﻿_id	OBJECTID	JOBNET_ID	PHASE_TYPE_CD	PHASE_TYPE_ABBRV	PHASE_SCHD_OBLG_DATE	PHASE_SCHD_ENDT	PHASE_ANTCP_CNST_DATE	STIP_STAT_DESC	FIVE_YEAR_RPT_IND	FIVE_YR_SHORT_DESC	FIVE_YR_LONG_DESC	JOB_TYPE_CD	SHORT_DESC	MJR_RTE_NAME	PR_RTE_NAME	RPT_LOC_DESC	RPT_WK_DESC	MPO_DESC	CNTY_DESC	TSC_DESC	TMPL_ID	PHASE_BDGT_AMT	SCHD_LET_DATE	ACTL_LET_DATE	WK_TYPE_DESC	WK_SUB_CAT_DESC	WK_CAT_DESC	PR_BEG_MP	PR_END_MP	PR_NUM	PR_MAJ_IND	ENV_JUS_DESC	FSCL_YR	ANTCP_CNST_YRS	GIS_TYPE_CD	GIS_ASSET_ID	STAT_CD	CRET_UID	CRET_TMSP	UPDT_UID	UPDT_TMSP	Shape__Length
1	12	210813	68	CON	2024-10-11T00:00:00	2026-12-30T00:00:00	2025-01-13T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	M-43	M-43	from 10th Street to Drake Road 	Widening for turn lanes, intersection and interchange ramp improvements	Kalamazoo Area Transportation Study [KATS]	Kalamazoo	Kalamazoo TSC	264	9163673	2024-12-06T00:00:00	""	Additional Lane(s) less than 0.5 mile long	Minor Widening	Road	12.093	12.372	3390106	N	""	2025	2025,2026	3	""	""	""	""	""	""	449.007800909703
2	13	210813	68	CON	2024-10-11T00:00:00	2026-12-30T00:00:00	2025-01-13T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	M-43	M-43	from 10th Street to Drake Road 	Widening for turn lanes, intersection and interchange ramp improvements	Kalamazoo Area Transportation Study [KATS]	Kalamazoo	Kalamazoo TSC	264	9163673	2024-12-06T00:00:00	""	Additional Lane(s) less than 0.5 mile long	Minor Widening	Road	0.157	0.34	22306	N	Not an EJ Priority Area	2025	2025,2026	3	003E	""	""	""	""	""	294.510367732055
3	14	210813	68	CON	2024-10-11T00:00:00	2026-12-30T00:00:00	2025-01-13T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	M-43	M-43	from 10th Street to Drake Road 	Widening for turn lanes, intersection and interchange ramp improvements	Kalamazoo Area Transportation Study [KATS]	Kalamazoo	Kalamazoo TSC	264	9163673	2024-12-06T00:00:00	""	Additional Lane(s) less than 0.5 mile long	Minor Widening	Road	0	0.32	22308	N	Priority (POC & Poverty),Priority (Poverty)	2025	2025,2026	3	003A	""	""	""	""	""	514.591467696925
4	15	210813	68	CON	2024-10-11T00:00:00	2026-12-30T00:00:00	2025-01-13T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	M-43	M-43	from 10th Street to Drake Road 	Widening for turn lanes, intersection and interchange ramp improvements	Kalamazoo Area Transportation Study [KATS]	Kalamazoo	Kalamazoo TSC	264	9163673	2024-12-06T00:00:00	""	Additional Lane(s) less than 0.5 mile long	Minor Widening	Road	0	0.192	22401	N	Priority (Poverty)	2025	2025,2026	3	003F	""	""	""	""	""	308.994624882006
5	16	210875	68	CON	2025-10-10T00:00:00	2027-06-25T00:00:00	2026-03-02T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	M-139	M-139	from 0.44 miles south of I-94 to I-94 BL	Reconstruction	Twin Cities Area Transportation Study [TwinCATS]	Berrien	Kalamazoo TSC	7	20803981	2025-12-05T00:00:00	""	Reconstruction	Reconstruction	Road	2.527	2.539	1363303	N	Priority (POC & Poverty),Priority (POC)	2026	2026,2027	3	""	""	""	""	""	""	19.3121369992047
6	17	210875	68	CON	2025-10-10T00:00:00	2027-06-25T00:00:00	2026-03-02T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	M-139	M-139	from 0.44 miles south of I-94 to I-94 BL	Reconstruction	Twin Cities Area Transportation Study [TwinCATS]	Berrien	Kalamazoo TSC	7	20803981	2025-12-05T00:00:00	""	Reconstruction	Reconstruction	Road	1.34	3.018	1366708	N	Priority (POC & Poverty),Not an EJ Priority Area	2026	2026,2027	3	""	""	""	""	""	""	2700.48423879988
7	18	210875	68	CON	2025-10-10T00:00:00	2027-06-25T00:00:00	2026-03-02T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	M-139	M-139	from 0.44 miles south of I-94 to I-94 BL	Reconstruction	Twin Cities Area Transportation Study [TwinCATS]	Berrien	Kalamazoo TSC	7	20803981	2025-12-05T00:00:00	""	Reconstruction	Reconstruction	Road	1.541	1.676	1376405	N	Priority (POC & Poverty)	2026	2026,2027	4	""	""	""	""	""	""	217.262026385265
8	19	210875	68	CON	2025-10-10T00:00:00	2027-06-25T00:00:00	2026-03-02T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	M-139	M-139	from 0.44 miles south of I-94 to I-94 BL	Reconstruction	Twin Cities Area Transportation Study [TwinCATS]	Berrien	Kalamazoo TSC	7	20803981	2025-12-05T00:00:00	""	Reconstruction	Reconstruction	Road	0	1.006	1364005	N	Priority (POC & Poverty),Priority (POC)	2026	2026,2027	3	""	""	""	""	""	""	1619.00302874516
9	20	210875	68	CON	2025-10-10T00:00:00	2027-06-25T00:00:00	2026-03-02T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	M-139	M-139	from 0.44 miles south of I-94 to I-94 BL	Reconstruction	Twin Cities Area Transportation Study [TwinCATS]	Berrien	Kalamazoo TSC	7	20803981	2025-12-05T00:00:00	""	Reconstruction	Reconstruction	Road	0.011	0.267	1394309	N	Priority (POC & Poverty),Priority (POC)	2026	2026,2027	4	""	""	""	""	""	""	411.805311517587
