBI	Non-NHS	12690.66	42	4416450	0.01	2024-07-24T00:00:00	24	A	6	6	6	N
1371	Detroit	Metro	12458	""	SPINOZA DRIVE	ROUGE RIVER	ROUGE PARK	5 Highway-pedestrian	5 Waterway	1930	1998			2	83	69.9	2	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	4		42.37	-83.25423	2025-08-18T00:00:00	POINT (-83.25423 42.37)	Detroit	NBI	Non-NHS	5801.7	49.9	1624005	1.96	2023-11-30T00:00:00	24	A	7	7	6	N
1372	MDOT	Metro	11885	82291-B02	I-275 NB	HURON R & METROPARK PATH	NEW BOSTON VILLAGE	1 Highway	5 Waterway	1974		1997	2009	4	285	56.5	4	3 Steel	32 Multi Str Comp	0	""	""	3 Latex Concrete/Similar	9 MS22.5(HS25)or greater	3		42.14	-83.381836	2025-08-18T00:00:00	POINT (-83.381836 42.14)	Taylor	NBI	NHS	16102.5	53.2	1607208	3.4	2024-05-29T00:00:00	24	A	6	6	6	N
1373	Wayne County	Metro	12208	""	JEFFERSON AVENUE	MONGUAGON CREEK	RIVERVIEW        N/SIBLEY	5 Highway-pedestrian	5 Waterway	1927		1978		1	34.8	84.3	1	1 Concrete	04 Tee Beam	0	""	""	2 Integral Concrete	0 Unknown	6		42.18	-83.16745	2025-08-18T00:00:00	POINT (-83.16745 42.18)	Taylor	NBI	NHS	2933.64	68.2	4302169	9.97	2025-03-31T00:00:00	12	A	4	3	4	N
1374	Macomb County	Metro	6217	""	26 MILE ROAD	COON CREEK	0.4 MI WEST OF NORTH AVE	1 Highway	5 Waterway	1993				1	75.8	49.5	1	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	9 MS22.5(HS25)or greater	2		42.72	-82.88175	2025-08-18T00:00:00	POINT (-82.88175 42.72)	Macomb	NBI	Non-NHS	3752.1	45.9	816702	10.69	2024-04-10T00:00:00	24	A	7	7	7	N
1375	MDOT	Metro	11259	82025-S14	MORANG AVE	I-94	IN DETROIT	5 Highway-pedestrian	1 Highway	1959	2000		2000	4	165.2	65.9	4	3 Steel	02 Multi Str Non Comp	0	""	""	5 Epoxy Overlay	5 MS 18 (HS 20)	4	6	42.42	-82.93345	2025-08-18T00:00:00	POINT (-82.93345 42.42)	Detroit	NBI	Non-NHS	10886.68	44	1578203	0.04	2024-06-17T00:00:00	24	A	7	6	6	N
1376	MDOT	Metro	11658	82191-S16-1	I-75 NB	ALLEN RD	S LTS OF SOUTHGATE	1 Highway	1 Highway	1966		1991	1991	4	218.2	54.5	4	4 Steel Continuous	02 Multi Str Non Comp	0	""	""	5 Epoxy Overlay	6 MS18(HS20)+mod	3	4	42.21	-83.22899	2025-08-18T00:00:00	POINT (-83.22899 42.21)	Taylor	NBI	NHS	11891.9	51.5	1592010	10.03	2025-07-03T00:00:00	24	A	5	7	7	N
1377	Farmington	Metro	8236	""	SHIAWASSEE STREET	BRANCH UPPER ROUGE RIVER	50FT W OF FARMINGTON ROAD	1 Highway	5 Waterway	1981				1	29.9	49.9	1	3 Steel	19 Culvert	0	""	""	1 Monolithic Concrete	0 Unknown	3		42.47	-83.37178	2025-08-18T00:00:00	POINT (-83.37178 42.47)	Oakland	NBI	Non-NHS	1492.01	58.1	633209	0.63	2025-04-16T00:00:00	12	A	N	N	N	4
1378	MDOT	Metro	6105	50061-S36	NB SERVICE RD	RAMPS B&G OFF I-696	CITY OF WARREN	5 Highway-pedestrian	1 Highway	1976		2008		1	145.5	37.7	1	3 Steel	82 Pl Girder Comp	0	""	""	5 Epoxy Overlay	5 MS 18 (HS 20)	2	2	42.49	-83.04468	2025-08-18T00:00:00	POINT (-83.04468 42.49)	Macomb	NBI	Non-NHS	5485.35	29.2	1740304	0.42	2025-04-14T00:00:00	24	A	6	6	5	N
1379	Oakland County	Metro	13648	""	11 MILE ROAD	NOVI-LYON DRAIN	LYON TWP SEC  15/22	1 Highway	5 Waterway	2024				1	22.1	27	1	1 Concrete	19 Culvert	0	""	""	8 Gravel	B Greater than HL 93	2		42.48	-83.60692	2025-08-18T00:00:00	POINT (-83.60692 42.48)	Oakland	NBI	Non-NHS	596.7	36	656603	3.13	2025-01-17T00:00:00	24	A	N	N	N	9
1380	MDOT	Metro	11572	82123-S25-3	OAKMAN BLVD EB	I-96 (JEFFRIES FRWY)	IN DETROIT	5 Highway-pedestrian	1 Highway	1971	2009		2009	2	233	50.9	2	3 Steel	82 Pl Girder Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	2	8	42.38	-83.14613	2025-08-18T00:00:00	POINT (-83.14613 42.38)	Detroit	NBI	Non-NHS	11859.7	38.5	1581709	0.9	2025-08-12T00:00:00	24	A	6	7	7	N
1381	MDOT	Metro	11966	82293-S03	M-14 ANN ARBOR RD	I-275	0.5 MI W OF LIVONIA	1 Highway	1 Highway	1972				2	262	102.7	2	3 Steel	82 Pl Girder Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	6	8	42.36	-83.435745	2025-08-18T00:00:00	POINT (-83.435745 42.36)	Taylor	NBI	NHS	26907.4	87.8	1604102	5.87	2024-10-11T00:00:00	24	A	5	6	7	N
1382	MDOT	Metro	11714	82193-S11-3	M-102 EB	M-39	N LTS OF DETROIT	5 Highway-pedestrian	1 Highway	1964	2010		1996	2	109.3	64.9	2	4 Steel Continuous	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	4	6	42.44	-83.21962	2025-08-18T00:00:00	POINT (-83.21962 42.44)	Detroit	NBI	NHS	7093.57	56.5	1817406	5.18	2025-06-16T00:00:00	24	A	7	7	7	N
1383	MDOT	Metro	11612	82125-S02	I-96 WB	EIGHT MILE RD	IN LIVONIA	1 Highway	1 Highway	1974		1998	1998	2	167	81.7	2	3 Steel	32 Multi Str Comp	0	""	""	3 Latex Concrete/Similar	9 MS22.5(HS25)or greater	5	4	42.44	-83.43234	2025-08-18T00:00:00	POINT (-83.43234 42.44)	Taylor	NBI	NHS	13643.9	79.7	639107	4.09	2024-12-26T00:00:00	24	A	7	7	6	N
1384	MDOT	Metro	7802	63022-S06	BECK RD	I-96	IN NOVI	1 Highway	1 Highway	2003				2	194	200	2	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	5 Epoxy Overlay	9 MS22.5(HS25)or greater	4	6	42.49	-83.51582	2025-08-18T00:00:00	POINT (-83.51582 42.49)	Oakland	NBI	NHS	38800	88	656605	3.94	2024-11-20T00:00:00	24	A	7	8	7	N
1385	MDOT	Metro	6110	50061-S44	U TURN @ ELCAPITAN	I-696	IN WARREN W OF RYAN	1 Highway	1 Highway	1972		2008	2008	2	178	23.6	2	3 Steel	32 Multi Str Comp	0	""	""	5 Epoxy Overlay	4 M 18 (H 20)	1	10	42.49	-83.068825	2025-08-18T00:00:00	POINT (-83.068825 42.49)	Macomb	NBI	Non-NHS	4200.8	18	805410	0.01	2025-03-12T00:00:00	12	A	4	7	7	N
1386	Detroit	Metro	14638	""	BATES STREET	PARKING LOT	250 FT S OF JEFFERSON AVE	1 Highway	0 Other	2000				19	294.3	42.3	19	5 Prestressed Concrete	05 Box Bm/Gird- Multiple	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	2		42.33	-83.04299	2025-08-18T00:00:00	POINT (-83.04299 42.33)	Detroit	NBI	Non-NHS	12448.89	28	4711781	0.06	2025-07-31T00:00:00	24	A	7	7	6	N
1387	Wayne County	Metro	12198	""	JEFFERSON AVENUE	BLAKELY DRAIN	GIBRALTAR  S/GIBRALTAR RD	1 Highway	5 Waterway	1924		1974		1	48.9	45.9	1	1 Concrete	04 Tee Beam	0	""	""	2 Integral Concrete	0 Unknown	2		42.09	-83.20764	2025-08-18T00:00:00	POINT (-83.20764 42.09)	Taylor	NBI	Non-NHS	2244.51	40	4302169	3.23	2024-09-18T00:00:00	12	A	4	4	5	N
1388	St Clair Shores	Metro	12793	""	LANGE STREET	LAKE ST CLAIR SHORES	0.1 MI E OF JEFFERSON	5 Highway-pedestrian	5 Waterway	2006				1	38	38.1	1	5 Prestressed Concrete	05 Box Bm/Gird- Multiple	0	""	""	2 Integral Concrete	9 MS22.5(HS25)or greater	2		42.48	-82.88863	2025-08-18T00:00:00	POINT (-82.88863 42.48)	Macomb	NBI	Non-NHS	1447.8	25.6	829901	0.03	2025-03-27T00:00:00	24	A	8	8	8	N
1389	MDOT	Metro	7951	63102-S39	LATHRUP ROAD	I-696	CITY OF LATHRUP VILLAGE	1 Highway	1 Highway	1988				2	130	40.7	2	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	2	4	42.49	-83.21869	2025-08-18T00:00:00	POINT (-83.21869 42.49)	Oakland	NBI	Non-NHS	5291	29.2	655509	0.5	2024-07-23T00:00:00	24	A	6	6	7	N
1390	MDOT	Metro	11309	82062-B01	US-12 WB	ROUGE RIVER	IN DEARBORN	5 Highway-pedestrian	5 Waterway	2009				3	352	77.3	3	5 Prestressed Concrete	06 Box Bms- Single/Sprd	0	""	""	1 Monolithic Concrete	B Greater than HL 93	4		42.31	-83.222664	2025-08-18T00:00:00	POINT (-83.222664 42.31)	Taylor	NBI	NHS	27209.6	68	4704788	0.71	2024-10-28T00:00:00	24	A	7	8	8	N
1391	MDOT	Metro	11899	82291-S03	SOUTH HURON	I-275	1.9 MI SE OF NEW BOSTON	5 Highway-pedestrian	1 Highway	1974			2009	2	295	90.2	2	3 Steel	82 Pl Girder Comp	0	""	""	3 Latex Concrete/Similar	5 MS 18 (HS 20)	6	7	42.14	-83.38168	2025-08-18T00:00:00	POINT (-83.38168 42.14)	Taylor	NBI	Non-NHS	26609	81.5	1607304	2.03	2024-05-29T00:00:00	24	A	7	7	6	N
1392	MDOT	Metro	11578	82123-S30	LIVERNOIS AVE	I-96	IN DETROIT	5 Highway-pedestrian	1 Highway	1972	2009		1993	2	198.8	117.6	2	3 Steel	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	8	8	42.37	-83.13873	2025-08-18T00:00:00	POINT (-83.13873 42.37)	Detroit	NBI	NHS	23378.88	92	1581701	4.8	2023-08-25T00:00:00	24	A	7	7	7	N
1393	MDOT	Metro	6035	50013-S13	M-53 NB	25 MILE RD	5.0 MI N OF M-59	1 Highway	1 Highway	1966			2001	3	114.5	42.9	3	3 Steel	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	2	2	42.7	-83.024155	2025-08-18T00:00:00	POINT (-83.024155 42.7)	Macomb	NBI	NHS	4912.05	39.5	4210208	10.94	2025-07-08T00:00:00	24	A	6	6	6	N
1394	Dearborn Height	Metro	12330	""	HANOVER RD	ECORSE CREEK	DBN HGTS HARDING-MERRICK	5 Highway-pedestrian	5 Waterway	1977				1	36.7	43.3	1	5 Prestressed Concrete	05 Box Bm/Gird- Multiple	0	""	""	2 Integral Concrete	6 MS18(HS20)+mod	2		42.27	-83.241455	2025-08-18T00:00:00	POINT (-83.241455 42.27)	Taylor	NBI	Non-NHS	1589.11	25.9	1646505	0.47	2023-10-17T00:00:00	24	A	6	7	6	N
1395	Oakland County	Metro	13808	""	INDIAN VIEW DRIVE	CLINTON RIVER	WATERFORD TWP SEC 11	1 Highway	5 Waterway	1995				2	31.3	29.5	2	3 Steel	19 Culvert	0	""	""	6 Bituminous	5 MS 18 (HS 20)	2		42.69	-83.3564	2025-08-18T00:00:00	POINT (-83.3564 42.69)	Oakland	NBI	Non-NHS	923.35	29.3	699106	0.25	2024-07-18T00:00:00	24	A	N	N	N	5
1396	Macomb County	Metro	6311	""	HAGEN ROAD	DEER CREEK	1.0 MI EAST OF NORTH AVE	1 Highway	5 Waterway	2014				1	39.7	30	1	1 Concrete	19 Culvert	0	""	""	6 Bituminous	A HL 93	2		42.71	-82.85907778	2025-08-18T00:00:00	POINT (-82.85907778 42.71)	Macomb	NBI	Non-NHS	1191	30	818408	1.02	2024-09-17T00:00:00	24	A	N	N	N	8
1397	Macomb County	Metro	6283	""	CALLENS RD	FISH CREEK	0.5 MI EAST OF SUGARBUSH	1 Highway	5 Waterway	1964		2022		1	30.8	33.1	1	3 Steel	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	2		42.67	-82.78327	2025-08-18T00:00:00	POINT (-82.78327 42.67)	Macomb	NBI	Non-NHS	1019.48	29.9	814710	0.5	2024-09-17T00:00:00	24	A	6	5	8	N
1398	Detroit	Metro	12428	""	ANTIETAM AVE	DEQUINDRE CUT GREENWAY	BETWN ORLEANS & ST AUBIN	5 Highway-pedestrian	3 Pedestrian-bicycle	2007				2	90.6	29.9	2	1 Concrete	19 Culvert	0	""	""	2 Integral Concrete	6 MS18(HS20)+mod	2		42.35	-83.0346	2025-08-18T00:00:00	POINT (-83.0346 42.35)	Detroit	NBI	Non-NHS	2708.94	29.9	1587309	0.63	2023-11-14T00:00:00	24	A	N	N	N	7
1399	MDOT	Metro	11567	82123-S19	I-96 (JEFFRIES)	RAMP TO M-8	IN DETROIT	1 Highway	1 Highway	1971		2005	2005	1	179.8	128.3	1	3 Steel	82 Pl Girder Comp	0	""	""	3 Latex Concrete/Similar	5 MS 18 (HS 20)	6	3	42.38	-83.15172	2025-08-18T00:00:00	POINT (-83.15172 42.38)	Detroit	NBI	NHS	23068.34	125.7	1606201	15.42	2023-09-27T00:00:00	24	A	7	7	7	N
1400	Oakland County	Metro	8167	""	GRAND RIVER AVE	CSX RR	BET NOVI AND TAFT RDS	1 Highway	2 Railroad	2004				1	91.2	90.7	1	5 Prestressed Concrete	05 Box Bm/Gird- Multiple	0	""	""	2 Integral Concrete	6 MS18(HS20)+mod	5		42.48	-83.48199	2025-08-18T00:00:00	POINT (-83.48199 42.48)	Oakland	NBI	Non-NHS	8271.84	68.5	4104142	11.01	2024-06-26T00:00:00	24	A	6	6	7	N
1401	MDOT	Metro	11216	82024-S09-4	EB E GRAND BLVD	I-94	IN DETROIT	5 Highway-pedestrian	1 Highway	2021				2	197.3	55.4	2	4 Steel Continuous	82 Pl Girder Comp	0	""	""	1 Monolithic Concrete	B Greater than HL 93	2	8	42.38	-83.04167	2025-08-18T00:00:00	POINT (-83.04167 42.38)	Detroit	NBI	Non-NHS	10930.42	26	1577308	5.78	2025-03-07T00:00:00	24	A	8	8	8	N
1402	Wayne County	Metro	12275	""	S POINTE DRIVE	SWAN ISLAND CANAL	GROSSE ILE         S/GROH	5 Highway-pedestrian	5 Waterway	1939	2000	2000		1	44.6	44.8	1	5 Prestressed Concrete	05 Box Bm/Gird- Multiple	0	""	""	5 Epoxy Overlay	4 M 18 (H 20)	2		42.1	-83.17213	2025-08-18T00:00:00	POINT (-83.17213 42.1)	Taylor	NBI	Non-NHS	1998.08	29.9	1688902	0.61	2024-10-16T00:00:00	24	A	7	8	7	N
1403	MDOT	Metro	11790	82211-B03-2	M-85 SB	SEXTON-KILFOIL DRAIN	IN LINCOLN PARK	5 Highway-pedestrian	5 Waterway	2011				1	74	62.4	1	5 Prestressed Concrete	05 Box Bm/Gird- Multiple	0	""	""	1 Monolithic Concrete	A HL 93	4		42.22	-83.1815	2025-08-18T00:00:00	POINT (-83.1815 42.22)	Taylor	NBI	NHS	4617.6	52	1592106	11.03	2024-05-15T00:00:00	24	A	7	8	8	N
1404	Wayne County	Metro	12263	""	LOTZ ROAD	FELLOWS CREEK	CANTON           N/PALMER	5 Highway-pedestrian	5 Waterway	1981		1981		1	24.9	53.5	1	5 Prestressed Concrete	05 Box Bm/Gird- Multiple	0	""	""	2 Integral Concrete	4 M 18 (H 20)	2		42.3	-83.43793	2025-08-18T00:00:00	POINT (-83.43793 42.3)	Taylor	NBI	Non-NHS	1332.15	36.1	4705519	1.48	2025-06-17T00:00:00	24	A	7	7	7	N
1405	MDOT	Metro	11329	82081-B05	M-153 EB	ROUGE RIVER	IN DEARBORN	1 Highway	5 Waterway	1971		1993	1971	3	290	65.9	3	3 Steel	82 Pl Girder Comp	0	""	""	3 Latex Concrete/Similar	5 MS 18 (HS 20)	4		42.33	-83.24134	2025-08-18T00:00:00	POINT (-83.24134 42.33)	Taylor	NBI	NHS	19111	56.5	1595510	15.59	2025-05-22T00:00:00	12	A	5	4	6	N
1406	MDOT	Metro	7898	63101-S01	M-5  (OLD M-102)	I-696 EB	@I-96 (I-696 EB)	1 Highway	1 Highway	2008				3	235.1	39.9	3	4 Steel Continuous	82 Pl Girder Comp	0	""	""	1 Monolithic Concrete	B Greater than HL 93	2	2	42.48	-83.43935	2025-08-18T00:00:00	POINT (-83.43935 42.48)	Oakland	NBI	NHS	9380.49	36.7	657304	12.25	2024-03-25T00:00:00	24	A	8	8	7	N
1407	MDOT	Metro	12663	82022-R10	VINING ROAD	NORFOLK & WESTERN RR	CITY OF ROMULUS	1 Highway	2 Railroad	1996		1996		2	165	71.2	2	5 Prestressed Concrete	05 Box Bm/Gird- Multiple	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	4		42.23	-83.370224	2025-08-18T00:00:00	POINT (-83.370224 42.23)	Taylor	NBI	Non-NHS	11748	68	4711341	1.14	2025-08-01T00:00:00	24	A	6	7	8	N
1408	MDOT	Metro	11751	82194-S22	I-75 RAMP WB TO SB	RAMP TO WB I-96	IN DETROIT	1 Highway	1 Highway	1970	2007		2007	3	202.5	31.1	3	3 Steel	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	6 MS18(HS20)+mod	1	1	42.33	-83.08397	2025-08-18T00:00:00	POINT (-83.08397 42.33)	Detroit	NBI	NHS	6297.75	28	1590408	0.07	2024-05-23T00:00:00	24	A	7	7	6	N
1409	MDOT	Metro	11813	82251-S12	M-3 TO I-375 S RMP	I-75	IN DETROIT	1 Highway	1 Highway	1963	1998		2007	4	237.2	30.8	4	3 Steel	82 Pl Girder Comp	0	""	""	1 Monolithic Concrete	6 MS18(HS20)+mod	2	8	42.34	-83.04403	2025-08-18T00:00:00	POINT (-83.04403 42.34)	Detroit	NBI	NHS	7305.76	27.6	1585603	0.08	2024-03-27T00:00:00	24	A	7	7	7	N
1410	MDOT	Metro	12665	82102-S07-3	RAMP B (EB)	M-14	0.9 MI W OF PLYMOUTH	1 Highway	1 Highway	1976			2006	4	220	29.2	4	3 Steel	82 Pl Girder Comp	0	""	""	1 Monolithic Concrete	9 MS22.5(HS25)or greater	2	6	42.39	-83.47556	2025-08-18T00:00:00	POINT (-83.47556 42.39)	Taylor	NBI	NHS	6424	26.5	1778202	0.17	2023-10-23T00:00:00	24	A	7	7	6	N
1411	MDOT	Metro	6032	50013-S10	M-53 SB	25 MILE RD	5.0 MI N OF M-59	1 Highway	1 Highway	1966		2001	2001	3	114.5	42.9	3	3 Steel	32 Multi Str Comp	0	""	""	3 Latex Concrete/Similar	5 MS 18 (HS 20)	2	2	42.7	-83.02451	2025-08-18T00:00:00	POINT (-83.02451 42.7)	Macomb	NBI	NHS	4912.05	39.5	813706	10.95	2025-07-08T00:00:00	24	A	6	6	7	N
1412	Wayne County	Metro	12270	""	DENTON ROAD	FOWLER CREEK	CANTON           N/GEDDES	1 Highway	5 Waterway	2001				1	22	22	1	1 Concrete	19 Culvert	0	""	""	N N/A (no deck (NBI))	0 Unknown	2		42.28	-83.52498	2025-08-18T00:00:00	POINT (-83.52498 42.28)	Taylor	NBI	Non-NHS	484	0	1599103	2.27	2025-06-11T00:00:00	24	A	N	N	N	7
1413	MDOT	Metro	12454	82701-B04	CENTRAL AVE	CANOE STREAM	BELLE ISLE	5 Highway-pedestrian	5 Waterway	1913				1	23	48.9	1	1 Concrete	11 Arch- Deck, Filled Sp	0	""	""	6 Bituminous	5 MS 18 (HS 20)	2		42.34	-82.976265	2025-08-18T00:00:00	POINT (-82.976265 42.34)	Detroit	NBI	Non-NHS	1124.7	45.9	1633203	1.07	2024-08-08T00:00:00	24	P	5	5	6	N
1414	MDOT	Metro	11172	82023-S04	CENTRAL AVE	I-94	IN DETROIT	5 Highway-pedestrian	1 Highway	1950			2012	4	183.8	57.7	4	3 Steel	02 Multi Str Non Comp	0	""	""	5 Epoxy Overlay	5 MS 18 (HS 20)	4	6	42.33	-83.138405	2025-08-18T00:00:00	POINT (-83.138405 42.33)	Detroit	NBI	Non-NHS	10605.26	44	1577202	2.31	2025-03-11T00:00:00	24	A	6	6	5	N
1415	Westland	Metro	12524	""	NEWBURGH RD	TONQUISH CREEK	IN WESTLAND	1 Highway	5 Waterway	1982	2019			1	44	64.4	1	5 Prestressed Concrete	05 Box Bm/Gird- Multiple	0	""	""	1 Monolithic Concrete	6 MS18(HS20)+mod	2		42.34	-83.40921	2025-08-18T00:00:00	POINT (-83.40921 42.34)	Taylor	NBI	Non-NHS	2833.6	52	4710394	3.94	2025-04-14T00:00:00	24	A	7	5	7	N
1416	Other Local Agencies	Metro	14722	""	ATWATER ST	RING ROAD	E OF RENAISSANCE DR	5 Highway-pedestrian	0 Other	1977	2004	2014		33	691.6	63.4	33	2 Concrete Continuous	03 Gir-Flr Bm Non Comp	0	""	""	5 Epoxy Overlay	5 MS 18 (HS 20)	3				2025-08-18T00:00:00	""	Detroit	NBI	Non-NHS	43847.44	40.4	4708755	0.33	2024-07-18T00:00:00	24	A	6	6	5	N
1417	MDOT	Metro	11639	82191-R01-2	I-75 SB	GTW RR	IN WOODHAVEN	1 Highway	2 Railroad	2006				1	147.2	63.3	1	3 Steel	82 Pl Girder Comp	0	""	""	2 Integral Concrete	9 MS22.5(HS25)or greater	3		42.12	-83.24146	2025-08-18T00:00:00	POINT (-83.24146 42.12)	Taylor	NBI	NHS	9317.76	60	1595106	3.94	2024-07-12T00:00:00	24	A	8	8	7	N
1418	Birmingham	Metro	13480	""	N OLD WOODWARD	ROUGE RIVER	0.3 NW OF MAPLE	5 Highway-pedestrian	5 Waterway	2006				1	26	72.2	1	1 Concrete	19 Culvert	0	""	""	N N/A (no deck (NBI))	9 MS22.5(HS25)or greater	5		42.55	-83.21728	2025-08-18T00:00:00	POINT (-83.21728 42.55)	Oakland	NBI	Non-NHS	1877.2	72.2	613810	0.46	2024-10-24T00:00:00	24	A	N	N	N	7
1419	Macomb County	Metro	6327	""	27 MILE ROAD	DEER CREEK	0.2 MI WEST OF PLACE RD.	1 Highway	5 Waterway	1999				1	57.7	42.7	1	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	2		42.73	-82.835625	2025-08-18T00:00:00	POINT (-82.835625 42.73)	Macomb	NBI	Non-NHS	2463.79	39.4	822108	0.58	2024-08-30T00:00:00	24	A	7	8	8	N
1420	MDOT	Metro	11675	82192-B02-6	M-39 SB SERV RD	ROUGE RIVER	IN DEARBORN	5 Highway-pedestrian	5 Waterway	1963		2020	1997	5	340	39.5	5	4 Steel Continuous	32 Multi Str Comp	0	""	""	6 Bituminous	6 MS18(HS20)+mod	2		42.31	-83.21461	2025-08-18T00:00:00	POINT (-83.21461 42.31)	Taylor	NBI	NHS	13430	30	1595505	3.09	2023-10-04T00:00:00	24	A	6	6	7	N
1421	MDOT	Metro	11695	82192-S17	SCHOOLCRAFT AVE	M-39	IN DETROIT	5 Highway-pedestrian	1 Highway	1961	2010		1996	2	108.5	138.1	2	4 Steel Continuous	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	6 MS18(HS20)+mod	8	6	42.39	-83.217545	2025-08-18T00:00:00	POINT (-83.217545 42.39)	Detroit	NBI	Non-NHS	14983.85	118	4705258	11.92	2024-09-20T00:00:00	24	A	7	7	7	N
1422	MDOT	Metro	7850	63043-S13	M-59 WB	JOHN R RD	4.0 MI W OF UTICA	1 Highway	1 Highway	1972	2009		2009	1	117.5	68.6	1	3 Steel	82 Pl Girder Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	2	2	42.63	-83.11115	2025-08-18T00:00:00	POINT (-83.11115 42.63)	Oakland	NBI	NHS	8060.5	65.3	677208	9.24	2025-05-15T00:00:00	24	A	8	8	7	N
1423	Wayne County	Metro	12009	""	WEST ROAD	SMITH CREEK	BROWNSTOWNW/TELEGRAPH	1 Highway	5 Waterway	1986				1	40	43.6	1	5 Prestressed Concrete	05 Box Bm/Gird- Multiple	0	0 Other	00 Other	1 Monolithic Concrete	5 MS 18 (HS 20)	2		42.14	-83.2811	2025-08-18T00:00:00	POINT (-83.2811 42.14)	Taylor	NBI	Non-NHS	1744	41	1674210	4.21	2025-05-12T00:00:00	24	A	7	7	7	N
1424	MDOT	Metro	11444	82112-S19	LINWOOD AVE	M-10 JOHN LODGE FRWY	IN DETROIT	5 Highway-pedestrian	1 Highway	1955	1994		1994	4	167	72	4	4 Steel Continuous	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	4	6	42.41	-83.1274	2025-08-18T00:00:00	POINT (-83.1274 42.41)	Detroit	NBI	NHS	12024	48	1584609	3.76	2025-04-29T00:00:00	24	A	7	7	6	N
1425	Wayne County	Metro	12017	""	PENNSYLVANIA ROAD	BLAKELY DRAIN	BROWNSTN/TAYLOR E/INKSTER	1 Highway	5 Waterway	2014				1	29.9	40	1	1 Concrete	19 Culvert	0	""	""	6 Bituminous	9 MS22.5(HS25)or greater	2		42.18	-83.302864	2025-08-18T00:00:00	POINT (-83.302864 42.18)	Taylor	NBI	Non-NHS	1196	40	1674307	5.82	2024-09-13T00:00:00	24	A	N	N	N	8
1426	MDOT	Metro	7845	63043-S08	AUBURN RD	M-59	1.0 MI W OF M-150	1 Highway	1 Highway	1972	2009	2009	2009	4	311.9	52.4	4	3 Steel	82 Pl Girder Comp	0	""	""	3 Latex Concrete/Similar	5 MS 18 (HS 20)	2	4	42.64	-83.1455	2025-08-18T00:00:00	POINT (-83.1455 42.64)	Oakland	NBI	Non-NHS	16343.56	48.5	625105	7.51	2025-05-14T00:00:00	24	A	7	7	7	N
1427	MDOT	Metro	6058	50023-S03	X OVER W/MOUND RD	M-59	0.5 WEST OF UTICA	1 Highway	1 Highway	1994				2	177.7	40.2	2	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	2	4	42.62	-83.06193	2025-08-18T00:00:00	POINT (-83.06193 42.62)	Macomb	NBI	Non-NHS	7143.54	37.1	4205539	0.01	2023-11-30T00:00:00	24	A	7	7	7	N
1428	Macomb County	Metro	6200	""	WB METRO PARKWAY	CLINTON RIVER SPILLWAY	0.02 MI E OF UNION LAKE	1 Highway	5 Waterway	1964	2004		1964	5	303.8	48.9	5	3 Steel	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	3		42.57	-82.86191	2025-08-18T00:00:00	POINT (-82.86191 42.57)	Macomb	NBI	NHS	14855.82	45.6	801202	11.56	2023-08-16T00:00:00	24	P	7	5	6	N
1429	Macomb County	Metro	6251	""	SCHOENHERR RD	STERLING RELIEF DRAIN	0.5 MI S OF 16 MILE RD	5 Highway-pedestrian	5 Waterway	1971				4	64	59.1	4	3 Steel	19 Culvert	0	""	""	N N/A (no deck (NBI))	5 MS 18 (HS 20)	5		42.56	-82.98775	2025-08-18T00:00:00	POINT (-82.98775 42.56)	Macomb	NBI	NHS	3782.4	0	798810	7.67	2025-04-18T00:00:00	24	A	N	N	N	5
1430	Macomb County	Metro	6368	""	28 MILE ROAD	OVERFLOW N B CLINTON	1.5 MI WEST OF NORTH AVE	1 Highway	5 Waterway	2018				1	22	36	1	1 Concrete	19 Culvert	0	""	""	6 Bituminous	B Greater than HL 93	2		42.75	-82.90948	2025-08-18T00:00:00	POINT (-82.90948 42.75)	Macomb	NBI	Non-NHS	792	36	4208920	9.53	2024-07-08T00:00:00	24	A	N	N	N	9
1431	MDOT	Metro	11851	82252-S10-7	M-102 EB SERV RD	I-75	IN DETROIT	5 Highway-pedestrian	1 Highway	1969		2007	2007	2	127.3	54.1	2	3 Steel	32 Multi Str Comp	0	""	""	3 Latex Concrete/Similar	5 MS 18 (HS 20)	3	6	42.45	-83.09468	2025-08-18T00:00:00	POINT (-83.09468 42.45)	Detroit	NBI	NHS	6886.93	41	1586006	0.28	2024-03-06T00:00:00	24	A	5	6	7	N
1432	Oakland County	Metro	14123	""	FISH LAKE RD	SHIAWASSEE RIVER	HOLLY TWP SEC 29/28	1 Highway	5 Waterway	2022				1	30.9	34.5	1	1 Concrete	19 Culvert	0	""	""	6 Bituminous	B Greater than HL 93	2		42.8	-83.64772	2025-08-18T00:00:00	POINT (-83.64772 42.8)	Oakland	NBI	Non-NHS	1066.05	34.5	649104	8.16	2024-06-28T00:00:00	24	A	N	N	N	8
1433	Macomb County	Metro	6198	""	WB METRO PARKWAY	HARRINGTON DRAIN	0.75 MI WEST OF M-97	1 Highway	5 Waterway	1952	2010			1	35	53.3	1	5 Prestressed Concrete	05 Box Bm/Gird- Multiple	0	""	""	1 Monolithic Concrete	9 MS22.5(HS25)or greater	3		42.57	-82.92861	2025-08-18T00:00:00	POINT (-82.92861 42.57)	Macomb	NBI	NHS	1865.5	50.1	801202	8.18	2024-08-30T00:00:00	24	A	7	8	7	N
1434	MDOT	Metro	8018	63172-S13	WALDON RD	I-75	2.5 MI SE OF M-15	1 Highway	1 Highway	1962		2004	2004	4	335.5	32.8	4	3 Steel	82 Pl Girder Comp	0	""	""	3 Latex Concrete/Similar	2 M 13.5 (H 15)	2	6	42.73	-83.375854	2025-08-18T00:00:00	POINT (-83.375854 42.73)	Oakland	NBI	Non-NHS	11004.4	25.9	627303	2.17	2025-03-31T00:00:00	24	A	5	6	5	N
1435	MDOT	Metro	6014	50011-S06	M-59 WB	M-53	M-59 WB OV M-53	1 Highway	1 Highway	1994				2	236	84.2	2	5 Prestressed Concrete	05 Box Bm/Gird- Multiple	0	""	""	5 Epoxy Overlay	9 MS22.5(HS25)or greater	5	6	42.63	-83.012695	2025-08-18T00:00:00	POINT (-83.012695 42.63)	Macomb	NBI	NHS	19871.2	80.9	807801	4.01	2023-11-13T00:00:00	24	A	7	6	7	N
1436	MDOT	Metro	11830	82251-S29	I-94 W-S RAMP	I-75 & RAMP	IN DETROIT	1 Highway	1 Highway	1962	2002	2014	1989	3	185.8	38.4	3	3 Steel	32 Multi Str Comp	0	""	""	5 Epoxy Overlay	9 MS22.5(HS25)or greater	2	7	42.37	-83.05793	2025-08-18T00:00:00	POINT (-83.05793 42.37)	Detroit	NBI	NHS	7134.72	35.1	1577703	0.1	2023-10-16T00:00:00	24	A	8	6	7	N
1437	MDOT	Metro	11370	82103-S13	SECOND AVENUE	M-8, DAVISON FWY	HIGHLAND PARK  W/WOODWARD	5 Highway-pedestrian	1 Highway	1996				2	234.2	74.5	2	5 Prestressed Concrete	05 Box Bm/Gird- Multiple	0	""	""	5 Epoxy Overlay	5 MS 18 (HS 20)	4	10	42.4	-83.09877	2025-08-18T00:00:00	POINT (-83.09877 42.4)	Detroit	NBI	Non-NHS	17447.9	57.7	4700005	0.01	2023-10-23T00:00:00	24	A	7	7	7	N
1438	MDOT	Metro	11509	82122-S21	OUTER DRIVE	I-96	IN DETROIT	5 Highway-pedestrian	1 Highway	1970	2003		2003	2	230.5	169.9	2	3 Steel	82 Pl Girder Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	10	10	42.39	-83.25603	2025-08-18T00:00:00	POINT (-83.25603 42.39)	Detroit	NBI	Non-NHS	39161.95	166	1582205	0.23	2024-04-24T00:00:00	24	A	6	6	7	N
1439	Wayne County	Metro	12301	""	WOODS DRIVE	MIDDLE ROUGE RIVER	PLYMOUTH TW S/PLYMOUTH RD	1 Highway	5 Waterway	1933	1935		1973	1	47.9	28.9	1	3 Steel	02 Multi Str Non Comp	0	""	""	2 Integral Concrete	4 M 18 (H 20)	2		42.38	-83.45486	2025-08-18T00:00:00	POINT (-83.45486 42.38)	Taylor	NBI	Non-NHS	1384.31	26.2	1710105	0.01	2025-03-03T00:00:00	12	K	5	2	5	N
1440	Wayne County	Metro	12148	""	VENOY ROAD	LOWER ROUGE RIVER	WAYNE          N/MICHIGAN	1 Highway	5 Waterway	1937	1981			1	50.9	45.3	1	3 Steel	02 Multi Str Non Comp	0	""	""	1 Monolithic Concrete	0 Unknown	2		42.28	-83.363396	2025-08-18T00:00:00	POINT (-83.363396 42.28)	Taylor	NBI	Non-NHS	2305.77	35.8	1599408	1.22	2025-05-15T00:00:00	24	A	5	5	6	N
1441	Wayne County	Metro	12237	""	SOUTHERN AVENUE	WYOMING AVENUE	DEARBORN       S/MICHIGAN	5 Highway-pedestrian	1 Highway	1925			1984	4	94.8	48.2	2	4 Steel Continuous	42 Multi Str Encsd	2	3 Steel	42 Multi Str Encsd	2 Integral Concrete	6 MS18(HS20)+mod	4	4	42.32	-83.15777	2025-08-18T00:00:00	POINT (-83.15777 42.32)	Taylor	NBI	Non-NHS	4569.36	35.8	1653407	0.25	2024-10-17T00:00:00	24	A	5	5	5	N
1442	Wayne County	Metro	12007	""	GROSSE ILE PARKWAY	WEST RIVER ROAD	GROSSE ILE T E/TRENTON CH	5 Highway-pedestrian	1 Highway	2019				1	50	43	1	3 Steel	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	B Greater than HL 93	2	2	42.13	-83.172226	2025-08-18T00:00:00	POINT (-83.172226 42.13)	Taylor	NBI	Non-NHS	2150	28	1692407	0.68	2025-02-28T00:00:00	24	A	8	8	8	N
1443	MDOT	Metro	13311	82073-B01	M-85	ROUGE RIVER	M-85 AT ROUGE RIVER	5 Highway-pedestrian	5 Waterway	2013				3	330	86	1	3 Steel	16 Movable- Bascule	2	3 Steel	32 Multi Str Comp	2 Integral Concrete	B Greater than HL 93	5		42.29	-83.1423	2025-08-18T00:00:00	POINT (-83.1423 42.29)	Detroit	NBI	NHS	28380	64	1585010	0.05	2025-05-01T00:00:00	24	A	6	6	6	N
1444	Wayne County	Metro	13659	""	MORTON TAYLOR RD	WILLOW CREEK	NORTH OF FORD RD	5 Highway-pedestrian	5 Waterway	2000				3	90.5	76.5	3	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	5 Epoxy Overlay	6 MS18(HS20)+mod	3		42.33	-83.46873	2025-08-18T00:00:00	POINT (-83.46873 42.33)	Taylor	NBI	Non-NHS	6923.25	62	4706622	1.03	2025-05-12T00:00:00	24	A	5	7	7	N
1445	MDOT	Metro	11858	82252-S22	I-75	MCNICHOLS RD	IN DETROIT OVER MCNICHOLS	1 Highway	1 Highway	1969	2003			4	224.7	149.2	4	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	5 Epoxy Overlay	6 MS18(HS20)+mod	8	8	42.42	-83.08763	2025-08-18T00:00:00	POINT (-83.08763 42.42)	Detroit	NBI	NHS	33525.24	142.8	1577706	6.99	2025-04-18T00:00:00	24	A	7	5	8	N
1446	MDOT	Metro	6148	50111-S02	9 MI RD	I-94	W LTS OF ST CLAIR SHORES	5 Highway-pedestrian	1 Highway	1967	2002		1997	4	209.4	62.4	4	3 Steel	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	6 MS18(HS20)+mod	4	6	42.47	-82.92101	2025-08-18T00:00:00	POINT (-82.92101 42.47)	Macomb	NBI	Non-NHS	13066.56	47.9	803006	8.31	2025-07-09T00:00:00	12	A	6	6	4	N
1447	MDOT	Metro	11223	82024-S16	HARPER AVE	I-94	IN DETROIT	5 Highway-pedestrian	1 Highway	1958		1958	1958	2	170.8	40	2	4 Steel Continuous	02 Multi Str Non Comp	0	""	""	6 Bituminous	5 MS 18 (HS 20)	2	6	42.38	-83.031944	2025-08-18T00:00:00	POINT (-83.031944 42.38)	Detroit	NBI	Non-NHS	6832	30	1577810	0.1	2024-04-18T00:00:00	24	A	5	6	4	N
1448	MDOT	Metro	11540	82123-R01	SB TO WB TURN RDWY	CSX RR & FULLERTON AVE	IN DETROIT	1 Highway	4 Highway-railroad	1975			1987	3	278.7	28.9	3	4 Steel Continuous	02 Multi Str Non Comp	0	""	""	5 Epoxy Overlay	5 MS 18 (HS 20)	1	2	42.38	-83.21797	2025-08-18T00:00:00	POINT (-83.21797 42.38)	Detroit	NBI	NHS	8054.43	26.9	1591902	0.25	2023-08-16T00:00:00	24	A	5	6	7	N
1449	Detroit	Metro	11479	""	I-96 EB SERV RD	ROUGE RIVER	IN DETROIT	5 Highway-pedestrian	5 Waterway	1970	2011		2011	3	270	39.9	3	3 Steel	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	6 MS18(HS20)+mod	2		42.39	-83.26673	2025-08-18T00:00:00	POINT (-83.26673 42.39)	Detroit	NBI	Non-NHS	10773	24	4705231	9.45	2024-06-05T00:00:00	24	A	7	7	7	N
1450	MDOT	Metro	8115	63191-S01	MEADOWBROOK RD	I-96	IN THE VILLAGE OF NOVI	1 Highway	1 Highway	1972	2008	2008	2008	2	287	42.4	2	3 Steel	02 Multi Str Non Comp	0	""	""	5 Epoxy Overlay	4 M 18 (H 20)	2	9	42.49	-83.45599	2025-08-18T00:00:00	POINT (-83.45599 42.49)	Oakland	NBI	Non-NHS	12168.8	38.5	656706	3.22	2024-12-11T00:00:00	24	A	6	7	7	N
1451	Macomb County	Metro	6232	""	ARMADA RIDGE RD	HIGHBANK CREEK	0.1 MI E OF CRYDERMAN RD	1 Highway	5 Waterway	1950				2	22	36.1	2	1 Concrete	19 Culvert	0	""	""	N N/A (no deck (NBI))	4 M 18 (H 20)	2		42.84	-82.83483	2025-08-18T00:00:00	POINT (-82.83483 42.84)	Macomb	NBI	Non-NHS	794.2	0	817602	6.54	2024-08-07T00:00:00	12	A	N	N	N	4
1452	Macomb County	Metro	6328	""	27 MILE ROAD	KIRKHAM DRAIN	0.8 MI EAST OF GRATIOT	1 Highway	5 Waterway	1994				1	67.9	43.6	1	5 Prestressed Concrete	05 Box Bm/Gird- Multiple	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	2		42.73	-82.76322	2025-08-18T00:00:00	POINT (-82.76322 42.73)	Macomb	NBI	Non-NHS	2960.44	39.4	822108	4.26	2023-09-14T00:00:00	24	A	7	7	8	N
1453	MDOT	Metro	6093	50061-S26	BUNERT RD	I-696	IN WARREN	5 Highway-pedestrian	1 Highway	1973			2000	2	196	66.4	2	4 Steel Continuous	82 Pl Girder Comp	0	""	""	5 Epoxy Overlay	4 M 18 (H 20)	4	8	42.49	-82.977425	2025-08-18T00:00:00	POINT (-82.977425 42.49)	Macomb	NBI	Non-NHS	13014.4	52	805804	0.49	2023-09-22T00:00:00	24	A	6	7	6	N
1454	MDOT	Metro	11550	82123-S04	U-TRN SERV RD	M-39(SOUTHFIELD EXPR)	IN DETROIT	6 2d level interchg	1 Highway	1970			1989	4	241.6	34.1	4	3 Steel	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	2	8	42.38	-83.21656	2025-08-18T00:00:00	POINT (-83.21656 42.38)	Detroit	NBI	Non-NHS	8238.56	24.6	1804001	0.08	2023-08-22T00:00:00	24	A	6	6	7	N
1455	MDOT	Metro	11975	82293-S11	SB TO EB I-96	I-275 NB	0.3 MI W OF LIVONIA	1 Highway	1 Highway	1971		2001	2001	3	310.8	44.6	3	3 Steel	02 Multi Str Non Comp	0	""	""	5 Epoxy Overlay	5 MS 18 (HS 20)	2	3	42.39	-83.434	2025-08-18T00:00:00	POINT (-83.434 42.39)	Taylor	NBI	NHS	13861.68	42	1606201	0.36	2024-10-23T00:00:00	24	A	5	5	6	N
1456	Macomb County	Metro	6383	""	HAYES ROAD	PRICE BROOK DRAIN	0.25 MI S OF 28 MILE RD	1 Highway	5 Waterway	1979				2	23.3	16.4	2	3 Steel	19 Culvert	0	""	""	N N/A (no deck (NBI))	4 M 18 (H 20)	2		42.74	-82.97787	2025-08-18T00:00:00	POINT (-82.97787 42.74)	Macomb	NBI	Non-NHS	382.12	0	857308	0.66	2025-06-17T00:00:00	24	A	N	N	N	6
1457	Macomb County	Metro	6193	""	SHOOK RD	CLINTON HARRISON DRAIN	200 FT WEST OF I-94	1 Highway	5 Waterway	2016				1	70	54.2	1	5 Prestressed Concrete	06 Box Bms- Single/Sprd	0	""	""	1 Monolithic Concrete	B Greater than HL 93	2		42.56	-82.86273611	2025-08-18T00:00:00	POINT (-82.86273611 42.56)	Macomb	NBI	NHS	3794	40	4211898	0.37	2024-10-04T00:00:00	24	A	8	9	8	N
1458	Macomb County	Metro	6256	""	GARFIELD RD	CLINTON RIVER	0.1 MI S OF CLINTON R RD	5 Highway-pedestrian	5 Waterway	1986	2000			3	149.9	71.2	3	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	3 Latex Concrete/Similar	9 MS22.5(HS25)or greater	5		42.58	-82.95208	2025-08-18T00:00:00	POINT (-82.95208 42.58)	Macomb	NBI	NHS	10672.88	56.1	798703	3.1	2024-08-29T00:00:00	24	A	7	8	7	N
1459	MDOT	Metro	11186	82023-S18	LINWOOD AVE	I-94	IN DETROIT	5 Highway-pedestrian	1 Highway	1953	1997		2004	4	173.4	61.7	4	3 Steel	02 Multi Str Non Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	4	6	42.35	-83.09371	2025-08-18T00:00:00	POINT (-83.09371 42.35)	Detroit	NBI	NHS	10698.78	44	1577410	0.12	2023-11-14T00:00:00	24	A	7	6	6	N
1460	Oakland County	Metro	8151	""	ADAMS ROAD	CLINTON RIVER	BET HAMLIN AND AVON RDS	1 Highway	5 Waterway	1959		2016		1	35.8	33.8	1	5 Prestressed Concrete	05 Box Bm/Gird- Multiple	0	""	""	6 Bituminous	6 MS18(HS20)+mod	2		42.65	-83.192825	2025-08-18T00:00:00	POINT (-83.192825 42.65)	Oakland	NBI	NHS	1210.04	29.9	4415861	8.64	2024-09-26T00:00:00	12	A	6	5	5	N
1461	MDOT	Metro	8015	63172-S11	NB BALDWIN RD	I-75	3.1 MI NW OF M-24	1 Highway	1 Highway	1993				2	236	56.3	2	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	5 Epoxy Overlay	4 M 18 (H 20)	3	8	42.71	-83.30673	2025-08-18T00:00:00	POINT (-83.30673 42.71)	Oakland	NBI	NHS	13286.8	44	655009	1.41	2025-03-25T00:00:00	24	A	7	5	7	N
1462	Wayne County	Metro	12125	""	NORTHVILLE ROAD	MIDDLE ROUGE RIVER	NORTHVILLE  N OF SIX MILE	5 Highway-pedestrian	5 Waterway	1922	1991	1996		2	64	62	2	5 Prestressed Concrete	02 Multi Str Non Comp	0	0 Other	00 Other	1 Monolithic Concrete	4 M 18 (H 20)	2		42.41	-83.469955	2025-08-18T00:00:00	POINT (-83.469955 42.41)	Taylor	NBI	Non-NHS	3968	47.9	1679402	2.14	2025-03-31T00:00:00	24	A	5	5	5	N
1463	MDOT	Metro	8083	63174-S17	SQUIRREL RD	I-75	2.7 MI SE OF M-59	1 Highway	1 Highway	2017				2	236	42.8	2	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	B Greater than HL 93	2	11	42.61	-83.223	2025-08-18T00:00:00	POINT (-83.223 42.61)	Oakland	NBI	Non-NHS	10100.8	33	617001	2.4	2023-12-08T00:00:00	24	A	8	8	7	N
1464	MDOT	Metro	11591	82123-S43	GD RIV ENT TO I94W	RAMP TO I-94	IN DETROIT OVER I94WB TO	1 Highway	1 Highway	1971	2004		2004	3	149.7	24.3	3	4 Steel Continuous	82 Pl Girder Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	1	2	42.35	-83.09764	2025-08-18T00:00:00	POINT (-83.09764 42.35)	Detroit	NBI	NHS	3637.71	21	1581705	0.07	2023-10-20T00:00:00	24	A	8	8	7	N
1465	MDOT	Metro	11606	82124-S01	WARREN AVE	I-96	IN DETROIT	5 Highway-pedestrian	1 Highway	1971	2005			4	256.3	103.4	4	5 Prestressed Concrete	06 Box Bms- Single/Sprd	0	""	""	5 Epoxy Overlay	5 MS 18 (HS 20)	5	10	42.35	-83.09645	2025-08-18T00:00:00	POINT (-83.09645 42.35)	Detroit	NBI	NHS	26501.42	81	1628604	5.1	2023-10-25T00:00:00	24	A	7	7	7	N
1466	Birmingham	Metro	8235	""	LAKESIDE ST SOUTH	QUARTON LK-ROUGE RIVER	0.4 MI S OF QUARTON RD	5 Highway-pedestrian	5 Waterway	1994				1	24	25.9	1	1 Concrete	19 Culvert	0	""	""	6 Bituminous	5 MS 18 (HS 20)	2		42.55	-83.22601	2025-08-18T00:00:00	POINT (-83.22601 42.55)	Oakland	NBI	Non-NHS	621.6	0	614609	0.48	2024-10-24T00:00:00	24	A	N	N	N	7
1467	MDOT	Metro	11621	82141-B03-3	M-102 EB	PLUM CREEK	0.5 MI E OF US-24	1 Highway	5 Waterway	2013				1	75	61.9	1	5 Prestressed Concrete	06 Box Bms- Single/Sprd	0	""	""	1 Monolithic Concrete	B Greater than HL 93	4		42.44	-83.270164	2025-08-18T00:00:00	POINT (-83.270164 42.44)	Detroit	NBI	NHS	4642.5	52	1817406	2.6	2024-09-03T00:00:00	24	A	7	8	8	N
1468	Woodhaven	Metro	12526	""	ARLINGTON STREET	BLAKELY DRAIN	300 FT W MONTEBELLO DR	5 Highway-pedestrian	5 Waterway	1971		2023		4	53.8	26.9	4	2 Concrete Continuous	19 Culvert	0	""	""	6 Bituminous	6 MS18(HS20)+mod	2		42.12	-83.22047	2025-08-18T00:00:00	POINT (-83.22047 42.12)	Taylor	NBI	Non-NHS	1447.22	24.9	1692504	0.43	2023-08-29T00:00:00	24	A	N	N	N	7
1469	MDOT	Metro	8059	63174-S03-2	I-75 SB	12 MILE RD	IN MADISON HTS	1 Highway	1 Highway	2023				2	170	73.7	2	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	0 None	B Greater than HL 93	4	6	42.5	-83.115	2025-08-18T00:00:00	POINT (-83.115 42.5)	Oakland	NBI	NHS	12529	70.4	646106	4.36	2025-04-22T00:00:00	24	A	8	8	8	N
1470	MDOT	Metro	7997	63172-R01-2	I-75 SB	GTW RR	5.7 MI NW OF M-59	1 Highway	2 Railroad	1962		1981		3	144	62.2	3	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	5 Epoxy Overlay	6 MS18(HS20)+mod	3		42.7	-83.28708	2025-08-18T00:00:00	POINT (-83.28708 42.7)	Oakland	NBI	NHS	8956.8	58	646106	24.3	2025-03-28T00:00:00	24	A	7	7	7	N
1471	Dearborn Height	Metro	12326	""	GULLEY ROAD	ECORSE CREEK	IN DEARBORN HEIGHTS	1 Highway	5 Waterway	1958	2007			1	30.8	50.1	1	5 Prestressed Concrete	05 Box Bm/Gird- Multiple	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	2		42.27	-83.28468	2025-08-18T00:00:00	POINT (-83.28468 42.27)	Taylor	NBI	Non-NHS	1543.08	36.1	1643407	0.35	2023-10-11T00:00:00	24	A	7	7	7	N
1472	Macomb County	Metro	6271	""	JEFFERSON AVE	CLINTON RIVER SPILLWAY	0.4MI W OF CROCKER BLVD	1 Highway	5 Waterway	1950		2016	1950	3	196	36.4	3	3 Steel	32 Multi Str Comp	0	""	""	5 Epoxy Overlay	5 MS 18 (HS 20)	2		42.56	-82.84719	2025-08-18T00:00:00	POINT (-82.84719 42.56)	Macomb	NBI	Non-NHS	7134.4	29.5	4718263	8.62	2025-05-14T00:00:00	24	A	6	5	6	N
1473	MDOT	Metro	11843	82252-S03	E GRAND BLVD	I-75	IN DETROIT	5 Highway-pedestrian	1 Highway	1968	2007		1995	2	152.9	110	2	3 Steel	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	6	8	42.37	-83.05995	2025-08-18T00:00:00	POINT (-83.05995 42.37)	Detroit	NBI	Non-NHS	16819	72	1577308	4.56	2024-04-17T00:00:00	24	A	7	7	6	N
1474	Oakland County	Metro	8209	""	CLARKSTON RD	PAINT CREEK	AT KERN RD	1 Highway	5 Waterway	1958	1985			1	26.9	18	1	5 Prestressed Concrete	05 Box Bm/Gird- Multiple	0	""	""	6 Bituminous	6 MS18(HS20)+mod	2		42.77	-83.21788	2025-08-18T00:00:00	POINT (-83.21788 42.77)	Oakland	NBI	Non-NHS	484.2	18	4400096	0.02	2024-07-23T00:00:00	24	A	5	5	5	N
1475	Wayne County	Metro	12093	""	SEVEN MILE ROAD	N/BRANCH JOHNSON DRAIN	NORTHVILLE T       E/BECK	1 Highway	5 Waterway	1934				1	21	38.1	1	1 Concrete	19 Culvert	0	""	""	N N/A (no deck (NBI))	0 Unknown	2		42.42	-83.50412	2025-08-18T00:00:00	POINT (-83.50412 42.42)	Taylor	NBI	Non-NHS	800.1	37.1	1680703	2.4	2025-05-27T00:00:00	24	A	N	N	N	5
1476	Mt Clemens	Metro	6415	""	DICKINSON ST	CLINTON RIVER	EAST OF GRATIOT	5 Highway-pedestrian	5 Waterway	1953	2007	2007	2007	3	212	56.4	3	3 Steel	32 Multi Str Comp	0	""	""	3 Latex Concrete/Similar	6 MS18(HS20)+mod	4		42.6	-82.874596	2025-08-18T00:00:00	POINT (-82.874596 42.6)	Macomb	NBI	Non-NHS	11956.8	44	800808	0.7	2024-04-26T00:00:00	24	A	7	5	6	N
1477	MDOT	Metro	11613	82125-S03	SEVEN MILE RD	I-96	IN LIVONIA	5 Highway-pedestrian	1 Highway	1974	2007		1986	4	307	84.4	4	3 Steel	02 Multi Str Non Comp	0	""	""	5 Epoxy Overlay	5 MS 18 (HS 20)	4	10	42.43	-83.42408	2025-08-18T00:00:00	POINT (-83.42408 42.43)	Taylor	NBI	NHS	25910.8	56	1700106	0.43	2024-12-13T00:00:00	24	A	7	7	7	N
1478	MDOT	Metro	7956	63102-S45	I-696 WB	M-1 WOODWARD	AT WOODWARD & I-696	1 Highway	1 Highway	1986			1986	2	122	76.1	2	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	9 MS22.5(HS25)or greater	4	4	42.48	-83.14541111	2025-08-18T00:00:00	POINT (-83.14541111 42.48)	Oakland	NBI	NHS	9284.2	71.7	1904002	2.85	2024-07-09T00:00:00	24	A	6	7	7	N
1479	MDOT	Metro	11129	82022-S23	I-94 EB	OUTER DR	IN ALLEN PARK	1 Highway	1 Highway	1998				1	112.6	66.3	1	5 Prestressed Concrete	05 Box Bm/Gird- Multiple	0	""	""	1 Monolithic Concrete	9 MS22.5(HS25)or greater	3	6	42.28	-83.20341	2025-08-18T00:00:00	POINT (-83.20341 42.28)	Taylor	NBI	NHS	7465.38	63	1576405	18.42	2023-08-21T00:00:00	24	A	6	7	7	N
1480	Wayne County	Metro	12074	""	E.N.HINES DR/AA TR	BEECH-DALY ROAD	DBN HTS          N/WARREN	5 Highway-pedestrian	1 Highway	1953			1995	1	70.9	62.3	1	3 Steel	32 Multi Str Comp	0	0 Other	00 Other	6 Bituminous	5 MS 18 (HS 20)	4	4	42.35	-83.293564	2025-08-18T00:00:00	POINT (-83.293564 42.35)	Taylor	NBI	NHS	4417.07	47.9	1689409	11.78	2024-09-13T00:00:00	24	A	5	6	6	N
1481	Oakland County	Metro	8180	""	ELIZABETH LAKE RD	CLINTON RIVER	BET AIRPORT AND CRESCENT	1 Highway	5 Waterway	1986				1	42	43.6	1	5 Prestressed Concrete	05 Box Bm/Gird- Multiple	0	""	""	1 Monolithic Concrete	6 MS18(HS20)+mod	2		42.65	-83.403305	2025-08-18T00:00:00	POINT (-83.403305 42.65)	Oakland	NBI	Non-NHS	1831.2	40	630906	2.04	2024-07-23T00:00:00	24	A	6	7	7	N
1482	Macomb County	Metro	6288	""	34 MILE ROAD	NORTH BRANCH CLINTON R	2.1 MI EAST OF VAN DYKE	1 Highway	5 Waterway	1991				1	56.8	43.3	1	5 Prestressed Concrete	05 Box Bm/Gird- Multiple	0	""	""	6 Bituminous	5 MS 18 (HS 20)	2		42.83	-82.98091	2025-08-18T00:00:00	POINT (-82.98091 42.83)	Macomb	NBI	Non-NHS	2459.44	39.4	821608	6.09	2024-07-22T00:00:00	24	A	6	7	7	N
1483	MDOT	Metro	11439	82112-S14	M-10 RAMP	M-8 EB DAVISON	IN DETROIT	1 Highway	1 Highway	1957	1996			4	302.1	28.5	4	3 Steel	82 Pl Girder Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	1	4	42.4	-83.10864	2025-08-18T00:00:00	POINT (-83.10864 42.4)	Detroit	NBI	NHS	8609.85	25.3	1590902	0.13	2025-04-28T00:00:00	24	A	6	6	6	N
1484	MDOT	Metro	7874	63081-S03	M-10 (RAMP B)	M-10 RAMP	IN SOUTHFIELD (RAMP A)	1 Highway	1 Highway	1964	2006	2006	1989	3	193.9	34.9	3	3 Steel	32 Multi Str Comp	0	""	""	3 Latex Concrete/Similar	5 MS 18 (HS 20)	2	1	42.46	-83.21788	2025-08-18T00:00:00	POINT (-83.21788 42.46)	Oakland	NBI	NHS	6767.11	30.9	710608	0.16	2024-08-27T00:00:00	24	A	6	7	6	N
1485	MDOT	Metro	11449	82112-S24	PURITAN AVE	M-10	IN DETROIT	5 Highway-pedestrian	1 Highway	1963	2006		2006	2	132.9	106.4	2	3 Steel	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	4	6	42.41	-83.16498	2025-08-18T00:00:00	POINT (-83.16498 42.41)	Detroit	NBI	Non-NHS	14140.56	84	4707953	3.25	2024-08-13T00:00:00	24	A	7	7	7	N
1486	MDOT	Metro	7800	63022-S04	OLD PLANK RD	I-96	5.1 MI E OF LIVINGSTON CO	1 Highway	1 Highway	2003				2	244.3	46.6	2	5 Prestressed Concrete	05 Box Bm/Gird- Multiple	0	""	""	5 Epoxy Overlay	5 MS 18 (HS 20)	2	6	42.51	-83.5756	2025-08-18T00:00:00	POINT (-83.5756 42.51)	Oakland	NBI	Non-NHS	11384.38	43.3	657001	0.31	2024-11-25T00:00:00	24	A	7	7	8	N
1487	MDOT	Metro	11268	82025-S21	HARPER AVE	I-94	IN HARPER WOODS	5 Highway-pedestrian	1 Highway	1960	1996		1996	4	208.5	45.9	4	4 Steel Continuous	02 Multi Str Non Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	2	6	42.45	-82.91652	2025-08-18T00:00:00	POINT (-82.91652 42.45)	Detroit	NBI	NHS	9570.15	35.5	1578305	0.08	2024-06-27T00:00:00	24	A	7	7	7	N
1488	MDOT	Metro	11395	82111-S06	WASHINGTON ST	M-10	IN DETROIT	5 Highway-pedestrian	1 Highway	1958	2004		2004	2	101.8	173.2	2	4 Steel Continuous	32 Multi Str Comp	0	""	""	6 Bituminous	6 MS18(HS20)+mod	6	6	42.33	-83.047844	2025-08-18T00:00:00	POINT (-83.047844 42.33)	Detroit	NBI	Non-NHS	17631.76	157.5	5500333	0.01	2024-06-26T00:00:00	24	A	7	7	7	N
1489	MDOT	Metro	11281	82052-B04	US-24 SB	FRANK & POET DRAIN	IN TAYLOR	5 Highway-pedestrian	5 Waterway	1964	2001			1	24.6	65.9	1	5 Prestressed Concrete	05 Box Bm/Gird- Multiple	0	""	""	1 Monolithic Concrete	9 MS22.5(HS25)or greater	4		42.2	-83.26828	2025-08-18T00:00:00	POINT (-83.26828 42.2)	Taylor	NBI	NHS	1621.14	50.9	1576806	0.68	2024-08-28T00:00:00	24	A	7	7	6	N
1490	Wayne County	Metro	12197	""	JEFFERSON AVENUE	SILVER CREEK	BROWNSTOWN       S/CAMPAU	1 Highway	5 Waterway	1927			1990	2	71.9	45.6	2	3 Steel	02 Multi Str Non Comp	0	""	""	2 Integral Concrete	6 MS18(HS20)+mod	2		42.05	-83.21137	2025-08-18T00:00:00	POINT (-83.21137 42.05)	Taylor	NBI	Non-NHS	3278.64	36.1	4302169	0.45	2024-09-18T00:00:00	12	A	3	6	5	N
1491	MDOT	Metro	6004	50011-B01	M-53	BEAR CREEK	IN WARREN	1 Highway	5 Waterway	1960		1960		2	27.9	56	2	2 Concrete Continuous	19 Culvert	0	""	""	6 Bituminous	5 MS 18 (HS 20)	6		42.52	-83.02886667	2025-08-18T00:00:00	POINT (-83.02886667 42.52)	Macomb	NBI	NHS	1562.4	44	799108	4.97	2024-03-28T00:00:00	24	A	N	N	N	6
1492	Dearborn Height	Metro	12331	""	HANOVER RD	ECORSE CREEK	DBN HGT BET HURON-MAYFAIR	5 Highway-pedestrian	5 Waterway	1977				1	47.9	43	1	5 Prestressed Concrete	05 Box Bm/Gird- Multiple	0	""	""	2 Integral Concrete	6 MS18(HS20)+mod	2		42.27	-83.236885	2025-08-18T00:00:00	POINT (-83.236885 42.27)	Taylor	NBI	Non-NHS	2059.7	25.9	1646505	0.7	2024-10-29T00:00:00	12	A	4	7	6	N
1493	MDOT	Metro	11263	82025-S17	WOODSIDE AVE	I-94	IN HARPER WOODS	1 Highway	1 Highway	1959	2000			4	161	57.1	4	4 Steel Continuous	02 Multi Str Non Comp	0	""	""	5 Epoxy Overlay	6 MS18(HS20)+mod	2	6	42.43	-82.925095	2025-08-18T00:00:00	POINT (-82.925095 42.43)	Detroit	NBI	Non-NHS	9193.1	47.9	4706147	0.01	2025-01-23T00:00:00	17	A	6	5	6	N
1494	MDOT	Metro	11788	82211-B02-2	M-85 SB	FRANK & POET DRAIN	IN TRENTON	5 Highway-pedestrian	5 Waterway	1958		2016		1	55	46	1	1 Concrete	04 Tee Beam	0	""	""	3 Latex Concrete/Similar	6 MS18(HS20)+mod	2		42.13	-83.20396	2025-08-18T00:00:00	POINT (-83.20396 42.13)	Taylor	NBI	NHS	2530	42.9	1592106	3.76	2024-05-15T00:00:00	24	A	6	6	7	N
1495	Wayne County	Metro	12174	""	BEECH-DALY ROAD	BELL CREEK	REDFORD TWP   S/FIVE MILE	5 Highway-pedestrian	5 Waterway	1933	1961			2	67.9	62.3	2	4 Steel Continuous	32 Multi Str Comp	0	""	""	6 Bituminous	6 MS18(HS20)+mod	4		42.39	-83.29556	2025-08-18T00:00:00	POINT (-83.29556 42.39)	Taylor	NBI	Non-NHS	4230.17	47.9	1600802	2.46	2025-04-29T00:00:00	12	P	5	5	5	N
1496	Wayne County	Metro	12267	""	SHELDON ROAD	SINES DRAIN	CANTON         N/MICHIGAN	1 Highway	5 Waterway	1935	1965	1989	1995	1	27.9	40	1	3 Steel	02 Multi Str Non Comp	0	""	""	2 Integral Concrete	4 M 18 (H 20)	2		42.28	-83.47611	2025-08-18T00:00:00	POINT (-83.47611 42.28)	Taylor	NBI	Non-NHS	1116	36.7	1670201	1.76	2025-05-27T00:00:00	12	P	5	4	5	N
1497	MDOT	Metro	11547	82123-S01	TURN RDWY EB TO SB	WB&U-TURN SERVICE ROADS	IN DETROIT	1 Highway	1 Highway	1972			1989	5	372.4	28.9	5	4 Steel Continuous	02 Multi Str Non Comp	0	""	""	5 Epoxy Overlay	5 MS 18 (HS 20)	1		42.38	-83.21738	2025-08-18T00:00:00	POINT (-83.21738 42.38)	Detroit	NBI	NHS	10762.36	26.9	1591904	0.27	2023-08-19T00:00:00	24	A	5	5	7	N
1498	Macomb County	Metro	12847	""	DEQUINDRE RD	RED RUN DRAIN	0.1 MI N OF CHICAGO RD	5 Highway-pedestrian	5 Waterway	1970				5	129.9	55.8	5	1 Concrete	19 Culvert	0	""	""	N N/A (no deck (NBI))	5 MS 18 (HS 20)	5		42.52	-83.08641	2025-08-18T00:00:00	POINT (-83.08641 42.52)	Macomb	NBI	NHS	7248.42	0	799402	5.33	2024-07-31T00:00:00	24	A	N	N	N	7
1499	Macomb County	Metro	6274	""	JEFFERSON AVE	AUVASE CREEK	0.2MI WEST OF COTTON ROAD	1 Highway	5 Waterway	1983				1	55.8	46.6	1	5 Prestressed Concrete	05 Box Bm/Gird- Multiple	0	""	""	3 Latex Concrete/Similar	9 MS22.5(HS25)or greater	2		42.65	-82.813225	2025-08-18T00:00:00	POINT (-82.813225 42.65)	Macomb	NBI	Non-NHS	2600.28	42.7	821205	0.96	2024-09-17T00:00:00	24	A	5	6	7	N
1500	MDOT	Metro	11777	82195-S20	SECOND BLVD	I-75	IN DETROIT	5 Highway-pedestrian	1 Highway	1967	1996		1996	2	155.8	74.7	2	5 Prestressed Concrete	05 Box Bm/Gird- Multiple	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	4	8	42.34	-83.05829	2025-08-18T00:00:00	POINT (-83.05829 42.34)	Detroit	NBI	Non-NHS	11638.26	49	1803905	0.01	2024-05-28T00:00:00	24	A	6	5	6	N
1501	MDOT	Metro	11502	82122-S16	BEECH DALY RD	I-96	IN REDFORD TWP	5 Highway-pedestrian	1 Highway	1974	2014		2001	2	177	82.4	2	3 Steel	02 Multi Str Non Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	5	8	42.38	-83.29538	2025-08-18T00:00:00	POINT (-83.29538 42.38)	Taylor	NBI	Non-NHS	14584.8	64	1600802	1.96	2024-09-27T00:00:00	24	A	7	7	7	N
1502	Warren	Metro	6434	""	THIRTEEN MILE ROAD	BEAR CREEK DRAIN	0.1 MI E OF VAN DYKE AVE	1 Highway	5 Waterway	1959				2	43	38.1	2	1 Concrete	19 Culvert	0	""	""	1 Monolithic Concrete	6 MS18(HS20)+mod	2		42.52	-83.02661	2025-08-18T00:00:00	POINT (-83.02661 42.52)	Macomb	NBI	Non-NHS	1638.3	0	803410	0.11	2023-10-26T00:00:00	24	A	N	N	N	6
1503	MDOT	Metro	11799	82251-S01	M-3 (GRATIOT AVE)	I-375	DOWNTOWN DETROIT	5 Highway-pedestrian	1 Highway	1963	1996		1996	5	298.8	119.8	5	3 Steel	32 Multi Str Comp	0	""	""	0 None	5 MS 18 (HS 20)	8	8	42.34	-83.041336	2025-08-18T00:00:00	POINT (-83.041336 42.34)	Detroit	NBI	NHS	35796.24	89.9	4711788	0.91	2025-05-02T00:00:00	24	A	6	6	6	N
1504	Southfield	Metro	8295	""	BEECH RD	ROUGE RIVER	IN SOUTHFIELD	1 Highway	5 Waterway	1952				1	54.5	29.2	1	3 Steel	32 Multi Str Comp	0	""	""	5 Epoxy Overlay	6 MS18(HS20)+mod	2		42.47	-83.29858	2025-08-18T00:00:00	POINT (-83.29858 42.47)	Oakland	NBI	Non-NHS	1591.4	25.9	684801	1.71	2023-09-21T00:00:00	24	A	6	5	6	N
1505	MDOT	Metro	11710	82193-S07	CURTIS AVE	M-39	IN DETROIT	5 Highway-pedestrian	1 Highway	1963	2010			2	108.8	71.5	2	5 Prestressed Concrete	06 Box Bms- Single/Sprd	0	""	""	1 Monolithic Concrete	B Greater than HL 93	2	6	42.42	-83.218956	2025-08-18T00:00:00	POINT (-83.218956 42.42)	Detroit	NBI	Non-NHS	7779.2	44	1594907	0.98	2025-06-12T00:00:00	24	A	7	8	7	N
1506	MDOT	Metro	11313	82062-S02-3	US-12 EB	M-39	IN DEARBORN OVER M-39	5 Highway-pedestrian	1 Highway	1970	2020		1970	4	243.5	76.2	4	3 Steel	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	5	10	42.31	-83.21466	2025-08-18T00:00:00	POINT (-83.21466 42.31)	Taylor	NBI	NHS	18554.7	68	1600206	17.73	2024-09-30T00:00:00	24	A	8	6	7	N
1507	MDOT	Metro	11946	82292-S04	I-275 SB	VAN BORN ROAD	2.2 MI W OF WAYNE	1 Highway	1 Highway	1974			2012	1	120	55.8	1	3 Steel	82 Pl Girder Comp	0	""	""	5 Epoxy Overlay	9 MS22.5(HS25)or greater	3	2	42.26	-83.44098	2025-08-18T00:00:00	POINT (-83.44098 42.26)	Taylor	NBI	NHS	6696	52.5	1607610	13.3	2024-08-28T00:00:00	24	A	7	7	7	N
1508	MDOT	Metro	6118	50062-S05	NIEMAN ST	I-696	IN ROSEVILLE	5 Highway-pedestrian	1 Highway	1972	2008		2009	2	196	47.4	2	4 Steel Continuous	82 Pl Girder Comp	0	""	""	1 Monolithic Concrete	2 M 13.5 (H 15)	2	8	42.49	-82.93101	2025-08-18T00:00:00	POINT (-82.93101 42.49)	Macomb	NBI	Non-NHS	9290.4	33	4208739	0.16	2025-04-22T00:00:00	24	A	7	7	6	N
1509	MDOT	Metro	7848	63043-S11	M-59 WB	UNIVERSITY DR CONNECTOR	IN PONTIAC	7 3d level interchg	6 Highway-waterway	1966	1998		1998	3	208	35.1	3	3 Steel	32 Multi Str Comp	0	""	""	5 Epoxy Overlay	5 MS 18 (HS 20)	2	2	42.64	-83.280495	2025-08-18T00:00:00	POINT (-83.280495 42.64)	Oakland	NBI	NHS	7300.8	30.5	677208	0.07	2025-05-22T00:00:00	24	A	6	7	7	N
1510	MDOT	Metro	11460	82112-S31	PEMBROKE AVE	M-10	IN DETROIT	5 Highway-pedestrian	1 Highway	1963	2006		2006	2	140.1	68.7	2	3 Steel	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	4	6	42.44	-83.19415	2025-08-18T00:00:00	POINT (-83.19415 42.44)	Detroit	NBI	Non-NHS	9624.87	44	1584502	1.72	2025-04-15T00:00:00	24	A	7	7	7	N
1511	MDOT	Metro	6140	50111-B02	I-94 RAMP	CLINTON RIVER SPILLWAY	2.0 MI SE OF MT CLEMENS	5 Highway-pedestrian	5 Waterway	1984			1998	4	276	36.3	4	3 Steel	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	2		42.57	-82.8589	2025-08-18T00:00:00	POINT (-82.8589 42.57)	Macomb	NBI	NHS	10018.8	34.7	4205735	0.16	2025-06-17T00:00:00	24	A	6	7	5	N
1512	MDOT	Metro	14107	82700-B02	LAKESIDE DRIVE	INLET CHANNEL	BELLE ISLE	5 Highway-pedestrian	5 Waterway	2019				1	59.5	48.4	1	5 Prestressed Concrete	06 Box Bms- Single/Sprd	0	""	""	1 Monolithic Concrete	B Greater than HL 93	2		42.34	-82.96072	2025-08-18T00:00:00	POINT (-82.96072 42.34)	Detroit	NBI	Non-NHS	2879.8	22	5494521	0.43	2025-07-21T00:00:00	24	A	8	8	7	N
1513	MDOT	Metro	11818	82251-S17	WARREN RMP TO I-75	I-75 NB TO E&W TURN RDWY	IN DETROIT	1 Highway	1 Highway	1964	2007		2007	1	105	29.5	1	3 Steel	82 Pl Girder Comp	0	""	""	1 Monolithic Concrete	6 MS18(HS20)+mod	1	2	42.36	-83.054726	2025-08-18T00:00:00	POINT (-83.054726 42.36)	Detroit	NBI	NHS	3097.5	27.1	1586105	0.05	2024-03-27T00:00:00	24	A	7	7	7	N
1514	MDOT	Metro	7879	63081-S08	9 MI RD	M-10	SOUTHFIELD (M-39 SB & US	6 2d level interchg	1 Highway	1964	1998		1996	4	249.1	64	4	3 Steel	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	5	4	42.46	-83.221214	2025-08-18T00:00:00	POINT (-83.221214 42.46)	Oakland	NBI	Non-NHS	15942.4	56.1	684404	4.91	2023-10-30T00:00:00	24	A	7	6	7	N
1515	Auburn Hills	Metro	12686	""	HAMLIN ROAD E BD	CLINTON RIVER	BET SQUIRREL AND ADAMS	1 Highway	5 Waterway	1989				1	64	40	1	5 Prestressed Concrete	05 Box Bm/Gird- Multiple	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	2		42.65	-83.212585	2025-08-18T00:00:00	POINT (-83.212585 42.65)	Oakland	NBI	Non-NHS	2560	26.9	626003	0.34	2024-10-16T00:00:00	24	A	7	7	7	N
1516	MDOT	Metro	11918	82292-B01	I-275 SB EXIT RAMP	LOWER ROUGE R/BIKE PATH	2.5 MI W OF WAYNE	1 Highway	5 Waterway	1974	2006	2006	2006	4	227.4	26.7	4	3 Steel	32 Multi Str Comp	0	""	""	3 Latex Concrete/Similar	9 MS22.5(HS25)or greater	1		42.28	-83.44354	2025-08-18T00:00:00	POINT (-83.44354 42.28)	Taylor	NBI	NHS	6071.58	23.5	1599110	0.18	2024-10-29T00:00:00	24	A	7	7	6	N
1517	Macomb County	Metro	13573	""	CRIMSON DRIVE	PRICE BROOK DRAIN	0.2 MI S OF 29 MILE RD	1 Highway	5 Waterway	2002				1	24.4	27.8	1	1 Concrete	19 Culvert	0	""	""	6 Bituminous	5 MS 18 (HS 20)	2		42.75	-83.00372	2025-08-18T00:00:00	POINT (-83.00372 42.75)	Macomb	NBI	Non-NHS	678.32		4210452	0.24	2024-08-06T00:00:00	24	A	N	N	N	7