10	21	210875	68	CON	2025-10-10T00:00:00	2027-06-25T00:00:00	2026-03-02T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	M-139	M-139	from 0.44 miles south of I-94 to I-94 BL	Reconstruction	Twin Cities Area Transportation Study [TwinCATS]	Berrien	Kalamazoo TSC	7	20803981	2025-12-05T00:00:00	""	Reconstruction	Reconstruction	Road	1.531	1.786	3111249	N	Priority (POC & Poverty)	2026	2026,2027	4	""	""	""	""	""	""	410.383535958251
11	22	208435	68	CON	2024-10-25T00:00:00	2025-12-19T00:00:00	2025-03-03T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-194	I-194 N	under M-96 (Columbia Avenue)	Full Depth Deck Patching, Concrete Deep Overlay, zone Paint, Beam Repairs	Battle Creek Area Transportation Study [BCATS]	Calhoun	Marshall TSC	286	3564700	2024-12-06T00:00:00	""	Overlay - Deep	Bridge Rehabilitation	Bridge	0	0.035	1297202	N	Not an EJ Priority Area	2025	2025	3	002B	""	""	""	""	""	56.3272259666279
12	23	208435	68	CON	2024-10-25T00:00:00	2025-12-19T00:00:00	2025-03-03T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-194	I-194 N	under M-96 (Columbia Avenue)	Full Depth Deck Patching, Concrete Deep Overlay, zone Paint, Beam Repairs	Battle Creek Area Transportation Study [BCATS]	Calhoun	Marshall TSC	286	3564700	2024-12-06T00:00:00	""	Overlay - Deep	Bridge Rehabilitation	Bridge	0	0.035	1297210	N	Not an EJ Priority Area,Priority (POC & Poverty)	2025	2025	3	002D	""	""	""	""	""	56.32718389228
13	24	214141	68	CON	2025-10-10T00:00:00	2026-07-31T00:00:00	2026-03-02T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	US-12	US-12	at Beebe Road and Adamsville Road intersection in Cass County	Addition of Left turn lane and Passing Flare	Niles-Buchanan-Cass Area Transportation Study [NATS]	Cass	Kalamazoo TSC	29	1370380	2025-12-05T00:00:00	""	Passing Relief Lane(s)	Minor Widening	Road	5.009	5.19	594006	N	Not an EJ Priority Area	2026	2026	3	""	""	""	""	""	""	291.291872714253
14	25	213488	68	CON	2025-10-10T00:00:00	2028-07-31T00:00:00	2026-02-02T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	US-23	US-23 N	School Road to Ida Center Road	Road Reconstruction	Southeast Michigan Council of Governments [SEMCOG]	Monroe	Brighton TSC	9	69841408	2025-12-05T00:00:00	""	Concrete Reconstruction	Reconstruction	Road	0.177	0.342	1224011	N	Priority (Poverty)	2026	2026,2027,2028	3	RA2B	""	""	""	""	""	265.412572098516
15	26	213488	68	CON	2025-10-10T00:00:00	2028-07-31T00:00:00	2026-02-02T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	US-23	US-23 N	School Road to Ida Center Road	Road Reconstruction	Southeast Michigan Council of Governments [SEMCOG]	Monroe	Brighton TSC	9	69841408	2025-12-05T00:00:00	""	Concrete Reconstruction	Reconstruction	Road	0	0.188	1224002	N	Priority (Poverty)	2026	2026,2027,2028	3	008A	""	""	""	""	""	301.79435799934
16	27	210813	68	CON	2024-10-11T00:00:00	2026-12-30T00:00:00	2025-01-13T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	M-43	M-43	from 10th Street to Drake Road 	Widening for turn lanes, intersection and interchange ramp improvements	Kalamazoo Area Transportation Study [KATS]	Kalamazoo	Kalamazoo TSC	264	9163673	2024-12-06T00:00:00	""	Additional Lane(s) less than 0.5 mile long	Minor Widening	Road	5.036	6.032	21502	Y	Not an EJ Priority Area,Priority (POC & Poverty),Priority (Poverty)	2025	2025,2026	3	""	""	""	""	""	""	1602.90957872524
17	28	213488	68	CON	2025-10-10T00:00:00	2028-07-31T00:00:00	2026-02-02T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	US-23	US-23 N	School Road to Ida Center Road	Road Reconstruction	Southeast Michigan Council of Governments [SEMCOG]	Monroe	Brighton TSC	9	69841408	2025-12-05T00:00:00	""	Concrete Reconstruction	Reconstruction	Road	0.207	0.406	1223910	N	Priority (Poverty)	2026	2026,2027,2028	3	""	""	""	""	""	""	320.260073420878
18	29	213488	68	CON	2025-10-10T00:00:00	2028-07-31T00:00:00	2026-02-02T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	US-23	US-23 N	School Road to Ida Center Road	Road Reconstruction	Southeast Michigan Council of Governments [SEMCOG]	Monroe	Brighton TSC	9	69841408	2025-12-05T00:00:00	""	Concrete Reconstruction	Reconstruction	Road	0	0.162	1223701	N	Priority (Poverty)	2026	2026,2027,2028	3	008D	""	""	""	""	""	260.624067732272
19	30	213488	68	CON	2025-10-10T00:00:00	2028-07-31T00:00:00	2026-02-02T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	US-23	US-23 N	School Road to Ida Center Road	Road Reconstruction	Southeast Michigan Council of Governments [SEMCOG]	Monroe	Brighton TSC	9	69841408	2025-12-05T00:00:00	""	Concrete Reconstruction	Reconstruction	Road	6.035	10.055	1223504	N	Priority (Poverty),Not an EJ Priority Area	2026	2026,2027,2028	3	""	""	""	""	""	""	6469.57473166261
20	31	213488	68	CON	2025-10-10T00:00:00	2028-07-31T00:00:00	2026-02-02T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	US-23	US-23 N	School Road to Ida Center Road	Road Reconstruction	Southeast Michigan Council of Governments [SEMCOG]	Monroe	Brighton TSC	9	69841408	2025-12-05T00:00:00	""	Concrete Reconstruction	Reconstruction	Road	5.99	10.01	1223505	Y	Priority (Poverty),Not an EJ Priority Area	2026	2026,2027,2028	3	""	""	""	""	""	""	6469.57463175811
21	32	214943	68	CON	2026-06-12T00:00:00	2027-12-17T00:00:00	2027-01-11T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	M-21	M-21	Swartz Creek to I-475	Reconstruction	Genesee County Metropolitan Planning Commission [GCMPC]	Genesee	Davison TSC	3	18720000	2026-08-07T00:00:00	""	Reconstruction	Reconstruction	Road	0	0.203	1525102	N	Priority (POC & Poverty)	2026	2027	3	""	""	""	""	""	""	326.397077860009
22	33	214943	68	CON	2026-06-12T00:00:00	2027-12-17T00:00:00	2027-01-11T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	M-21	M-21	Swartz Creek to I-475	Reconstruction	Genesee County Metropolitan Planning Commission [GCMPC]	Genesee	Davison TSC	3	18720000	2026-08-07T00:00:00	""	Reconstruction	Reconstruction	Road	0	0.306	1499403	N	Priority (POC & Poverty)	2026	2027	3	""	""	""	""	""	""	492.460251901267
23	34	214943	68	CON	2026-06-12T00:00:00	2027-12-17T00:00:00	2027-01-11T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	M-21	M-21	Swartz Creek to I-475	Reconstruction	Genesee County Metropolitan Planning Commission [GCMPC]	Genesee	Davison TSC	3	18720000	2026-08-07T00:00:00	""	Reconstruction	Reconstruction	Road	5.825	6.415	1498006	Y	Priority (POC & Poverty)	2026	2027	3	""	""	""	""	""	""	949.514764923575
24	35	214943	68	CON	2026-06-12T00:00:00	2027-12-17T00:00:00	2027-01-11T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	M-21	M-21	Swartz Creek to I-475	Reconstruction	Genesee County Metropolitan Planning Commission [GCMPC]	Genesee	Davison TSC	3	18720000	2026-08-07T00:00:00	""	Reconstruction	Reconstruction	Road	0.306	0.589	1499403	N	Priority (POC & Poverty)	2026	2027	3	""	""	""	""	""	""	455.445119665618
25	36	219198	68	CON	2029-08-10T00:00:00	2031-06-06T00:00:00	2030-05-13T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	US-2 E	US-2 E	at M-35 in the city of Gladstone.	Construct roundabout.	Rural	Delta	Crystal Falls TSC	264	1450000	2029-10-05T00:00:00	""	Intersection Improvements	Traffic Safety	Traffic Safety	26.075	26.533	1349006	Y	Priority (Poverty)	2029	2030	3	""	""	""	""	""	""	737.080808715862
26	37	219198	68	CON	2029-08-10T00:00:00	2031-06-06T00:00:00	2030-05-13T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	US-2 E	US-2 E	at M-35 in the city of Gladstone.	Construct roundabout.	Rural	Delta	Crystal Falls TSC	264	1450000	2029-10-05T00:00:00	""	Intersection Improvements	Traffic Safety	Traffic Safety	2.364	2.725	3210001	N	Priority (Poverty)	2029	2030	3	""	""	""	""	""	""	580.974303154104
27	38	219198	68	CON	2029-08-10T00:00:00	2031-06-06T00:00:00	2030-05-13T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	US-2 E	US-2 E	at M-35 in the city of Gladstone.	Construct roundabout.	Rural	Delta	Crystal Falls TSC	264	1450000	2029-10-05T00:00:00	""	Intersection Improvements	Traffic Safety	Traffic Safety	2.725	3.178	3210001	N	Priority (Poverty)	2029	2030	3	""	""	""	""	""	""	729.034100231572
28	39	210599	68	CON	2024-12-13T00:00:00	2028-12-01T00:00:00	2025-04-07T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-75BL (Woodward Ave Loop)	I-75BL S	I-75 BL (Woodward Ave Loop), M-59, and US-24 BR (N Cass Ave)	Reconstruction	Southeast Michigan Council of Governments [SEMCOG]	Oakland	Oakland TSC	5	41300000	2025-02-07T00:00:00	""	Concrete Reconstruction	Reconstruction	Road	0	1.068	672705	N	Priority (POC & Poverty)	2025	2025,2026	3	""	""	""	""	""	""	1718.78240626177
29	40	210599	68	CON	2024-12-13T00:00:00	2028-12-01T00:00:00	2025-04-07T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-75BL (Woodward Ave Loop)	I-75BL S	I-75 BL (Woodward Ave Loop), M-59, and US-24 BR (N Cass Ave)	Reconstruction	Southeast Michigan Council of Governments [SEMCOG]	Oakland	Oakland TSC	5	41300000	2025-02-07T00:00:00	""	Concrete Reconstruction	Reconstruction	Road	0	1.183	674803	N	Priority (POC & Poverty)	2025	2025,2026	3	""	""	""	""	""	""	1903.85728950389
30	41	210813	68	CON	2024-10-11T00:00:00	2026-12-30T00:00:00	2025-01-13T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	M-43	M-43	from 10th Street to Drake Road 	Widening for turn lanes, intersection and interchange ramp improvements	Kalamazoo Area Transportation Study [KATS]	Kalamazoo	Kalamazoo TSC	264	9163673	2024-12-06T00:00:00	""	Additional Lane(s) less than 0.5 mile long	Minor Widening	Road	0	0.11	3391831	N	Not an EJ Priority Area,Priority (POC & Poverty)	2025	2025,2026	4	""	""	""	""	""	""	177.027892075208