1518	MDOT	Metro	11558	82123-S11	I-96 RAMP	LAND	IN DETROIT	1 Highway	0 Other	1973			1989	18	1236.2	51.5	14	3 Steel	32 Multi Str Comp	4	1 Concrete	01 Slab	5 Epoxy Overlay	5 MS 18 (HS 20)	3		42.38	-83.213745	2025-08-18T00:00:00	POINT (-83.213745 42.38)	Detroit	NBI	NHS	63664.3	49.2	1591903	0.27	2024-08-20T00:00:00	12	A	4	6	5	N
1519	Oakland County	Metro	13941	""	BREWER ROAD	STONEY CREEK	ADDISON TWP SEC 25/36	1 Highway	5 Waterway	1984				1	23	18	1	5 Prestressed Concrete	05 Box Bm/Gird- Multiple	0	""	""	8 Gravel	5 MS 18 (HS 20)	2		42.82	-83.11797	2025-08-18T00:00:00	POINT (-83.11797 42.82)	Oakland	NBI	Non-NHS	414	17	604104	0.9	2024-09-13T00:00:00	12	P	5	5	3	N
1520	MDOT	Metro	11753	82194-S24	US-12	I-96	IN DETROIT	5 Highway-pedestrian	1 Highway	1970	2005		2005	5	254.5	113.2	5	4 Steel Continuous	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	8	4	42.33	-83.08685	2025-08-18T00:00:00	POINT (-83.08685 42.33)	Detroit	NBI	NHS	28809.4	94	1577103	5.45	2024-05-23T00:00:00	24	A	7	6	6	N
1521	Wayne County	Metro	12136	""	HAGGERTY ROAD	MIDDLE ROUGE RIVER	PLYMOUTH T S/PLYMOUTH RD	5 Highway-pedestrian	5 Waterway	1949	2001			1	89.9	65.5	1	5 Prestressed Concrete	02 Multi Str Non Comp	0	""	""	1 Monolithic Concrete	9 MS22.5(HS25)or greater	4		42.37	-83.44551	2025-08-18T00:00:00	POINT (-83.44551 42.37)	Taylor	NBI	Non-NHS	5888.45	51.2	4706524	11.33	2025-03-28T00:00:00	24	A	6	8	8	N
1522	Wayne County	Metro	12280	""	CLARK ROAD	SWAN CREEK	HURON/SUMPTER    N/WILLOW	1 Highway	5 Waterway	1935	1995		1990	1	29.5	43	1	5 Prestressed Concrete	05 Box Bm/Gird- Multiple	0	""	""	2 Integral Concrete	9 MS22.5(HS25)or greater	2		42.12	-83.42136	2025-08-18T00:00:00	POINT (-83.42136 42.12)	Taylor	NBI	Non-NHS	1268.5	40	1670703	2.21	2024-07-23T00:00:00	24	A	7	8	8	N
1523	MDOT	Metro	7981	63111-R01	I-75 BL SB	GTW RR	S LTS OF PONTIAC	1 Highway	2 Railroad	2000				1	94.1	47.1	1	5 Prestressed Concrete	05 Box Bm/Gird- Multiple	0	""	""	1 Monolithic Concrete	9 MS22.5(HS25)or greater	3		42.6	-83.25261	2025-08-18T00:00:00	POINT (-83.25261 42.6)	Oakland	NBI	NHS	4432.11	44	625912	1.44	2025-07-15T00:00:00	24	A	7	8	7	N
1524	MDOT	Metro	11970	82293-S07	I-275 SB	SCHOOLCRAFT RD	0.3 MI W OF LIVONIA	1 Highway	1 Highway	1971		2022	2001	4	293	66	4	3 Steel	82 Pl Girder Comp	0	""	""	3 Latex Concrete/Similar	5 MS 18 (HS 20)	4	4	42.38	-83.4371	2025-08-18T00:00:00	POINT (-83.4371 42.38)	Taylor	NBI	NHS	19338	62.5	1607610	21.5	2023-09-21T00:00:00	24	A	6	7	6	N
1525	Oakland County	Metro	8198	""	CHEVRON ST	DUCK LAKE	NORTH OF LUDEAN	1 Highway	5 Waterway	1967				1	22	27.9	1	1 Concrete	01 Slab	0	""	""	6 Bituminous	6 MS18(HS20)+mod	2		42.68	-83.597626	2025-08-18T00:00:00	POINT (-83.597626 42.68)	Oakland	NBI	Non-NHS	613.8	24	648408	0.71	2024-06-12T00:00:00	24	P	7	7	7	N
1526	MDOT	Metro	8089	63174-S21-1	I-75 NB	MAPLE RD, 15 MILE RD	IN TROY (OVER MAPLE RD)	1 Highway	1 Highway	2019				1	113.5	73.8	1	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	B Greater than HL 93	4	4	42.55	-83.116585	2025-08-18T00:00:00	POINT (-83.116585 42.55)	Oakland	NBI	NHS	8376.3	70.4	647308	7.43	2025-07-02T00:00:00	24	A	8	8	8	N
1527	Wayne County	Metro	12052	""	ROTUNDA DRIVE	SCHAEFER ROAD	DEARBORN           N/I-94	5 Highway-pedestrian	1 Highway	1932	1987	1987		4	94.8	72.5	4	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	5	4	42.31	-83.175606	2025-08-18T00:00:00	POINT (-83.175606 42.31)	Taylor	NBI	Non-NHS	6873	59.7	1577009	3.88	2024-10-15T00:00:00	12	A	5	7	4	N
1528	MDOT	Metro	11655	82191-S13	I-75 SB	US-24 CONN	IN TAYLOR OVER US-24 CONN	1 Highway	1 Highway	1964	2018		1991	3	190.6	63.2	3	3 Steel	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	6 MS18(HS20)+mod	3	2	42.19	-83.24409	2025-08-18T00:00:00	POINT (-83.24409 42.19)	Taylor	NBI	NHS	12045.92	60	1595106	8.42	2024-09-24T00:00:00	24	A	8	7	7	N
1529	Rochester	Metro	8272	""	UNIVERSITY ST	PAINT CREEK	EAST OF ROCHESTER RD	5 Highway-pedestrian	5 Waterway	1966	2004			1	50.6	47.9	1	1 Concrete	19 Culvert	0	""	""	2 Integral Concrete	9 MS22.5(HS25)or greater	2		42.68	-83.12948	2025-08-18T00:00:00	POINT (-83.12948 42.68)	Oakland	NBI	Non-NHS	2423.74	47.9	678410	0.96	2024-09-25T00:00:00	24	A	N	N	N	7
1530	MDOT	Metro	11327	82081-B01	M-153	FELLOWS CREEK	3.3 MI E OF WASHTENAW COL	1 Highway	5 Waterway	2006				1	46	103.5	1	5 Prestressed Concrete	05 Box Bm/Gird- Multiple	0	""	""	2 Integral Concrete	9 MS22.5(HS25)or greater	5		42.32	-83.48397	2025-08-18T00:00:00	POINT (-83.48397 42.32)	Taylor	NBI	NHS	4761	80	1595510	3.18	2025-06-11T00:00:00	24	A	7	8	8	N
1531	MDOT	Metro	12787	50111-S32	M-59 EB	I-94	CHESTERFIELD/HARRISON TWP	1 Highway	1 Highway	1996			1996	2	275.9	47.25	2	4 Steel Continuous	82 Pl Girder Comp	0	""	""	5 Epoxy Overlay	9 MS22.5(HS25)or greater	2	8	42.63	-82.84969	2025-08-18T00:00:00	POINT (-82.84969 42.63)	Macomb	NBI	NHS	13036.28	44	4205580	0.54	2025-06-26T00:00:00	24	A	6	7	6	N
1532	MDOT	Metro	11491	82122-S05	STARK RD	I-96	IN LIVONIA	5 Highway-pedestrian	1 Highway	1974	2014		2014	2	182	66.4	2	3 Steel	02 Multi Str Non Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	4	10	42.38	-83.37789	2025-08-18T00:00:00	POINT (-83.37789 42.38)	Taylor	NBI	Non-NHS	12084.8	52	1604610	1.67	2024-11-11T00:00:00	24	A	7	8	7	N
1533	MDOT	Metro	11854	82252-S12	CANIFF AVE & TURN	I-75	IN HAMTRAMCK	5 Highway-pedestrian	1 Highway	1969	2007		1998	2	159.5	100.9	2	3 Steel	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	6	8	42.4	-83.06827	2025-08-18T00:00:00	POINT (-83.06827 42.4)	Detroit	NBI	Non-NHS	16093.55	78.5	1632110	0.51	2024-04-09T00:00:00	24	A	7	6	6	N
1534	Dearborn	Metro	12310	""	GULLEY RD	LOW BRANCH ROUGE RIVER	IN DEARBORN	5 Highway-pedestrian	5 Waterway	1935	1991	1991	1991	1	64	45.3	1	3 Steel	02 Multi Str Non Comp	0	""	""	2 Integral Concrete	5 MS 18 (HS 20)	2		42.3	-83.285904	2025-08-18T00:00:00	POINT (-83.285904 42.3)	Taylor	NBI	Non-NHS	2899.2	33.1	1643407	2.6	2025-07-18T00:00:00	24	A	6	7	7	N
1535	Pontiac	Metro	8265	""	PADDOCK ST	CLINTON RIVER	1/4 MI E M-59 & I-75 BL	5 Highway-pedestrian	5 Waterway	1954	2009		2009	1	35.1	49.6	1	3 Steel	02 Multi Str Non Comp	0	""	""	1 Monolithic Concrete	0 Unknown	2		42.64	-83.28221	2025-08-18T00:00:00	POINT (-83.28221 42.64)	Oakland	NBI	Non-NHS	1740.96	36.1	624209	0.03	2024-07-26T00:00:00	24	A	6	7	6	N
1536	Oakland County	Metro	14276	""	TEN HILL ROAD	FRANKLIN SUBWATERSHD DRN	W BLOOMFIELD TWP SEC 36	1 Highway	5 Waterway	1975				2	21.3	19	2	1 Concrete	19 Culvert	0	""	""	6 Bituminous	0 Unknown	2		42.53	-83.3321	2025-08-18T00:00:00	POINT (-83.3321 42.53)	Oakland	NBI	Non-NHS	404.7	19	621604	0.14	2024-10-15T00:00:00	24	A	N	N	N	7
1537	MDOT	Metro	11184	82023-S15	24TH ST	I-94	IN DETROIT	5 Highway-pedestrian	1 Highway	1968	1996		1996	3	202	52.4	3	3 Steel	02 Multi Str Non Comp	0	""	""	5 Epoxy Overlay	5 MS 18 (HS 20)	2	10	42.35	-83.103065	2025-08-18T00:00:00	POINT (-83.103065 42.35)	Detroit	NBI	Non-NHS	10584.8	30	4705563	2.27	2024-06-11T00:00:00	24	A	6	6	6	N
1538	Livonia	Metro	12509	""	NEWBURGH ROAD	ROUGE RIVER	NEWBURGH RD @ ROUGE RIVER	5 Highway-pedestrian	5 Waterway	1989				1	59.7	80.7	1	5 Prestressed Concrete	05 Box Bm/Gird- Multiple	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	5		42.37	-83.41128	2025-08-18T00:00:00	POINT (-83.41128 42.37)	Taylor	NBI	Non-NHS	4817.79	62	4710394	5.99	2024-10-16T00:00:00	24	A	6	7	7	N
1539	Macomb County	Metro	14329	""	BROUGHTON RD	MCBRIDE DRAIN	0.3 MI S OF 25 MILE RD	1 Highway	5 Waterway	2001				1	20	24	1	1 Concrete	19 Culvert	0	""	""	4 Low Slump Concrete	5 MS 18 (HS 20)	2		42.7	-82.9211	2025-08-18T00:00:00	POINT (-82.9211 42.7)	Macomb	NBI	Non-NHS	480	24	4211105	0.34	2023-08-09T00:00:00	24	A	N	N	N	7
1540	Macomb County	Metro	6225	""	29 MILE ROAD	TUPPER BROOK	100FT EAST OF HARTWAY RD	1 Highway	5 Waterway	1980				2	32.8	39.4	2	3 Steel	19 Culvert	0	""	""	N N/A (no deck (NBI))	9 MS22.5(HS25)or greater	2		42.76	-82.90111	2025-08-18T00:00:00	POINT (-82.90111 42.76)	Macomb	NBI	Non-NHS	1292.32	0	815710	7.95	2025-06-25T00:00:00	24	A	N	N	N	5
1541	Oakland County	Metro	8163	""	8 MILE RD	ROUGE RIVER	BET GRAND RIVER AND MIDDL	1 Highway	5 Waterway	1966	2004			1	30.8	76.4	1	5 Prestressed Concrete	02 Multi Str Non Comp	0	""	""	1 Monolithic Concrete	6 MS18(HS20)+mod	5		42.44	-83.328094	2025-08-18T00:00:00	POINT (-83.328094 42.44)	Oakland	NBI	NHS	2353.12	60	4412701	7.18	2025-07-23T00:00:00	12	A	6	7	5	N
1542	Wayne County	Metro	12150	""	MERRIMAN ROAD	LOWER ROUGE RIVER	WAYNE/WESTLANDN/MICHIGAN	5 Highway-pedestrian	5 Waterway	1929				3	105	59.4	3	2 Concrete Continuous	04 Tee Beam	0	""	""	2 Integral Concrete	6 MS18(HS20)+mod	4		42.29	-83.34891	2025-08-18T00:00:00	POINT (-83.34891 42.29)	Taylor	NBI	NHS	6237	45.9	4700000	5.04	2025-04-29T00:00:00	12	A	4	5	5	N
1543	MDOT	Metro	11648	82191-S06-2	I-75 SB	VAN HORN RD	IN WOODHAVEN	1 Highway	1 Highway	2006				1	160	63.3	1	3 Steel	82 Pl Girder Comp	0	""	""	2 Integral Concrete	9 MS22.5(HS25)or greater	3	2	42.12	-83.24147	2025-08-18T00:00:00	POINT (-83.24147 42.12)	Taylor	NBI	NHS	10128	60	1595106	4.05	2024-07-16T00:00:00	24	A	7	8	7	N
1544	Macomb County	Metro	13570	""	SANTA ANITA DRIVE	FULLER DRAIN	0.4 MI N OF SUGARBUSH RD	1 Highway	5 Waterway	1998				1	20	28	1	1 Concrete	19 Culvert	0	""	""	2 Integral Concrete	5 MS 18 (HS 20)	2		42.65	-82.83031	2025-08-18T00:00:00	POINT (-82.83031 42.65)	Macomb	NBI	Non-NHS	560		4208390	0.29	2024-09-17T00:00:00	24	A	N	N	N	8
1545	Troy	Metro	13611	""	BEACH ROAD	ROUGE RIVER	0.3 MI N OF WATTLES	5 Highway-pedestrian	5 Waterway	1981		2012		1	24	39.9	1	5 Prestressed Concrete	05 Box Bm/Gird- Multiple	0	""	""	6 Bituminous	6 MS18(HS20)+mod	2		42.58	-83.1976	2025-08-18T00:00:00	POINT (-83.1976 42.58)	Oakland	NBI	Non-NHS	957.6	24	626301	1.13	2025-04-01T00:00:00	24	A	5	5	7	N
1546	Wayne County	Metro	12248	""	WOODRUFF ROAD	SMITH CREEK	BRNTWN/RKWDE/FORT	1 Highway	5 Waterway	1981				1	24.9	47.6	1	5 Prestressed Concrete	05 Box Bm/Gird- Multiple	0	""	""	2 Integral Concrete	4 M 18 (H 20)	2		42.08	-83.23687	2025-08-18T00:00:00	POINT (-83.23687 42.08)	Taylor	NBI	Non-NHS	1185.24	43	1694803	2.18	2024-09-18T00:00:00	24	A	6	6	6	N
1547	MDOT	Metro	11221	82024-S14	BURNS AVE	I-94	IN DETROIT	5 Highway-pedestrian	1 Highway	2022				2	185	60.8	2	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	B Greater than HL 93	2	6	42.39	-83.01412	2025-08-18T00:00:00	POINT (-83.01412 42.39)	Detroit	NBI	Non-NHS	11248	38	1577906	1.49	2023-11-28T00:00:00	24	A	8	8	8	N
1548	MDOT	Metro	11828	82251-S27	I-94	I-75	IN DETROIT	1 Highway	1 Highway	1962	1996		1988	3	188.3	118.1	3	3 Steel	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	6 MS18(HS20)+mod	7	7	42.37	-83.05772	2025-08-18T00:00:00	POINT (-83.05772 42.37)	Detroit	NBI	NHS	22238.23	115.8	1576405	28.62	2023-12-15T00:00:00	24	A	6	6	5	N
1549	MDOT	Metro	13106	63043-S15	WB M-59(OFF RMP)	ADAMS RD ON RAMP	ROCHESTER HILLS	1 Highway	1 Highway	2004				1	89	78.3	1	5 Prestressed Concrete	05 Box Bm/Gird- Multiple	0	""	""	1 Monolithic Concrete	9 MS22.5(HS25)or greater	4	1	42.65	-83.19596	2025-08-18T00:00:00	POINT (-83.19596 42.65)	Oakland	NBI	NHS	6968.7	75	4462968	0.2	2023-10-27T00:00:00	24	A	7	8	7	N
1550	MDOT	Metro	11829	82251-S28	I-75 S-W RAMP	NORTH SERVICE RD	IN DETROIT	1 Highway	1 Highway	1964		1995	1964	3	152.6	43.3	3	3 Steel	32 Multi Str Comp	0	""	""	5 Epoxy Overlay	6 MS18(HS20)+mod	2	1	42.37	-83.06050556	2025-08-18T00:00:00	POINT (-83.06050556 42.37)	Detroit	NBI	NHS	6607.58	38.4	4705662	0.43	2024-10-24T00:00:00	12	A	4	6	7	N
1551	Wayne County	Metro	12107	""	BECK ROAD	JOHNSON DRAIN	NORTHVILLE T   N/SIX MILE	1 Highway	5 Waterway	1930	1989			1	27.9	41	1	1 Concrete	04 Tee Beam	0	0 Other	00 Other	2 Integral Concrete	0 Unknown	2		42.41	-83.51118	2025-08-18T00:00:00	POINT (-83.51118 42.41)	Taylor	NBI	NHS	1143.9	37.7	1595603	9.98	2025-05-27T00:00:00	12	P	4	5	6	N
1552	MDOT	Metro	11361	82102-S08	M-14	EDWARD HINES DRIVE	0.4 MI WEST OF PLYMOUTH	1 Highway	1 Highway	1976		2006	2006	1	129	123.8	1	3 Steel	02 Multi Str Non Comp	0	""	""	5 Epoxy Overlay	9 MS22.5(HS25)or greater	6	2	42.39	-83.46857	2025-08-18T00:00:00	POINT (-83.46857 42.39)	Taylor	NBI	NHS	15970.2	117	1606205	4.67	2023-10-12T00:00:00	24	A	6	7	6	N
1553	MDOT	Metro	11960	82293-R02	I-275 SB	CSX RR	IN LIVONIA	1 Highway	2 Railroad	1971		2001	2001	4	285	64.6	4	3 Steel	32 Multi Str Comp	0	""	""	3 Latex Concrete/Similar	5 MS 18 (HS 20)	4		42.38	-83.437096	2025-08-18T00:00:00	POINT (-83.437096 42.38)	Taylor	NBI	NHS	18411	62	1607610	21.38	2024-12-19T00:00:00	22	A	6	6	7	N
1554	MDOT	Metro	11783	82195-S28	RUSSELL ST	I-75 CONN TO M-3	IN DETROIT	5 Highway-pedestrian	1 Highway	1970	2006		2006	2	155.2	84	2	4 Steel Continuous	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	5	6	42.34	-83.03951	2025-08-18T00:00:00	POINT (-83.03951 42.34)	Detroit	NBI	Non-NHS	13036.8	60	1577709	0.18	2024-09-27T00:00:00	24	A	7	7	5	N
1555	MDOT	Metro	11980	82293-S17	I-275 NB	KOPPERNICK RD	1 MI W OF LIVONIA	1 Highway	1 Highway	1972				1	98.5	56.5	1	3 Steel	02 Multi Str Non Comp	0	""	""	5 Epoxy Overlay	5 MS 18 (HS 20)	3	2	42.34	-83.44172	2025-08-18T00:00:00	POINT (-83.44172 42.34)	Taylor	NBI	NHS	5565.25	53.3	1607208	18.59	2024-11-15T00:00:00	24	A	7	6	7	N
1556	MDOT	Metro	11543	82123-R04	WB TO NB TURN RDWY	CSX RAILROAD-FULLERTON	IN DETROIT	1 Highway	4 Highway-railroad	1973		2005	1989	2	249.4	39.4	2	4 Steel Continuous	82 Pl Girder Comp	0	""	""	3 Latex Concrete/Similar	5 MS 18 (HS 20)	1	4	42.38	-83.21637	2025-08-18T00:00:00	POINT (-83.21637 42.38)	Detroit	NBI	NHS	9826.36	37.4	1591903	0.49	2023-08-11T00:00:00	24	A	6	6	7	N
1557	MDOT	Metro	11485	82122-R01	EVERGREEN RD	I-96 & CSX RR	IN DETROIT	5 Highway-pedestrian	4 Highway-railroad	1971		2016	2003	19	1346.1	92.4	19	3 Steel	02 Multi Str Non Comp	0	""	""	3 Latex Concrete/Similar	5 MS 18 (HS 20)	7	12	42.38	-83.2365	2025-08-18T00:00:00	POINT (-83.2365 42.38)	Detroit	NBI	NHS	124379.64	70	1596908	4.85	2024-07-24T00:00:00	24	A	6	5	6	N
1558	MDOT	Metro	8121	63191-S06	TRN RDWY C (I-696)	I-96 & I-275	I-96 & I-696 INTERCHANGE	7 3d level interchg	1 Highway	1972		2016	1999	5	629	44.4	5	3 Steel	82 Pl Girder Comp	0	""	""	2 Integral Concrete	6 MS18(HS20)+mod	2	3	42.49	-83.431854	2025-08-18T00:00:00	POINT (-83.431854 42.49)	Oakland	NBI	NHS	27927.6	40.5	637802	0.64	2024-12-11T00:00:00	24	A	6	6	6	N
1559	Dearborn Height	Metro	12336	""	MADISON ST	ECORSE CREEK	IN DEARBORN HEIGHTS	1 Highway	5 Waterway	1996		1996		1	37	25.9	1	1 Concrete	19 Culvert	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	2		42.27	-83.26537	2025-08-18T00:00:00	POINT (-83.26537 42.27)	Taylor	NBI	Non-NHS	958.3	26.7	1644001	0.15	2023-10-11T00:00:00	24	A	N	N	N	6
1560	MDOT	Metro	11513	82122-S25	INDUSTRIAL AVE	I-96	IN DETROIT	5 Highway-pedestrian	1 Highway	1973			2001	4	251.5	31.5	4	3 Steel	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	2	12	42.38	-83.231415	2025-08-18T00:00:00	POINT (-83.231415 42.38)	Detroit	NBI	NHS	7922.25	26.3	6200225	0.74	2024-09-20T00:00:00	24	A	6	6	6	N
1561	Wayne County	Metro	12021	""	PENNSYLVANIA ROAD	FRANK & POET DRAIN	RIVERVIEW/STHGATE E/ALLEN	1 Highway	5 Waterway	2004				1	32	40	1	1 Concrete	19 Culvert	0	""	""	N N/A (no deck (NBI))	9 MS22.5(HS25)or greater	5		42.18	-83.214874	2025-08-18T00:00:00	POINT (-83.214874 42.18)	Taylor	NBI	Non-NHS	1280	61	1674307	10.34	2024-11-12T00:00:00	24	A	N	N	N	7
1562	MDOT	Metro	6010	50011-B07	M-53 NB	CLINTON RIVER	1.6 MI S OF M-59	1 Highway	5 Waterway	1966		2024	1993	3	250	36.42	3	3 Steel	32 Multi Str Comp	0	""	""	3 Latex Concrete/Similar	5 MS 18 (HS 20)	2		42.6	-83.020195	2025-08-18T00:00:00	POINT (-83.020195 42.6)	Macomb	NBI	NHS	9105	31	4210208	4.13	2025-02-06T00:00:00	13	A	6	6	6	N
1563	Wayne County	Metro	12295	""	MARTINSVILLE ROAD	CLARK & MOREY DRAIN	SUMPTERS/ARKONA	1 Highway	5 Waterway	1987				2	24.9	24	2	3 Steel	19 Culvert	0	""	""	N N/A (no deck (NBI))	9 MS22.5(HS25)or greater	2		42.1	-83.459816	2025-08-18T00:00:00	POINT (-83.459816 42.1)	Taylor	NBI	Non-NHS	597.6	0	1670702	0.57	2024-08-15T00:00:00	24	A	N	N	N	6
1564	Oakland County	Metro	13601	""	OXBOW LAKE ROAD	CLINTON RIVER	SOUTH OF SCOUT TRAIL	1 Highway	5 Waterway	2007				1	33	25	1	1 Concrete	19 Culvert	0	""	""	6 Bituminous	9 MS22.5(HS25)or greater	2		42.62	-83.49067	2025-08-18T00:00:00	POINT (-83.49067 42.62)	Oakland	NBI	Non-NHS	825	36	630010	0.38	2024-06-12T00:00:00	24	A	N	N	N	7
1565	Macomb County	Metro	12656	""	25 MILE ROAD	FISH CREEK	0.5 MI EAST OF GRATIOT	1 Highway	5 Waterway	1995				1	25.9	65	1	7 Timber	01 Slab	0	""	""	6 Bituminous	5 MS 18 (HS 20)	2		42.7	-82.79718	2025-08-18T00:00:00	POINT (-82.79718 42.7)	Macomb	NBI	Non-NHS	1683.5	39.4	818407	3.4	2023-09-14T00:00:00	24	P	7	8	7	N
1566	Northville	Metro	8245	""	OLD NOVI ROAD	MIDDLE RIVER ROUGE	0.15 MI E OF OAKLAND AVE	1 Highway	5 Waterway	1994				1	34.8	29.9	1	1 Concrete	19 Culvert	0	""	""	N N/A (no deck (NBI))	6 MS18(HS20)+mod	2		42.44	-83.473366	2025-08-18T00:00:00	POINT (-83.473366 42.44)	Oakland	NBI	Non-NHS	1040.52	26.9	4412661	0.02	2024-04-22T00:00:00	24	A	N	N	N	7
1567	MDOT	Metro	6157	50111-S14	12 MI RD S INTERCH	I-94	W LTS OF ST CLAIR SHORES	1 Highway	1 Highway	1967		2002	1997	4	194.8	28.6	4	3 Steel	32 Multi Str Comp	0	""	""	3 Latex Concrete/Similar	6 MS18(HS20)+mod	1	6	42.51	-82.918175	2025-08-18T00:00:00	POINT (-82.918175 42.51)	Macomb	NBI	Non-NHS	5571.28	25.4	1803405	0.01	2025-06-25T00:00:00	24	A	6	6	6	N
1568	Macomb County	Metro	6367	""	28 MILE ROAD	CAMP BROOK DRAIN	1.2 MI E OF ROMEO PLANK	1 Highway	5 Waterway	1995				1	25.6	43.8	1	5 Prestressed Concrete	05 Box Bm/Gird- Multiple	0	""	""	5 Epoxy Overlay	5 MS 18 (HS 20)	2		42.75	-82.93496	2025-08-18T00:00:00	POINT (-82.93496 42.75)	Macomb	NBI	Non-NHS	1121.28	40.6	4208920	8.23	2024-07-08T00:00:00	24	A	8	8	7	N
1569	MDOT	Metro	8043	63174-B04-1	I-75 NB	CLINTON RIVER	0.6 MI S OF M-59	1 Highway	5 Waterway	1964	2001	2001		1	44	91.3	1	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	3 Latex Concrete/Similar	6 MS18(HS20)+mod	4		42.63	-83.238556	2025-08-18T00:00:00	POINT (-83.238556 42.63)	Oakland	NBI	NHS	4017.2	83.3	647308	17.92	2025-07-10T00:00:00	24	A	5	8	7	N
1570	Southfield	Metro	8304	""	TAMARACK TRAIL	EVANSBRANCHOFROUGE	IN SOUTHFIELD	1 Highway	5 Waterway	1987				2	46.9	31.8	2	7 Timber	72 Multi Str Timb Deck	0	""	""	6 Bituminous	6 MS18(HS20)+mod	2		42.47	-83.2536	2025-08-18T00:00:00	POINT (-83.2536 42.47)	Oakland	NBI	Non-NHS	1491.42	29.9	687208	0.11	2023-09-18T00:00:00	24	A	5	5	6	N
1571	MDOT	Metro	13757	63041-C05	M-59 (E HURON ST)	PONTIAC CREEK	AT E SIDE US-24 BR	5 Highway-pedestrian	5 Waterway	1964				2	29.2	40	2	1 Concrete	19 Culvert	0	""	""	1 Monolithic Concrete	6 MS18(HS20)+mod	3		42.64	-83.289	2025-08-18T00:00:00	POINT (-83.289 42.64)	Oakland	NBI	NHS	1168	40	648906	21.15	2024-10-29T00:00:00	20	A	N	N	N	6
1572	MDOT	Metro	11770	82195-S12	M-10N TO I-75S RMP	M-10	IN DETROIT	1 Highway	1 Highway	1970		2017	1990	4	288.5	28	4	4 Steel Continuous	32 Multi Str Comp	0	""	""	3 Latex Concrete/Similar	6 MS18(HS20)+mod	1	7	42.34	-83.064415	2025-08-18T00:00:00	POINT (-83.064415 42.34)	Detroit	NBI	NHS	8078	24.9	1585003	0.25	2024-05-23T00:00:00	24	A	7	7	7	N
1573	MDOT	Metro	6166	50111-S24-3	I-94 EB	HARPER RD	0.7 MI S OF M-29	1 Highway	1 Highway	1964	2006		1990	3	175.6	74.4	3	3 Steel	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	6 MS18(HS20)+mod	4	4	42.55	-82.87154	2025-08-18T00:00:00	POINT (-82.87154 42.55)	Macomb	NBI	NHS	13064.64	71.3	798501	8.5	2025-06-17T00:00:00	24	A	7	8	6	N
1574	Oakland County	Metro	8148	""	LAHSER RD	ROUGE RIVER	BET 12 AND 13 MILE RDS	1 Highway	5 Waterway	1985				1	64	43.3	1	5 Prestressed Concrete	05 Box Bm/Gird- Multiple	0	""	""	1 Monolithic Concrete	6 MS18(HS20)+mod	2		42.51	-83.2623	2025-08-18T00:00:00	POINT (-83.2623 42.51)	Oakland	NBI	Non-NHS	2771.2	40	685510	4.62	2024-07-23T00:00:00	24	A	6	6	8	N
1575	MDOT	Metro	11119	82022-S09	I-94 EB	ECORSE RD	IN TAYLOR,OVER ECORSE RD	1 Highway	1 Highway	1962	1997	1997	1997	4	237	61.5	4	3 Steel	32 Multi Str Comp	0	""	""	5 Epoxy Overlay	5 MS 18 (HS 20)	4	5	42.25	-83.29838	2025-08-18T00:00:00	POINT (-83.29838 42.25)	Taylor	NBI	NHS	14575.5	58.2	1576405	13.05	2023-08-29T00:00:00	24	A	6	7	7	N
1576	MDOT	Metro	7891	63082-S01	US-24	M-10 SB	IN SOUTHFIELD	1 Highway	1 Highway	1964	1975		1999	3	198.6	123	3	3 Steel	32 Multi Str Comp	0	""	""	3 Latex Concrete/Similar	6 MS18(HS20)+mod	6	5	42.49	-83.28456	2025-08-18T00:00:00	POINT (-83.28456 42.49)	Oakland	NBI	NHS	24427.8	116.5	710106	3.19	2025-05-09T00:00:00	24	A	6	5	5	N
1577	Wayne County	Metro	12096	""	SEVEN MILE ROAD	UPPER ROUGE RIVER	LIVONIA         W/INKSTER	5 Highway-pedestrian	5 Waterway	1928	2004	2004		1	33.8	55.8	1	1 Concrete	05 Box Bm/Gird- Multiple	0	""	""	6 Bituminous	6 MS18(HS20)+mod	4		42.43	-83.31939	2025-08-18T00:00:00	POINT (-83.31939 42.43)	Taylor	NBI	NHS	1886.04	40	1700106	5.81	2025-06-17T00:00:00	24	A	7	7	7	N
1578	Macomb County	Metro	6399	""	JEWELL ROAD	MIDDLE BR CLINTON RIVER	0.5 MI NORTH OF 25 MILE	1 Highway	5 Waterway	1973				1	53.8	34.1	1	5 Prestressed Concrete	05 Box Bm/Gird- Multiple	0	""	""	6 Bituminous	5 MS 18 (HS 20)	2		42.71	-83.01565	2025-08-18T00:00:00	POINT (-83.01565 42.71)	Macomb	NBI	Non-NHS	1834.58	29.5	816307	1.53	2025-06-17T00:00:00	12	A	4	4	7	N
1579	MDOT	Metro	11634	82191-C04	I-75	BROWNSTOWN CREEK	4.2 MI N OF N HURON RI DR	1 Highway	5 Waterway	2006				1	22.4	123	1	1 Concrete	19 Culvert	0	""	""	N N/A (no deck (NBI))	9 MS22.5(HS25)or greater	2		42.13	-83.24117	2025-08-18T00:00:00	POINT (-83.24117 42.13)	Taylor	NBI	NHS	2755.2	0	1592010	4.21	2024-07-24T00:00:00	24	A	N	N	N	6
1580	MDOT	Metro	6099	50061-S33	RAMPS E&F	MOUND &SER.RDS OV I-696	CITY OF WARREN	7 3d level interchg	1 Highway	1976	2008			7	622.1	88.2	7	3 Steel	82 Pl Girder Comp	0	""	""	1 Monolithic Concrete	9 MS22.5(HS25)or greater	4	17	42.49	-83.04508	2025-08-18T00:00:00	POINT (-83.04508 42.49)	Macomb	NBI	NHS	54869.22	85	1740507	0.15	2025-04-30T00:00:00	24	A	7	7	6	N
1581	Macomb County	Metro	6230	""	32 MILE ROAD	HIGHBANK CREEK	0.3 MI EAST OF OMO RD	1 Highway	5 Waterway	1979				1	65	45.6	1	5 Prestressed Concrete	05 Box Bm/Gird- Multiple	0	""	""	6 Bituminous	9 MS22.5(HS25)or greater	2		42.81	-82.8524	2025-08-18T00:00:00	POINT (-82.8524 42.81)	Macomb	NBI	Non-NHS	2964	41.67	815804	12.61	2024-08-07T00:00:00	12	P	5	4	7	N
1582	Beverly Hills	Metro	8223	""	RIVERSIDE RD	ROUGE RIVER	0.1 MI E OF EVERGREEN	1 Highway	5 Waterway	1992				1	82	43.3	1	5 Prestressed Concrete	05 Box Bm/Gird- Multiple	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	2		42.53	-83.24187	2025-08-18T00:00:00	POINT (-83.24187 42.53)	Oakland	NBI	Non-NHS	3550.6	30.8	611001	0.13	2024-09-26T00:00:00	24	A	8	6	7	N
1583	MDOT	Metro	8097	63174-S28	WOODWARD HTS BLVD	I-75	@ CITY OF HAZEL PARK	5 Highway-pedestrian	1 Highway	2020				2	184.1	66.7	2	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	B Greater than HL 93	4	10	42.47	-83.10899	2025-08-18T00:00:00	POINT (-83.10899 42.47)	Oakland	NBI	Non-NHS	12279.47	52	644905	1.56	2025-04-17T00:00:00	24	A	8	8	8	N
1584	MDOT	Metro	8126	63191-S12	I-96 EB	9 MILE RD	1 MI W OF FARMINGTON	1 Highway	1 Highway	1971			1998	1	90.9	74.4	1	3 Steel	02 Multi Str Non Comp	0	""	""	5 Epoxy Overlay	6 MS18(HS20)+mod	4	2	42.45	-83.43152	2025-08-18T00:00:00	POINT (-83.43152 42.45)	Oakland	NBI	NHS	6762.96	70.5	639202	2.98	2024-12-19T00:00:00	24	A	6	7	6	N
1585	MDOT	Metro	11811	82251-S09-4	M-3 WB  CONN	I-375 & I-75 RAMP	IN DETROIT OVER I-375 NW	1 Highway	1 Highway	1964	1998		1998	1	37.4	45	1	3 Steel	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	6 MS18(HS20)+mod	2	1	42.34	-83.04222	2025-08-18T00:00:00	POINT (-83.04222 42.34)	Detroit	NBI	NHS	1683	41.3	1595106	24.49	2024-03-27T00:00:00	24	A	7	6	6	N
1586	Macomb County	Metro	6307	""	MCKAY ROAD	N B CLINTON RIVER	0.1 MI S OF SCOTCH SETTLE	1 Highway	5 Waterway	2006				1	58	40.8	1	5 Prestressed Concrete	05 Box Bm/Gird- Multiple	0	""	""	2 Integral Concrete	5 MS 18 (HS 20)	2		42.88	-83.00041	2025-08-18T00:00:00	POINT (-83.00041 42.88)	Macomb	NBI	Non-NHS	2366.4	38.7	821905	4.16	2023-08-01T00:00:00	24	A	7	8	8	N
1587	MDOT	Metro	11954	82293-B01	I-275 SB	TONQUISH CR	3.5 MI SE OF PLYMOUTH	1 Highway	5 Waterway	1972				1	35	55.7	1	5 Prestressed Concrete	02 Multi Str Non Comp	0	""	""	5 Epoxy Overlay	6 MS18(HS20)+mod	3		42.33	-83.4436	2025-08-18T00:00:00	POINT (-83.4436 42.33)	Taylor	NBI	NHS	1949.5	52.5	1607610	18.15	2024-10-17T00:00:00	24	A	7	8	7	N
1588	MDOT	Metro	6086	50061-S17	U-TRN & LFT TRN	I-696	IN WARREN & CENTERLINE	1 Highway	1 Highway	1972	2010		2000	2	196	65.9	2	4 Steel Continuous	82 Pl Girder Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	3	8	42.49	-83.029236	2025-08-18T00:00:00	POINT (-83.029236 42.49)	Macomb	NBI	Non-NHS	12916.4	55.5	1803409	0.01	2023-09-13T00:00:00	24	A	7	6	6	N
1589	Macomb County	Metro	6379	""	30 MILE ROAD	COON CREEK	0.1 MI EAST OF NORTH AVE	1 Highway	5 Waterway	1994				1	32	39.4	1	1 Concrete	19 Culvert	0	""	""	N N/A (no deck (NBI))	5 MS 18 (HS 20)	2		42.78	-82.88014	2025-08-18T00:00:00	POINT (-82.88014 42.78)	Macomb	NBI	Non-NHS	1260.8	39.4	5500978	2.69	2025-06-25T00:00:00	24	A	N	N	N	6
1590	MDOT	Metro	11882	82271-S02	US-24 I-75 CONN NB	RACHO RD	IN TAYLOR OVER RACHO RD	1 Highway	1 Highway	1964	2001		2001	3	125.2	43.3	3	3 Steel	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	6 MS18(HS20)+mod	2	2	42.19	-83.247856	2025-08-18T00:00:00	POINT (-83.247856 42.19)	Taylor	NBI	NHS	5421.16	40	1579905	0.4	2024-12-10T00:00:00	24	A	7	5	6	N
1591	Lincoln Park	Metro	12498	""	HARRISON ST	S BR ECORSE RIVER	IN LINCOLN PARK	5 Highway-pedestrian	5 Waterway	1965				2	54.8	41	2	2 Concrete Continuous	04 Tee Beam	0	""	""	1 Monolithic Concrete	6 MS18(HS20)+mod	2		42.22	-83.17913	2025-08-18T00:00:00	POINT (-83.17913 42.22)	Taylor	NBI	Non-NHS	2246.8	29.9	5491819	0.09	2024-08-20T00:00:00	12	P	4	3	6	N