31	42	210599	68	CON	2024-12-13T00:00:00	2028-12-01T00:00:00	2025-04-07T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-75BL (Woodward Ave Loop)	I-75BL S	I-75 BL (Woodward Ave Loop), M-59, and US-24 BR (N Cass Ave)	Reconstruction	Southeast Michigan Council of Governments [SEMCOG]	Oakland	Oakland TSC	5	41300000	2025-02-07T00:00:00	""	Concrete Reconstruction	Reconstruction	Road	20.796	21.175	648906	N	Priority (POC & Poverty)	2025	2025,2026	3	""	""	""	""	""	""	609.942429873999
32	43	210599	68	CON	2024-12-13T00:00:00	2028-12-01T00:00:00	2025-04-07T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-75BL (Woodward Ave Loop)	I-75BL S	I-75 BL (Woodward Ave Loop), M-59, and US-24 BR (N Cass Ave)	Reconstruction	Southeast Michigan Council of Governments [SEMCOG]	Oakland	Oakland TSC	5	41300000	2025-02-07T00:00:00	""	Concrete Reconstruction	Reconstruction	Road	0	0.022	4407547	N	Priority (POC & Poverty)	2025	2025,2026	3	""	""	""	""	""	""	35.4055495758461
33	44	214089	68	CON	2026-10-09T00:00:00	2028-04-07T00:00:00	2027-05-17T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-94BL E	I-94BL E	at Ravenswood Road	Installation of left turn lanes	Southeast Michigan Council of Governments [SEMCOG]	St. Clair	Huron TSC	25	363000	2026-12-04T00:00:00	""	Intersection Improvements	Traffic Safety	Traffic Safety	17.334	17.442	963509	Y	Not an EJ Priority Area,Priority (POC & Poverty)	2027	2027	3	""	""	""	""	""	""	173.809592422837
34	45	204053	68	CON	2024-10-11T00:00:00	2026-12-30T00:00:00	2025-05-05T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	US-31	US-31	from Reynolds Road to Sullivan Road.	Reconstruct and add center-left turn lane	Rural	Benzie	Traverse City TSC	6	32101300	2024-12-06T00:00:00	""	Asphalt Reconstruction	Reconstruction	Road	0	5.65	992204	N	Not an EJ Priority Area,Priority (Poverty)	2025	2025,2026	3	""	""	""	""	""	""	9092.81031484286
35	46	204053	68	CON	2024-10-11T00:00:00	2026-12-30T00:00:00	2025-05-05T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	US-31	US-31	from Reynolds Road to Sullivan Road.	Reconstruct and add center-left turn lane	Rural	Benzie	Traverse City TSC	6	32101300	2024-12-06T00:00:00	""	Asphalt Reconstruction	Reconstruction	Road	21.421	23.589	1074106	Y	Not an EJ Priority Area	2025	2025,2026	3	""	""	""	""	""	""	3489.06425641101
36	47	214087	68	CON	2025-02-07T00:00:00	2026-11-06T00:00:00	2025-05-05T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	M-21	M-21	from Gould Street to State Road in Owosso	Installation of a 5' wide sidewalk	Rural	Shiawassee	Davison TSC	25	1535554	2025-04-04T00:00:00	""	Pedestrian/Bike Safety Improvements	Traffic Safety	Traffic Safety	10.607	12.578	551310	Y	Not an EJ Priority Area	2025	2025,2026	3	""	""	""	""	""	""	3172.02285318481
37	48	217675	68	CON	2025-06-06T00:00:00	2026-11-13T00:00:00	2026-03-09T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	M-25	M-25	from Sanilac/Huron County Line to Helena Road	Milling and One Course HMA Overlay	Rural	Huron	Huron TSC	76	3408182	2025-08-01T00:00:00	""	Milling & One Course Asphalt Overlay	Road Capital Preventive Maintenance	Road	0	0.069	6701056	N	Not an EJ Priority Area	2025	2026	3	""	""	""	""	""	""	110.470360729533
38	49	211164	68	CON	2028-10-06T00:00:00	2029-12-28T00:00:00	2029-03-26T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	M-21	M-21	Morton Street to Scott Road	Reconstruction	Tri-County Regional Planning Commission [TCRPC]	Clinton	Lansing TSC	9	15576600	2028-12-01T00:00:00	""	Asphalt Reconstruction	Reconstruction	Road	13.609	14.505	208909	Y	Not an EJ Priority Area,Priority (Poverty)	2029	2029	3	""	""	""	""	""	""	1441.97485030038
39	50	213488	68	CON	2025-10-10T00:00:00	2028-07-31T00:00:00	2026-02-02T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	US-23	US-23 N	School Road to Ida Center Road	Road Reconstruction	Southeast Michigan Council of Governments [SEMCOG]	Monroe	Brighton TSC	9	69841408	2025-12-05T00:00:00	""	Concrete Reconstruction	Reconstruction	Road	0	0.168	1223703	N	Priority (Poverty)	2026	2026,2027,2028	3	008C	""	""	""	""	""	269.998119169851
40	51	215469	68	CON	2028-06-23T00:00:00	2030-04-12T00:00:00	2029-05-07T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	M-35	M-35	from Marshall Drive to Smith Street	Crush and Shape HMA surface with two course HMA resurfacing 	Rural	Marquette	Ishpeming TSC	8	2362430	2028-08-04T00:00:00	""	Crush & Shape & Asphalt Resurfacing	Road Rehabilitation	Road	13.93	15.221	1560808	Y	Not an EJ Priority Area	2028	2029	3	""	""	""	""	""	""	2077.66693706247
41	52	211057	68	CON	2028-08-25T00:00:00	2029-12-28T00:00:00	2029-05-01T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	M-28	M-28	from the Houghton/Baraga county line to Johnson Road	HMA Crush and Shape with HMA Resurfacing	Rural	Baraga	Ishpeming TSC	8	7314649	2028-10-06T00:00:00	""	Crush & Shape & Asphalt Resurfacing	Road Rehabilitation	Road	0	6.178	1189709	Y	Not an EJ Priority Area,Priority (POC)	2028	2029	3	""	""	""	""	""	""	9942.54560608298
42	53	201228	68	CON	2027-06-11T00:00:00	2029-06-08T00:00:00	2028-05-15T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	US-2	US-2	from Eddy Street to Pierce Street in the city of Wakefield	HMA reconstruction, cold milling, HMA resurfacing, & drainage improvements.	Rural	Gogebic	Crystal Falls TSC	8	5007236	2027-08-06T00:00:00	""	Asphalt Reconstruction	Reconstruction	Road	12.867	13.358	1476001	Y	Not an EJ Priority Area	2027	2028	3	""	""	""	""	""	""	790.18933358011
43	54	201228	68	CON	2027-06-11T00:00:00	2029-06-08T00:00:00	2028-05-15T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	US-2	US-2	from Eddy Street to Pierce Street in the city of Wakefield	HMA reconstruction, cold milling, HMA resurfacing, & drainage improvements.	Rural	Gogebic	Crystal Falls TSC	8	5007236	2027-08-06T00:00:00	""	Asphalt Reconstruction	Reconstruction	Road	12.543	12.866	1476001	N	Not an EJ Priority Area	2027	2028	3	""	""	""	""	""	""	519.819067755113
44	55	201228	68	CON	2027-06-11T00:00:00	2029-06-08T00:00:00	2028-05-15T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	US-2	US-2	from Eddy Street to Pierce Street in the city of Wakefield	HMA reconstruction, cold milling, HMA resurfacing, & drainage improvements.	Rural	Gogebic	Crystal Falls TSC	8	5007236	2027-08-06T00:00:00	""	Asphalt Reconstruction	Reconstruction	Road	12.284	12.543	1476001	N	Not an EJ Priority Area	2027	2028	3	""	""	""	""	""	""	416.82084029303
45	56	210086	68	CON	2025-06-06T00:00:00	2027-12-14T00:00:00	2025-10-20T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-475	I-475 N	Thread Creek to Flint River and 10 Structure Locations	Road Reconstruction and Structure Work	Genesee County Metropolitan Planning Commission [GCMPC]	Genesee	Davison TSC	3	150429885	2025-08-01T00:00:00	""	Reconstruction	Reconstruction	Road	0	0.144	1844210	N	""	2025	2026,2027	3	032B	""	""	""	""	""	231.244985200528
46	57	210086	68	CON	2025-06-06T00:00:00	2027-12-14T00:00:00	2025-10-20T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-475	I-475 N	Thread Creek to Flint River and 10 Structure Locations	Road Reconstruction and Structure Work	Genesee County Metropolitan Planning Commission [GCMPC]	Genesee	Davison TSC	3	150429885	2025-08-01T00:00:00	""	Reconstruction	Reconstruction	Road	5.974	8.574	1497903	Y	""	2025	2026,2027	3	""	""	""	""	""	""	4184.30214936827
47	58	210086	68	CON	2025-06-06T00:00:00	2027-12-14T00:00:00	2025-10-20T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-475	I-475 N	Thread Creek to Flint River and 10 Structure Locations	Road Reconstruction and Structure Work	Genesee County Metropolitan Planning Commission [GCMPC]	Genesee	Davison TSC	3	150429885	2025-08-01T00:00:00	""	Reconstruction	Reconstruction	Road	0	0.189	1844704	N	""	2025	2026,2027	3	033C	""	""	""	""	""	304.16652457947
48	59	210086	68	CON	2025-06-06T00:00:00	2027-12-14T00:00:00	2025-10-20T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-475	I-475 N	Thread Creek to Flint River and 10 Structure Locations	Road Reconstruction and Structure Work	Genesee County Metropolitan Planning Commission [GCMPC]	Genesee	Davison TSC	3	150429885	2025-08-01T00:00:00	""	Reconstruction	Reconstruction	Road	0	0.176	1844705	N	""	2025	2026,2027	3	034D	""	""	""	""	""	283.193287157716
49	60	210086	68	CON	2025-06-06T00:00:00	2027-12-14T00:00:00	2025-10-20T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-475	I-475 N	Thread Creek to Flint River and 10 Structure Locations	Road Reconstruction and Structure Work	Genesee County Metropolitan Planning Commission [GCMPC]	Genesee	Davison TSC	3	150429885	2025-08-01T00:00:00	""	Reconstruction	Reconstruction	Road	0	0.224	1844707	N	""	2025	2026,2027	3	034C	""	""	""	""	""	360.444329259119
50	61	210086	68	CON	2025-06-06T00:00:00	2027-12-14T00:00:00	2025-10-20T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-475	I-475 N	Thread Creek to Flint River and 10 Structure Locations	Road Reconstruction and Structure Work	Genesee County Metropolitan Planning Commission [GCMPC]	Genesee	Davison TSC	3	150429885	2025-08-01T00:00:00	""	Reconstruction	Reconstruction	Road	6.121	8.705	1497904	N	""	2025	2026,2027	3	""	""	""	""	""	""	4158.55257377888