1592	Bloomfield Hill	Metro	13439	""	BLMFLD HILLS PKWY	ROUGE RIVER TRIB /N CULV	IN BLOOMFIELD HILLS	1 Highway	5 Waterway	1975				3	37.8	49.9	3	1 Concrete	19 Culvert	0	""	""	N N/A (no deck (NBI))	5 MS 18 (HS 20)	2		42.58	-83.23686	2025-08-18T00:00:00	POINT (-83.23686 42.58)	Oakland	NBI	Non-NHS	1886.22	49.9	1890603	0.55	2024-01-22T00:00:00	24	A	N	N	N	7
1593	MDOT	Metro	11908	82291-S13	I-275 NB	NORTHLINE RD	IN ROMULUS	1 Highway	1 Highway	1974		1997	2009	3	201.4	56.5	3	3 Steel	82 Pl Girder Comp	0	""	""	1 Monolithic Concrete	9 MS22.5(HS25)or greater	3	2	42.21	-83.39241	2025-08-18T00:00:00	POINT (-83.39241 42.21)	Taylor	NBI	NHS	11379.1	53.2	1607208	8.03	2023-09-19T00:00:00	24	A	6	7	7	N
1594	Milford	Metro	8241	""	MAIN ST	HURON RIVER	IN MILFORD S OF CANAL ST	5 Highway-pedestrian	5 Waterway	1989				1	24	29.9	1	1 Concrete	19 Culvert	0	""	""	N N/A (no deck (NBI))	5 MS 18 (HS 20)	2		42.59	-83.60043	2025-08-18T00:00:00	POINT (-83.60043 42.59)	Oakland	NBI	Non-NHS	717.6	25.9	660502	0.73	2023-10-25T00:00:00	24	A	N	N	N	7
1595	Lake Orion	Metro	8239	""	BELLEVUE AVENUE	LAKE ORION CANAL	N OF HEIGHTS RD	1 Highway	5 Waterway	1998				1	42.3	26.9	1	1 Concrete	19 Culvert	0	""	""	N N/A (no deck (NBI))	5 MS 18 (HS 20)	2		42.78	-83.25233	2025-08-18T00:00:00	POINT (-83.25233 42.78)	Oakland	NBI	Non-NHS	1137.87	0	669108	0.45	2024-08-16T00:00:00	24	A	N	N	N	7
1596	Oakland County	Metro	8158	""	JOHN R ROAD	GIBSON DRAIN	BET LONG LK AND SQ LAKE	1 Highway	5 Waterway	1988	2019			1	40	81	1	5 Prestressed Concrete	06 Box Bms- Single/Sprd	0	""	""	1 Monolithic Concrete	B Greater than HL 93	4		42.59	-83.1096	2025-08-18T00:00:00	POINT (-83.1096 42.59)	Oakland	NBI	Non-NHS	3240	52	646806	10.21	2024-08-23T00:00:00	24	A	7	8	7	N
1597	Birmingham	Metro	8228	""	W MAPLE RD	ROUGE RIVER	0.5 MI W OF WOODWARD AVE	5 Highway-pedestrian	5 Waterway	1950		1998	1998	1	47.9	64.8	1	3 Steel	02 Multi Str Non Comp	0	""	""	3 Latex Concrete/Similar	5 MS 18 (HS 20)	4		42.55	-83.224556	2025-08-18T00:00:00	POINT (-83.224556 42.55)	Oakland	NBI	NHS	3103.92	52.2	683906	13.24	2024-10-25T00:00:00	24	A	7	7	6	N
1598	MDOT	Metro	11255	82025-S10	NOTTINGHAM RD	I-94	IN DETROIT	5 Highway-pedestrian	1 Highway	1958	2000		2000	4	164.6	62	4	3 Steel	02 Multi Str Non Comp	0	""	""	5 Epoxy Overlay	5 MS 18 (HS 20)	2	6	42.41	-82.95395	2025-08-18T00:00:00	POINT (-82.95395 42.41)	Detroit	NBI	Non-NHS	10205.2	44	4705381	2.23	2024-06-17T00:00:00	24	A	6	6	7	N
1599	MDOT	Metro	11125	82022-S15	I-94 EB	MONROE BLVD	IN TAYLOR OVER MONROE BLV	1 Highway	1 Highway	2004				3	125	87.6	3	5 Prestressed Concrete	06 Box Bms- Single/Sprd	0	""	""	1 Monolithic Concrete	9 MS22.5(HS25)or greater	5	2	42.27	-83.25039	2025-08-18T00:00:00	POINT (-83.25039 42.27)	Taylor	NBI	NHS	10950	84	1576405	15.78	2025-08-06T00:00:00	24	A	7	8	7	N
1600	MDOT	Metro	7965	63103-S04	SHEVLIN DBL U TURN	I-75	IN HAZEL PARK	1 Highway	1 Highway	2021				2	232.8	99	2	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	B Greater than HL 93	2	10	42.47	-83.11046	2025-08-18T00:00:00	POINT (-83.11046 42.47)	Oakland	NBI	Non-NHS	23047.2	76.9	646708	0.01	2025-04-17T00:00:00	24	A	8	8	8	N
1601	Macomb County	Metro	6322	""	LAKESHORE DRIVE	CHANNEL TO LAKE ST CLAIR	0.2 MI SOUTH OF HURON PT	1 Highway	5 Waterway	2016				1	60	34.3	1	5 Prestressed Concrete	05 Box Bm/Gird- Multiple	0	""	""	1 Monolithic Concrete	B Greater than HL 93	2		42.58	-82.78623056	2025-08-18T00:00:00	POINT (-82.78623056 42.58)	Macomb	NBI	Non-NHS	2058	31.2	832302	0.81	2024-06-14T00:00:00	24	A	8	8	8	N
1602	Wayne County	Metro	12002	""	VAN HORN ROAD	SMITH CREEK	BROWNSTOWN      E/ARSENAL	1 Highway	5 Waterway	2017				1	22	40	1	1 Concrete	19 Culvert	0	""	""	6 Bituminous	A HL 93	2		42.12	-83.28398	2025-08-18T00:00:00	POINT (-83.28398 42.12)	Taylor	NBI	Non-NHS	880	0	1674101	3.44	2024-12-16T00:00:00	24	A	N	N	N	8
1603	MDOT	Metro	7810	63022-S14	M-5 WB	GRAND RIVER EB CONN	0.2 MI E. OF FARMINGTON	1 Highway	1 Highway	1957	1997		1997	3	222.1	51.8	3	3 Steel	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	2	2	42.45	-83.34624	2025-08-18T00:00:00	POINT (-83.34624 42.45)	Oakland	NBI	NHS	11504.78	48.6	657304	17.79	2024-11-27T00:00:00	24	A	6	6	6	N
1604	Wayne County	Metro	12205	""	TOLEDO ROAD	ECORSE CREEK	LINCOLN PARK  S/OUTER DRV	5 Highway-pedestrian	5 Waterway	1930	1959			2	29.9	101.4	2	2 Concrete Continuous	01 Slab	0	""	""	N N/A (no deck (NBI))	6 MS18(HS20)+mod	7		42.27	-83.18152	2025-08-18T00:00:00	POINT (-83.18152 42.27)	Taylor	NBI	NHS	3031.86	101.4	1688707	7.86	2024-11-12T00:00:00	24	A	5	5	6	N
1605	MDOT	Metro	8069	63174-S09-2	I-75 SB	BIG BEAVER RD	IN TROY	1 Highway	1 Highway	2020				2	230	80.1	2	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	B Greater than HL 93	4	7	42.56	-83.15835	2025-08-18T00:00:00	POINT (-83.15835 42.56)	Oakland	NBI	NHS	18423	76.7	646106	10.15	2025-07-07T00:00:00	24	A	8	8	8	N
1606	MDOT	Metro	6024	50013-B01	M-53 SB	MIDDLE BR CLINTON RIVER	5.6 MI N OF M-59	1 Highway	5 Waterway	1966	2001			3	104.2	45.5	3	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	9 MS22.5(HS25)or greater	2		42.71	-83.02606	2025-08-18T00:00:00	POINT (-83.02606 42.71)	Macomb	NBI	NHS	4741.1	42.2	813706	11.47	2025-07-08T00:00:00	24	A	7	8	6	N
1607	MDOT	Metro	7922	63102-S06	SANTA BARBARA	I-696	IN LATHRUP VILLAGE	1 Highway	1 Highway	1987				2	154.2	41.1	2	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	9 MS22.5(HS25)or greater	2	8	42.49	-83.23158	2025-08-18T00:00:00	POINT (-83.23158 42.49)	Oakland	NBI	Non-NHS	6337.62	29.2	655504	0.13	2024-07-22T00:00:00	24	A	7	7	7	N
1608	Macomb County	Metro	6237	""	RYAN RD	CLINTON RIVER	0.8 MI S OF 23 MILE ROAD	5 Highway-pedestrian	5 Waterway	1964		1986	1964	1	84.7	37.5	1	3 Steel	32 Multi Str Comp	0	""	""	6 Bituminous	5 MS 18 (HS 20)	2		42.66	-83.07324	2025-08-18T00:00:00	POINT (-83.07324 42.66)	Macomb	NBI	Non-NHS	3176.25	27.9	799302	14.45	2024-11-28T00:00:00	24	A	8	8	8	N
1609	MDOT	Metro	6175	50111-S30	21 MI RD	I-94	1.1 MI NE OF M-59	1 Highway	1 Highway	1960	2006	2006	1987	4	244.5	76.9	4	3 Steel	32 Multi Str Comp	0	""	""	3 Latex Concrete/Similar	6 MS18(HS20)+mod	4	4	42.65	-82.84032	2025-08-18T00:00:00	POINT (-82.84032 42.65)	Macomb	NBI	NHS	18802.05	71.4	817708	10.1	2025-06-17T00:00:00	24	A	5	6	6	N
1610	Oakland County	Metro	13594	""	MEADOWWOOD ROAD	DEVONSHIRE DRAIN	IN SUBDIVISION SEC 9	1 Highway	5 Waterway	1986		2019		1	24.3	42	1	7 Timber	01 Slab	0	""	""	6 Bituminous	5 MS 18 (HS 20)	2		42.6	-83.27611	2025-08-18T00:00:00	POINT (-83.27611 42.6)	Oakland	NBI	Non-NHS	1020.6	34.3	1871003	0.47	2024-08-23T00:00:00	12	P	4	4	4	N
1611	MDOT	Metro	8004	63172-S04-1	I-75 NB	PONTIAC RD	2.0 MI N OF M-59	1 Highway	1 Highway	1963		1989		3	129.8	72.8	3	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	3 Latex Concrete/Similar	6 MS18(HS20)+mod	5	2	42.67	-83.24102	2025-08-18T00:00:00	POINT (-83.24102 42.67)	Oakland	NBI	NHS	9449.44	69.6	647308	20.62	2024-09-18T00:00:00	24	A	7	6	7	N
1612	MDOT	Metro	11587	82123-S39	I-96	RAMP FROM I-94	IN DETROIT	1 Highway	1 Highway	1971	2005		2005	1	55.8	145.7	1	3 Steel	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	8	1	42.35	-83.100525	2025-08-18T00:00:00	POINT (-83.100525 42.35)	Detroit	NBI	NHS	8130.06	143.4	1577404	3.38	2023-10-20T00:00:00	24	A	7	7	6	N
1613	St Clair Shores	Metro	6421	""	ROSEDALE STREET	MILK RIVER	IN SAINT CLAIR SHORES	5 Highway-pedestrian	5 Waterway	1959				3	73.8	41	3	2 Concrete Continuous	04 Tee Beam	0	""	""	1 Monolithic Concrete	3 MS 13.5 (HS 15)	2		42.45	-82.88656	2025-08-18T00:00:00	POINT (-82.88656 42.45)	Macomb	NBI	Non-NHS	3025.8	29.9	830810	0.23	2025-03-27T00:00:00	24	P	7	5	5	N
1614	Other Local Agencies	Metro	13373	""	MIDFIELD RAMP C&C2	DINGELL RD & RAMP D2	1.3 MI N OF EUREKA	1 Highway	1 Highway	2002				3	179.4	65	3	4 Steel Continuous	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	2		42.21	-83.35291	2025-08-18T00:00:00	POINT (-83.35291 42.21)	Taylor	NBI	Non-NHS	11661	58.4	4712001	0.03	2025-05-27T00:00:00	24	A	5	7	5	N
1615	Oakland County	Metro	8195	""	FOURTEEN MILE	FRANKLIN RIVER	EAST OF FRANKLIN	1 Highway	5 Waterway	1961				2	29.9	29.9	2	3 Steel	19 Culvert	0	""	""	6 Bituminous	6 MS18(HS20)+mod	2		42.53	-83.30416944	2025-08-18T00:00:00	POINT (-83.30416944 42.53)	Oakland	NBI	Non-NHS	894.01	20	5499983	3.71	2024-08-23T00:00:00	12	A	N	N	N	4
1616	Wayne County	Metro	12179	""	OUTER DRIVE	LOWER ROUGE RIVER	DEARBORN       N/MICHIGAN	5 Highway-pedestrian	5 Waterway	1930		1995		1	72.8	84	1	1 Concrete	11 Arch- Deck, Filled Sp	0	""	""	N N/A (no deck (NBI))	6 MS18(HS20)+mod	5		42.3	-83.26336	2025-08-18T00:00:00	POINT (-83.26336 42.3)	Taylor	NBI	NHS	6115.2	60	4710471	1.11	2024-09-18T00:00:00	24	A	N	5	6	N
1617	MDOT	Metro	11429	82112-S04	SEWARD AVENUE	M-10	IN DETROIT	5 Highway-pedestrian	1 Highway	1954	2000		2000	2	143.2	71.6	2	4 Steel Continuous	02 Multi Str Non Comp	0	""	""	2 Integral Concrete	5 MS 18 (HS 20)	4	8	42.37	-83.08496	2025-08-18T00:00:00	POINT (-83.08496 42.37)	Detroit	NBI	Non-NHS	10253.12	44	4705618	0.26	2024-09-26T00:00:00	24	A	7	7	5	N
1618	MDOT	Metro	11197	82023-S29	M-10 WB	I-94 RAMP FROM M-10	IN DETROIT,OVER RAMP HE	5 Highway-pedestrian	1 Highway	1953	2004		2004	3	223.5	53.9	3	3 Steel	02 Multi Str Non Comp	0	""	""	3 Latex Concrete/Similar	5 MS 18 (HS 20)	3	2	42.36	-83.076706	2025-08-18T00:00:00	POINT (-83.076706 42.36)	Detroit	NBI	NHS	12046.65	49.5	1577510	9.44	2024-04-22T00:00:00	24	D	7	6	5	N
1619	Oakland County	Metro	8175	""	BIG BEAVER	STURGIS DRAIN	EAST OF ROCHESTER	1 Highway	5 Waterway	1975				2	31.6	111	2	3 Steel	19 Culvert	0	""	""	1 Monolithic Concrete	6 MS18(HS20)+mod	8		42.56	-83.12747	2025-08-18T00:00:00	POINT (-83.12747 42.56)	Oakland	NBI	NHS	3507.6	111	4408243	3.51	2024-08-23T00:00:00	24	A	N	N	N	6
1620	Southfield	Metro	13086	""	BRIDGE STREET	ROUGE RIVER	N OF 8 MILE RD	5 Highway-pedestrian	5 Waterway	2001				3	206	27.9	3	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	9 MS22.5(HS25)or greater	1		42.45	-83.28426	2025-08-18T00:00:00	POINT (-83.28426 42.45)	Oakland	NBI	Non-NHS	5747.4	20	685406	0.24	2023-09-19T00:00:00	24	A	8	9	7	N
1621	Macomb County	Metro	6276	""	WASHINGTON ST	CREPEAU CREEK	400 FT N OF GREEN STREET	5 Highway-pedestrian	5 Waterway	1968				2	23	39.4	2	1 Concrete	19 Culvert	0	""	""	N N/A (no deck (NBI))	4 M 18 (H 20)	4		42.68	-82.73832	2025-08-18T00:00:00	POINT (-82.73832 42.68)	Macomb	NBI	Non-NHS	906.2	0	814905	0.31	2023-08-16T00:00:00	24	A	N	N	N	7
1622	MDOT	Metro	11564	82123-S16	M-5 GRAND RIVER AV	I-96 (JEFFRIES FRWY)	IN DETROIT	5 Highway-pedestrian	1 Highway	1971	2005		2005	4	392.3	103.5	4	3 Steel	82 Pl Girder Comp	0	""	""	1 Monolithic Concrete	9 MS22.5(HS25)or greater	6	12	42.38	-83.17573	2025-08-18T00:00:00	POINT (-83.17573 42.38)	Detroit	NBI	NHS	40603.05	81	1577408	5.16	2025-08-14T00:00:00	24	A	7	7	5	N
1623	Auburn Hills	Metro	7827	""	OLD M-59	CLINTON RIVER	1.3 MI W OF AUBURN HTS	5 Highway-pedestrian	5 Waterway	1947	2003	1989	2004	1	54.8	52.9	1	3 Steel	02 Multi Str Non Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	3		42.64	-83.24646	2025-08-18T00:00:00	POINT (-83.24646 42.64)	Oakland	NBI	Non-NHS	2898.92	44	625105	2.36	2024-10-16T00:00:00	24	A	8	7	7	N
1624	MDOT	Metro	11736	82194-S08	GREEN AVE	I-75	IN DETROIT	5 Highway-pedestrian	1 Highway	2023				2	187	97.8	2	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	B Greater than HL 93	4	10	42.3	-83.113815	2025-08-18T00:00:00	POINT (-83.113815 42.3)	Detroit	NBI	Non-NHS	18288.6	46	1589906	0.66	2025-06-24T00:00:00	24	A	8	8	8	N
1625	MDOT	Metro	6027	50013-S01	23 MI RD	M-53	3.0 MI N OF M-59	1 Highway	1 Highway	1965	2013	2013	2001	4	227.5	59	4	3 Steel	32 Multi Str Comp	0	""	""	3 Latex Concrete/Similar	4 M 18 (H 20)	4	6	42.67	-83.01463	2025-08-18T00:00:00	POINT (-83.01463 42.67)	Macomb	NBI	NHS	13422.5	55.8	807106	4.2	2023-12-18T00:00:00	24	A	6	6	7	N
1626	Wayne County	Metro	12035	""	SERVICE DR N I-94	WILLOW RUN DRAIN	VAN BUREN   E/RAWSONVILLE	1 Highway	5 Waterway	1975				3	57.7	40	3	1 Concrete	19 Culvert	0	""	""	N N/A (no deck (NBI))	6 MS18(HS20)+mod	2		42.22	-83.53673	2025-08-18T00:00:00	POINT (-83.53673 42.22)	Taylor	NBI	Non-NHS	2308	0	4603886	0.57	2025-06-17T00:00:00	24	A	N	N	N	5
1627	MDOT	Metro	6122	50062-S09	696 SERVICE RD	I-696 RAMP N TO W	IN ROSEVILLE	5 Highway-pedestrian	1 Highway	1972	2008	2008	1997	3	147	82.4	3	3 Steel	32 Multi Str Comp	0	""	""	3 Latex Concrete/Similar	5 MS 18 (HS 20)	4	2	42.5	-82.91944	2025-08-18T00:00:00	POINT (-82.91944 42.5)	Macomb	NBI	Non-NHS	12112.8	56	806006	0.14	2025-04-24T00:00:00	24	A	5	7	7	N
1628	Macomb County	Metro	6291	""	IRWIN ROAD	COON CREEK	0.1 MI WEST OF COON CREEK	1 Highway	5 Waterway	2015				1	22	30	1	1 Concrete	19 Culvert	0	""	""	6 Bituminous	B Greater than HL 93	2		42.86	-82.92351111	2025-08-18T00:00:00	POINT (-82.92351111 42.86)	Macomb	NBI	Non-NHS	660	30	819907	2.11	2023-09-14T00:00:00	24	A	N	N	N	8
1629	MDOT	Metro	7977	63103-S16	I-696 TURN RDWY EB	I-696&RAMPS FROM I-75NB	@ I-75	7 3d level interchg	1 Highway	1971	2007	2007	2007	4	408	44.4	4	3 Steel	82 Pl Girder Comp	0	""	""	3 Latex Concrete/Similar	6 MS18(HS20)+mod	2	2	42.48	-83.11153	2025-08-18T00:00:00	POINT (-83.11153 42.48)	Oakland	NBI	NHS	18115.2	39.5	1738907	0.1	2025-07-15T00:00:00	24	A	5	7	6	N
1630	MDOT	Metro	11554	82123-S08	I-96 RAMP NB TO EB	M-39 RAMP & E SERVICE RD	IN DETROIT	1 Highway	1 Highway	1970		2005	1989	6	371.8	39.4	6	4 Steel Continuous	02 Multi Str Non Comp	0	""	""	5 Epoxy Overlay	5 MS 18 (HS 20)	2	3	42.38	-83.21612	2025-08-18T00:00:00	POINT (-83.21612 42.38)	Detroit	NBI	NHS	14648.92	37.4	1591901	0.19	2023-08-22T00:00:00	24	A	5	6	7	N
1631	MDOT	Metro	6146	50111-R01-4	I-94 WB	SELFRIDGE ANGB SPUR TRK	1.3 MI SW OF M-59	1 Highway	2 Railroad	1963	2006	2006	2006	3	165	54.9	3	3 Steel	32 Multi Str Comp	0	""	""	3 Latex Concrete/Similar	6 MS18(HS20)+mod	3		42.61	-82.85607	2025-08-18T00:00:00	POINT (-82.85607 42.61)	Macomb	NBI	NHS	9058.5	51.5	798502	13.03	2025-06-17T00:00:00	24	A	5	6	5	N
1632	MDOT	Metro	8076	63174-S13	NB CROOKS RD	I-75	IN TROY	1 Highway	1 Highway	1990			2020	4	281.8	56.1	4	4 Steel Continuous	82 Pl Girder Comp	0	""	""	5 Epoxy Overlay	4 M 18 (H 20)	3	8	42.6	-83.169	2025-08-18T00:00:00	POINT (-83.169 42.6)	Oakland	NBI	NHS	15808.98	44	659810	7.64	2024-11-06T00:00:00	24	A	6	7	7	N
1633	MDOT	Metro	11860	82252-S24	SAVANNAH AVENUE	I-75	IN DETROIT	5 Highway-pedestrian	1 Highway	1967		2003	2021	2	198	35.8	2	3 Steel	82 Pl Girder Comp	0	""	""	5 Epoxy Overlay	5 MS 18 (HS 20)	2	8	42.43	-83.09383	2025-08-18T00:00:00	POINT (-83.09383 42.43)	Detroit	NBI	Non-NHS	7088.4	27.2	4708768	3.96	2023-10-25T00:00:00	24	K	6	7	6	N
1634	Oakland County	Metro	8205	""	BURNS	HURON RIVER	NORTH OF GARDEN	1 Highway	5 Waterway	1964		2014		1	29.9	27	1	5 Prestressed Concrete	05 Box Bm/Gird- Multiple	0	""	""	6 Bituminous	6 MS18(HS20)+mod	2		42.58	-83.57996	2025-08-18T00:00:00	POINT (-83.57996 42.58)	Oakland	NBI	Non-NHS	807.3	21	660801	0.03	2024-06-06T00:00:00	24	A	6	6	5	N
1635	Oakland County	Metro	14031	""	DEER HILL DRIVE	DEER LAKE CREEK	0.2 MI SE I-75&DIXIE HWY	1 Highway	5 Waterway	1977				3	36.1	23	3	3 Steel	19 Culvert	0	""	""	6 Bituminous	5 MS 18 (HS 20)	2		42.74	-83.44544	2025-08-18T00:00:00	POINT (-83.44544 42.74)	Oakland	NBI	Non-NHS	830.3	23	1762809	0.29	2025-07-25T00:00:00	24	K	N	N	N	3
1636	MDOT	Metro	11169	82023-S01	WEIR RD	I-94	IN DETROIT	5 Highway-pedestrian	1 Highway	1950	1994		2012	4	211.4	41.4	4	3 Steel	02 Multi Str Non Comp	0	""	""	5 Epoxy Overlay	5 MS 18 (HS 20)	2	6	42.33	-83.154274	2025-08-18T00:00:00	POINT (-83.154274 42.33)	Detroit	NBI	NHS	8751.96	30.8	4711432	0.05	2023-09-25T00:00:00	24	A	7	7	7	N
1637	Wayne County	Metro	12185	""	ALLEN ROAD	BLAKELY DRAIN	BROWNSTOWN       N/SIBLEY	5 Highway-pedestrian	5 Waterway	2023				1	59.4	78.5	1	3 Steel	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	B Greater than HL 93	5		42.17	-83.22716	2025-08-18T00:00:00	POINT (-83.22716 42.17)	Taylor	NBI	NHS	4662.9	64	4705756	4.89	2023-08-23T00:00:00	24	A	9	9	9	N
1638	MDOT	Metro	11922	82292-B05	I-275 NB ON RAMP	LOWER ROUGE R/BIKE PATH	0.25 MI W OF WAYNE	1 Highway	5 Waterway	1974			2012	4	242.5	26.7	4	3 Steel	02 Multi Str Non Comp	0	""	""	5 Epoxy Overlay	9 MS22.5(HS25)or greater	1		42.28	-83.44151	2025-08-18T00:00:00	POINT (-83.44151 42.28)	Taylor	NBI	NHS	6474.75	23.5	1599202	0.21	2024-10-29T00:00:00	24	A	7	7	7	N
1639	Lincoln Park	Metro	12503	""	PORTER ST	N BR ECORSE RIVER	IN LINCOLN PARK	5 Highway-pedestrian	5 Waterway	1948	1960			1	29.9	40	1	1 Concrete	04 Tee Beam	0	""	""	1 Monolithic Concrete	6 MS18(HS20)+mod	2		42.27	-83.1787	2025-08-18T00:00:00	POINT (-83.1787 42.27)	Taylor	NBI	Non-NHS	1196	30	4710184	1.06	2024-08-20T00:00:00	12	P	5	4	6	N
1640	Detroit	Metro	12443	""	PLYMOUTH ROAD	ROUGE RIVER	ROUGE PARK	5 Highway-pedestrian	5 Waterway	1959	1983	2022		3	119.4	110.4	3	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	3 Latex Concrete/Similar	9 MS22.5(HS25)or greater	6		42.37	-83.255486	2025-08-18T00:00:00	POINT (-83.255486 42.37)	Detroit	NBI	NHS	13181.76	88	1604102	15.3	2023-11-21T00:00:00	24	A	7	7	5	N
1641	MDOT	Metro	7939	63102-S26	I-696 EB SERV	M-1 (WOODWARD AVE)	AT I-696 & WOODWARD	5 Highway-pedestrian	1 Highway	1986				2	124.4	114.8	2	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	9 MS22.5(HS25)or greater	5	4	42.47	-83.14502	2025-08-18T00:00:00	POINT (-83.14502 42.47)	Oakland	NBI	Non-NHS	14281.12	111.2	633409	11.73	2023-07-12T00:00:00	24	A	5	7	7	N
1642	MDOT	Metro	11138	82022-S32	RAMP FROM US-12EB	I-94	IN DEARBORN	1 Highway	1 Highway	1948	2005		2005	5	259.6	45.6	5	3 Steel	02 Multi Str Non Comp	0	""	""	3 Latex Concrete/Similar	5 MS 18 (HS 20)	3	6	42.32	-83.16229	2025-08-18T00:00:00	POINT (-83.16229 42.32)	Taylor	NBI	NHS	11837.76	44	1577102	0.15	2023-09-26T00:00:00	24	A	7	7	7	N
1643	MDOT	Metro	13012	50015-S11	33 MILE RD	M-53	BRUCE TWP SEC 26-35	1 Highway	1 Highway	2002				4	397.8	46.6	4	5 Prestressed Concrete	05 Box Bm/Gird- Multiple	0	""	""	1 Monolithic Concrete	9 MS22.5(HS25)or greater	2	4	42.82	-83.003555	2025-08-18T00:00:00	POINT (-83.003555 42.82)	Macomb	NBI	Non-NHS	18537.48	43.3	4210214	0.31	2023-12-21T00:00:00	24	A	5	6	7	N
1644	Wayne County	Metro	12159	""	MIDDLE BELT ROAD	E N HINES & MID ROUGE RV	WESTLAND  S/ANN ARBOR TRL	5 Highway-pedestrian	6 Highway-waterway	1953		1991		2	139.8	62	2	2 Concrete Continuous	07 Frame- Rigid exc Culv	0	""	""	3 Latex Concrete/Similar	6 MS18(HS20)+mod	4	2	42.34	-83.331726	2025-08-18T00:00:00	POINT (-83.331726 42.34)	Taylor	NBI	NHS	8667.6	47.9	1674403	15.62	2024-06-28T00:00:00	24	A	5	5	6	N
1645	MDOT	Metro	13582	82191-S26	TOLEDO-DIX HWY	I-75	N OF WOODHAVEN	1 Highway	1 Highway	2012				2	243.9	83.3	2	5 Prestressed Concrete	06 Box Bms- Single/Sprd	0	""	""	1 Monolithic Concrete	B Greater than HL 93	5	6	42.17	-83.24298	2025-08-18T00:00:00	POINT (-83.24298 42.17)	Taylor	NBI	NHS	20316.87	80	4718578	2	2024-07-09T00:00:00	24	A	7	7	8	N
1646	MDOT	Metro	7860	63051-S01-6	M-1 SB RAMP	M-102 (8 MILE RD)	AT N LTS OF DETROIT	1 Highway	1 Highway	1956	2003		2003	2	119	65.9	2	3 Steel	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	9 MS22.5(HS25)or greater	3	6	42.45	-83.125275	2025-08-18T00:00:00	POINT (-83.125275 42.45)	Oakland	NBI	NHS	7842.1	43.4	1598510	0.01	2023-09-26T00:00:00	24	A	6	6	7	N
1647	Other Local Agencies	Metro	12284	""	NORTHVILLE PARK DR	MIDDLE ROUGE RIVER	NORTHVILLE T S/SEVEN MILE	5 Highway-pedestrian	5 Waterway	1945				1	33.8	27.2	1	3 Steel	02 Multi Str Non Comp	0	""	""	2 Integral Concrete	4 M 18 (H 20)	2		42.42	-83.475624	2025-08-18T00:00:00	POINT (-83.475624 42.42)	Taylor	NBI	Non-NHS	919.36	22	1708702	0.25	2024-11-12T00:00:00	12	K	4	4	5	N
1648	Wayne County	Metro	12079	""	FIVE MILE ROAD	UPPER ROUGE RIVER	DETROIT       E/TELEGRAPH	5 Highway-pedestrian	5 Waterway	2024				1	135.9	66.4	1	5 Prestressed Concrete	06 Box Bms- Single/Sprd	0	""	""	1 Monolithic Concrete	B Greater than HL 93	4		42.4	-83.271545	2025-08-18T00:00:00	POINT (-83.271545 42.4)	Detroit	NBI	Non-NHS	9023.76	52	1579605	2.2	2025-01-30T00:00:00	24	A	9	9	9	N
1649	Macomb County	Metro	6363	""	27 MILE ROAD	HEALY BROOK DRAIN	100 FT E OF ROMEO PLANK	1 Highway	5 Waterway	1953				1	22	26.2	1	3 Steel	19 Culvert	0	""	""	N N/A (no deck (NBI))	4 M 18 (H 20)	2		42.73	-82.957924	2025-08-18T00:00:00	POINT (-82.957924 42.73)	Macomb	NBI	Non-NHS	576.4	0	819105	3.98	2025-06-17T00:00:00	12	A	N	N	N	4
1650	MDOT	Metro	11902	82291-S06	PENNSYLVANIA RD	I-275	@ S LIMITSOF ROMULUS	1 Highway	1 Highway	1974		2022	2009	2	288	48.4	2	3 Steel	82 Pl Girder Comp	0	""	""	3 Latex Concrete/Similar	5 MS 18 (HS 20)	2	6	42.18	-83.388016	2025-08-18T00:00:00	POINT (-83.388016 42.18)	Taylor	NBI	Non-NHS	13939.2	44.5	1674307	1.41	2024-05-29T00:00:00	24	A	7	6	7	N
1651	Wayne County	Metro	12254	""	RIDGE ROAD	FELLOWS CREEK	CANTON             N/FORD	1 Highway	5 Waterway	1978	2020			1	22	27	1	1 Concrete	19 Culvert	0	""	19 Culvert	N N/A (no deck (NBI))	A HL 93	2		42.33	-83.5274	2025-08-18T00:00:00	POINT (-83.5274 42.33)	Taylor	NBI	Non-NHS	594	0	1595602	3.01	2025-05-09T00:00:00	24	A	N	N	N	8
1652	MDOT	Metro	11407	82111-S20	RAMP FROM M-10	JEFFERSON AVE	IN CITY OF DETROIT	1 Highway	1 Highway	1980		2009	2005	11	822.2	40.7	11	3 Steel	82 Pl Girder Comp	0	""	""	3 Latex Concrete/Similar	9 MS22.5(HS25)or greater	2	5	42.33	-83.053116	2025-08-18T00:00:00	POINT (-83.053116 42.33)	Detroit	NBI	NHS	33463.54	38.3	4718278	0.08	2025-06-24T00:00:00	12	A	4	6	6	N
1653	Detroit	Metro	12370	""	TWELFTH STREET	CONRAIL	TWELFTH ST N OF LAFAYETTE	5 Highway-pedestrian	2 Railroad	1984			1984	2	160.7	114	2	3 Steel	02 Multi Str Non Comp	0	""	""	2 Integral Concrete	5 MS 18 (HS 20)	6		42.32	-83.067375	2025-08-18T00:00:00	POINT (-83.067375 42.32)	Detroit	NBI	NHS	18319.8	91	4706959	0.18	2023-12-13T00:00:00	24	A	7	7	7	N
1654	MDOT	Metro	11575	82123-S27	U-TRN N OF GR RIV	I-96	IN DETROIT	5 Highway-pedestrian	1 Highway	1972	2009		2009	2	174	29.7	2	4 Steel Continuous	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	1	8	42.37	-83.14564	2025-08-18T00:00:00	POINT (-83.14564 42.37)	Detroit	NBI	Non-NHS	5167.8	21.1	1804005	0.01	2024-03-06T00:00:00	24	A	7	8	6	N
1655	Macomb County	Metro	6210	""	23 MILE ROAD	MCBRIDE DRAIN	0.25 MILES WEST OF CARD	1 Highway	5 Waterway	2022				1	28.3	60	1	1 Concrete	19 Culvert	0	""	""	4 Low Slump Concrete	B Greater than HL 93	2		42.67	-82.90114	2025-08-18T00:00:00	POINT (-82.90114 42.67)	Macomb	NBI	NHS	1698	60	807106	10	2024-11-28T00:00:00	24	A	N	N	N	9
1656	Macomb County	Metro	6208	""	23 MILE RD	MIDDLE BR CLINTON RIVER	0.1MI EAST OF ROMEO PLANK	1 Highway	5 Waterway	2006				2	86.7	60	2	1 Concrete	19 Culvert	0	""	""	N N/A (no deck (NBI))	9 MS22.5(HS25)or greater	6		42.67	-82.939545	2025-08-18T00:00:00	POINT (-82.939545 42.67)	Macomb	NBI	NHS	5202	76.1	807106	8.04	2025-07-11T00:00:00	24	A	N	N	N	7
1657	Rochester Hills	Metro	8277	""	KINGSCOVE ROAD	PAINT CREEK	0.1 MI N OF TIENKEN ROAD	1 Highway	5 Waterway	1965	1998			1	60	47	1	5 Prestressed Concrete	05 Box Bm/Gird- Multiple	0	""	""	0 None	5 MS 18 (HS 20)	2		42.7	-83.14699	2025-08-18T00:00:00	POINT (-83.14699 42.7)	Oakland	NBI	Non-NHS	2820	35.1	1819703	0.03	2024-11-06T00:00:00	24	A	6	6	6	N
1658	MDOT	Metro	11869	82252-S34	DEQUINDRE AVE	M-8 DAVISON	IN DETROIT	5 Highway-pedestrian	1 Highway	1969	2003			4	199.8	71.4	4	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	5 Epoxy Overlay	5 MS 18 (HS 20)	4	6	42.41	-83.077225	2025-08-18T00:00:00	POINT (-83.077225 42.41)	Detroit	NBI	Non-NHS	14265.72	48	1585803	0.54	2024-03-28T00:00:00	24	A	8	8	7	N
1659	MDOT	Metro	11705	82193-S02	M-5 GRAND RIVER	M-39 (SOUTHFIELD EXP)	IN DETROIT	5 Highway-pedestrian	1 Highway	1963	1995		1995	2	123	116.5	2	4 Steel Continuous	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	6 MS18(HS20)+mod	7	6	42.4	-83.2182	2025-08-18T00:00:00	POINT (-83.2182 42.4)	Detroit	NBI	NHS	14329.5	102.7	1577408	2.73	2024-05-28T00:00:00	24	A	6	6	6	N
1660	MDOT	Metro	7805	63022-S10	I-96 BL (GRAND RV)	M-5	2MI W OF FARMINGTON	1 Highway	1 Highway	1957		2019	1957	4	245	57.8	4	3 Steel	32 Multi Str Comp	0	""	""	3 Latex Concrete/Similar	4 M 18 (H 20)	4	4	42.47	-83.417175	2025-08-18T00:00:00	POINT (-83.417175 42.47)	Oakland	NBI	Non-NHS	14161	48	4104142	14.46	2024-11-27T00:00:00	24	A	6	6	7	N
1661	MDOT	Metro	11833	82251-S30-6	I-75S/I-94E RAMP	I-94 RELIEF	IN DETROIT	7 3d level interchg	0 Other	1962		1979	1983	5	359.9	29.2	5	3 Steel	82 Pl Girder Comp	0	""	""	3 Latex Concrete/Similar	6 MS18(HS20)+mod	1		42.37	-83.05630278	2025-08-18T00:00:00	POINT (-83.05630278 42.37)	Detroit	NBI	NHS	10509.08	26	4705723	0.59	2024-04-11T00:00:00	24	A	6	7	7	N
1662	Wayne County	Metro	12233	""	GREENFIELD ROAD	ROUGE RIVER	DEARBORN/MELVINDAL S/I-94	5 Highway-pedestrian	5 Waterway	1928	2002			7	362.9	78.4	7	5 Prestressed Concrete	04 Tee Beam	0	5 Prestressed Concrete	04 Tee Beam	6 Bituminous	6 MS18(HS20)+mod	5		42.29	-83.17909	2025-08-18T00:00:00	POINT (-83.17909 42.29)	Taylor	NBI	NHS	28451.36	60	1651002	1.7	2024-10-15T00:00:00	12	A	4	6	5	N
1663	MDOT	Metro	11629	82191-B06	I-75 RAMP C	FRANK & POET DRAIN	IN TAYLOR	1 Highway	5 Waterway	1966				2	24.9	54.1	2	1 Concrete	19 Culvert	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	1		42.2	-83.23971	2025-08-18T00:00:00	POINT (-83.23971 42.2)	Taylor	NBI	NHS	1347.09	54.1	1592302	0.15	2024-07-26T00:00:00	24	A	N	N	N	7
1664	Wayne County	Metro	12142	""	WAYNE ROAD	LOWER ROUGE RIVER	WAYNE          N/MICHIGAN	5 Highway-pedestrian	5 Waterway	1983		1983		2	98.8	75.1	2	5 Prestressed Concrete	05 Box Bm/Gird- Multiple	0	""	""	5 Epoxy Overlay	0 Unknown	5		42.28	-83.38355	2025-08-18T00:00:00	POINT (-83.38355 42.28)	Taylor	NBI	NHS	7419.88	55.1	4719470	6.64	2024-09-18T00:00:00	24	A	6	5	5	N
1665	MDOT	Metro	11489	82122-S03	LEVAN RD	I-96	IN LIVONIA	5 Highway-pedestrian	1 Highway	1974			2014	2	178.5	76.4	2	3 Steel	32 Multi Str Comp	0	""	""	5 Epoxy Overlay	5 MS 18 (HS 20)	5	8	42.38	-83.402176	2025-08-18T00:00:00	POINT (-83.402176 42.38)	Taylor	NBI	Non-NHS	13637.4	64	1604605	1.17	2024-10-04T00:00:00	24	A	7	7	7	N