51	62	210086	68	CON	2025-06-06T00:00:00	2027-12-14T00:00:00	2025-10-20T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-475	I-475 N	Thread Creek to Flint River and 10 Structure Locations	Road Reconstruction and Structure Work	Genesee County Metropolitan Planning Commission [GCMPC]	Genesee	Davison TSC	3	150429885	2025-08-01T00:00:00	""	Reconstruction	Reconstruction	Road	0	0.167	1844303	N	""	2025	2026,2027	3	033B	""	""	""	""	""	268.760938334734
52	63	210813	68	CON	2024-10-11T00:00:00	2026-12-30T00:00:00	2025-01-13T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	M-43	M-43	from 10th Street to Drake Road 	Widening for turn lanes, intersection and interchange ramp improvements	Kalamazoo Area Transportation Study [KATS]	Kalamazoo	Kalamazoo TSC	264	9163673	2024-12-06T00:00:00	""	Additional Lane(s) less than 0.5 mile long	Minor Widening	Road	0	0.036	3392740	N	Not an EJ Priority Area	2025	2025,2026	4	""	""	""	""	""	""	57.7763985963618
53	64	208421	68	CON	2025-06-20T00:00:00	2026-12-30T00:00:00	2026-03-16T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	M-35	M-35	from County Road 480 to US-41	Crush and Shape with 2 course HMA resurfacing	Rural	Marquette	Ishpeming TSC	8	6448769	2025-08-01T00:00:00	""	Crush & Shape & Asphalt Resurfacing	Road Rehabilitation	Road	39.965	42.039	1560808	N	Not an EJ Priority Area	2025	2026	3	""	""	""	""	""	""	3337.78568804414
54	65	213441	68	CON	2026-06-12T00:00:00	2027-08-27T00:00:00	2027-07-12T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	M-68	M-68	from US-31 to King Road	Milling and one course asphalt overlay	Rural	Cheboygan	Gaylord TSC	79	2508000	2026-08-07T00:00:00	""	Milling & One Course Asphalt Overlay	Road Capital Preventive Maintenance	Road	0	4.227	544208	Y	Not an EJ Priority Area	2026	2027	3	""	""	""	""	""	""	6802.7097351541
55	66	213441	68	CON	2026-06-12T00:00:00	2027-08-27T00:00:00	2027-07-12T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	M-68	M-68	from US-31 to King Road	Milling and one course asphalt overlay	Rural	Cheboygan	Gaylord TSC	79	2508000	2026-08-07T00:00:00	""	Milling & One Course Asphalt Overlay	Road Capital Preventive Maintenance	Road	0.407	3.044	1165210	N	Not an EJ Priority Area	2026	2027	3	""	""	""	""	""	""	4243.5945864921
56	67	210829	68	CON	2024-10-25T00:00:00	2025-11-14T00:00:00	2025-05-01T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-96	I-96 W	from M-37 east to Cascade Road	"Milling & One Course Asphalt Overlay (2"")"	Grand Valley Metropolitan Council [GVMC]	Kent	Grand Rapids TSC	249	3958000	2024-12-06T00:00:00	""	Milling & One Course Asphalt Overlay	Road Capital Preventive Maintenance	Road	12.813	14.962	405406	N	Not an EJ Priority Area	2025	2025	3	""	""	""	""	""	""	3458.48642339732
57	68	210829	68	CON	2024-10-25T00:00:00	2025-11-14T00:00:00	2025-05-01T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-96	I-96 W	from M-37 east to Cascade Road	"Milling & One Course Asphalt Overlay (2"")"	Grand Valley Metropolitan Council [GVMC]	Kent	Grand Rapids TSC	249	3958000	2024-12-06T00:00:00	""	Milling & One Course Asphalt Overlay	Road Capital Preventive Maintenance	Road	12.209	14.877	406004	Y	Not an EJ Priority Area	2025	2025	3	""	""	""	""	""	""	4293.73763691736
58	69	201305	68	CON	2024-10-11T00:00:00	2025-12-26T00:00:00	2025-01-01T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-96	I-96 E	Fruit Ridge Road Over I-96	Bridge Replacement	Grand Valley Metropolitan Council [GVMC]	Kent	Grand Rapids TSC	284	26752447	2024-12-06T00:00:00	""	Bridge Replacement	Bridge Replacement	Bridge	0	0.173	405410	N	Not an EJ Priority Area	2025	2025	3	026B	""	""	""	""	""	278.325696124502
59	70	201305	68	CON	2024-10-11T00:00:00	2025-12-26T00:00:00	2025-01-01T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-96	I-96 E	Fruit Ridge Road Over I-96	Bridge Replacement	Grand Valley Metropolitan Council [GVMC]	Kent	Grand Rapids TSC	284	26752447	2024-12-06T00:00:00	""	Bridge Replacement	Bridge Replacement	Bridge	0.06	0.323	406006	N	Not an EJ Priority Area	2025	2025	3	026C	""	""	""	""	""	423.258288801005
60	71	201305	68	CON	2024-10-11T00:00:00	2025-12-26T00:00:00	2025-01-01T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-96	I-96 E	Fruit Ridge Road Over I-96	Bridge Replacement	Grand Valley Metropolitan Council [GVMC]	Kent	Grand Rapids TSC	284	26752447	2024-12-06T00:00:00	""	Bridge Replacement	Bridge Replacement	Bridge	0	0.156	989905	N	Not an EJ Priority Area	2025	2025	3	026E	""	""	""	""	""	251.058120835873