1666	Wayne County	Metro	12144	""	WAYNE ROAD	E N HINES DRIVE	LIVONIA   N/ANN ARBR TRL	5 Highway-pedestrian	6 Highway-waterway	1947		1988		2	140.7	62	2	2 Concrete Continuous	07 Frame- Rigid exc Culv	0	""	""	2 Integral Concrete	6 MS18(HS20)+mod	4	2	42.36	-83.386475	2025-08-18T00:00:00	POINT (-83.386475 42.36)	Taylor	NBI	NHS	8723.4	47.9	4719470	11.8	2025-04-29T00:00:00	12	A	4	4	6	N
1667	Wayne County	Metro	11992	""	GIBRALTAR ROAD	BROWNSTOWN CREEK	GIBRALTAR     W/JEFFERSON	5 Highway-pedestrian	5 Waterway	1976		2022		3	90	52.2	3	1 Concrete	01 Slab	0	""	""	6 Bituminous	9 MS22.5(HS25)or greater	2		42.1	-83.211	2025-08-18T00:00:00	POINT (-83.211 42.1)	Taylor	NBI	Non-NHS	4698	48.5	1698410	0.21	2024-11-13T00:00:00	12	A	4	4	6	N
1668	MDOT	Metro	7907	63101-S10	FRANKLIN RD	I-696	IN SOUTHFIELD	5 Highway-pedestrian	1 Highway	2006				4	396.1	82.4	4	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	2 Integral Concrete	9 MS22.5(HS25)or greater	2	8	42.49	-83.29959	2025-08-18T00:00:00	POINT (-83.29959 42.49)	Oakland	NBI	Non-NHS	32638.64	62.9	638109	0.58	2024-03-28T00:00:00	24	A	7	7	8	N
1669	MDOT	Metro	11530	82122-S42	NEWBURGH E LFT TRN	I-96	IN LIVONIA	1 Highway	1 Highway	1974			2001	2	176	23.7	2	3 Steel	02 Multi Str Non Comp	0	""	""	5 Epoxy Overlay	5 MS 18 (HS 20)	2	8	42.38	-83.40942	2025-08-18T00:00:00	POINT (-83.40942 42.38)	Taylor	NBI	Non-NHS	4171.2	18	1804008	0.02	2024-10-02T00:00:00	24	A	7	5	8	N
1670	MDOT	Metro	6151	50111-S05	10 MI RD S INT	I-94	W LTS OF ST CLAIR SHORES	1 Highway	1 Highway	2002		1979	1990	4	182.5	28.6	4	3 Steel	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	6 MS18(HS20)+mod	1	6	42.48	-82.916466	2025-08-18T00:00:00	POINT (-82.916466 42.48)	Macomb	NBI	Non-NHS	5219.5	25.4	801002	0.02	2025-07-09T00:00:00	24	A	7	6	5	N
1671	MDOT	Metro	6070	50051-B02	M-3 NB	CLINTON RIVER	IN MT CLEMENS	5 Highway-pedestrian	5 Waterway	2011				3	270	56.4	3	5 Prestressed Concrete	06 Box Bms- Single/Sprd	0	""	""	1 Monolithic Concrete	A HL 93	3		42.58	-82.88248	2025-08-18T00:00:00	POINT (-82.88248 42.58)	Macomb	NBI	NHS	15228	42	833209	0.65	2023-12-20T00:00:00	24	A	7	8	7	N
1672	MDOT	Metro	6044	50021-S01	UTICA RD	M-59	IN UTICA	5 Highway-pedestrian	1 Highway	1994				2	143	64.4	2	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	4	7	42.62	-83.041275	2025-08-18T00:00:00	POINT (-83.041275 42.62)	Macomb	NBI	Non-NHS	9209.2	52	4211434	10.4	2023-11-21T00:00:00	24	A	6	8	7	N
1673	Bloomfield Hill	Metro	13437	""	CHESTERFIELD RD	QUARTON BR/ROUGE RIVER	IN BLOOMFIELD HILLS	1 Highway	5 Waterway	1979				2	24.3	29.9	2	3 Steel	19 Culvert	0	""	""	6 Bituminous	4 M 18 (H 20)	2		42.56	-83.235	2025-08-18T00:00:00	POINT (-83.235 42.56)	Oakland	NBI	Non-NHS	726.57	29.9	5498706	0.09	2025-01-23T00:00:00	12	P	N	N	N	3
1674	MDOT	Metro	11226	82024-S19	SAGINAW ST U-TRN	I-94	IN DETROIT	1 Highway	1 Highway	1983			1983	2	160.7	48.9	2	4 Steel Continuous	02 Multi Str Non Comp	0	""	""	3 Latex Concrete/Similar	9 MS22.5(HS25)or greater	2	7	42.38	-83.0349	2025-08-18T00:00:00	POINT (-83.0349 42.38)	Detroit	NBI	Non-NHS	7858.23	45.9	1877006	0.03	2024-04-18T00:00:00	24	A	5	6	5	N
1675	MDOT	Metro	11660	82191-S17-1	I-75 NB	NORTH LINE RD	IN SOUTHGATE	1 Highway	1 Highway	1966	2019		1991	4	207.1	63.3	4	4 Steel Continuous	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	6 MS18(HS20)+mod	3	4	42.21	-83.22208	2025-08-18T00:00:00	POINT (-83.22208 42.21)	Taylor	NBI	NHS	13109.43	60	1592010	10.54	2025-07-03T00:00:00	24	A	8	7	7	N
1676	MDOT	Metro	7867	63053-B02	US-24	CLINTON R	1.5MI SE OF M-15	5 Highway-pedestrian	5 Waterway	1929	1989	1989	1929	1	40.2	83.3	1	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	3 Latex Concrete/Similar	2 M 13.5 (H 15)	5		42.7	-83.40369	2025-08-18T00:00:00	POINT (-83.40369 42.7)	Oakland	NBI	NHS	3348.66	64	689103	3.95	2025-05-29T00:00:00	24	A	7	8	6	N
1677	Wayne County	Metro	12210	""	WEST RIVER ROAD	THOROFARE CANAL	GROSSE ILE N/GROSS I PKWY	5 Highway-pedestrian	5 Waterway	1935	1995		1990	3	95.8	43	3	5 Prestressed Concrete	05 Box Bm/Gird- Multiple	0	""	""	2 Integral Concrete	6 MS18(HS20)+mod	2		42.13	-83.17217	2025-08-18T00:00:00	POINT (-83.17217 42.13)	Taylor	NBI	Non-NHS	4119.4	40	1691206	1.33	2023-10-04T00:00:00	24	A	7	7	5	N
1678	MDOT	Metro	11517	82122-S29	MELVIN	I-96	IN LIVONIA	5 Highway-pedestrian	1 Highway	1973			2001	2	176.2	48.4	2	3 Steel	02 Multi Str Non Comp	0	""	""	5 Epoxy Overlay	4 M 18 (H 20)	2	9	42.38	-83.33986	2025-08-18T00:00:00	POINT (-83.33986 42.38)	Taylor	NBI	Non-NHS	8528.08	34	1606309	0.01	2024-09-16T00:00:00	24	A	7	7	7	N
1679	MDOT	Metro	12482	82706-B07	PICNIC WAY	CANOE STREAM	BELLE ISLE	5 Highway-pedestrian	5 Waterway	1901	1990			1	34.5	38.7	1	5 Prestressed Concrete	05 Box Bm/Gird- Multiple	0	""	""	2 Integral Concrete	6 MS18(HS20)+mod	2		42.33	-82.98695	2025-08-18T00:00:00	POINT (-82.98695 42.33)	Detroit	NBI	Non-NHS	1335.15	33.1	5494461	0.01	2024-08-07T00:00:00	24	A	6	8	7	N
1680	MDOT	Metro	11106	82022-B03-4	I-94 WB	ROUGE RIVER	ALLEN PARK	1 Highway	5 Waterway	1943	1997			7	405.5	63.3	7	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	9 MS22.5(HS25)or greater	3		42.3	-83.18764	2025-08-18T00:00:00	POINT (-83.18764 42.3)	Taylor	NBI	NHS	25668.15	60	1588802	19.88	2025-07-24T00:00:00	24	A	7	7	6	N
1681	MDOT	Metro	11151	82022-S49	I-94 WB	M-39	IN ALLEN PARK	1 Highway	1 Highway	1984				21	845.4	72.2	4	5 Prestressed Concrete	02 Multi Str Non Comp	17	1 Concrete	01 Slab	5 Epoxy Overlay	9 MS22.5(HS25)or greater	4	9	42.27	-83.22196	2025-08-18T00:00:00	POINT (-83.22196 42.27)	Taylor	NBI	NHS	61037.88	48.2	1588802	17.08	2024-11-19T00:00:00	24	A	6	7	6	N
1682	MDOT	Metro	7941	63102-S28	MAIN STREET	I-696	IN ROYAL OAK	1 Highway	1 Highway	1986				2	154	88.3	2	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	9 MS22.5(HS25)or greater	5	8	42.48	-83.14371	2025-08-18T00:00:00	POINT (-83.14371 42.48)	Oakland	NBI	NHS	13598.2	84.3	644806	0.09	2023-07-14T00:00:00	24	A	5	7	7	N
1683	MDOT	Metro	7884	63081-S11-2	EVERGREEN RD (SB)	M-10	IN SOUTHFIELD	5 Highway-pedestrian	1 Highway	1963	1997	2020	1997	2	173.6	48.7	2	3 Steel	32 Multi Str Comp	0	""	""	3 Latex Concrete/Similar	2 M 13.5 (H 15)	3	6	42.47	-83.24044	2025-08-18T00:00:00	POINT (-83.24044 42.47)	Oakland	NBI	Non-NHS	8454.32	41.3	4416556	0.14	2024-06-13T00:00:00	24	A	7	7	7	N
1684	MDOT	Metro	11687	82192-S09	PAUL AVE	M-39	IN DETROIT	5 Highway-pedestrian	1 Highway	2005				2	128	64.5	2	5 Prestressed Concrete	06 Box Bms- Single/Sprd	0	""	""	2 Integral Concrete	5 MS 18 (HS 20)	4	6	42.34	-83.21575	2025-08-18T00:00:00	POINT (-83.21575 42.34)	Detroit	NBI	Non-NHS	8256	52	1582602	1.1	2024-05-29T00:00:00	24	A	7	7	7	N
1685	Trenton	Metro	12516	""	MARIAN DRIVE	FRANK AND POET DRAIN	IN TRENTON	5 Highway-pedestrian	5 Waterway	1959		2019		1	58.7	55.4	1	5 Prestressed Concrete	05 Box Bm/Gird- Multiple	0	""	""	6 Bituminous	6 MS18(HS20)+mod	2		42.13	-83.2039	2025-08-18T00:00:00	POINT (-83.2039 42.13)	Taylor	NBI	Non-NHS	3251.98	41	4711361	0.64	2025-06-06T00:00:00	12	A	6	5	4	N
1686	MDOT	Metro	6103	50061-S33-6	SB SERVICE RD	I-696	IN THE CITY OF WARREN	6 2d level interchg	1 Highway	1976	2008		2008	2	174.8	37.9	2	3 Steel	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	6 MS18(HS20)+mod	2	8	42.49	-83.04631	2025-08-18T00:00:00	POINT (-83.04631 42.49)	Macomb	NBI	Non-NHS	6624.92	29.5	1740303	0.25	2025-04-24T00:00:00	24	A	7	7	7	N
1687	Macomb County	Metro	6190	""	MORAVIAN DRIVE	CLINTON RIVER	0.5 MI SOUTH OF CASS AVE	5 Highway-pedestrian	5 Waterway	2011				3	238.3	49.4	3	5 Prestressed Concrete	06 Box Bms- Single/Sprd	0	""	""	1 Monolithic Concrete	B Greater than HL 93	2		42.6	-82.9092	2025-08-18T00:00:00	POINT (-82.9092 42.6)	Macomb	NBI	Non-NHS	11772.02	32.2	803604	5.83	2025-07-11T00:00:00	24	A	7	8	7	N
1688	Wayne County	Metro	11999	""	VREELAND ROAD	BLAKELY DRAIN	BRWNTWN/WOODHE/ALLEN	5 Highway-pedestrian	5 Waterway	1925	1956			3	55.8	45.3	3	2 Concrete Continuous	01 Slab	0	""	""	6 Bituminous	4 M 18 (H 20)	2		42.11	-83.22244	2025-08-18T00:00:00	POINT (-83.22244 42.11)	Taylor	NBI	Non-NHS	2527.74	37.1	1606105	3.24	2024-11-13T00:00:00	12	P	4	4	4	N
1689	MDOT	Metro	11824	82251-S23	I-94EB-I-75NB RAMP	I-75	IN DETROIT	1 Highway	1 Highway	1964		1985	2002	4	307.5	29.4	4	3 Steel	82 Pl Girder Comp	0	""	""	3 Latex Concrete/Similar	6 MS18(HS20)+mod	1	6	42.37	-83.057335	2025-08-18T00:00:00	POINT (-83.057335 42.37)	Detroit	NBI	NHS	9040.5	16	1577701	0.19	2025-04-28T00:00:00	24	A	5	5	6	N
1690	MDOT	Metro	6161	50111-S19	I-94	13 MILE RD	IN ROSEVILLE	1 Highway	1 Highway	1965		1980	1997	3	180.8	130.6	3	3 Steel	32 Multi Str Comp	0	""	""	3 Latex Concrete/Similar	6 MS18(HS20)+mod	7	2	42.52	-82.9119	2025-08-18T00:00:00	POINT (-82.9119 42.52)	Macomb	NBI	NHS	23612.48	124.7	798501	5.42	2025-06-07T00:00:00	24	A	7	7	5	N
1691	Macomb County	Metro	6259	""	ROMEO PLANK RD	M B CLINTON RIVER	0.3 MI N OF 25 MILE ROAD	1 Highway	5 Waterway	1997				2	116.1	47.2	2	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	9 MS22.5(HS25)or greater	2		42.71	-82.959274	2025-08-18T00:00:00	POINT (-82.959274 42.71)	Macomb	NBI	Non-NHS	5479.92	42.7	816509	0.39	2025-06-17T00:00:00	24	A	7	8	6	N
1692	MDOT	Metro	11212	82024-S05	BRUSH ST	I-94	IN DETROIT	5 Highway-pedestrian	1 Highway	2019				2	228.3	60.8	2	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	B Greater than HL 93	2	6	42.37	-83.06446	2025-08-18T00:00:00	POINT (-83.06446 42.37)	Detroit	NBI	Non-NHS	13880.64	38	4705554	0.83	2023-11-13T00:00:00	24	A	8	8	8	N
1693	MDOT	Metro	7924	63102-S08	SOUTHFIELD RD	I-696	IN LATHRUP VILLAGE	1 Highway	1 Highway	1987				2	130	106	2	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	9 MS22.5(HS25)or greater	7	8	42.49	-83.22184	2025-08-18T00:00:00	POINT (-83.22184 42.49)	Oakland	NBI	NHS	13780	87.9	611304	3	2024-07-22T00:00:00	24	A	6	7	7	N
1694	MDOT	Metro	11338	82081-S06-1	EVERGREEN RD NB	M-153	IN DEARBORN	1 Highway	1 Highway	1972	2008		2008	2	234.3	62.6	2	3 Steel	82 Pl Girder Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	4	8	42.33	-83.23442	2025-08-18T00:00:00	POINT (-83.23442 42.33)	Taylor	NBI	NHS	14667.18	54	1596908	1.48	2024-05-28T00:00:00	24	A	7	8	8	N
1695	MDOT	Metro	11436	82112-S11	GLENDALE AVE	M-10	IN DETROIT	5 Highway-pedestrian	1 Highway	1955	2006		2006	4	169.7	67.9	4	4 Steel Continuous	02 Multi Str Non Comp	0	""	""	1 Monolithic Concrete	6 MS18(HS20)+mod	4	6	42.39	-83.10721	2025-08-18T00:00:00	POINT (-83.10721 42.39)	Detroit	NBI	Non-NHS	11522.63	52	1584707	0.21	2024-12-18T00:00:00	24	A	7	7	7	N
1696	MDOT	Metro	11368	82103-S11	HAMILTON AVENUE	M-8, DAVISON FWY	HIGHLAND PARK E/LODGE FWY	5 Highway-pedestrian	1 Highway	1996				2	183.9	103.4	2	5 Prestressed Concrete	05 Box Bm/Gird- Multiple	0	""	""	5 Epoxy Overlay	5 MS 18 (HS 20)	5	10	42.4	-83.10455	2025-08-18T00:00:00	POINT (-83.10455 42.4)	Detroit	NBI	Non-NHS	19015.26	81	1615607	1.41	2023-10-23T00:00:00	24	A	7	7	7	N
1697	Wayne County	Metro	12120	""	NORTHVILLE ROAD	MIDDLE ROUGE RIVER	PLYMOUTH T   S/NORTHVILLE	5 Highway-pedestrian	5 Waterway	2000		2000		1	68	33.8	1	5 Prestressed Concrete	02 Multi Str Non Comp	0	""	""	5 Epoxy Overlay	6 MS18(HS20)+mod	4		42.39	-83.46726	2025-08-18T00:00:00	POINT (-83.46726 42.39)	Taylor	NBI	Non-NHS	2298.4	24	1679402	0.66	2025-05-27T00:00:00	24	A	6	8	7	N
1698	MDOT	Metro	6170	50111-S27-3	I-94 EB	CROCKER RD	0.5 MI SE OF MT CLEMENS	1 Highway	1 Highway	1963	2006	2006	1998	5	379.9	57	5	3 Steel	32 Multi Str Comp	0	""	""	3 Latex Concrete/Similar	6 MS18(HS20)+mod	3	2	42.58	-82.858	2025-08-18T00:00:00	POINT (-82.858 42.58)	Macomb	NBI	NHS	21654.3	53.8	798501	10.65	2025-06-26T00:00:00	24	A	5	6	6	N
1699	Troy	Metro	8308	""	STEPHENSON HWY	BARNARD DRAIN	0.2 MI S OF MAPLE ROAD	5 Highway-pedestrian	5 Waterway	1974				2	31	167	2	2 Concrete Continuous	19 Culvert	0	""	""	1 Monolithic Concrete	6 MS18(HS20)+mod	4		42.55	-83.12028	2025-08-18T00:00:00	POINT (-83.12028 42.55)	Oakland	NBI	Non-NHS	5177	45.9	680107	3.07	2025-04-08T00:00:00	24	A	N	N	N	5
1700	Macomb County	Metro	6244	""	NB MOUND RD	PLUM BROOK DRAIN	0.3 MI N OF 18 MILE RD	5 Highway-pedestrian	5 Waterway	1992				1	34	57.3	1	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	9 MS22.5(HS25)or greater	4		42.6	-83.05058	2025-08-18T00:00:00	POINT (-83.05058 42.6)	Macomb	NBI	NHS	1948.2	54	799110	10.35	2024-07-31T00:00:00	24	A	7	8	7	N
1701	Wayne County	Metro	11987	""	MARLEY DRIVE	CANAL (MIDDLE)	BROWNSTOWNE/DERN	5 Highway-pedestrian	5 Waterway	2002		2002		1	45	29.9	1	1 Concrete	19 Culvert	0	""	""	5 Epoxy Overlay	6 MS18(HS20)+mod	2		42.05	-83.19108	2025-08-18T00:00:00	POINT (-83.19108 42.05)	Taylor	NBI	Non-NHS	1345.5	24	1709809	0.12	2024-09-19T00:00:00	24	A	N	N	N	7
1702	MDOT	Metro	12941	63192-S02	M-5	I-96/I-696	NOVI TWP SEC 13	1 Highway	1 Highway	1992				4	459	63	4	3 Steel	82 Pl Girder Comp	0	""	""	1 Monolithic Concrete	9 MS22.5(HS25)or greater	3	5	42.48	-83.44806	2025-08-18T00:00:00	POINT (-83.44806 42.48)	Oakland	NBI	NHS	28917	59.7	4402005	4.91	2024-11-18T00:00:00	24	A	7	7	7	N
1703	MDOT	Metro	11140	82022-S34	US-12 (MICHIGAN AV	I-94	IN DEARBORN	5 Highway-pedestrian	1 Highway	1948	1996		2004	2	223.8	117.9	2	3 Steel	52 Pl Girder Non Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	9	6	42.33	-83.16061	2025-08-18T00:00:00	POINT (-83.16061 42.33)	Taylor	NBI	NHS	26386.02	90	1577103	1.63	2023-09-26T00:00:00	24	A	6	6	6	N
1704	MDOT	Metro	11806	82251-S07-2	I-75 SB	I-75 SB TO EB RAMP	I-75 & I-375 INTCHG	1 Highway	1 Highway	1970	1998		1998	1	33.8	56.4	1	3 Steel	02 Multi Str Non Comp	0	""	""	1 Monolithic Concrete	6 MS18(HS20)+mod	3	1	42.34	-83.046234	2025-08-18T00:00:00	POINT (-83.046234 42.34)	Detroit	NBI	NHS	1906.32	53.1	1595106	24.26	2024-03-06T00:00:00	24	A	7	7	7	N
1705	Macomb County	Metro	6242	""	NB & SB MOUND RD	BIG BEAVER CREEK	0.5 MI N OF 14 MILE RD	5 Highway-pedestrian	5 Waterway	1996				1	36	97.8	1	1 Concrete	19 Culvert	0	""	""	N N/A (no deck (NBI))	9 MS22.5(HS25)or greater	8		42.54	-83.04779	2025-08-18T00:00:00	POINT (-83.04779 42.54)	Macomb	NBI	NHS	3520.8	96	812510	6.37	2024-05-07T00:00:00	24	A	N	N	N	7
1706	MDOT	Metro	7833	63043-B05	M-59 WB	CLINTON RIVER	E LTS OF PONTIAC	1 Highway	5 Waterway	1967	1998		1998	3	127.8	42.3	3	3 Steel	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	2		42.64	-83.2599	2025-08-18T00:00:00	POINT (-83.2599 42.64)	Oakland	NBI	NHS	5405.94	40	677208	1.14	2025-05-20T00:00:00	24	A	7	7	7	N
1707	Macomb County	Metro	6404	""	28 MILE ROAD	STONY CREEK	0.5 MI WEST OF MOUND RD	1 Highway	5 Waterway	1961	2017			1	40	31.2	1	5 Prestressed Concrete	05 Box Bm/Gird- Multiple	0	""	""	1 Monolithic Concrete	B Greater than HL 93	2		42.74	-83.06769	2025-08-18T00:00:00	POINT (-83.06769 42.74)	Macomb	NBI	Non-NHS	1248	28.2	4208920	1.46	2023-10-02T00:00:00	24	A	7	8	8	N
1708	Wayne County	Metro	12059	""	JOY ROAD	TONQUISH CREEK	CANTON/PLYMOUTH T W/LILLY	1 Highway	5 Waterway	1928				1	20	37.4	1	1 Concrete	01 Slab	0	""	""	6 Bituminous	6 MS18(HS20)+mod	2		42.35	-83.46265	2025-08-18T00:00:00	POINT (-83.46265 42.35)	Taylor	NBI	Non-NHS	748	35.8	1672705	3.96	2025-05-12T00:00:00	24	A	5	5	7	N
1709	MDOT	Metro	11523	82122-S35	LFT TRN E BEECH DL	I-96	IN REDFORD TWP	1 Highway	1 Highway	1974		2001	2001	2	176.5	23.7	2	3 Steel	02 Multi Str Non Comp	0	""	""	5 Epoxy Overlay	5 MS 18 (HS 20)	1	8	42.39	-83.294136	2025-08-18T00:00:00	POINT (-83.294136 42.39)	Taylor	NBI	Non-NHS	4183.05	20.1	4705283	0.02	2024-09-27T00:00:00	24	A	6	7	7	N
1710	MDOT	Metro	11390	82111-S01	MONROE AVE	I-375	IN DETROIT	5 Highway-pedestrian	1 Highway	1959	1996			4	181.6	46.3	4	5 Prestressed Concrete	06 Box Bms- Single/Sprd	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	2	6	42.34	-83.0384	2025-08-18T00:00:00	POINT (-83.0384 42.34)	Detroit	NBI	Non-NHS	8408.08	30	4711771	0.51	2024-06-07T00:00:00	24	A	7	7	7	N
1711	MDOT	Metro	11464	82112-S34	M-102 RAMP	M-10 RAMP	N LTS OF DETROIT	1 Highway	1 Highway	1965	2010		2010	1	58.9	23.5	1	3 Steel	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	1	1	42.45	-83.203415	2025-08-18T00:00:00	POINT (-83.203415 42.45)	Detroit	NBI	NHS	1384.15	21	710006	0.02	2024-08-01T00:00:00	24	A	7	8	7	N
1712	Pontiac	Metro	13764	""	UNION STREET	CLINTON RIVER	S OF UNIVERSITY DR	5 Highway-pedestrian	5 Waterway	1963				3	39	26	3	1 Concrete	19 Culvert	0	""	""	N N/A (no deck (NBI))	0 Unknown	1		42.64	-83.28795	2025-08-18T00:00:00	POINT (-83.28795 42.64)	Oakland	NBI	Non-NHS	1014		675904	0.06	2024-06-27T00:00:00	24	A	N	N	N	6
1713	Macomb County	Metro	6341	""	GARFIELD RD	SALT SLANG GLOEDE DRAIN	MACOMB TWP SEC 31 & 32	1 Highway	5 Waterway	1993				1	35.8	39	1	1 Concrete	19 Culvert	0	""	""	N N/A (no deck (NBI))	9 MS22.5(HS25)or greater	5		42.63	-82.95345	2025-08-18T00:00:00	POINT (-82.95345 42.63)	Macomb	NBI	NHS	1396.2	62	798703	6.55	2024-06-07T00:00:00	24	A	N	N	N	6
1714	MDOT	Metro	11289	82053-B02-2	US-24 SB	MIDDLE ROUGE R	IN DEARBORN HTS	1 Highway	5 Waterway	1959	2006			2	124	66.6	2	5 Prestressed Concrete	06 Box Bms- Single/Sprd	0	""	""	1 Monolithic Concrete	9 MS22.5(HS25)or greater	3		42.34	-83.27376	2025-08-18T00:00:00	POINT (-83.27376 42.34)	Taylor	NBI	NHS	8258.4	56	1576806	10.74	2024-08-12T00:00:00	24	A	7	8	7	N
1715	MDOT	Metro	11665	82191-S22	CHAMPAIGN RD	I-75	IN LINCOLN PARK	5 Highway-pedestrian	1 Highway	1966	2002		2002	2	146.4	66.3	2	4 Steel Continuous	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	4	6	42.25	-83.19132	2025-08-18T00:00:00	POINT (-83.19132 42.25)	Taylor	NBI	Non-NHS	9706.32	44	6703134	0.59	2024-10-07T00:00:00	24	A	7	7	7	N
1716	MDOT	Metro	8086	63174-S19	SOUTH BLVD	I-75	1.5 MI S OF M-59	1 Highway	1 Highway	2001				2	308.7	71	2	4 Steel Continuous	82 Pl Girder Comp	0	""	""	1 Monolithic Concrete	9 MS22.5(HS25)or greater	2	10	42.62	-83.23539	2025-08-18T00:00:00	POINT (-83.23539 42.62)	Oakland	NBI	Non-NHS	21917.7	40	616405	0.64	2024-09-10T00:00:00	24	A	8	8	7	N
1717	MDOT	Metro	11447	82112-S22	GREENLAWN AVE	M-10	IN DETROIT	5 Highway-pedestrian	1 Highway	1955		1982	1971	4	162.5	67.9	4	4 Steel Continuous	32 Multi Str Comp	0	""	""	3 Latex Concrete/Similar	5 MS 18 (HS 20)	4	6	42.4	-83.150604	2025-08-18T00:00:00	POINT (-83.150604 42.4)	Detroit	NBI	Non-NHS	11033.75	44	1584602	0.14	2024-08-28T00:00:00	24	A	5	5	6	N
1718	Macomb County	Metro	6233	""	ARMADA CENTER RD	N. BRANCH CLINTON RIVER	0.2 MI WEST OF MCFADDEN	1 Highway	5 Waterway	1995				1	79.7	43.3	1	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	9 MS22.5(HS25)or greater	2		42.85	-82.97874	2025-08-18T00:00:00	POINT (-82.97874 42.85)	Macomb	NBI	Non-NHS	3451.01	39.4	824306	0.47	2023-07-14T00:00:00	24	A	7	8	8	N
1719	MDOT	Metro	6082	50061-S11-3	11 MI RD EB	MND RD &RMPS O I-696	CITY OF WARREN	5 Highway-pedestrian	1 Highway	1977				4	389.9	49.9	4	3 Steel	82 Pl Girder Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	3	8	42.49	-83.04521	2025-08-18T00:00:00	POINT (-83.04521 42.49)	Macomb	NBI	Non-NHS	19456.01	40.9	803208	2.23	2025-04-24T00:00:00	24	A	5	6	6	N
1720	Wayne County	Metro	12013	""	WEST ROAD	5TH ST, CONRAIL,GTW RR	TRENTON            E/FORT	5 Highway-pedestrian	4 Highway-railroad	1939	1985			35	1230.3	54.8	35	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	2 Integral Concrete	6 MS18(HS20)+mod	4	9	42.14	-83.182915	2025-08-18T00:00:00	POINT (-83.182915 42.14)	Taylor	NBI	NHS	67420.44	47.2	1674210	9.2	2025-04-09T00:00:00	12	P	6	5	3	N
1721	MDOT	Metro	11260	82025-S15	HARPER AVE	I-94	IN DETROIT	5 Highway-pedestrian	1 Highway	1959	2001		2001	4	232.4	47.9	4	3 Steel	02 Multi Str Non Comp	0	""	""	5 Epoxy Overlay	5 MS 18 (HS 20)	2	6	42.42	-82.93212	2025-08-18T00:00:00	POINT (-82.93212 42.42)	Detroit	NBI	Non-NHS	11131.96	29.9	4705399	0.14	2024-06-17T00:00:00	24	A	6	7	7	N
1722	Sterling Heights	Metro	6427	""	RYAN RD	BIG BEAVER DRAIN	S OF 15 MILE RD	5 Highway-pedestrian	5 Waterway	1983				2	33.8	57.1	2	1 Concrete	19 Culvert	0	""	""	N N/A (no deck (NBI))	6 MS18(HS20)+mod	5		42.55	-83.06924	2025-08-18T00:00:00	POINT (-83.06924 42.55)	Macomb	NBI	Non-NHS	1929.98	0	799302	7.05	2024-09-04T00:00:00	24	A	N	N	N	5
1723	MDOT	Metro	11432	82112-S07	HAMILTON AVENUE	M-10	0.1 MI E OF CHICAGO BLVD	5 Highway-pedestrian	1 Highway	1954	1994		1994	4	278.2	50.7	4	3 Steel	02 Multi Str Non Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	3	7	42.38	-83.09227	2025-08-18T00:00:00	POINT (-83.09227 42.38)	Detroit	NBI	Non-NHS	14104.74	33	4705640	0.01	2024-06-18T00:00:00	24	A	7	7	6	N
1724	MDOT	Metro	11679	82192-S02-3	OUTER DRIVE S EB	M-39	IN ALLEN PARK	5 Highway-pedestrian	1 Highway	1964	2001		1997	2	104	78.1	2	4 Steel Continuous	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	5	6	42.28	-83.21724	2025-08-18T00:00:00	POINT (-83.21724 42.28)	Taylor	NBI	NHS	8122.4	67.8	4710471	4.24	2023-11-16T00:00:00	24	A	7	6	5	N
1725	MDOT	Metro	6025	50013-B03	M-53 NB	MIDDLE BR CLINTON RIVER	5.6 MI N OF M-59	1 Highway	5 Waterway	1966		2001	2001	3	104.5	42.9	3	3 Steel	32 Multi Str Comp	0	""	""	3 Latex Concrete/Similar	5 MS 18 (HS 20)	2		42.71	-83.0257	2025-08-18T00:00:00	POINT (-83.0257 42.71)	Macomb	NBI	NHS	4483.05	39.5	4210208	11.47	2025-07-08T00:00:00	24	A	7	6	7	N
1726	MDOT	Metro	11144	82022-S39	I-94 EB RAMP	GREENFIELD RD	IN DEARBORN	1 Highway	1 Highway	1971			1971	2	178	40.4	2	3 Steel	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	2	4	42.3	-83.18295	2025-08-18T00:00:00	POINT (-83.18295 42.3)	Taylor	NBI	NHS	7191.2	37.7	1580403	0.23	2023-09-07T00:00:00	24	A	5	7	6	N
1727	MDOT	Metro	6171	50111-S27-4	I-94 WB	CROCKER RD	0.5 MI SE OF MT CLEMENS	1 Highway	1 Highway	1963	2006	2006	1998	5	380	57	5	3 Steel	32 Multi Str Comp	0	""	""	3 Latex Concrete/Similar	6 MS18(HS20)+mod	3	2	42.58	-82.85819	2025-08-18T00:00:00	POINT (-82.85819 42.58)	Macomb	NBI	NHS	21660	53.8	798502	10.71	2025-06-26T00:00:00	24	A	5	6	6	N
1728	Wayne County	Metro	12006	""	GROSSE ILE PARKWAY	TRENTON CHANNEL	GROSSE ILE	5 Highway-pedestrian	5 Waterway	1932	2007		1978	12	1345.88	31.8	2	4 Steel Continuous	17 Movable- Swing	10	3 Steel	03 Gir-Flr Bm Non Comp	0 None	6 MS18(HS20)+mod	2		42.13	-83.17303	2025-08-18T00:00:00	POINT (-83.17303 42.13)	Taylor	NBI	Non-NHS	42798.98	20	1692407	0.64	2025-06-26T00:00:00	12	P	7	4	5	N
1729	Macomb County	Metro	12865	""	IRIS DRIVE	SUTHERLAND - OEMIG DRAIN	0.1 MI SE OF DONNER RD	5 Highway-pedestrian	5 Waterway	1999				3	54.1	44.6	3	7 Timber	01 Slab	0	""	""	6 Bituminous	5 MS 18 (HS 20)	2		42.66	-82.819	2025-08-18T00:00:00	POINT (-82.819 42.66)	Macomb	NBI	Non-NHS	2412.86	29.5	4206846	0.1	2023-09-15T00:00:00	24	A	7	8	8	N
1730	MDOT	Metro	8075	63174-S12	I-75 ACCESS RAMPS	I-75	IN TROY	1 Highway	1 Highway	2019				2	207.1	55.3	2	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	B Greater than HL 93	2	9	42.6	-83.162544	2025-08-18T00:00:00	POINT (-83.162544 42.6)	Oakland	NBI	NHS	11452.63	48	625609	0.21	2023-09-18T00:00:00	24	A	7	8	8	N
1731	MDOT	Metro	11250	82025-S06	BARRETT ST	I-94	IN DETROIT	5 Highway-pedestrian	1 Highway	1958	1999		2006	4	171.2	62	4	3 Steel	02 Multi Str Non Comp	0	""	""	5 Epoxy Overlay	9 MS22.5(HS25)or greater	2	6	42.4	-82.984	2025-08-18T00:00:00	POINT (-82.984 42.4)	Detroit	NBI	Non-NHS	10614.4	42	1578009	0.24	2024-06-25T00:00:00	24	A	6	7	5	N
1732	Wayne County	Metro	12164	""	INKSTER ROAD	SILVER CREEK	BROWNSTOWN/HURON   S/GRIX	1 Highway	5 Waterway	1997				2	25.3	40	2	1 Concrete	19 Culvert	0	""	""	N N/A (no deck (NBI))	9 MS22.5(HS25)or greater	2		42.13	-83.30461	2025-08-18T00:00:00	POINT (-83.30461 42.13)	Taylor	NBI	Non-NHS	1012	44	1674404	1.57	2025-05-27T00:00:00	24	A	N	N	N	8
1733	Birmingham	Metro	8232	""	NORTHLAWN BLVD	ROUGE RIVER	0.3 MI W OF SOUTHFIELD RD	5 Highway-pedestrian	5 Waterway	1961	2008		2008	1	55.8	38.5	1	3 Steel	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	2		42.54	-83.230156	2025-08-18T00:00:00	POINT (-83.230156 42.54)	Oakland	NBI	Non-NHS	2148.3	29.9	611105	0.82	2024-10-24T00:00:00	24	A	6	7	6	N
1734	Oakland County	Metro	8191	""	SILVER BELL	GTW RR	EAST OF GIDDINGS	1 Highway	2 Railroad	2010				1	96.6	63.8	1	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	B Greater than HL 93	4		42.72	-83.2567	2025-08-18T00:00:00	POINT (-83.2567 42.72)	Oakland	NBI	Non-NHS	6163.08	52.2	626102	1.67	2024-07-23T00:00:00	24	A	7	8	7	N
1735	MDOT	Metro	6017	50011-S09	M-53 NB	19 MILE RD	1.0 MI S OF M-59	1 Highway	1 Highway	1966	2001			3	121.5	45.3	3	5 Prestressed Concrete	05 Box Bm/Gird- Multiple	0	""	""	5 Epoxy Overlay	5 MS 18 (HS 20)	2	2	42.61	-83.012985	2025-08-18T00:00:00	POINT (-83.012985 42.61)	Macomb	NBI	NHS	5503.95	42	4210208	4.72	2025-02-13T00:00:00	13	A	7	6	7	N
1736	Wayne County	Metro	12034	""	SERVICE DR S I-94	WILLOW RUN DRAIN	VAN BUREN   E/RAWSONVILLE	1 Highway	5 Waterway	1975				3	58.7	40	3	1 Concrete	19 Culvert	0	""	""	N N/A (no deck (NBI))	6 MS18(HS20)+mod	2		42.22	-83.53555	2025-08-18T00:00:00	POINT (-83.53555 42.22)	Taylor	NBI	Non-NHS	2348	0	1811006	0.61	2025-06-17T00:00:00	24	A	N	N	N	6
1737	MDOT	Metro	11715	82193-S11-4	M-102 WB	M-39	N LTS OF DETROIT	5 Highway-pedestrian	1 Highway	1964	2010		1996	2	109.3	81.4	2	4 Steel Continuous	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	4	6	42.44	-83.21963	2025-08-18T00:00:00	POINT (-83.21963 42.44)	Detroit	NBI	NHS	8897.02	71.3	640807	5.2	2025-06-16T00:00:00	24	A	7	7	7	N
1738	Macomb County	Metro	6317	""	HEYDENREICH ROAD	MILLER DRAIN	0.5 MI NORTH OF CASS AVE	5 Highway-pedestrian	5 Waterway	1990				1	27.9	39.4	1	1 Concrete	19 Culvert	0	""	""	N N/A (no deck (NBI))	6 MS18(HS20)+mod	2		42.61	-82.917435	2025-08-18T00:00:00	POINT (-82.917435 42.61)	Macomb	NBI	Non-NHS	1099.26	0	819502	0.25	2025-05-14T00:00:00	24	A	N	N	N	7
1739	MDOT	Metro	11967	82293-S04	ANN ARBOR TRAIL	I-275	0.3 MI W OF LIVONIA LTS	1 Highway	1 Highway	1972	2012	2012	2012	4	344.9	48	4	3 Steel	82 Pl Girder Comp	0	""	""	3 Latex Concrete/Similar	5 MS 18 (HS 20)	2	7	42.36	-83.43596	2025-08-18T00:00:00	POINT (-83.43596 42.36)	Taylor	NBI	Non-NHS	16555.2	44.5	1604108	4.37	2024-10-11T00:00:00	24	A	6	7	6	N
1740	MDOT	Metro	7918	63102-S02	I-696	M-10	IN SOUTHFIELD	1 Highway	1 Highway	1967	1988	1988	1967	3	303.3	125.3	3	3 Steel	82 Pl Girder Comp	0	""	""	5 Epoxy Overlay	6 MS18(HS20)+mod	6	4	42.49	-83.26675	2025-08-18T00:00:00	POINT (-83.26675 42.49)	Oakland	NBI	NHS	38003.49	118.8	710701	9.58	2025-07-18T00:00:00	24	A	6	6	7	N
1741	MDOT	Metro	11895	82291-R01	I-275 SB	CSX RR	IN ROMULUS	1 Highway	2 Railroad	1973		1998	1998	3	179.6	62.5	3	3 Steel	32 Multi Str Comp	0	""	""	3 Latex Concrete/Similar	9 MS22.5(HS25)or greater	3		42.21	-83.39493	2025-08-18T00:00:00	POINT (-83.39493 42.21)	Taylor	NBI	NHS	11225	59.2	1607610	8.16	2023-09-20T00:00:00	24	A	7	7	7	N
1742	Wayne County	Metro	12182	""	OUTER DRIVE	UPPER ROUGE RIVER	DETROIT            S/I-96	5 Highway-pedestrian	5 Waterway	1927				2	96	82	2	1 Concrete	04 Tee Beam	0	""	""	5 Epoxy Overlay	6 MS18(HS20)+mod	4		42.38	-83.259155	2025-08-18T00:00:00	POINT (-83.259155 42.38)	Detroit	NBI	Non-NHS	7872	60	1596803	4.83	2025-04-14T00:00:00	12	A	4	4	5	N
1743	MDOT	Metro	11379	82104-S07	JOSEPH CAMPAU	M-8	IN DETROIT	5 Highway-pedestrian	1 Highway	1971	2009		2009	2	170	81.4	2	4 Steel Continuous	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	4	8	42.41	-83.06884	2025-08-18T00:00:00	POINT (-83.06884 42.41)	Detroit	NBI	Non-NHS	13838	59	1591101	2.08	2023-10-03T00:00:00	24	A	7	7	7	N
1744	Detroit	Metro	12380	""	LARNED STREET	DEQUINDRE CUT GREENWAY	W OF ST AUBIN	5 Highway-pedestrian	2 Railroad	1923	2010			3	82.2	114	3	4 Steel Continuous	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	6 MS18(HS20)+mod	6		42.34	-83.02868	2025-08-18T00:00:00	POINT (-83.02868 42.34)	Detroit	NBI	Non-NHS	9370.8	65.9	1585504	1.29	2023-11-30T00:00:00	24	A	7	8	6	N
1745	Macomb County	Metro	6280	""	NEW HAVEN RD	COON CREEK	0.7 MI EAST OF NORTH AVE	1 Highway	5 Waterway	1974				2	30.8	39.4	2	3 Steel	19 Culvert	0	""	""	N N/A (no deck (NBI))	4 M 18 (H 20)	2		42.76	-82.87029	2025-08-18T00:00:00	POINT (-82.87029 42.76)	Macomb	NBI	Non-NHS	1213.52	0	814905	8.95	2025-06-25T00:00:00	24	A	N	N	N	6
1746	MDOT	Metro	11173	82023-S05	CECIL AVE	I-94	IN DETROIT	5 Highway-pedestrian	1 Highway	1950	1996		2012	4	175.4	57.8	4	3 Steel	02 Multi Str Non Comp	0	""	""	5 Epoxy Overlay	5 MS 18 (HS 20)	4	6	42.33	-83.13389	2025-08-18T00:00:00	POINT (-83.13389 42.33)	Detroit	NBI	Non-NHS	10138.12	44	1577203	0.2	2024-12-30T00:00:00	24	A	6	8	6	N
1747	Sterling Heights	Metro	6426	""	RIVERLAND DR	CLINTON RIVER	EAST OF VAN DYKE AVE	5 Highway-pedestrian	5 Waterway	1964	1998		2017	2	105	35.7	2	3 Steel	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	9 MS22.5(HS25)or greater	2		42.61	-83.02597	2025-08-18T00:00:00	POINT (-83.02597 42.61)	Macomb	NBI	Non-NHS	3748.5	28	820109	0.29	2024-09-17T00:00:00	24	A	6	6	5	N
1748	MDOT	Metro	11644	82191-S03	M-85 SB	I-75 NB	@ M-85	1 Highway	1 Highway	2005	2008		2005	2	343.5	47.3	2	3 Steel	82 Pl Girder Comp	0	""	""	1 Monolithic Concrete	6 MS18(HS20)+mod	2	3	42.09	-83.241684	2025-08-18T00:00:00	POINT (-83.241684 42.09)	Taylor	NBI	NHS	16247.55	44	1592106	0.33	2024-07-12T00:00:00	24	A	7	8	7	N
1749	MDOT	Metro	6109	50061-S43	SCHOENHERR LFT TRN	I-696	IN WARREN @ SCHOENHERR	1 Highway	1 Highway	1973	2010		2000	2	196	24.5	2	4 Steel Continuous	82 Pl Girder Comp	0	""	""	1 Monolithic Concrete	4 M 18 (H 20)	1	8	42.49	-82.98897778	2025-08-18T00:00:00	POINT (-82.98897778 42.49)	Macomb	NBI	Non-NHS	4802	21.2	805708	0.02	2024-10-08T00:00:00	24	A	7	6	6	N
1750	MDOT	Metro	8040	63173-S10	I-75 NB	DIXIE HWY AND RAMPS	0.2 MI NW OF M-10	1 Highway	1 Highway	1962		2003	1991	4	299.6	49.4	4	3 Steel	32 Multi Str Comp	0	""	""	5 Epoxy Overlay	6 MS18(HS20)+mod	3	5	42.87	-83.59252	2025-08-18T00:00:00	POINT (-83.59252 42.87)	Oakland	NBI	NHS	14800.24	46	647308	46.17	2024-12-16T00:00:00	24	A	7	7	6	N
1751	MDOT	Metro	7811	63031-B01	US-24 NB	ROUGE RIVER	IN SOUTHFIELD	1 Highway	5 Waterway	1953	1999		1999	3	119	59.3	3	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	9 MS22.5(HS25)or greater	4		42.48	-83.28448	2025-08-18T00:00:00	POINT (-83.28448 42.48)	Oakland	NBI	NHS	7056.7	55.9	710106	2.43	2024-12-11T00:00:00	24	A	6	7	5	N
1752	MDOT	Metro	11398	82111-S12	LAFAYETTE BLVD	M-10	IN DETROIT	5 Highway-pedestrian	1 Highway	1952	1997		1997	2	116.8	81.7	2	4 Steel Continuous	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	4	6	42.33	-83.056656	2025-08-18T00:00:00	POINT (-83.056656 42.33)	Detroit	NBI	Non-NHS	9542.56	49.9	4718963	1.15	2024-06-11T00:00:00	24	A	5	6	6	N
1753	MDOT	Metro	11134	82022-S28	I-94	ENT TO FORD PLANT	IN DEARBORN	1 Highway	1 Highway	1971	2004			4	141.3	128.3	4	5 Prestressed Concrete	05 Box Bm/Gird- Multiple	0	""	""	1 Monolithic Concrete	6 MS18(HS20)+mod	8	4	42.3	-83.180664	2025-08-18T00:00:00	POINT (-83.180664 42.3)	Taylor	NBI	NHS	18128.79	126	1576405	20.59	2023-09-14T00:00:00	24	A	6	4	6	N
1754	Wayne County	Metro	12191	""	TOLEDO ROAD	PENNSYLVANIA ROAD	BRNTWN/STHGTEE/ALLEN	1 Highway	1 Highway	1959	2018		2018	3	143	91.5	3	3 Steel	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	6 MS18(HS20)+mod	4	4	42.18	-83.22677	2025-08-18T00:00:00	POINT (-83.22677 42.18)	Taylor	NBI	NHS	13084.5	84	1688707	1.19	2025-03-05T00:00:00	24	A	8	7	6	N
1755	MDOT	Metro	11912	82291-S16-4	I-94 WB	I-275 SB TO I-94 EB RAMP	IN ROMULUS	1 Highway	1 Highway	1972	2011		1992	1	123	63.3	1	3 Steel	82 Pl Girder Comp	0	""	""	1 Monolithic Concrete	6 MS18(HS20)+mod	3	1	42.22	-83.415215	2025-08-18T00:00:00	POINT (-83.415215 42.22)	Taylor	NBI	NHS	7785.9	60	1588802	6.6	2024-08-13T00:00:00	24	A	7	7	7	N
1756	MDOT	Metro	6031	50013-S09	22 MI RD	M-53	2.0 MI N OF M-59	1 Highway	1 Highway	1965		2001		4	207.3	33.4	4	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	3 Latex Concrete/Similar	2 M 13.5 (H 15)	2	4	42.66	-83.01412	2025-08-18T00:00:00	POINT (-83.01412 42.66)	Macomb	NBI	Non-NHS	6923.82	26	807104	3.1	2023-12-14T00:00:00	24	A	7	7	7	N
1757	MDOT	Metro	7935	63102-S20	SCOTIA ROAD	I-696	0.5 M WEST OF COOLIDGE	1 Highway	1 Highway	1985				2	166.6	103	2	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	9 MS22.5(HS25)or greater	4	8	42.47	-83.17276	2025-08-18T00:00:00	POINT (-83.17276 42.47)	Oakland	NBI	Non-NHS	17159.8	73	648205	1.22	2024-07-24T00:00:00	24	A	6	6	6	N
1758	MDOT	Metro	12453	82701-B03	CENTRAL AVE	CANOE STREAM	BELLE ISLE	5 Highway-pedestrian	5 Waterway	1947	2008		2008	1	54.8	73.8	1	5 Prestressed Concrete	05 Box Bm/Gird- Multiple	0	""	""	2 Integral Concrete	6 MS18(HS20)+mod	2		42.34	-82.994606	2025-08-18T00:00:00	POINT (-82.994606 42.34)	Detroit	NBI	Non-NHS	4044.24	48.9	1633203	0.03	2024-08-08T00:00:00	24	A	7	8	7	N
1759	MDOT	Metro	11568	82123-S21	I-96 WB COLLECTOR	RAMP TO M-8	IN DETROIT	1 Highway	1 Highway	1971		2005	2005	2	337.9	46.4	2	3 Steel	82 Pl Girder Comp	0	""	""	5 Epoxy Overlay	5 MS 18 (HS 20)	2	6	42.38	-83.1508	2025-08-18T00:00:00	POINT (-83.1508 42.38)	Detroit	NBI	NHS	15678.56	27.6	1583106	5.29	2023-08-23T00:00:00	24	A	6	7	7	N
1760	Macomb County	Metro	6295	""	PRATT ROAD	EAST BRANCH COON CREEK	0.4 MI WEST OF NORTH AVE	1 Highway	5 Waterway	1953				1	23	23	1	3 Steel	19 Culvert	0	""	""	N N/A (no deck (NBI))	4 M 18 (H 20)	2		42.89	-82.890625	2025-08-18T00:00:00	POINT (-82.890625 42.89)	Macomb	NBI	Non-NHS	529	0	819909	4.54	2023-11-15T00:00:00	24	A	N	N	N	5
1761	MDOT	Metro	11747	82194-S18	I-75 SB	I-96 WB	IN DETROIT	1 Highway	1 Highway	1970	2007		2007	1	51.5	59.1	1	3 Steel	82 Pl Girder Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	3	2	42.33	-83.08649	2025-08-18T00:00:00	POINT (-83.08649 42.33)	Detroit	NBI	NHS	3043.65	56	1595106	21.93	2024-05-29T00:00:00	24	A	7	8	7	N
1762	Wayne County	Metro	12066	""	E N HINES DRIVE	MIDDLE ROUGE RIVER	PLYMOUTH T  W/NORTHVIL RD	5 Highway-pedestrian	5 Waterway	1932	1976	1976		3	96	52	3	2 Concrete Continuous	04 Tee Beam	0	""	""	2 Integral Concrete	4 M 18 (H 20)	2		42.38	-83.46496	2025-08-18T00:00:00	POINT (-83.46496 42.38)	Taylor	NBI	NHS	4992	35.5	1689409	0.62	2025-07-24T00:00:00	6	D	4	4	6	N
1763	MDOT	Metro	11864	82252-S28	I-75	RAMP TO DAVISON(M-8)	IN DETROIT OVER RAMP C TO	1 Highway	1 Highway	1969		2003	2003	1	50	148	1	3 Steel	32 Multi Str Comp	0	""	""	5 Epoxy Overlay	6 MS18(HS20)+mod	8	1	42.41	-83.07794	2025-08-18T00:00:00	POINT (-83.07794 42.41)	Detroit	NBI	NHS	7400	140	1577706	6.12	2023-10-24T00:00:00	24	A	6	7	6	N
1764	MDOT	Metro	11400	82111-S14-1	US-12	M-10 NB	IN DETROIT	5 Highway-pedestrian	1 Highway	1954	1997	1997		1	68	122	1	5 Prestressed Concrete	05 Box Bm/Gird- Multiple	0	""	""	2 Integral Concrete	9 MS22.5(HS25)or greater	9	3	42.33	-83.06118	2025-08-18T00:00:00	POINT (-83.06118 42.33)	Detroit	NBI	NHS	8296	89.9	1577103	6.79	2024-05-09T00:00:00	24	A	6	5	6	N
1765	Lincoln Park	Metro	12499	""	HARRISON ST	S BR ECORSE RIVER	IN LINCOLN PARK	5 Highway-pedestrian	5 Waterway	2011				1	68	43.2	1	5 Prestressed Concrete	06 Box Bms- Single/Sprd	0	""	""	1 Monolithic Concrete	B Greater than HL 93	2		42.22	-83.16887	2025-08-18T00:00:00	POINT (-83.16887 42.22)	Taylor	NBI	Non-NHS	2937.6	27.9	1664406	0.63	2023-08-29T00:00:00	24	A	6	8	8	N
1766	Wayne County	Metro	12258	""	SHELDON ROAD	FELLOWS CREEK	CANTON             S/FORD	5 Highway-pedestrian	5 Waterway	1979				2	27.9	35.8	2	3 Steel	19 Culvert	0	""	""	N N/A (no deck (NBI))	0 Unknown	2		42.32	-83.47802	2025-08-18T00:00:00	POINT (-83.47802 42.32)	Taylor	NBI	Non-NHS	998.82	0	1670201	4.36	2025-03-01T00:00:00	24	A	N	N	N	6
1767	Oakland County	Metro	8187	""	WALTON BLVD	CLINTON RIVER	BET SASHABAW AND CLINTONV	1 Highway	5 Waterway	1992				1	37	72	1	5 Prestressed Concrete	05 Box Bm/Gird- Multiple	0	""	""	5 Epoxy Overlay	5 MS 18 (HS 20)	5		42.69	-83.35192	2025-08-18T00:00:00	POINT (-83.35192 42.69)	Oakland	NBI	NHS	2664	68.7	696509	1.72	2024-07-18T00:00:00	24	A	7	6	7	N
1768	Farmington Hill	Metro	13932	""	DRAKE ROAD	MINNOW POND DRAIN	0.35 MI N OF 13 MILE ROAD	5 Highway-pedestrian	5 Waterway	2016		2016		1	23.5	41	1	1 Concrete	19 Culvert	0	""	""	6 Bituminous	B Greater than HL 93	3		42.52	-83.398834	2025-08-18T00:00:00	POINT (-83.398834 42.52)	Oakland	NBI	Non-NHS	963.5	38	633804	0.05	2024-11-13T00:00:00	24	A	N	N	N	8
1769	MDOT	Metro	7955	63102-S43	WASHINGTON	M-1 WOODWARD	AT I-696 & WOODWARD	5 Highway-pedestrian	1 Highway	1986				2	96.3	68.1	2	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	9 MS22.5(HS25)or greater	3	4	42.48	-83.14667	2025-08-18T00:00:00	POINT (-83.14667 42.48)	Oakland	NBI	Non-NHS	6558.03	39.5	644804	0.03	2024-07-09T00:00:00	24	A	6	8	7	N
1770	MDOT	Metro	6071	50051-S01-1	I-94 CONN NB GRATI	13 MILE RD	IN ROSEVILLE (13 MI RD)	1 Highway	1 Highway	1964	2003		1964	3	133.3	45.6	3	3 Steel	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	9 MS22.5(HS25)or greater	1	4	42.52	-82.91618	2025-08-18T00:00:00	POINT (-82.91618 42.52)	Macomb	NBI	NHS	6078.48	42.4	801102	0.39	2025-06-07T00:00:00	24	A	7	8	7	N
1771	MDOT	Metro	11865	82252-S29	DEQUINDRE	I-75 RAMP TO DAVISON	IN DETROIT OVER RAMP C TO	5 Highway-pedestrian	1 Highway	1969	2003		2003	1	55.2	71.8	1	3 Steel	32 Multi Str Comp	0	""	""	5 Epoxy Overlay	5 MS 18 (HS 20)	4	2	42.41	-83.0768	2025-08-18T00:00:00	POINT (-83.0768 42.41)	Detroit	NBI	Non-NHS	3963.36	48	1585803	0.49	2024-04-09T00:00:00	24	A	7	7	7	N
1772	MDOT	Metro	7883	63081-S11-1	EVERGREEN RD (NB)	M-10	IN SOUTHFIELD	5 Highway-pedestrian	1 Highway	1974		2020	1997	2	173.6	48.7	2	3 Steel	32 Multi Str Comp	0	""	""	3 Latex Concrete/Similar	5 MS 18 (HS 20)	3	6	42.47	-83.24045	2025-08-18T00:00:00	POINT (-83.24045 42.47)	Oakland	NBI	Non-NHS	8454.32	41.3	666003	1.9	2024-06-13T00:00:00	24	A	7	6	7	N
1773	Detroit	Metro	12475	""	KLENK AVE	FOX CREEK	NORTH OF RIVERSIDE	5 Highway-pedestrian	5 Waterway	1981				3	35	33.8	3	1 Concrete	01 Slab	0	""	""	2 Integral Concrete	4 M 18 (H 20)	2		42.36	-82.93045	2025-08-18T00:00:00	POINT (-82.93045 42.36)	Detroit	NBI	Non-NHS	1183	24	4701195	0	2024-06-27T00:00:00	24	A	7	8	7	N
1774	MDOT	Metro	11571	82123-S24	FULLERTON AVE	I-96 (JEFFRIES FRWY)	IN DETROIT	5 Highway-pedestrian	1 Highway	1971			1992	2	228.1	70.5	2	3 Steel	02 Multi Str Non Comp	0	""	""	5 Epoxy Overlay	5 MS 18 (HS 20)	4	8	42.38	-83.14645	2025-08-18T00:00:00	POINT (-83.14645 42.38)	Detroit	NBI	Non-NHS	16081.05	48	4710521	3.63	2025-08-12T00:00:00	24	A	6	7	6	N
1775	Detroit	Metro	12344	""	JEFFERSON AVENUE	CONRAIL (ABN)	E OF BEAUFAIT	5 Highway-pedestrian	0 Other	2016				1	24.3	89.9	1	1 Concrete	19 Culvert	0	""	""	4 Low Slump Concrete	B Greater than HL 93	7		42.35	-83.00682778	2025-08-18T00:00:00	POINT (-83.00682778 42.35)	Detroit	NBI	NHS	2184.57	89.9	4705824	1.9	2024-11-21T00:00:00	24	A	N	N	N	8
1776	Macomb County	Metro	6358	""	25 MILE ROAD	DEER CREEK	25 MILE RD AND FAIRCHILD	1 Highway	5 Waterway	2002				1	28.2	51.2	1	1 Concrete	19 Culvert	0	""	""	6 Bituminous	5 MS 18 (HS 20)	2		42.7	-82.86375	2025-08-18T00:00:00	POINT (-82.86375 42.7)	Macomb	NBI	Non-NHS	1443.84	46.3	818407	0.01	2025-05-20T00:00:00	24	A	N	N	N	6
1777	Wayne County	Metro	12153	""	MERRIMAN ROAD	BELL CREEK	LIVONIA        S/SIX MILE	5 Highway-pedestrian	5 Waterway	1935	1965	1995		2	63	73.8	2	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	2 Integral Concrete	5 MS 18 (HS 20)	5		42.41	-83.35444	2025-08-18T00:00:00	POINT (-83.35444 42.41)	Taylor	NBI	NHS	4649.4	59.7	4700000	13.16	2025-06-10T00:00:00	24	A	5	5	5	N
1778	Macomb County	Metro	6205	""	CASS AVE	NORTH BRANCH CLINTON RIV	0.25 MI WEST OF MORAVIAN	5 Highway-pedestrian	5 Waterway	1976				4	284.8	71.2	4	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	9 MS22.5(HS25)or greater	2		42.6	-82.91002	2025-08-18T00:00:00	POINT (-82.91002 42.6)	Macomb	NBI	NHS	20277.76	59.1	819209	1.31	2024-04-10T00:00:00	24	A	8	7	6	N
1779	MDOT	Metro	6127	50072-B02	M-29	SALT RIVER	0.7 MI W OF NEW BALTIMORE	5 Highway-pedestrian	5 Waterway	1972	2008	2008		3	97.8	78.4	3	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	3 Latex Concrete/Similar	5 MS 18 (HS 20)	5		42.68	-82.77089	2025-08-18T00:00:00	POINT (-82.77089 42.68)	Macomb	NBI	Non-NHS	7667.52	64	807106	16.63	2023-12-19T00:00:00	24	A	7	6	7	N
1780	Wayne County	Metro	11988	""	MARLEY DRIVE	CANAL (EAST)	BROWNSTOWNE/MARCUS	5 Highway-pedestrian	5 Waterway	2002		2002		1	45	29.9	1	1 Concrete	19 Culvert	0	""	""	5 Epoxy Overlay	6 MS18(HS20)+mod	2		42.05	-83.18883	2025-08-18T00:00:00	POINT (-83.18883 42.05)	Taylor	NBI	Non-NHS	1345.5	24	1709809	0.24	2024-09-19T00:00:00	24	A	N	N	N	7
1781	MDOT	Metro	11310	82062-B02	US-12 EB	ROUGE RIVER	IN DEARBORN	5 Highway-pedestrian	5 Waterway	2009				3	352	77.3	3	5 Prestressed Concrete	06 Box Bms- Single/Sprd	0	""	""	1 Monolithic Concrete	B Greater than HL 93	4		42.31	-83.22204	2025-08-18T00:00:00	POINT (-83.22204 42.31)	Taylor	NBI	NHS	27209.6	68	1600206	17.33	2024-10-28T00:00:00	24	A	7	8	8	N
1782	Macomb County	Metro	6345	""	21 MILE ROAD	MIDDLE BR CLINTON RIVER	0.2 MI E OF ROMEO PLANK	5 Highway-pedestrian	5 Waterway	1979				2	105	36.7	2	5 Prestressed Concrete	05 Box Bm/Gird- Multiple	0	""	""	6 Bituminous	5 MS 18 (HS 20)	2		42.64	-82.93347	2025-08-18T00:00:00	POINT (-82.93347 42.64)	Macomb	NBI	Non-NHS	3853.5	28	817708	5.36	2024-05-01T00:00:00	24	A	7	6	7	N
1783	MDOT	Metro	7866	63053-B01	US-24	CLINTON R	3.6 MI SE OF M-15	5 Highway-pedestrian	5 Waterway	2012				1	39.2	83.9	1	5 Prestressed Concrete	06 Box Bms- Single/Sprd	0	""	""	1 Monolithic Concrete	B Greater than HL 93	5		42.68	-83.37222	2025-08-18T00:00:00	POINT (-83.37222 42.68)	Oakland	NBI	NHS	3288.88	64	689103	6.15	2025-05-29T00:00:00	24	A	8	8	7	N
1784	MDOT	Metro	7809	63022-S13	ORCHARD LAKE RD	M-5	2.0 MI NW OF WAYNE CO LIN	1 Highway	1 Highway	1957	1997		1997	2	143	58.7	2	3 Steel	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	4	4	42.45	-83.35575	2025-08-18T00:00:00	POINT (-83.35575 42.45)	Oakland	NBI	Non-NHS	8394.1	48.2	633806	0.78	2024-11-27T00:00:00	24	A	6	6	6	N
1785	Wayne County	Metro	12296	""	CLARK ROAD	MOSQUITO DRAIN	SUMPTER 200'N/OAKVL-WALTZ	1 Highway	5 Waterway	1987				2	23	35.8	2	3 Steel	19 Culvert	0	""	""	N N/A (no deck (NBI))	9 MS22.5(HS25)or greater	2		42.09	-83.42072	2025-08-18T00:00:00	POINT (-83.42072 42.09)	Taylor	NBI	Non-NHS	823.4	0	1670703	0.29	2024-08-26T00:00:00	12	P	N	N	N	4
1786	MDOT	Metro	11112	82022-S03	I-94 WB	WAYNE RD	4.3 MI W OF TAYLOR	1 Highway	1 Highway	1962	1996		1996	3	140.5	59.9	3	3 Steel	32 Multi Str Comp	0	""	""	5 Epoxy Overlay	9 MS22.5(HS25)or greater	4	4	42.23	-83.385605	2025-08-18T00:00:00	POINT (-83.385605 42.23)	Taylor	NBI	NHS	8415.95	56.6	1588802	8.18	2024-08-09T00:00:00	24	A	6	5	7	N
1787	MDOT	Metro	11664	82191-S21-2	I-75 SB	TOLEDO-DIX HWY & RAMP C&	IN LINCOLN PARK	1 Highway	1 Highway	1966	2001		2001	10	799.6	64	10	4 Steel Continuous	82 Pl Girder Comp	0	""	""	1 Monolithic Concrete	9 MS22.5(HS25)or greater	3	8	42.24	-83.19434	2025-08-18T00:00:00	POINT (-83.19434 42.24)	Taylor	NBI	NHS	51174.4	60.3	1595106	13.06	2024-10-03T00:00:00	24	A	6	7	6	N
1788	MDOT	Metro	8138	63201-C01	I-75 BR	PONTIAC CREEK	BET UNIVERSITY DR & HURON	1 Highway	5 Waterway	1973				4	41.6	35.8	1	1 Concrete	19 Culvert	3	""	""	N N/A (no deck (NBI))	0 Unknown	4		42.64	-83.28874167	2025-08-18T00:00:00	POINT (-83.28874167 42.64)	Oakland	NBI	NHS	1489.28	0	672705	0.7	2024-10-29T00:00:00	20	A	N	N	N	6
1789	MDOT	Metro	6147	50111-S01	9 MI RD SB TURN RD	I-94	IN ST CLAIR SHORES	1 Highway	1 Highway	1964		2002	1997	4	184	28.6	4	3 Steel	32 Multi Str Comp	0	""	""	3 Latex Concrete/Similar	6 MS18(HS20)+mod	1	6	42.46	-82.92164	2025-08-18T00:00:00	POINT (-82.92164 42.46)	Macomb	NBI	Non-NHS	5262.4	25.4	800907	0.02	2025-07-09T00:00:00	24	A	6	5	5	N
1790	MDOT	Metro	8009	63172-S07-4	M-24 CONN WB	I-75	@ M-24 (M-24 CONN TO I-75	1 Highway	1 Highway	1962	2002		2002	4	246.5	29.3	4	3 Steel	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	1	9	42.69	-83.251045	2025-08-18T00:00:00	POINT (-83.251045 42.69)	Oakland	NBI	NHS	7222.45	26	4408159	0	2025-03-14T00:00:00	24	A	7	6	7	N
1791	MDOT	Metro	11978	82293-S15	I-275 NB	E HINES DR	0.3 MI W OF LIVONIA LTS	1 Highway	1 Highway	1972		2012		1	120	55.7	1	3 Steel	82 Pl Girder Comp	0	""	""	3 Latex Concrete/Similar	5 MS 18 (HS 20)	3	2	42.37	-83.43619	2025-08-18T00:00:00	POINT (-83.43619 42.37)	Taylor	NBI	NHS	6684	52.5	1607208	20.62	2024-10-31T00:00:00	24	A	7	7	6	N
1792	MDOT	Metro	6036	50013-S14	M-53 NB	27 MILE RD	7.1 MI N OF M-59	1 Highway	1 Highway	1966		2001		3	116.7	42.9	3	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	3 Latex Concrete/Similar	5 MS 18 (HS 20)	2	2	42.73	-83.02641	2025-08-18T00:00:00	POINT (-83.02641 42.73)	Macomb	NBI	NHS	5006.43	38.5	4210208	13	2025-07-08T00:00:00	24	A	7	7	7	N
1793	MDOT	Metro	11292	82053-B04	US-24 TELEGRAPH RD	ROUGE RIVER	0.1 MI S OF M-102	1 Highway	5 Waterway	1967		2000	1967	1	83	150.4	1	3 Steel	82 Pl Girder Comp	0	""	""	3 Latex Concrete/Similar	5 MS 18 (HS 20)	10		42.44	-83.27864	2025-08-18T00:00:00	POINT (-83.27864 42.44)	Detroit	NBI	NHS	12483.2	141.7	4700038	24.34	2023-11-15T00:00:00	24	A	6	6	6	N
1794	MDOT	Metro	7911	63101-S14	US-24 N TO M-10 W	I-696	IN SOUTHFIELD (I-696)	1 Highway	1 Highway	1967		1999	1986	4	251	26.9	4	3 Steel	32 Multi Str Comp	0	""	""	3 Latex Concrete/Similar	5 MS 18 (HS 20)	1	6	42.49	-83.28407	2025-08-18T00:00:00	POINT (-83.28407 42.49)	Oakland	NBI	NHS	6751.9	23	710108	0.03	2025-05-20T00:00:00	24	A	5	6	7	N
1795	MDOT	Metro	8100	63174-S32	SB CROOKS ROAD	I-75	IN TROY	5 Highway-pedestrian	1 Highway	1990			2020	4	281.7	56.1	4	4 Steel Continuous	82 Pl Girder Comp	0	""	""	5 Epoxy Overlay	4 M 18 (H 20)	3	8	42.6	-83.16935	2025-08-18T00:00:00	POINT (-83.16935 42.6)	Oakland	NBI	NHS	15803.37	44	4408239	1.41	2024-11-06T00:00:00	24	A	7	7	7	N
1796	Wayne County	Metro	12214	""	JEFFERSON AVENUE	ROUGE RIVER	DET&RIVRRGEN/SCHAEFER	5 Highway-pedestrian	5 Waterway	1922	1982		1982	6	248	69.9	2	3 Steel	16 Movable- Bascule	4	3 Steel	02 Multi Str Non Comp	9 Other	6 MS18(HS20)+mod	4		42.28	-83.12865	2025-08-18T00:00:00	POINT (-83.12865 42.28)	Detroit	NBI	NHS	17335.2	45.9	4302169	17.63	2025-04-23T00:00:00	12	A	5	4	5	N
1797	MDOT	Metro	7945	63102-S32	CORPORATE DR	I-696	0.2 MI EAST OF LASHER	5 Highway-pedestrian	1 Highway	1985				2	236	46.7	2	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	9 MS22.5(HS25)or greater	2	6	42.49	-83.2578	2025-08-18T00:00:00	POINT (-83.2578 42.49)	Oakland	NBI	Non-NHS	11021.2	28	686208	0.2	2024-07-18T00:00:00	24	A	7	7	6	N
1798	Wayne County	Metro	12105	""	BECK ROAD	LOWER ROUGE RIVER	CANTON           N/GEDDES	5 Highway-pedestrian	5 Waterway	1967			1996	1	40	42	1	3 Steel	32 Multi Str Comp	0	0 Other	00 Other	2 Integral Concrete	0 Unknown	2		42.28	-83.50547	2025-08-18T00:00:00	POINT (-83.50547 42.28)	Taylor	NBI	Non-NHS	1680	38.7	1595603	1.11	2025-05-30T00:00:00	24	A	7	8	6	N
1799	MDOT	Metro	11330	82081-C01	M-153	WILLOW CREEK	4.4 MI W OF GARDEN CITY	1 Highway	5 Waterway	1974				2	23	35.8	2	1 Concrete	19 Culvert	0	""	""	6 Bituminous	0 Unknown	3		42.32	-83.440075	2025-08-18T00:00:00	POINT (-83.440075 42.32)	Taylor	NBI	NHS	823.4	43.3	1595510	5.43	2025-06-11T00:00:00	24	A	N	N	N	6
1800	MDOT	Metro	8129	63191-S19	I-96	M-5	I-96/I-696 INTERCHANGE	1 Highway	1 Highway	1972			2006	4	265.67	44.4	4	3 Steel	02 Multi Str Non Comp	0	""	""	5 Epoxy Overlay	5 MS 18 (HS 20)	2	6	42.48	-83.42789	2025-08-18T00:00:00	POINT (-83.42789 42.48)	Oakland	NBI	NHS	11795.75	40.5	4410620	0.11	2024-12-17T00:00:00	24	A	6	7	7	N
1801	MDOT	Metro	11353	82102-R03	M-14 EB	CSX RR	1.5 MI W OF PLYMOUTH	1 Highway	2 Railroad	1976	2006	2006	2006	3	321	63.7	3	3 Steel	82 Pl Girder Comp	0	""	""	3 Latex Concrete/Similar	9 MS22.5(HS25)or greater	3		42.38	-83.48751	2025-08-18T00:00:00	POINT (-83.48751 42.38)	Taylor	NBI	NHS	20447.7	60.5	1606205	3.52	2023-10-23T00:00:00	24	A	6	7	6	N
1802	Macomb County	Metro	6407	""	31 MILE ROAD	STONY CREEK	0.5 MI EAST OF DEQUINDRE	1 Highway	5 Waterway	2016				1	32	32.1	1	7 Timber	01 Slab	0	""	""	6 Bituminous	B Greater than HL 93	2		42.79	-83.086876	2025-08-18T00:00:00	POINT (-83.086876 42.79)	Macomb	NBI	Non-NHS	1027.2	29.6	4408230	0.89	2025-05-20T00:00:00	24	A	8	8	8	N
1803	Novi	Metro	13860	""	ASHBURY DRIVE	TRIB TO MIDDLE ROUGE RIV	CHASE FARMS SUBDIVISION	5 Highway-pedestrian	5 Waterway	2000				1	26	27	1	1 Concrete	19 Culvert	0	""	""	6 Bituminous	9 MS22.5(HS25)or greater	2		42.45	-83.46922	2025-08-18T00:00:00	POINT (-83.46922 42.45)	Oakland	NBI	Non-NHS	702	27	4401742	0.23	2024-09-27T00:00:00	24	A	N	N	N	7
1804	Oakland County	Metro	8170	""	12 MILE RD (EAST)	ROUGE RIVER	BET TELEGRAPH AND LAHSER	1 Highway	5 Waterway	1972				3	115	74.5	3	2 Concrete Continuous	01 Slab	0	""	""	5 Epoxy Overlay	6 MS18(HS20)+mod	5		42.5	-83.273735	2025-08-18T00:00:00	POINT (-83.273735 42.5)	Oakland	NBI	NHS	8567.5	61	4462980	12.39	2024-07-23T00:00:00	24	P	7	7	7	N
1805	MDOT	Metro	11951	82292-S10	I-275 NB	VANBORN ROAD	2.2 MI W OF WAYNE	1 Highway	1 Highway	1974			2012	1	120	55.7	1	3 Steel	82 Pl Girder Comp	0	""	""	5 Epoxy Overlay	9 MS22.5(HS25)or greater	3	2	42.26	-83.440506	2025-08-18T00:00:00	POINT (-83.440506 42.26)	Taylor	NBI	NHS	6684	52.5	1607208	13.29	2024-08-28T00:00:00	24	A	7	7	7	N
1806	MDOT	Metro	11217	82024-S10	MT ELLIOT ST	I-94	IN DETROIT	5 Highway-pedestrian	1 Highway	2021				3	257.1	88.8	3	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	B Greater than HL 93	6	6	42.38	-83.03375	2025-08-18T00:00:00	POINT (-83.03375 42.38)	Detroit	NBI	NHS	22830.48	66	1577808	2.93	2024-06-12T00:00:00	24	A	8	8	8	N
1807	Macomb County	Metro	6299	""	HICKS ROAD	COON CREEK	0.4 MI NORTH OF 32 MILE	1 Highway	5 Waterway	1964		2021	2024	1	35.8	32.8	1	3 Steel	02 Multi Str Non Comp	0	""	""	1 Monolithic Concrete	4 M 18 (H 20)	2		42.81	-82.92303	2025-08-18T00:00:00	POINT (-82.92303 42.81)	Macomb	NBI	Non-NHS	1174.24	28	817603	0.42	2023-10-02T00:00:00	24	A	6	6	7	N
1808	MDOT	Metro	6064	50023-S08	M-59 WB	DEQUINDRE RD	@ OAKLAND COUNTY LINE	1 Highway	1 Highway	1972	2009		2005	3	159.3	68.6	3	3 Steel	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	2	4	42.63	-83.09151	2025-08-18T00:00:00	POINT (-83.09151 42.63)	Macomb	NBI	NHS	10927.98	65.3	807801	0	2025-05-14T00:00:00	24	A	7	6	7	N
1809	Gibraltar	Metro	11995	""	STOEFLET ROAD	W GIBRALTAR WATERWAY	GIBRALTAR  E/S GIBRALTAR	5 Highway-pedestrian	5 Waterway	1992				1	26.9	37.7	1	5 Prestressed Concrete	05 Box Bm/Gird- Multiple	0	""	""	1 Monolithic Concrete	9 MS22.5(HS25)or greater	2		42.09	-83.193146	2025-08-18T00:00:00	POINT (-83.193146 42.09)	Taylor	NBI	Non-NHS	1014.13	24	1698403	0.4	2025-08-04T00:00:00	24	A	5	6	6	N
1810	MDOT	Metro	11510	82122-S22	BURT RD	I-96	IN DETROIT	5 Highway-pedestrian	1 Highway	1970	2003		2003	4	276.3	70.2	4	3 Steel	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	4	12	42.39	-83.246574	2025-08-18T00:00:00	POINT (-83.246574 42.39)	Detroit	NBI	Non-NHS	19396.26	47.9	1582303	1.92	2024-04-25T00:00:00	24	A	6	7	5	N
1811	MDOT	Metro	8062	63174-S05-1	I-75 NB	14 MILE RD	N LTS OF MADISON HTS	1 Highway	1 Highway	2019				1	156	73.8	1	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	B Greater than HL 93	4	7	42.53	-83.11593	2025-08-18T00:00:00	POINT (-83.11593 42.53)	Oakland	NBI	NHS	11512.8	70.4	647308	6.39	2023-12-12T00:00:00	24	A	8	9	9	N
1812	Macomb County	Metro	6263	""	HARPER AVE	CLINTON HARRISON DRAIN	BET 15 MILE RD AND I-94	5 Highway-pedestrian	5 Waterway	1964	2002		2002	3	84	71.2	3	3 Steel	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	4 M 18 (H 20)	4		42.55	-82.87052	2025-08-18T00:00:00	POINT (-82.87052 42.55)	Macomb	NBI	NHS	5980.8	57.1	798408	7.75	2025-07-11T00:00:00	24	A	7	6	7	N
1813	Wayne County	Metro	12116	""	GRISWOLD STREET	MIDDLE ROUGE RIVER	NORTHVILLE     N/MAIN ST	5 Highway-pedestrian	5 Waterway	1928				2	24	35.8	2	1 Concrete	19 Culvert	0	""	""	N N/A (no deck (NBI))	4 M 18 (H 20)	4		42.43	-83.47887	2025-08-18T00:00:00	POINT (-83.47887 42.43)	Taylor	NBI	Non-NHS	859.2	35.8	1680204	0.25	2025-05-27T00:00:00	24	A	N	N	N	6