61	72	210875	68	CON	2025-10-10T00:00:00	2027-06-25T00:00:00	2026-03-02T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	M-139	M-139	from 0.44 miles south of I-94 to I-94 BL	Reconstruction	Twin Cities Area Transportation Study [TwinCATS]	Berrien	Kalamazoo TSC	7	20803981	2025-12-05T00:00:00	""	Reconstruction	Reconstruction	Road	2.539	2.93	1363303	N	Priority (POC & Poverty)	2026	2026,2027	3	""	""	""	""	""	""	629.254640177343
62	73	217336	68	CON	2025-06-06T00:00:00	2030-12-30T00:00:00	2026-03-06T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-94	I-94 E	Beech Daly Rd to Pelham Rd	Concrete Pavement Repair 	Southeast Michigan Council of Governments [SEMCOG]	Wayne	Taylor TSC	249	6000000	2025-08-01T00:00:00	""	Concrete Pavement Repair	Road Rehabilitation	Road	0	0.36	1580004	N	Not an EJ Priority Area,Priority (Poverty)	2025	2026,2027,2028	3	202E	""	""	""	""	""	579.108496481276
63	74	217336	68	CON	2025-06-06T00:00:00	2030-12-30T00:00:00	2026-03-06T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-94	I-94 E	Beech Daly Rd to Pelham Rd	Concrete Pavement Repair 	Southeast Michigan Council of Governments [SEMCOG]	Wayne	Taylor TSC	249	6000000	2025-08-01T00:00:00	""	Concrete Pavement Repair	Road Rehabilitation	Road	13.725	16.728	1588802	N	Not an EJ Priority Area,Priority (Poverty)	2025	2026,2027,2028	3	""	""	""	""	""	""	4832.86898349225
64	75	220874	68	CON	2026-11-13T00:00:00	2027-12-29T00:00:00	2027-03-01T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	US-12	US-12 W	County Line to Denton Rd	Concrete Inlay	Southeast Michigan Council of Governments [SEMCOG]	Wayne	Taylor TSC	5	21900000	2027-01-08T00:00:00	""	Concrete Pavement Inlay	Road Rehabilitation	Road	0	0.02	6703035	N	Not an EJ Priority Area	2027	2027	3	""	""	""	""	""	""	31.5673826654957
65	76	217336	68	CON	2025-06-06T00:00:00	2030-12-30T00:00:00	2026-03-06T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-94	I-94 E	Beech Daly Rd to Pelham Rd	Concrete Pavement Repair 	Southeast Michigan Council of Governments [SEMCOG]	Wayne	Taylor TSC	249	6000000	2025-08-01T00:00:00	""	Concrete Pavement Repair	Road Rehabilitation	Road	0	0.095	4712150	N	Not an EJ Priority Area,Priority (Poverty)	2025	2026,2027,2028	3	202B	""	""	""	""	""	152.888087945478
66	77	217336	68	CON	2025-06-06T00:00:00	2030-12-30T00:00:00	2026-03-06T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-94	I-94 E	Beech Daly Rd to Pelham Rd	Concrete Pavement Repair 	Southeast Michigan Council of Governments [SEMCOG]	Wayne	Taylor TSC	249	6000000	2025-08-01T00:00:00	""	Concrete Pavement Repair	Road Rehabilitation	Road	0	0.361	1576804	N	Not an EJ Priority Area,Priority (Poverty)	2025	2026,2027,2028	3	202A	""	""	""	""	""	580.804477749749
67	78	213488	68	CON	2025-10-10T00:00:00	2028-07-31T00:00:00	2026-02-02T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	US-23	US-23 N	School Road to Ida Center Road	Road Reconstruction	Southeast Michigan Council of Governments [SEMCOG]	Monroe	Brighton TSC	9	69841408	2025-12-05T00:00:00	""	Concrete Reconstruction	Reconstruction	Road	0	0.177	1224011	N	Priority (Poverty)	2026	2026,2027,2028	3	""	""	""	""	""	""	284.854398996526
68	79	217336	68	CON	2025-06-06T00:00:00	2030-12-30T00:00:00	2026-03-06T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-94	I-94 E	Beech Daly Rd to Pelham Rd	Concrete Pavement Repair 	Southeast Michigan Council of Governments [SEMCOG]	Wayne	Taylor TSC	249	6000000	2025-08-01T00:00:00	""	Concrete Pavement Repair	Road Rehabilitation	Road	0	0.041	4718570	N	Priority (Poverty)	2025	2026,2027,2028	3	""	""	""	""	""	""	65.3857159058074
69	80	211426	68	CON	2025-06-06T00:00:00	2030-12-30T00:00:00	2026-03-06T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-94	I-94 E	Middlebelt Rd to Beech Daly Rd 	Reconstruct 	Southeast Michigan Council of Governments [SEMCOG]	Wayne	Taylor TSC	5	128600000	2025-08-01T00:00:00	""	Reconstruction	Reconstruction	Road	0	0.224	1578709	N	No data	2025	2026,2027,2028	3	200D	""	""	""	""	""	359.762701916186
70	81	211426	68	CON	2025-06-06T00:00:00	2030-12-30T00:00:00	2026-03-06T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-94	I-94 E	Middlebelt Rd to Beech Daly Rd 	Reconstruct 	Southeast Michigan Council of Governments [SEMCOG]	Wayne	Taylor TSC	5	128600000	2025-08-01T00:00:00	""	Reconstruction	Reconstruction	Road	0	0.229	1576710	N	Not an EJ Priority Area,No data	2025	2026,2027,2028	3	200B	""	""	""	""	""	367.84675616541
71	82	211426	68	CON	2025-06-06T00:00:00	2030-12-30T00:00:00	2026-03-06T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-94	I-94 E	Middlebelt Rd to Beech Daly Rd 	Reconstruct 	Southeast Michigan Council of Governments [SEMCOG]	Wayne	Taylor TSC	5	128600000	2025-08-01T00:00:00	""	Reconstruction	Reconstruction	Road	12.029	13.725	1588802	N	No data,Priority (Poverty),Not an EJ Priority Area	2025	2026,2027,2028	3	""	""	""	""	""	""	2729.4523432459