1814	MDOT	Metro	7971	63103-S10	JOHN R RD	I-696	IN MADISON HTS	1 Highway	1 Highway	1972	1997		1997	2	200	70.2	2	3 Steel	02 Multi Str Non Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	4	10	42.48	-83.10472	2025-08-18T00:00:00	POINT (-83.10472 42.48)	Oakland	NBI	Non-NHS	14040	52	646806	2.07	2024-07-25T00:00:00	24	A	6	6	6	N
1815	Wayne County	Metro	12039	""	SOUTHFIELD ROAD	ECORSE CREEK	LINCOLN PK &ECORSE E/FORT	1 Highway	5 Waterway	2024				1	92	80	1	5 Prestressed Concrete	06 Box Bms- Single/Sprd	0	""	""	1 Monolithic Concrete	B Greater than HL 93	5		42.25	-83.159515	2025-08-18T00:00:00	POINT (-83.159515 42.25)	Taylor	NBI	NHS	7360	64	4710185	0.92	2024-10-31T00:00:00	24	A	8	8	8	N
1816	Wayne County	Metro	12170	""	INKSTER ROAD	BELL CREEK	LIVONIA/REDFORD  N/5 MILE	5 Highway-pedestrian	5 Waterway	1958				3	91.1	66	3	2 Concrete Continuous	01 Slab	0	""	""	5 Epoxy Overlay	5 MS 18 (HS 20)	4		42.41	-83.31526	2025-08-18T00:00:00	POINT (-83.31526 42.41)	Taylor	NBI	NHS	6012.6	52	1674404	20.57	2025-03-01T00:00:00	12	A	4	4	6	N
1817	MDOT	Metro	11344	82101-B02	M-14 (OLD)	WILLOW CREEK	2.7 MI E OF WASHTENAW COL	1 Highway	5 Waterway	2003				1	38	44	1	1 Concrete	19 Culvert	0	""	""	6 Bituminous	9 MS22.5(HS25)or greater	2		42.36	-83.50119	2025-08-18T00:00:00	POINT (-83.50119 42.36)	Taylor	NBI	Non-NHS	1672	44	1604102	2.54	2023-10-09T00:00:00	24	A	N	N	N	7
1818	MDOT	Metro	11273	82051-B01	US-24	SILVER CREEK	1.3 MI NE OF MONROE COL	1 Highway	5 Waterway	2005				1	23.1	64	1	1 Concrete	19 Culvert	0	""	""	6 Bituminous	9 MS22.5(HS25)or greater	4		42.11	-83.283226	2025-08-18T00:00:00	POINT (-83.283226 42.11)	Taylor	NBI	NHS	1478.4	64	4700038	1.39	2024-05-15T00:00:00	24	A	N	N	N	7
1819	MDOT	Metro	11941	82292-R01	I-275 SB	MDOT RR CORRIDOR	2.2 MI.W OF WAYNE	1 Highway	2 Railroad	1974		2012		3	155.3	55.8	3	5 Prestressed Concrete	02 Multi Str Non Comp	0	""	""	5 Epoxy Overlay	9 MS22.5(HS25)or greater	3		42.27	-83.44118	2025-08-18T00:00:00	POINT (-83.44118 42.27)	Taylor	NBI	NHS	8665.74	52.5	1607610	13.55	2024-08-28T00:00:00	24	A	8	8	7	N
1820	MDOT	Metro	11527	82122-S39	FARMINGTON LFT TRN	I-96	IN LIVONIA	1 Highway	1 Highway	1974		2001	2001	2	176	33.7	2	3 Steel	02 Multi Str Non Comp	0	""	""	5 Epoxy Overlay	5 MS 18 (HS 20)	1	8	42.38	-83.37166	2025-08-18T00:00:00	POINT (-83.37166 42.38)	Taylor	NBI	Non-NHS	5931.2	28	1803806	0.01	2024-11-11T00:00:00	24	A	6	7	7	N
1821	Macomb County	Metro	6222	""	29 MILE ROAD	HEALY BROOK DRAIN	1.9MI EAST OF VAN DYKE	1 Highway	5 Waterway	2017				1	26.9	32	1	1 Concrete	19 Culvert	0	""	""	6 Bituminous	B Greater than HL 93	2		42.76	-82.98104	2025-08-18T00:00:00	POINT (-82.98104 42.76)	Macomb	NBI	Non-NHS	860.8	32	815710	3.88	2023-11-16T00:00:00	24	A	N	N	N	8
1822	MDOT	Metro	11505	82122-S19	US-24 TELEGRAPH RD	I-96	W LTS OF DETROIT	7 3d level interchg	1 Highway	1970	2003		2003	7	900	89.2	7	4 Steel Continuous	82 Pl Girder Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	6	10	42.38	-83.27604	2025-08-18T00:00:00	POINT (-83.27604 42.38)	Taylor	NBI	NHS	80280	87.9	4700038	20.38	2024-04-24T00:00:00	24	A	7	6	6	N
1823	Macomb County	Metro	6248	""	UTICA RD	RED RUN DRAIN	0.1 MI SOUTH OF HAYES RD	5 Highway-pedestrian	5 Waterway	1985				4	274.9	76.1	4	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	3 Latex Concrete/Similar	9 MS22.5(HS25)or greater	5		42.57	-82.969406	2025-08-18T00:00:00	POINT (-82.969406 42.57)	Macomb	NBI	Non-NHS	20919.89	65.9	4211434	4.89	2023-10-02T00:00:00	24	A	6	7	7	N
1824	MDOT	Metro	11692	82192-S14	W CHICAGO AVE	M-39	IN DETROIT	5 Highway-pedestrian	1 Highway	1963	2010		2010	2	108.5	85.9	2	4 Steel Continuous	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	6 MS18(HS20)+mod	5	6	42.37	-83.21638	2025-08-18T00:00:00	POINT (-83.21638 42.37)	Detroit	NBI	Non-NHS	9320.15	66	1581803	1.65	2023-12-14T00:00:00	24	A	7	8	8	N
1825	Macomb County	Metro	6336	""	31 MILE ROAD	EAST BRANCH COON CREEK	0.05 MI EAST OF OMO ROAD	1 Highway	5 Waterway	2005				1	88	42.2	1	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	2		42.79	-82.857475	2025-08-18T00:00:00	POINT (-82.857475 42.79)	Macomb	NBI	Non-NHS	3713.6	40	4408230	12.62	2025-06-25T00:00:00	24	A	7	7	7	N
1826	Macomb County	Metro	6386	""	TELLER ROAD	CAMP BROOK DRAIN	0.5 MI SOUTH OF 28 MILE	1 Highway	5 Waterway	1979				1	22	18	1	5 Prestressed Concrete	05 Box Bm/Gird- Multiple	0	""	""	6 Bituminous	5 MS 18 (HS 20)	2		42.74	-82.91273	2025-08-18T00:00:00	POINT (-82.91273 42.74)	Macomb	NBI	Non-NHS	396	16.1	4208044	0.5	2024-07-08T00:00:00	12	A	5	5	4	N
1827	Wayne County	Metro	12271	""	HORSE MILL ROAD	THOROFARE CANAL	GROSSE ILE     E/MERIDIAN	5 Highway-pedestrian	5 Waterway	1937	2000	2000		1	82	45.8	1	5 Prestressed Concrete	05 Box Bm/Gird- Multiple	0	""	""	2 Integral Concrete	5 MS 18 (HS 20)	2		42.16	-83.14811	2025-08-18T00:00:00	POINT (-83.14811 42.16)	Taylor	NBI	Non-NHS	3755.6	35.1	1692003	0.63	2024-10-18T00:00:00	24	A	7	8	5	N
1828	MDOT	Metro	6152	50111-S06	10 MI RD	I-94	W LTS OF ST CLAIR SHORES	5 Highway-pedestrian	1 Highway	1965	2002		1990	4	185	62.4	4	3 Steel	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	4 M 18 (H 20)	4	6	42.48	-82.91653	2025-08-18T00:00:00	POINT (-82.91653 42.48)	Macomb	NBI	Non-NHS	11544	47.9	803101	8.57	2024-06-27T00:00:00	24	A	7	5	5	N
1829	MDOT	Metro	11468	82112-S35	GREENFIELD RD LF T	M-10	IN DETROIT	1 Highway	1 Highway	1964	2006		2006	2	110.7	22.4	2	3 Steel	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	1	7	42.44	-83.20102	2025-08-18T00:00:00	POINT (-83.20102 42.44)	Detroit	NBI	NHS	2479.68	20	1584410	0	2024-08-27T00:00:00	24	A	7	6	5	N
1830	MDOT	Metro	7885	63081-S12	10 MI RD	M-10	IN SOUTHFIELD	5 Highway-pedestrian	1 Highway	1963	1997	2020	1997	2	165.6	60.4	2	3 Steel	02 Multi Str Non Comp	0	""	""	3 Latex Concrete/Similar	2 M 13.5 (H 15)	4	6	42.47	-83.24196	2025-08-18T00:00:00	POINT (-83.24196 42.47)	Oakland	NBI	Non-NHS	10002.24	48	633409	6.76	2024-06-13T00:00:00	24	A	7	7	7	N
1831	Macomb County	Metro	6388	""	POWELL ROAD	EAST POND CREEK	200 FT NORTH OF 32 MILE	1 Highway	5 Waterway	1964	1988			1	25.9	42.7	1	3 Steel	19 Culvert	0	""	""	N N/A (no deck (NBI))	4 M 18 (H 20)	3		42.8	-82.9801	2025-08-18T00:00:00	POINT (-82.9801 42.8)	Macomb	NBI	Non-NHS	1105.93	0	817209	2.43	2023-08-09T00:00:00	24	A	N	N	N	6
1832	MDOT	Metro	7839	63043-S01	OPDYKE RD	M-59	E LTS OF PONTIAC	1 Highway	1 Highway	1965	2009		1965	4	233.5	78.1	4	3 Steel	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	A HL 93	5	8	42.64	-83.2498	2025-08-18T00:00:00	POINT (-83.2498 42.64)	Oakland	NBI	Non-NHS	18236.35	63	616205	3.79	2024-09-26T00:00:00	24	A	7	7	7	N
1833	Wayne	Metro	12521	""	JOHN HIX ROAD	LOWER ROUGE RIVER	IN CITY OF WAYNE	5 Highway-pedestrian	5 Waterway	1989	2020			1	87	43.8	1	5 Prestressed Concrete	05 Box Bm/Gird- Multiple	0	""	""	1 Monolithic Concrete	6 MS18(HS20)+mod	2		42.28	-83.421875	2025-08-18T00:00:00	POINT (-83.421875 42.28)	Taylor	NBI	Non-NHS	3810.6	28	4705360	0.19	2024-05-29T00:00:00	24	P	8	7	7	N
1834	MDOT	Metro	11190	82023-S22	M-10 EB	I-94 RAMP	IN DETROIT	5 Highway-pedestrian	1 Highway	1953	1995		1995	3	232.1	54.1	3	3 Steel	52 Pl Girder Non Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	3	2	42.36	-83.07611	2025-08-18T00:00:00	POINT (-83.07611 42.36)	Detroit	NBI	NHS	12556.61	51.2	1577509	9.58	2024-11-16T00:00:00	12	A	7	7	5	N
1835	MDOT	Metro	11546	82123-R05-8	OFF RAMP @ GRNFLD.	LAND	IN DETROIT	1 Highway	2 Railroad	1973		1993	1993	3	243.8	39.7	3	3 Steel	32 Multi Str Comp	0	""	""	3 Latex Concrete/Similar	5 MS 18 (HS 20)	1		42.38	-83.19618889	2025-08-18T00:00:00	POINT (-83.19618889 42.38)	Detroit	NBI	NHS	9678.86	28.2	1590606	0.17	2023-08-11T00:00:00	24	A	6	8	7	N
1836	MDOT	Metro	8019	63172-S14	SASHABAW RD	I-75	2.2 MI SE OF M-15	5 Highway-pedestrian	1 Highway	1962		1990	2004	4	366.5	64.6	4	3 Steel	82 Pl Girder Comp	0	""	""	3 Latex Concrete/Similar	4 M 18 (H 20)	4	4	42.74	-83.37963	2025-08-18T00:00:00	POINT (-83.37963 42.74)	Oakland	NBI	Non-NHS	23675.9	52.5	6200147	3.99	2025-03-14T00:00:00	24	A	6	6	6	N
1837	Birmingham	Metro	13481	""	WILLITS STREET	ROUGE RIVER	0.3 MI W OF N OLDWOODWARD	1 Highway	5 Waterway	1961				2	30.5	25.9	2	3 Steel	19 Culvert	0	""	""	N N/A (no deck (NBI))	4 M 18 (H 20)	2		42.55	-83.22113889	2025-08-18T00:00:00	POINT (-83.22113889 42.55)	Oakland	NBI	Non-NHS	789.95	25.9	611204	0.15	2024-10-24T00:00:00	24	A	N	N	N	4
1838	Macomb County	Metro	6326	""	EAST ARCHER DRIVE	CHANNEL TO LAKE ST CLAIR	0.1 MI S OF S RIVER RD	1 Highway	5 Waterway	2015				1	57	28.3	1	5 Prestressed Concrete	05 Box Bm/Gird- Multiple	0	""	""	1 Monolithic Concrete	B Greater than HL 93	2		42.59	-82.78999	2025-08-18T00:00:00	POINT (-82.78999 42.59)	Macomb	NBI	Non-NHS	1613.1	25.1	832301	0.04	2024-05-07T00:00:00	24	A	8	8	8	N
1839	Troy	Metro	8311	""	ALLEN DRIVE	BARNARD DRAIN	0.2 MI S OF MAPLE ROAD	1 Highway	5 Waterway	1969				2	31	68.9	2	2 Concrete Continuous	19 Culvert	0	""	""	1 Monolithic Concrete	6 MS18(HS20)+mod	2		42.55	-83.124855	2025-08-18T00:00:00	POINT (-83.124855 42.55)	Oakland	NBI	Non-NHS	2135.9	33.1	690109	0.2	2025-04-08T00:00:00	24	A	N	N	N	7
1840	MDOT	Metro	11394	82111-S05	CHRYSLER DR	I-375	IN DETROIT	5 Highway-pedestrian	1 Highway	1962		2016	2005	2	111.4	69	2	3 Steel	02 Multi Str Non Comp	0	""	""	6 Bituminous	6 MS18(HS20)+mod	4	4	42.33	-83.035995	2025-08-18T00:00:00	POINT (-83.035995 42.33)	Detroit	NBI	Non-NHS	7686.6	59.7	4704921	0	2025-05-23T00:00:00	12	A	4	5	5	N
1841	MDOT	Metro	11670	82192-B01	M-39	ECORSE CREEK	IN ALLEN PARK	1 Highway	5 Waterway	1963		1985	1997	1	32.8	118.4	1	3 Steel	32 Multi Str Comp	0	""	""	3 Latex Concrete/Similar	5 MS 18 (HS 20)	7		42.27	-83.220406	2025-08-18T00:00:00	POINT (-83.220406 42.27)	Taylor	NBI	NHS	3883.52	116.1	1592408	3.26	2024-10-24T00:00:00	12	A	4	5	6	N
1842	Oakland County	Metro	8176	""	LONG LAKE RD	ROUGE RIVER	BET ADAMS AND COOLIDGE RD	1 Highway	5 Waterway	1984				1	44	63	1	1 Concrete	19 Culvert	0	""	""	6 Bituminous	6 MS18(HS20)+mod	4		42.59	-83.18944	2025-08-18T00:00:00	POINT (-83.18944 42.59)	Oakland	NBI	NHS	2772	58.4	641102	9.19	2024-08-23T00:00:00	24	A	N	N	N	7
1843	MDOT	Metro	11443	82112-S18	ROSA PARKS BLVD	M-10	IN DETROIT	5 Highway-pedestrian	1 Highway	1957	1995		2006	2	140.6	67.9	2	4 Steel Continuous	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	4	7	42.4	-83.118065	2025-08-18T00:00:00	POINT (-83.118065 42.4)	Detroit	NBI	Non-NHS	9546.74	44	1584701	0.01	2025-04-29T00:00:00	24	A	7	6	6	N
1844	Wayne County	Metro	12018	""	PENNSYLVANIA ROAD	BLAKELY DRAIN	BRNTN/TAYLOR E/BEECH-DALY	5 Highway-pedestrian	5 Waterway	2020				1	27.2	44	1	1 Concrete	19 Culvert	0	""	""	4 Low Slump Concrete	B Greater than HL 93	3		42.18	-83.28273	2025-08-18T00:00:00	POINT (-83.28273 42.18)	Taylor	NBI	Non-NHS	1196.8	44	1674307	6.86	2024-08-28T00:00:00	24	A	N	N	N	8
1845	MDOT	Metro	11453	82112-S27-3	OUTER DRIVE EB	M-10	IN DETROIT	5 Highway-pedestrian	1 Highway	1964	2006		2006	2	110	59.1	2	3 Steel	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	4	6	42.42	-83.17609	2025-08-18T00:00:00	POINT (-83.17609 42.42)	Detroit	NBI	Non-NHS	6501	48	1584506	2.87	2024-08-27T00:00:00	24	A	7	7	6	N
1846	Macomb County	Metro	6252	""	NB SCHOENHERR RD	PLUM BROOK DRAIN	0.6 MI N OF METRO. PKWY	5 Highway-pedestrian	5 Waterway	1991				2	129.9	38.7	2	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	9 MS22.5(HS25)or greater	2		42.57	-82.98975	2025-08-18T00:00:00	POINT (-82.98975 42.57)	Macomb	NBI	NHS	5027.13	29.9	798810	8.53	2024-05-07T00:00:00	24	A	8	8	6	N
1847	MDOT	Metro	11256	82025-S11	HARPER AVE	I-94	IN DETROIT	5 Highway-pedestrian	1 Highway	1959	1997		2006	4	258.3	69.9	4	3 Steel	02 Multi Str Non Comp	0	""	""	5 Epoxy Overlay	5 MS 18 (HS 20)	4	6	42.41	-82.94821	2025-08-18T00:00:00	POINT (-82.94821 42.41)	Detroit	NBI	Non-NHS	18055.17	47.9	1578108	4.39	2024-06-17T00:00:00	24	A	6	5	6	N
1848	Wayne County	Metro	12011	""	WEST ROAD	BLAKELY DRAIN	WOODHAVEN         E/ALLEN	5 Highway-pedestrian	5 Waterway	1934	1960			1	33.8	84	1	1 Concrete	04 Tee Beam	0	0 Other	00 Other	5 Epoxy Overlay	0 Unknown	5		42.14	-83.21893	2025-08-18T00:00:00	POINT (-83.21893 42.14)	Taylor	NBI	NHS	2839.2	71.9	1674210	7.42	2024-11-29T00:00:00	24	A	6	5	6	N
1849	Wayne County	Metro	12087	""	SIX MILE ROAD	EN HINES DRIVE	NORTHVILLE T W/NORTHV RD	5 Highway-pedestrian	1 Highway	1933		1994		1	66.9	53.8	1	1 Concrete	07 Frame- Rigid exc Culv	0	""	""	6 Bituminous	6 MS18(HS20)+mod	2	2	42.41	-83.471924	2025-08-18T00:00:00	POINT (-83.471924 42.41)	Taylor	NBI	Non-NHS	3599.22	40	1680701	4.01	2025-04-25T00:00:00	12	P	4	4	4	N
1850	Oakland County	Metro	8155	""	ORION RD	PAINT CREEK	BET SNELL AND COLLINS RDS	5 Highway-pedestrian	5 Waterway	2014				1	37.7	44	1	1 Concrete	19 Culvert	0	""	""	0 None	B Greater than HL 93	3		42.73	-83.160645	2025-08-18T00:00:00	POINT (-83.160645 42.73)	Oakland	NBI	Non-NHS	1658.8	48	604708	2.69	2024-09-13T00:00:00	24	A	N	N	N	8
1851	Oakland County	Metro	13649	""	GOLDEN LANE	UNKNOWN CHANNEL	W BLOOMFIELD TWP SEC 29	1 Highway	5 Waterway	1997				3	29	24	3	3 Steel	19 Culvert	0	""	""	6 Bituminous	5 MS 18 (HS 20)	2		42.55	-83.41758	2025-08-18T00:00:00	POINT (-83.41758 42.55)	Oakland	NBI	Non-NHS	696	24	4413283	0.67	2024-06-28T00:00:00	24	A	N	N	N	6
1852	Macomb County	Metro	6197	""	EB METRO PARKWAY	HARRINGTON DRAIN	0.75 MI WEST OF M-97	1 Highway	5 Waterway	1952	2010			1	35	53.3	1	5 Prestressed Concrete	05 Box Bm/Gird- Multiple	0	""	""	1 Monolithic Concrete	9 MS22.5(HS25)or greater	3		42.57	-82.92873	2025-08-18T00:00:00	POINT (-82.92873 42.57)	Macomb	NBI	NHS	1865.5	50.1	803608	8.18	2024-08-30T00:00:00	24	A	7	8	7	N
1853	Woodhaven	Metro	14321	""	FORD RD	BROWNSTOWN CREEK	200 FT N OF VAN HORN RD	1 Highway	5 Waterway	2017				1	21.3	39	1	1 Concrete	19 Culvert	0	""	""	6 Bituminous	9 MS22.5(HS25)or greater	3		42.13	-83.239624	2025-08-18T00:00:00	POINT (-83.239624 42.13)	Taylor	NBI	Non-NHS	830.7	37	4705817	1.12	2023-08-29T00:00:00	24	A	N	N	N	8
1854	MDOT	Metro	11847	82252-S07	7 MI RD	I-75	IN DETROIT	5 Highway-pedestrian	1 Highway	1967	2003		2004	4	220	70.2	4	3 Steel	32 Multi Str Comp	0	""	""	0 None	5 MS 18 (HS 20)	4	8	42.43	-83.09465	2025-08-18T00:00:00	POINT (-83.09465 42.43)	Detroit	NBI	NHS	15444	47.9	1700106	17.29	2024-04-23T00:00:00	24	A	8	7	5	N
1855	Oakland County	Metro	8214	""	WARNER STREET	GREEN LAKE CANAL	NORTH OF COMMERCE	1 Highway	5 Waterway	1961				1	46.9	11.8	1	5 Prestressed Concrete	05 Box Bm/Gird- Multiple	0	""	""	1 Monolithic Concrete	6 MS18(HS20)+mod	1		42.6	-83.42377	2025-08-18T00:00:00	POINT (-83.42377 42.6)	Oakland	NBI	Non-NHS	553.42	10.8	661101	0.43	2024-06-12T00:00:00	24	P	6	5	6	N
1856	Dearborn Height	Metro	12335	""	EDGEWOOD AVE	ECORSE CREEK	IN DEARBORN HEIGHTS	1 Highway	5 Waterway	1991				1	30.5	25.9	1	1 Concrete	19 Culvert	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	2		42.27	-83.22754	2025-08-18T00:00:00	POINT (-83.22754 42.27)	Taylor	NBI	Non-NHS	789.95	26	1646805	0.22	2023-10-24T00:00:00	24	A	N	N	N	6
1857	MDOT	Metro	11963	82293-R04-5	I-275 RAMP N	CSX RR	S OF SCHOOLCRAFT	1 Highway	2 Railroad	1971	2001		2001	5	323.5	32.1	5	3 Steel	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	1		42.38	-83.43636	2025-08-18T00:00:00	POINT (-83.43636 42.38)	Taylor	NBI	NHS	10384.35	28.7	1607504	0.15	2023-10-28T00:00:00	24	A	7	7	7	N
1858	Macomb County	Metro	6186	""	12 MILE ROAD	BEAR CREEK	0.25 MI EAST OF MOUND RD	5 Highway-pedestrian	5 Waterway	1955				1	24	59.1	1	3 Steel	19 Culvert	0	""	""	N N/A (no deck (NBI))	4 M 18 (H 20)	5		42.51	-83.04221	2025-08-18T00:00:00	POINT (-83.04221 42.51)	Macomb	NBI	NHS	1418.4	0	803401	2.21	2024-04-10T00:00:00	24	A	N	N	N	5
1859	MDOT	Metro	11579	82123-S31	LIVERNOIS LEFT TRN	I-96	IN DETROIT	5 Highway-pedestrian	1 Highway	1972	2009		2009	2	174	38.9	2	4 Steel Continuous	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	2	8	42.37	-83.13791	2025-08-18T00:00:00	POINT (-83.13791 42.37)	Detroit	NBI	Non-NHS	6768.6	30.7	4701502	0.05	2023-08-25T00:00:00	24	A	8	7	7	N
1860	MDOT	Metro	8079	63174-S15-1	I-75 NB	SQUARE LAKE RD	IN TROY	1 Highway	1 Highway	2017				1	147.9	73.8	1	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	B Greater than HL 93	4	2	42.61	-83.20543	2025-08-18T00:00:00	POINT (-83.20543 42.61)	Oakland	NBI	NHS	10915.02	70.5	647308	15.15	2023-12-08T00:00:00	24	A	8	7	8	N
1861	MDOT	Metro	6092	50061-S25	SCHOENHERR RD	I-696	IN WARREN	5 Highway-pedestrian	1 Highway	1973	2010	2010	2000	2	196	78.4	2	4 Steel Continuous	82 Pl Girder Comp	0	""	""	3 Latex Concrete/Similar	4 M 18 (H 20)	5	8	42.49	-82.98717	2025-08-18T00:00:00	POINT (-82.98717 42.49)	Macomb	NBI	NHS	15366.4	64	798810	2.97	2024-10-08T00:00:00	24	A	6	6	7	N
1862	MDOT	Metro	11620	82141-B02	M-102 WB	ROUGE RIVER	0.1 MI W OF US-24	5 Highway-pedestrian	5 Waterway	1987				1	70	72.5	1	5 Prestressed Concrete	02 Multi Str Non Comp	0	""	""	5 Epoxy Overlay	9 MS22.5(HS25)or greater	5		42.44	-83.281425	2025-08-18T00:00:00	POINT (-83.281425 42.44)	Detroit	NBI	NHS	5075	69	640807	2.05	2024-09-25T00:00:00	24	A	7	7	7	N
1863	MDOT	Metro	7794	63022-R02-3	I-96 EB	CSX RR	IN NOVI	1 Highway	2 Railroad	2008			2008	1	108.3	67.6	1	3 Steel	82 Pl Girder Comp	0	""	""	5 Epoxy Overlay	B Greater than HL 93	3		42.49	-83.48832	2025-08-18T00:00:00	POINT (-83.48832 42.49)	Oakland	NBI	NHS	7321.08	64.3	657303	9.72	2024-11-05T00:00:00	24	A	7	8	8	N
1864	MDOT	Metro	11374	82104-S02	JOHN R STREET	M-8, DAVISON FWY	HIGHLAND PARK  E/WOODWARD	5 Highway-pedestrian	1 Highway	1996				2	212.5	50.1	2	5 Prestressed Concrete	02 Multi Str Non Comp	0	""	""	5 Epoxy Overlay	6 MS18(HS20)+mod	4	10	42.4	-83.09252	2025-08-18T00:00:00	POINT (-83.09252 42.4)	Detroit	NBI	Non-NHS	10646.25	37	1625909	1.7	2023-10-23T00:00:00	24	A	7	7	7	N
1865	Wayne County	Metro	12129	""	HAGGERTY ROAD	SWAN CREEK	SUMPTER            S/JUDD	1 Highway	5 Waterway	1998				1	23.4	43	1	5 Prestressed Concrete	05 Box Bm/Gird- Multiple	0	""	""	1 Monolithic Concrete	9 MS22.5(HS25)or greater	2		42.13	-83.44594	2025-08-18T00:00:00	POINT (-83.44594 42.13)	Taylor	NBI	Non-NHS	1006.2	40	1670605	0.7	2024-08-26T00:00:00	24	A	7	7	7	N
1866	MDOT	Metro	11719	82194-B02	I-75	ECORSE RIVER	IN LINCOLN PARK	1 Highway	5 Waterway	1966		1966		1	35.8	54	1	1 Concrete	19 Culvert	0	""	""	6 Bituminous	6 MS18(HS20)+mod	7		42.26	-83.17344444	2025-08-18T00:00:00	POINT (-83.17344444 42.26)	Taylor	NBI	NHS	1933.2	156	1592010	14.93	2025-06-12T00:00:00	24	A	N	N	N	6
1867	Macomb County	Metro	6331	""	29 MILE ROAD	EAST BRANCH COON CREEK	0.2 MI EAST OF OMO ROAD	1 Highway	5 Waterway	2005				2	110.1	43.9	2	5 Prestressed Concrete	05 Box Bm/Gird- Multiple	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	2		42.76	-82.84954	2025-08-18T00:00:00	POINT (-82.84954 42.76)	Macomb	NBI	Non-NHS	4833.39	41.3	815710	10.61	2023-07-26T00:00:00	24	A	8	8	8	N
1868	MDOT	Metro	11551	82123-S05	I-96 EB COLLECTOR	M-39 SOUTHFIELD FRWY	IN DETROIT	6 2d level interchg	1 Highway	1970		2005	1989	4	230.6	65.6	4	3 Steel	32 Multi Str Comp	0	""	""	3 Latex Concrete/Similar	5 MS 18 (HS 20)	3	8	42.38	-83.21663	2025-08-18T00:00:00	POINT (-83.21663 42.38)	Detroit	NBI	NHS	15127.36	42.7	1583107	1.85	2023-08-22T00:00:00	24	A	6	7	7	N
1869	MDOT	Metro	11923	82292-B06	I-275 NB	FELLOWS CREEK	2.0 MI NW OF WAYNE	1 Highway	5 Waterway	1974	2012	2012	2012	3	105.9	56.5	3	3 Steel	32 Multi Str Comp	0	""	""	3 Latex Concrete/Similar	9 MS22.5(HS25)or greater	3		42.31	-83.44238	2025-08-18T00:00:00	POINT (-83.44238 42.31)	Taylor	NBI	NHS	5983.35	53.2	1607208	16.13	2024-10-30T00:00:00	24	A	7	7	7	N
1870	MDOT	Metro	7789	63022-C02	I-96	BASSETT DRAIN	0.75 MI NW OF NOVI	1 Highway	5 Waterway	2024				1	24.7	118	1	1 Concrete	19 Culvert	0	""	""	N N/A (no deck (NBI))	B Greater than HL 93	8		42.49	-83.49233	2025-08-18T00:00:00	POINT (-83.49233 42.49)	Oakland	NBI	NHS	2914.6	0	657303	9.52	2024-11-25T00:00:00	24	A	N	N	N	9
1871	MDOT	Metro	11100	82021-S02	HAGGERTY RD	I-94	5.3 MI E OF WASHTENAW COL	1 Highway	1 Highway	1974			2011	2	264	90.2	2	3 Steel	82 Pl Girder Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	6	8	42.22	-83.43995	2025-08-18T00:00:00	POINT (-83.43995 42.22)	Taylor	NBI	Non-NHS	23812.8	87.9	4706524	0.72	2024-08-09T00:00:00	24	A	6	6	7	N
1872	MDOT	Metro	6091	50061-S23	LFT TRN LANE	I-696	IN WARREN E OF HOOVER	1 Highway	1 Highway	1972	2010		2000	2	196	33.2	2	4 Steel Continuous	82 Pl Girder Comp	0	""	""	1 Monolithic Concrete	4 M 18 (H 20)	2	8	42.49	-83.0053	2025-08-18T00:00:00	POINT (-83.0053 42.49)	Macomb	NBI	Non-NHS	6507.2	30	1803501	0.02	2023-09-22T00:00:00	24	A	8	6	7	N
1873	MDOT	Metro	11498	82122-S12	RACE TRACK ENTRC	I-96	IN LIVONIA	5 Highway-pedestrian	1 Highway	1971	2014		2001	2	158	74.4	2	3 Steel	02 Multi Str Non Comp	0	""	""	1 Monolithic Concrete	2 M 13.5 (H 15)	4	9	42.38	-83.32669	2025-08-18T00:00:00	POINT (-83.32669 42.38)	Taylor	NBI	Non-NHS	11755.2	52	4704512	0.01	2024-09-16T00:00:00	24	A	7	7	7	N
1874	MDOT	Metro	11185	82023-S17	GRAND RIVER AVE	I-94	IN DETROIT	5 Highway-pedestrian	1 Highway	2022				2	243.4	106.8	2	4 Steel Continuous	82 Pl Girder Comp	0	""	""	1 Monolithic Concrete	B Greater than HL 93	5	8	42.35	-83.095345	2025-08-18T00:00:00	POINT (-83.095345 42.35)	Detroit	NBI	NHS	25995.12	74	1577408	9.86	2024-05-20T00:00:00	24	A	9	9	9	N
1875	MDOT	Metro	6077	50061-S04	MEREDITH DR	I-696	IN WARREN	5 Highway-pedestrian	1 Highway	1972		2008	2008	2	187.5	54.4	2	3 Steel	32 Multi Str Comp	0	""	""	5 Epoxy Overlay	4 M 18 (H 20)	2	10	42.49	-83.05922	2025-08-18T00:00:00	POINT (-83.05922 42.49)	Macomb	NBI	Non-NHS	10200	40	805502	0.19	2025-03-12T00:00:00	24	A	5	7	7	N
1876	MDOT	Metro	7950	63102-S38	SANTA BARBARA U EA	I-696	IN LATHRUP VILLAGE	1 Highway	1 Highway	1987				2	154	32.4	2	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	9 MS22.5(HS25)or greater	1	6	42.49	-83.230515	2025-08-18T00:00:00	POINT (-83.230515 42.49)	Oakland	NBI	Non-NHS	4989.6	21	655803	0.89	2024-07-22T00:00:00	24	A	6	6	7	N
1877	Detroit	Metro	12393	""	BAGLEY	CONRAIL	WEST OF FOURTEENTH ST	5 Highway-pedestrian	2 Railroad	1978			1978	4	277.9	77.8	4	3 Steel	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	4		42.33	-83.07467	2025-08-18T00:00:00	POINT (-83.07467 42.33)	Detroit	NBI	Non-NHS	21620.62	54.1	4718918	0.39	2024-03-27T00:00:00	24	A	7	7	7	N
1878	Wayne County	Metro	12132	""	HAGGERTY ROAD	TRUESDELL DRAIN	CANTON      S/CHERRY HILL	5 Highway-pedestrian	5 Waterway	1973				2	24	40	2	1 Concrete	19 Culvert	0	0 Other	00 Other	N N/A (no deck (NBI))	6 MS18(HS20)+mod	2		42.3	-83.44801	2025-08-18T00:00:00	POINT (-83.44801 42.3)	Taylor	NBI	Non-NHS	960	0	4706524	6.41	2025-05-09T00:00:00	24	A	N	N	N	6
1879	Wayne County	Metro	12276	""	CHURCH ROAD	THOROFARE CANAL	GROSSE ILE     E/MERIDIAN	5 Highway-pedestrian	5 Waterway	1939	2000			1	55	45.8	1	5 Prestressed Concrete	05 Box Bm/Gird- Multiple	0	""	""	2 Integral Concrete	5 MS 18 (HS 20)	2		42.15	-83.15232	2025-08-18T00:00:00	POINT (-83.15232 42.15)	Taylor	NBI	Non-NHS	2519	35.1	1691707	0.65	2024-10-18T00:00:00	24	A	6	8	8	N
1880	MDOT	Metro	11789	82211-B03-1	M-85 NB	SEXTON-KILFOIL DRAIN	IN LINCOLN PARK	5 Highway-pedestrian	5 Waterway	2011				1	74	62.4	1	5 Prestressed Concrete	05 Box Bm/Gird- Multiple	0	""	""	1 Monolithic Concrete	A HL 93	4		42.22	-83.18102	2025-08-18T00:00:00	POINT (-83.18102 42.22)	Taylor	NBI	NHS	4617.6	52	1592105	11.09	2024-05-15T00:00:00	24	A	7	7	8	N
1881	Macomb County	Metro	6284	""	CALLENS RD	SALT RIVER	0.5 SOUTH OF 23 MILE ROAD	1 Highway	5 Waterway	1983				2	129.9	41.7	2	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	5 Epoxy Overlay	5 MS 18 (HS 20)	2		42.67	-82.77439	2025-08-18T00:00:00	POINT (-82.77439 42.67)	Macomb	NBI	Non-NHS	5416.83	32	814710	1.01	2023-08-16T00:00:00	24	A	7	7	7	N
1882	Wayne County	Metro	12251	""	HARBIN DRIVE	SILVER CREEK	BRNTWNW/JEFFERSON	1 Highway	5 Waterway	1930				1	44.9	26.9	1	1 Concrete	11 Arch- Deck, Filled Sp	0	""	""	8 Gravel	4 M 18 (H 20)	2		42.04	-83.214165	2025-08-18T00:00:00	POINT (-83.214165 42.04)	Taylor	NBI	Non-NHS	1207.81	26.9	1709717	0	2024-09-18T00:00:00	12	A	5	4	6	N
1883	Macomb County	Metro	6267	""	NORTH AVE	COON CREEK	0.4 MI NORTH OF 27 MILE	1 Highway	5 Waterway	1978				2	44.9	39.4	2	3 Steel	19 Culvert	0	""	""	N N/A (no deck (NBI))	9 MS22.5(HS25)or greater	2		42.74	-82.875534	2025-08-18T00:00:00	POINT (-82.875534 42.74)	Macomb	NBI	Non-NHS	1769.06	0	1817105	7.71	2023-08-09T00:00:00	24	A	N	N	N	7
1884	Sterling Heights	Metro	6424	""	17 MILE ROAD	PLUMBROOK DRAIN	EAST OF VAN DYKE (M53)	5 Highway-pedestrian	5 Waterway	1984	2024			2	127	65	2	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	B Greater than HL 93	5		42.58	-83.02532	2025-08-18T00:00:00	POINT (-83.02532 42.58)	Macomb	NBI	Non-NHS	8255	48	805203	3.26	2024-07-26T00:00:00	24	A	9	9	7	N
1885	Wayne County	Metro	12262	""	PALMER ROAD	FELLOWS CREEK	CANTON             E/LOTZ	1 Highway	5 Waterway	1994				1	25.9	40	1	1 Concrete	19 Culvert	0	""	""	N N/A (no deck (NBI))	9 MS22.5(HS25)or greater	2		42.29	-83.43605	2025-08-18T00:00:00	POINT (-83.43605 42.29)	Taylor	NBI	Non-NHS	1036	27.9	1607406	2.58	2025-06-17T00:00:00	24	A	N	N	N	6
1886	MDOT	Metro	11404	82111-S17-3	MLK JR BLVD EB	M-10	IN DETROIT	5 Highway-pedestrian	1 Highway	2017				2	149	58.3	2	5 Prestressed Concrete	06 Box Bms- Single/Sprd	0	""	""	1 Monolithic Concrete	B Greater than HL 93	2	7	42.34	-83.06801	2025-08-18T00:00:00	POINT (-83.06801 42.34)	Detroit	NBI	NHS	8686.7	34	1581907	1.77	2024-03-07T00:00:00	24	A	8	8	7	N
1887	MDOT	Metro	11456	82112-S28-7	SCHAEFER SE TURN	M-10	IN DETROIT	1 Highway	1 Highway	1964	2000		2000	2	110.7	22.3	2	3 Steel	32 Multi Str Comp	0	""	""	0 None	5 MS 18 (HS 20)	1	6	42.42	-83.17979	2025-08-18T00:00:00	POINT (-83.17979 42.42)	Detroit	NBI	Non-NHS	2468.61	19.2	4718288	0	2025-04-18T00:00:00	24	A	6	6	6	N
1888	Birmingham	Metro	13578	""	BALDWIN AVENUE	ROUGE RIVER	0.03 MI N OF W MAPLE	5 Highway-pedestrian	5 Waterway	2009				1	36.5	20	1	1 Concrete	19 Culvert	0	""	""	2 Integral Concrete	5 MS 18 (HS 20)	2		42.55	-83.22378	2025-08-18T00:00:00	POINT (-83.22378 42.55)	Oakland	NBI	Non-NHS	730	23	613504	0.02	2024-10-25T00:00:00	24	A	N	N	N	8
1889	MDOT	Metro	11760	82195-S01	14TH ST	I-75	IN DETROIT	5 Highway-pedestrian	1 Highway	1970	1994		1994	6	329.8	80.4	6	3 Steel	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	5	11	42.33	-83.07695	2025-08-18T00:00:00	POINT (-83.07695 42.33)	Detroit	NBI	NHS	26515.92	58	4705601	0.4	2024-10-07T00:00:00	24	A	5	6	7	N
1890	MDOT	Metro	11594	82123-S46	I-96	I-94	IN DETROIT	6 2d level interchg	1 Highway	1971	2005		2005	3	211.6	154	3	3 Steel	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	8	8	42.35	-83.09886	2025-08-18T00:00:00	POINT (-83.09886 42.35)	Detroit	NBI	NHS	32586.4	148	1577404	3.47	2023-10-20T00:00:00	24	A	7	7	7	N
1891	Wayne County	Metro	12071	""	E N HINES DRIVE	MIDDLE ROUGE RIVER	WESTLAND       W/MERRIMAN	5 Highway-pedestrian	5 Waterway	1948				3	90.9	66.3	3	2 Concrete Continuous	01 Slab	0	""	""	6 Bituminous	5 MS 18 (HS 20)	2		42.34	-83.35129	2025-08-18T00:00:00	POINT (-83.35129 42.34)	Taylor	NBI	NHS	6026.67	47.9	1689409	8.48	2025-06-30T00:00:00	12	P	4	4	6	N
1892	Oakland County	Metro	8183	""	HATCHERY ROAD	CLINTON RIVER	BET FREMBES AND DIXIE	1 Highway	5 Waterway	2022				1	72	51.7	1	5 Prestressed Concrete	06 Box Bms- Single/Sprd	0	""	""	1 Monolithic Concrete	B Greater than HL 93	2		42.68	-83.37594	2025-08-18T00:00:00	POINT (-83.37594 42.68)	Oakland	NBI	Non-NHS	3722.4	40	4462999	3.41	2024-07-23T00:00:00	24	A	8	8	8	N
1893	Wayne County	Metro	12064	""	PLYMOUTH ROAD	E N HINES DRIVE	PLYMOUTH TWP   W/HAGGERTY	5 Highway-pedestrian	1 Highway	1934		1982		1	69.9	53.8	1	1 Concrete	07 Frame- Rigid exc Culv	0	""	""	2 Integral Concrete	6 MS18(HS20)+mod	4	2	42.38	-83.4551	2025-08-18T00:00:00	POINT (-83.4551 42.38)	Taylor	NBI	Non-NHS	3760.62	40	1680408	0.27	2025-05-16T00:00:00	24	A	5	5	5	N
1894	MDOT	Metro	7901	63101-S04	I-696	DRAKE RD	2.7MI E OF I-96 OVER DRAK	1 Highway	1 Highway	1960	2009			3	108.1	143.3	3	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	6 MS18(HS20)+mod	8	2	42.49	-83.39747	2025-08-18T00:00:00	POINT (-83.39747 42.49)	Oakland	NBI	NHS	15490.73	140.1	710701	2.61	2024-12-26T00:00:00	19	A	8	7	8	N
1895	MDOT	Metro	11752	82194-S23	W GRAND BLVD NB	I-75	IN DETROIT	5 Highway-pedestrian	1 Highway	2003				2	205.9	48.7	2	4 Steel Continuous	82 Pl Girder Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	3	10	42.32	-83.08428	2025-08-18T00:00:00	POINT (-83.08428 42.32)	Detroit	NBI	Non-NHS	10027.33	36.4	1581303	0.28	2024-05-20T00:00:00	24	A	7	8	7	N
1896	Oakland County	Metro	8202	""	SPAULDING RD	NOVI-LYON DRAIN	NORTH OF ELEVEN MILE	1 Highway	5 Waterway	1961				2	24.9	20	2	3 Steel	19 Culvert	0	""	""	N N/A (no deck (NBI))	6 MS18(HS20)+mod	2		42.48	-83.618385	2025-08-18T00:00:00	POINT (-83.618385 42.48)	Oakland	NBI	Non-NHS	498	0	656803	0.31	2024-06-20T00:00:00	24	K	N	N	N	3
1897	MDOT	Metro	12831	63043-S03-2	SQUIRREL RD SB	M-59	PONTIAC TWP SEC 25	1 Highway	1 Highway	1999		2022		4	359	64.4	4	5 Prestressed Concrete	05 Box Bm/Gird- Multiple	0	""	""	3 Latex Concrete/Similar	5 MS 18 (HS 20)	3	6	42.64	-83.220024	2025-08-18T00:00:00	POINT (-83.220024 42.64)	Oakland	NBI	Non-NHS	23119.6	52.1	4414559	0.64	2024-09-19T00:00:00	24	A	8	5	7	N
1898	MDOT	Metro	8023	63172-S18	I-75 RAMP B	I-75 RAMP B & I-75	I-75 @ CHRYSLER DR.	1 Highway	1 Highway	1990				4	364	36.2	3	4 Steel Continuous	82 Pl Girder Comp	1	3 Steel	82 Pl Girder Comp	1 Monolithic Concrete	5 MS 18 (HS 20)	2	5	42.65	-83.23822	2025-08-18T00:00:00	POINT (-83.23822 42.65)	Oakland	NBI	NHS	13176.8	33	1920603	0.39	2025-07-24T00:00:00	24	A	7	7	7	N
1899	Armada	Metro	6412	""	PROSPECT STREET	EAST BR OF COON CREEK	SEC 23 ARMADA TWP	5 Highway-pedestrian	5 Waterway	1982	2015			1	35	31.7	1	5 Prestressed Concrete	05 Box Bm/Gird- Multiple	0	""	""	1 Monolithic Concrete	B Greater than HL 93	2		42.85	-82.88489167	2025-08-18T00:00:00	POINT (-82.88489167 42.85)	Macomb	NBI	Non-NHS	1109.5	24.2	825605	0.18	2023-10-18T00:00:00	24	A	7	8	7	N
1900	MDOT	Metro	11704	82193-S01	LYNDON AVE	M-39	IN DETROIT	5 Highway-pedestrian	1 Highway	1961	2010			2	110.1	67	2	5 Prestressed Concrete	05 Box Bm/Gird- Multiple	0	""	""	1 Monolithic Concrete	B Greater than HL 93	4	6	42.39	-83.2179	2025-08-18T00:00:00	POINT (-83.2179 42.39)	Detroit	NBI	Non-NHS	7376.7	44	1594902	2.38	2025-08-12T00:00:00	24	A	7	8	7	N
1901	MDOT	Metro	11686	82192-S08-4	HUBBARD AV WB	M-39	IN DEARBORN	5 Highway-pedestrian	1 Highway	1964	1996		1996	4	177.5	69.7	4	4 Steel Continuous	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	4	6	42.32	-83.215225	2025-08-18T00:00:00	POINT (-83.215225 42.32)	Taylor	NBI	Non-NHS	12371.75	56.4	4704580	0.85	2023-11-16T00:00:00	24	A	6	6	4	N
1902	Detroit	Metro	12464	""	SIXTH ST	JEFFERSON AVE	S OF JEFFERSON AVENUE	5 Highway-pedestrian	1 Highway	1984			1984	7	400	38.7	7	3 Steel	32 Multi Str Comp	0	""	""	3 Latex Concrete/Similar	5 MS 18 (HS 20)	2	6	42.32	-83.05744	2025-08-18T00:00:00	POINT (-83.05744 42.32)	Detroit	NBI	Non-NHS	15480	26	4704804	0.09	2024-12-06T00:00:00	12	P	5	4	4	N
1903	Southfield	Metro	8299	""	CIVIC CENTER DRIVE	ROUGE RIVER	IN SOUTHFIELD	5 Highway-pedestrian	5 Waterway	1983				1	126	81	1	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	6 MS18(HS20)+mod	5		42.48	-83.284424	2025-08-18T00:00:00	POINT (-83.284424 42.48)	Oakland	NBI	Non-NHS	10206	62	684205	0.03	2023-09-21T00:00:00	24	A	7	6	6	N
1904	Wayne County	Metro	12101	""	BASE LINE	CSX RR	NORTHVILLE     E/NOVI RD	5 Highway-pedestrian	2 Railroad	1960			1995	3	180	64	3	4 Steel Continuous	02 Multi Str Non Comp	0	""	""	5 Epoxy Overlay	6 MS18(HS20)+mod	4		42.44	-83.474525	2025-08-18T00:00:00	POINT (-83.474525 42.44)	Taylor	NBI	NHS	11520	52	4412702	0.94	2025-03-31T00:00:00	12	A	3	7	6	N
1905	MDOT	Metro	11179	82023-S11	WARREN AVE	I-94	IN DETROIT	5 Highway-pedestrian	1 Highway	1953	1997		2012	5	294.8	101.8	5	3 Steel	02 Multi Str Non Comp	0	""	""	5 Epoxy Overlay	5 MS 18 (HS 20)	4	6	42.34	-83.11292	2025-08-18T00:00:00	POINT (-83.11292 42.34)	Detroit	NBI	NHS	30010.64	76	1628604	4.24	2025-03-13T00:00:00	24	A	7	6	7	N
1906	Macomb County	Metro	6218	""	26 MILE ROAD	DEER CREEK	2.5MI W OF GRATIOT US-25	1 Highway	5 Waterway	2012				1	50.7	40	1	1 Concrete	19 Culvert	0	""	""	6 Bituminous	B Greater than HL 93	2		42.72	-82.84779	2025-08-18T00:00:00	POINT (-82.84779 42.72)	Macomb	NBI	Non-NHS	2028	40	816702	12.42	2024-06-07T00:00:00	24	A	N	N	N	8
1907	Wayne County	Metro	12056	""	WARREN AVENUE	UPPER ROUGE RIVER	DBN HT/DETROIT E/OUTER DR	5 Highway-pedestrian	5 Waterway	1930	1992	1992		2	108.9	83	2	3 Steel	02 Multi Str Non Comp	0	""	""	3 Latex Concrete/Similar	6 MS18(HS20)+mod	6		42.34	-83.24886	2025-08-18T00:00:00	POINT (-83.24886 42.34)	Taylor	NBI	NHS	9038.7	59.7	1591804	0.68	2024-09-13T00:00:00	24	A	5	5	6	N
1908	Wayne County	Metro	12209	""	JEFFERSON AVENUE	ECORSE RIVER	ECRS&WYDOTTES/SOUTHFIELD	5 Highway-pedestrian	5 Waterway	1931	1994	1994		3	124	75.8	3	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	0 Unknown	5		42.24	-83.148476	2025-08-18T00:00:00	POINT (-83.148476 42.24)	Taylor	NBI	NHS	9399.2	61.4	4302169	14.28	2024-11-12T00:00:00	24	A	7	7	7	N
1909	Macomb County	Metro	6201	""	HARRINGTON ROAD	HARRINGTON DRAIN	JUST WEST OF M-97	5 Highway-pedestrian	5 Waterway	1949	1980		1980	3	108	52.5	3	3 Steel	32 Multi Str Comp	0	""	""	2 Integral Concrete	6 MS18(HS20)+mod	3		42.59	-82.90375	2025-08-18T00:00:00	POINT (-82.90375 42.59)	Macomb	NBI	Non-NHS	5670	39.83	825404	0.52	2025-07-11T00:00:00	24	A	6	7	6	N
1910	MDOT	Metro	6057	50023-S02	M-59 EB	DEQUINDER RD	@ OAKLAND COUNTY LINE	1 Highway	1 Highway	1972	2009		2005	3	159.3	68.6	3	3 Steel	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	2	4	42.63	-83.09149	2025-08-18T00:00:00	POINT (-83.09149 42.63)	Macomb	NBI	NHS	10927.98	65.3	807710	0	2025-05-14T00:00:00	24	A	7	7	7	N
1911	Taylor	Metro	12515	""	CONTINENTAL DRIVE	SEXTON-KILFOIL DRAIN	IN TAYLOR	1 Highway	5 Waterway	1970	2007			1	31.9	36.9	1	5 Prestressed Concrete	05 Box Bm/Gird- Multiple	0	""	""	1 Monolithic Concrete	9 MS22.5(HS25)or greater	2		42.23	-83.29255	2025-08-18T00:00:00	POINT (-83.29255 42.23)	Taylor	NBI	Non-NHS	1177.11	26.9	1658106	0.16	2024-12-03T00:00:00	24	A	7	8	6	N
1912	MDOT	Metro	6104	50061-S35	SB SERVICE RD	RAMPS D&H OFF I-696	CITY OF WARREN	5 Highway-pedestrian	1 Highway	1976		2008		1	187.6	37.9	1	3 Steel	82 Pl Girder Comp	0	""	""	5 Epoxy Overlay	9 MS22.5(HS25)or greater	2	2	42.49	-83.04658	2025-08-18T00:00:00	POINT (-83.04658 42.49)	Macomb	NBI	Non-NHS	7110.04	28.7	1740303	0.06	2025-04-14T00:00:00	24	A	5	7	7	N
1913	Macomb County	Metro	6366	""	28 MILE ROAD	HEALY BROOK DRAIN	0.4 MI W OF ROMEO PLANK	1 Highway	5 Waterway	1972				2	28.9	26.2	2	3 Steel	19 Culvert	0	""	""	N N/A (no deck (NBI))	4 M 18 (H 20)	2		42.75	-82.96773	2025-08-18T00:00:00	POINT (-82.96773 42.75)	Macomb	NBI	Non-NHS	757.18	0	4208920	6.56	2024-08-06T00:00:00	24	A	N	N	N	6
1914	Macomb County	Metro	6372	""	28 MILE ROAD	COON CREEK	300 FT EAST OF NORTH AVE	1 Highway	5 Waterway	1969		2000		1	35.8	32.8	1	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	2		42.75	-82.87688	2025-08-18T00:00:00	POINT (-82.87688 42.75)	Macomb	NBI	Non-NHS	1174.24	29.9	4208920	11.19	2023-07-26T00:00:00	24	A	6	8	7	N
1915	MDOT	Metro	11495	82122-S09	MERRIMAN RD	I-96	IN LIVONIA	5 Highway-pedestrian	1 Highway	1974	2014		2001	2	176.5	78.4	2	3 Steel	02 Multi Str Non Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	5	8	42.38	-83.35333	2025-08-18T00:00:00	POINT (-83.35333 42.38)	Taylor	NBI	NHS	13837.6	64	4700000	11.57	2024-11-12T00:00:00	24	A	7	7	7	N
1916	MDOT	Metro	8032	63173-S02	US-24	I-75 SB	@ US-24	1 Highway	1 Highway	2004				3	184	87.3	3	5 Prestressed Concrete	05 Box Bm/Gird- Multiple	0	""	""	5 Epoxy Overlay	9 MS22.5(HS25)or greater	5	4	42.74	-83.45161	2025-08-18T00:00:00	POINT (-83.45161 42.74)	Oakland	NBI	NHS	16063.2	84	689103	0.34	2024-12-26T00:00:00	24	A	7	7	7	N
1917	Wayne County	Metro	12302	""	STREICHER ROAD	SILVER CREEK	BROWNSTOWN S/HURON RIV DR	1 Highway	5 Waterway	1936				1	23	31.5	1	1 Concrete	01 Slab	0	""	""	1 Monolithic Concrete	2 M 13.5 (H 15)	2		42.06	-83.2305	2025-08-18T00:00:00	POINT (-83.2305 42.06)	Taylor	NBI	Non-NHS	724.5	29.9	1709607	0.26	2024-09-18T00:00:00	12	K	4	4	5	N
1918	St Clair Shores	Metro	12792	""	BEACH STREET	LAKE ST CLAIR CANAL	0.1 MI E OF JEFFERSON	5 Highway-pedestrian	5 Waterway	2006				1	34.7	37.1	1	5 Prestressed Concrete	05 Box Bm/Gird- Multiple	0	""	""	2 Integral Concrete	9 MS22.5(HS25)or greater	2		42.48	-82.88859	2025-08-18T00:00:00	POINT (-82.88859 42.48)	Macomb	NBI	Non-NHS	1287.37	25.6	829903	0.03	2025-03-27T00:00:00	24	A	8	8	8	N
1919	MDOT	Metro	11659	82191-S16-2	I-75 SB	ALLEN RD	S LTS OF SOUTHGATE	1 Highway	1 Highway	1966		1991	1991	4	218.2	54.5	4	4 Steel Continuous	02 Multi Str Non Comp	0	""	""	5 Epoxy Overlay	6 MS18(HS20)+mod	3	4	42.21	-83.229004	2025-08-18T00:00:00	POINT (-83.229004 42.21)	Taylor	NBI	NHS	11891.9	51.5	1595106	10.06	2024-09-27T00:00:00	24	A	5	7	6	N
1920	Pontiac	Metro	8252	""	GILLESPIE AVE	CLINTON RIVER	1/2 MI SW ORCH LK & BL 75	5 Highway-pedestrian	5 Waterway	1936				1	33.8	50.5	1	1 Concrete	07 Frame- Rigid exc Culv	0	""	""	6 Bituminous	6 MS18(HS20)+mod	2		42.63	-83.29764	2025-08-18T00:00:00	POINT (-83.29764 42.63)	Oakland	NBI	Non-NHS	1706.9	36.1	673009	0.36	2024-07-18T00:00:00	18	P	4	4	5	N
1921	MDOT	Metro	8136	63192-S04-6	M-5 S BD CD	12 MILE RD	I-96,I696,M-5 INTRCHG	1 Highway	1 Highway	1993				2	208.8	59.1	2	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	9 MS22.5(HS25)or greater	3	8	42.5	-83.44704	2025-08-18T00:00:00	POINT (-83.44704 42.5)	Oakland	NBI	NHS	12340.08	55.8	4410612	0.62	2025-03-07T00:00:00	24	A	7	6	7	N
1922	MDOT	Metro	11296	82053-S02	US-24 NB	HINES DRIVE	IN DEARBORN HTS	1 Highway	1 Highway	1959	2006			3	136.6	67.3	3	5 Prestressed Concrete	06 Box Bms- Single/Sprd	0	""	""	1 Monolithic Concrete	6 MS18(HS20)+mod	4	2	42.35	-83.27343	2025-08-18T00:00:00	POINT (-83.27343 42.35)	Taylor	NBI	NHS	9193.18	56.4	4700038	17.75	2024-08-27T00:00:00	24	A	7	8	6	N
1923	Wayne County	Metro	11984	""	WILLOW ROAD	HURON RIVER	HURON   S/HURON RIVER DR.	1 Highway	5 Waterway	1922	1993	1997		2	191.9	28.2	2	2 Concrete Continuous	11 Arch- Deck, Filled Sp	0	""	""	N N/A (no deck (NBI))	5 MS 18 (HS 20)	2		42.12	-83.3571	2025-08-18T00:00:00	POINT (-83.3571 42.12)	Taylor	NBI	Non-NHS	5411.58	25.3	1670406	6.96	2025-06-10T00:00:00	24	A	5	5	6	N
1924	Macomb County	Metro	6229	""	32 MILE ROAD	E B COON CREEK	0.6MI EAST OF NORTH AVE	1 Highway	5 Waterway	1976				1	50.9	45.9	1	5 Prestressed Concrete	05 Box Bm/Gird- Multiple	0	""	""	6 Bituminous	9 MS22.5(HS25)or greater	2		42.81	-82.87156	2025-08-18T00:00:00	POINT (-82.87156 42.81)	Macomb	NBI	Non-NHS	2336.31	42.7	815804	11.64	2023-08-09T00:00:00	24	A	6	6	7	N
1925	MDOT	Metro	8118	63191-S04	I-696 W TO I-275 S	M-5	@ I-96/I-696 INTERCHANGE	1 Highway	1 Highway	1971	1998		1998	4	281	52.2	4	3 Steel	02 Multi Str Non Comp	0	""	""	5 Epoxy Overlay	6 MS18(HS20)+mod	3	7	42.48	-83.43206	2025-08-18T00:00:00	POINT (-83.43206 42.48)	Oakland	NBI	NHS	14668.2	49.9	637802	1.07	2024-12-11T00:00:00	24	A	6	5	6	N
1926	MDOT	Metro	11365	82102-S12	M-14 EB	SHELDON ROAD	1.2 MI W OF PLYMOUTH	1 Highway	1 Highway	1976		2006	2006	4	260.3	71.8	4	3 Steel	82 Pl Girder Comp	0	""	""	3 Latex Concrete/Similar	9 MS22.5(HS25)or greater	4	6	42.38	-83.4807	2025-08-18T00:00:00	POINT (-83.4807 42.38)	Taylor	NBI	NHS	18689.54	69	1606205	3.85	2025-07-10T00:00:00	3	A	7	7	7	N
1927	Macomb County	Metro	6310	""	PEARL DRIVE	SECORD LAKE OUTLET	0.1 MI E OF DEQUINDRE RD	1 Highway	5 Waterway	1981				3	25.9	32.8	3	3 Steel	19 Culvert	0	""	""	N N/A (no deck (NBI))	4 M 18 (H 20)	2		42.87	-83.098656	2025-08-18T00:00:00	POINT (-83.098656 42.87)	Macomb	NBI	Non-NHS	849.52	0	4200747	0.32	2023-08-01T00:00:00	24	A	N	N	N	5
1928	Other Local Agencies	Metro	13368	""	NB DINGELL RD	EAST SERVICE RD	0.8 MI S OF I-94	5 Highway-pedestrian	1 Highway	2000				1	85.7	42.7	1	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	9 MS22.5(HS25)or greater	2	2	42.23	-83.34343	2025-08-18T00:00:00	POINT (-83.34343 42.23)	Taylor	NBI	NHS	3659.39	30.8	4711336	2.64	2025-05-27T00:00:00	24	A	6	7	6	N
1929	Oakland County	Metro	13809	""	CRESENT LAKE ROAD	CLINTON RIVER	WATERFORD TWP SEC 15/16	1 Highway	5 Waterway	1992				2	30	27	2	3 Steel	19 Culvert	0	""	""	6 Bituminous	5 MS 18 (HS 20)	2		42.66	-83.386696	2025-08-18T00:00:00	POINT (-83.386696 42.66)	Oakland	NBI	Non-NHS	810	22.5	699308	1.42	2024-07-23T00:00:00	24	A	N	N	N	5
1930	Southfield	Metro	8290	""	NINE MILE RD	RIVER ROUGE	W OF BEECH RD	1 Highway	5 Waterway	1930	2006			1	103	58.5	1	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	9 MS22.5(HS25)or greater	2		42.46	-83.30588	2025-08-18T00:00:00	POINT (-83.30588 42.46)	Oakland	NBI	Non-NHS	6025.5	40	684404	0.59	2023-09-20T00:00:00	24	A	8	8	7	N
1931	MDOT	Metro	11474	82121-B02	M-5 WB	ROUGE RIVER	IN DETROIT	5 Highway-pedestrian	5 Waterway	2003				1	102.2	60.7	1	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	9 MS22.5(HS25)or greater	4		42.42	-83.26782	2025-08-18T00:00:00	POINT (-83.26782 42.42)	Detroit	NBI	NHS	6203.54	52.2	1600605	3.07	2024-11-15T00:00:00	24	A	7	8	8	N
1932	Macomb County	Metro	6303	""	BORDMAN ROAD	N B CLINTON RIVER	2.2 MI EAST OF VAN DYKE	1 Highway	5 Waterway	1964			1964	1	44.9	33.1	1	3 Steel	02 Multi Str Non Comp	0	""	""	1 Monolithic Concrete	4 M 18 (H 20)	2		42.89	-83.00299	2025-08-18T00:00:00	POINT (-83.00299 42.89)	Macomb	NBI	Non-NHS	1486.19	29.5	824308	5.08	2024-07-22T00:00:00	24	P	7	5	7	N
1933	Oakland County	Metro	8172	""	THIRTEEN MILE	ROUGE RIVER	BET TELEGRAPH AND LAHSER	1 Highway	5 Waterway	2013				1	44.3	32	1	1 Concrete	19 Culvert	0	""	""	6 Bituminous	6 MS18(HS20)+mod	2		42.52	-83.279724	2025-08-18T00:00:00	POINT (-83.279724 42.52)	Oakland	NBI	Non-NHS	1417.6	32	607408	9.88	2024-07-23T00:00:00	24	A	N	N	N	8
1934	Auburn Hills	Metro	8217	""	SQUIRREL RD	CLINTON RIVER	BET M59 AND AUBURN	1 Highway	5 Waterway	2001				1	33.8	32.8	1	5 Prestressed Concrete	05 Box Bm/Gird- Multiple	0	""	""	6 Bituminous	4 M 18 (H 20)	2		42.64	-83.22002	2025-08-18T00:00:00	POINT (-83.22002 42.64)	Oakland	NBI	Non-NHS	1108.64	26.9	4414558	0.21	2024-10-16T00:00:00	24	A	8	7	7	N
1935	MDOT	Metro	11357	82102-S04	RIDGE ROAD	M-14	2.0 MI W OF PLYMOUTH	1 Highway	1 Highway	1976			2006	4	347	48.5	4	3 Steel	82 Pl Girder Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	2	4	42.38	-83.52921	2025-08-18T00:00:00	POINT (-83.52921 42.38)	Taylor	NBI	Non-NHS	16829.5	44.5	1595602	5.24	2023-10-09T00:00:00	24	A	6	7	7	N
1936	MDOT	Metro	13316	82194-S33	WB -96 RMP FRM TP	NB I-75	AMBASSADOR GATEWAY	1 Highway	1 Highway	2007			2007	3	503.5	31.5	3	4 Steel Continuous	82 Pl Girder Comp	0	""	""	2 Integral Concrete	9 MS22.5(HS25)or greater	1		42.32	-83.082184	2025-08-18T00:00:00	POINT (-83.082184 42.32)	Detroit	NBI	NHS	15860.25	28	4718921	0.01	2024-06-27T00:00:00	24	A	8	8	7	N
1937	Wayne County	Metro	12112	""	CANTON CENTER ROAD	FELLOWS CREEK	CANTON             N/FORD	5 Highway-pedestrian	5 Waterway	2001		2001		1	26	72	1	1 Concrete	19 Culvert	0	""	""	N N/A (no deck (NBI))	9 MS22.5(HS25)or greater	6		42.32	-83.48792	2025-08-18T00:00:00	POINT (-83.48792 42.32)	Taylor	NBI	NHS	1872	61.4	4706530	3.48	2025-05-30T00:00:00	24	A	N	N	N	8
1938	MDOT	Metro	11350	82102-B01	M-14	ROUGE RIVER	0.3 MI WEST OF PLYMOUTH	1 Highway	5 Waterway	1976		2006	2006	1	117.5	132.6	1	3 Steel	82 Pl Girder Comp	0	""	""	3 Latex Concrete/Similar	9 MS22.5(HS25)or greater	6		42.39	-83.46674	2025-08-18T00:00:00	POINT (-83.46674 42.39)	Taylor	NBI	NHS	15580.5	117	1606205	4.76	2023-10-11T00:00:00	24	A	6	7	6	N
1939	MDOT	Metro	11947	82292-S05	I-275 SB	MICHIGAN AVE(US-12)	3/4 MI W OF W OF LI WAYNE	1 Highway	1 Highway	1974			1992	2	269	63.7	2	3 Steel	02 Multi Str Non Comp	0	""	""	5 Epoxy Overlay	9 MS22.5(HS25)or greater	3	8	42.28	-83.44175	2025-08-18T00:00:00	POINT (-83.44175 42.28)	Taylor	NBI	NHS	17135.3	60	1607610	14.35	2024-10-17T00:00:00	20	A	7	7	7	N
1940	Oakland County	Metro	8166	""	10 MILE ROAD	CLAIRE DRAIN	WEST OF NORTHWESTERN	5 Highway-pedestrian	5 Waterway	1982				2	40	64	2	1 Concrete	19 Culvert	0	""	""	6 Bituminous	6 MS18(HS20)+mod	5		42.47	-83.247925	2025-08-18T00:00:00	POINT (-83.247925 42.47)	Oakland	NBI	Non-NHS	2560	64	633409	6.48	2024-07-30T00:00:00	24	A	N	N	N	7
1941	MDOT	Metro	11584	82123-S36	W GD BLVD & TIREMA	I-96	IN DETROIT	5 Highway-pedestrian	1 Highway	1972	2005	2005	1992	2	165.7	53.1	2	3 Steel	82 Pl Girder Comp	0	""	""	5 Epoxy Overlay	5 MS 18 (HS 20)	3	8	42.36	-83.110794	2025-08-18T00:00:00	POINT (-83.110794 42.36)	Detroit	NBI	Non-NHS	8798.67	40.7	1577307	1.02	2023-09-05T00:00:00	24	A	7	7	6	N
1942	MDOT	Metro	13851	82191-S27-1	I-75 NB	GODDARD ROAD	IN ALLEN PARK	1 Highway	1 Highway	2018				2	221	63.3	2	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	0 None	B Greater than HL 93	3	4	42.23	-83.21218	2025-08-18T00:00:00	POINT (-83.21218 42.23)	Taylor	NBI	NHS	13989.3	60	1592010	1.97	2023-11-16T00:00:00	24	A	8	8	7	N
1943	MDOT	Metro	7930	63102-S14	U-TURN E.OF GRNFLD	I-696	IN ROYAL OAK TOWNSHIP	5 Highway-pedestrian	1 Highway	1987				2	155.5	34.7	2	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	2	8	42.48	-83.20059	2025-08-18T00:00:00	POINT (-83.20059 42.48)	Oakland	NBI	Non-NHS	5395.85	30.5	4412694	0	2024-07-09T00:00:00	24	A	7	6	7	N
1944	MDOT	Metro	11766	82195-S08	I-75 E-N RAMP	M-10	IN DETROIT	1 Highway	1 Highway	1970	2017		2017	5	331.3	31.1	5	4 Steel Continuous	82 Pl Girder Comp	0	""	""	1 Monolithic Concrete	6 MS18(HS20)+mod	1	9	42.33	-83.063065	2025-08-18T00:00:00	POINT (-83.063065 42.33)	Detroit	NBI	NHS	10303.43	28	1585006	0.08	2024-05-28T00:00:00	24	A	8	7	6	N
1945	MDOT	Metro	8066	63174-S08-1	I-75 NB	LIVERNOIS RD	IN TROY	1 Highway	1 Highway	2019				1	128.5	73.8	1	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	B Greater than HL 93	4	4	42.56	-83.147514	2025-08-18T00:00:00	POINT (-83.147514 42.56)	Oakland	NBI	NHS	9483.3	70.4	647308	9.53	2023-12-12T00:00:00	24	A	9	9	9	N
1946	MDOT	Metro	7996	63172-R01-1	I-75 NB	GTW RR	5.7 MI NW OF M-59	1 Highway	2 Railroad	1962		1981		3	144	62.2	3	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	5 Epoxy Overlay	6 MS18(HS20)+mod	3		42.7	-83.286896	2025-08-18T00:00:00	POINT (-83.286896 42.7)	Oakland	NBI	NHS	8956.8	58	647308	24.31	2025-03-28T00:00:00	24	A	7	7	7	N
1947	Ortonville	Metro	8249	""	SOUTH STREET	KEARSLEY CREEK	IN ORTONVILLE	5 Highway-pedestrian	5 Waterway	2004		2022		1	52	38.2	1	7 Timber	72 Multi Str Timb Deck	0	""	""	6 Bituminous	5 MS 18 (HS 20)	2		42.85	-83.44689	2025-08-18T00:00:00	POINT (-83.44689 42.85)	Oakland	NBI	Non-NHS	1986.4	30	654506	0.3	2023-09-01T00:00:00	24	A	8	8	8	N
1948	MDOT	Metro	11335	82081-S03	GREENFIELD RD	M-153	IN DEARBORN	1 Highway	1 Highway	1961	2006		2006	2	111.2	153.4	2	3 Steel	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	6 MS18(HS20)+mod	9	6	42.33	-83.19546	2025-08-18T00:00:00	POINT (-83.19546 42.33)	Taylor	NBI	NHS	17058.08	131.3	1651002	4.31	2024-12-30T00:00:00	24	A	7	7	8	N
1949	MDOT	Metro	12712	82073-S01	M-85 (FORT ST)	PLEASANT ST	FORT ST	5 Highway-pedestrian	1 Highway	2010				1	62.5	106	1	5 Prestressed Concrete	02 Multi Str Non Comp	0	""	""	1 Monolithic Concrete	B Greater than HL 93	6	2	42.28	-83.14919	2025-08-18T00:00:00	POINT (-83.14919 42.28)	Detroit	NBI	NHS	6625	80	4700047	0.41	2024-05-15T00:00:00	24	A	7	8	7	N
1950	MDOT	Metro	8037	63173-S07	GRANGE HALL RD	I-75	3.3 MI SE OF GENESEE COL	1 Highway	1 Highway	1961		2004	2004	4	237	36.5	4	3 Steel	32 Multi Str Comp	0	""	""	5 Epoxy Overlay	6 MS18(HS20)+mod	2	8	42.82	-83.569565	2025-08-18T00:00:00	POINT (-83.569565 42.82)	Oakland	NBI	Non-NHS	8650.5	33.25	649504	6.25	2024-12-12T00:00:00	24	A	6	5	7	N
1951	Wayne County	Metro	12288	""	KINLOCH STREET	UPPER ROUGE RIVER	REDFORD        S/SIX MILE	1 Highway	5 Waterway	1934				1	31.8	41	1	1 Concrete	04 Tee Beam	0	""	""	6 Bituminous	6 MS18(HS20)+mod	2		42.41	-83.30171	2025-08-18T00:00:00	POINT (-83.30171 42.41)	Taylor	NBI	Non-NHS	1303.8	30.2	1641501	1.22	2025-06-05T00:00:00	12	A	5	4	5	N
1952	MDOT	Metro	11278	82052-B02-2	US-24 SB	SEXTON KILFOIL DRAIN	IN TAYLOR	5 Highway-pedestrian	5 Waterway	1964	2001		2001	1	35	54.8	1	3 Steel	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	5 MS 18 (HS 20)	3		42.23	-83.26941	2025-08-18T00:00:00	POINT (-83.26941 42.23)	Taylor	NBI	NHS	1918	47.6	1576806	2.66	2024-08-08T00:00:00	24	A	6	7	6	N
1953	Oakland County	Metro	8144	""	SASHABAW RD	CLINTON RIVER	BET WALTON AND PELTON RDS	1 Highway	5 Waterway	1928				1	33.8	43.6	1	1 Concrete	04 Tee Beam	0	""	""	6 Bituminous	6 MS18(HS20)+mod	2		42.71	-83.37556	2025-08-18T00:00:00	POINT (-83.37556 42.71)	Oakland	NBI	Non-NHS	1473.68	40	6200147	1.93	2025-03-25T00:00:00	12	P	3	3	4	N
1954	Macomb County	Metro	6350	""	24 MILE ROAD	MIDDLE BR CLINTON RIVER	0.3 MI E OF ROMEO PLANK	1 Highway	5 Waterway	1972				1	64	33.8	1	5 Prestressed Concrete	05 Box Bm/Gird- Multiple	0	""	""	6 Bituminous	5 MS 18 (HS 20)	2		42.69	-82.947334	2025-08-18T00:00:00	POINT (-82.947334 42.69)	Macomb	NBI	Non-NHS	2163.2	29.9	815510	7.48	2024-05-01T00:00:00	24	A	5	5	7	N
1955	Macomb County	Metro	13571	""	PARTRIDGE CRK BLVD	GLOEDE DRAIN	0.2 MI S OF M-59	5 Highway-pedestrian	5 Waterway	2005				3	78	62	3	7 Timber	01 Slab	0	""	""	6 Bituminous	5 MS 18 (HS 20)	4		42.62	-82.95042	2025-08-18T00:00:00	POINT (-82.95042 42.62)	Macomb	NBI	Non-NHS	4836	54.1	4210656	0.25	2024-07-31T00:00:00	24	A	6	8	8	N
1956	Other Local Agencies	Metro	14721	""	RENAISSANCE DR W	RING ROAD	S OF JEFFERSPN AVE	5 Highway-pedestrian	0 Other	1977	2004	2020		36	785.3	66.8	36	2 Concrete Continuous	03 Gir-Flr Bm Non Comp	0	""	""	5 Epoxy Overlay	5 MS 18 (HS 20)	4				2025-08-18T00:00:00	""	Detroit	NBI	Non-NHS	52458.04	16.2	1805409	0	2024-07-18T00:00:00	24	A	5	5	5	N
1957	MDOT	Metro	8122	63191-S07	I-96 WB	M-5	@ I-96/I-696 INTERCHANGE	1 Highway	1 Highway	1971			2006	4	261.9	44.4	4	3 Steel	02 Multi Str Non Comp	0	""	""	5 Epoxy Overlay	6 MS18(HS20)+mod	2	6	42.48	-83.42813	2025-08-18T00:00:00	POINT (-83.42813 42.48)	Oakland	NBI	NHS	11628.36	40.5	639107	1.33	2024-12-11T00:00:00	24	A	6	6	6	N
1958	Wayne County	Metro	12048	""	CHERRY HILL ROAD	FELLOWS CREEK	CANTON            W/I-275	1 Highway	5 Waterway	1975				3	133.9	48.2	3	3 Steel	32 Multi Str Comp	0	0 Other	00 Other	1 Monolithic Concrete	6 MS18(HS20)+mod	2		42.31	-83.44387	2025-08-18T00:00:00	POINT (-83.44387 42.31)	Taylor	NBI	Non-NHS	6453.98	44.3	1607409	5.19	2025-05-12T00:00:00	12	P	6	6	8	N
1959	MDOT	Metro	13207	50011-S12	M-53 SB	VAN DYKE RD & M-53 RMP	0.3 MI N OF 18 MILE RD	1 Highway	1 Highway	2004				2	181.9	53.3	2	5 Prestressed Concrete	32 Multi Str Comp	0	""	""	1 Monolithic Concrete	9 MS22.5(HS25)or greater	2		42.6	-83.02931	2025-08-18T00:00:00	POINT (-83.02931 42.6)	Macomb	NBI	NHS	9695.27	50	813706	3.61	2023-11-28T00:00:00	24	A	8	8	7	N
1960	Westland	Metro	12525	""	JOHN HIX RD	TONQUISH CREEK	IN WESTLAND	1 Highway	5 Waterway	2008				1	42	40	1	1 Concrete	19 Culvert	0	""	""	N N/A (no deck (NBI))	5 MS 18 (HS 20)	2		42.3	-83.42274	2025-08-18T00:00:00	POINT (-83.42274 42.3)	Taylor	NBI	Non-NHS	1680	40	4705360	1.66	2025-04-14T00:00:00	24	A	N	N	N	7
1961	MDOT	Metro	11640	82191-R02-1	I-75 NB	GTW RR	IN TAYLOR	1 Highway	2 Railroad	1965	2006	2006	1965	3	213.3	54.5	3	3 Steel	32 Multi Str Comp	0	""	""	5 Epoxy Overlay	6 MS18(HS20)+mod	3		42.2	-83.23364	2025-08-18T00:00:00	POINT (-83.23364 42.2)	Taylor	NBI	NHS	11624.85	51.5	1592010	9.66	2025-07-10T00:00:00	24	A	5	6	7	N