72	83	211426	68	CON	2025-06-06T00:00:00	2030-12-30T00:00:00	2026-03-06T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-94	I-94 E	Middlebelt Rd to Beech Daly Rd 	Reconstruct 	Southeast Michigan Council of Governments [SEMCOG]	Wayne	Taylor TSC	5	128600000	2025-08-01T00:00:00	""	Reconstruction	Reconstruction	Road	12.037	13.745	1576405	Y	Not an EJ Priority Area,No data	2025	2026,2027,2028	3	""	""	""	""	""	""	2748.7644123328
73	84	220408	68	CON	2028-10-06T00:00:00	2029-12-21T00:00:00	2029-04-16T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	US-12	US-12	US-12 at Gumwood Road	Install a roundabout	Niles-Buchanan-Cass Area Transportation Study [NATS]	Cass	Kalamazoo TSC	264	3263258	2028-12-01T00:00:00	""	Intersection Improvements	Traffic Safety	Traffic Safety	1.44	4.083	594006	Y	Not an EJ Priority Area	2029	2029	3	""	""	""	""	""	""	4253.50394334299
74	85	211426	68	CON	2025-06-06T00:00:00	2030-12-30T00:00:00	2026-03-06T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-94	I-94 E	Middlebelt Rd to Beech Daly Rd 	Reconstruct 	Southeast Michigan Council of Governments [SEMCOG]	Wayne	Taylor TSC	5	128600000	2025-08-01T00:00:00	""	Reconstruction	Reconstruction	Road	0	0.049	4718568	N	Not an EJ Priority Area	2025	2026,2027,2028	3	""	""	""	""	""	""	78.857933416387
75	86	220988	68	CON	2026-01-09T00:00:00	2026-11-16T00:00:00	2026-04-15T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	US-12	US-12	Haggerty to Lotz and EB / 0.2 miles west of Pershing to Howe	Reconstruct	Southeast Michigan Council of Governments [SEMCOG]	Wayne	Taylor TSC	5	31500000	2026-03-06T00:00:00	""	Reconstruction	Reconstruction	Road	0	0.016	6702985	N	Not an EJ Priority Area	2026	2026	3	""	""	""	""	""	""	25.7495181534572
76	87	220988	68	CON	2026-01-09T00:00:00	2026-11-16T00:00:00	2026-04-15T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	US-12	US-12	Haggerty to Lotz and EB / 0.2 miles west of Pershing to Howe	Reconstruct	Southeast Michigan Council of Governments [SEMCOG]	Wayne	Taylor TSC	5	31500000	2026-03-06T00:00:00	""	Reconstruction	Reconstruction	Road	0	0.029	6702984	N	Priority (Poverty)	2026	2026	3	""	""	""	""	""	""	46.6710546470784
77	88	220988	68	CON	2026-01-09T00:00:00	2026-11-16T00:00:00	2026-04-15T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	US-12	US-12	Haggerty to Lotz and EB / 0.2 miles west of Pershing to Howe	Reconstruct	Southeast Michigan Council of Governments [SEMCOG]	Wayne	Taylor TSC	5	31500000	2026-03-06T00:00:00	""	Reconstruction	Reconstruction	Road	0	0.027	4710648	N	Priority (POC)	2026	2026	3	""	""	""	""	""	""	43.4525092398923
78	89	220988	68	CON	2026-01-09T00:00:00	2026-11-16T00:00:00	2026-04-15T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	US-12	US-12	Haggerty to Lotz and EB / 0.2 miles west of Pershing to Howe	Reconstruct	Southeast Michigan Council of Governments [SEMCOG]	Wayne	Taylor TSC	5	31500000	2026-03-06T00:00:00	""	Reconstruction	Reconstruction	Road	5.474	6.01	4705565	N	Priority (POC)	2026	2026	3	""	""	""	""	""	""	862.609927465405
79	90	220988	68	CON	2026-01-09T00:00:00	2026-11-16T00:00:00	2026-04-15T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	US-12	US-12	Haggerty to Lotz and EB / 0.2 miles west of Pershing to Howe	Reconstruct	Southeast Michigan Council of Governments [SEMCOG]	Wayne	Taylor TSC	5	31500000	2026-03-06T00:00:00	""	Reconstruction	Reconstruction	Road	5.501	6.034	1600206	N	Priority (POC),Priority (Poverty)	2026	2026	3	""	""	""	""	""	""	857.78193733508
80	91	219757	68	CON	2025-11-14T00:00:00	2027-12-29T00:00:00	2026-03-02T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	US-24	US-24	South of 7th Street to Stewart Road	Mill & Single Course Overlay	Southeast Michigan Council of Governments [SEMCOG]	Monroe	Brighton TSC	82	3248000	2026-01-09T00:00:00	""	Milling & One Course Asphalt Overlay	Road Capital Preventive Maintenance	Road	14.401	16.717	4300001	Y	Priority (Poverty),Not an EJ Priority Area	2026	2026	3	""	""	""	""	""	""	3727.24753566839
81	92	220874	68	CON	2026-11-13T00:00:00	2027-12-29T00:00:00	2027-03-01T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	US-12	US-12 W	County Line to Denton Rd	Concrete Inlay	Southeast Michigan Council of Governments [SEMCOG]	Wayne	Taylor TSC	5	21900000	2027-01-08T00:00:00	""	Concrete Pavement Inlay	Road Rehabilitation	Road	0.836	1.421	1600206	N	Not an EJ Priority Area	2027	2027	3	""	""	""	""	""	""	941.467971398132
82	93	218427	68	CON	2024-11-01T00:00:00	2027-11-15T00:00:00	2025-03-14T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-94 E	I-94 E	I-94 east of X01 82024 (Conrail RR) to west of Burns Street  	Road Reconstruction 	Southeast Michigan Council of Governments [SEMCOG]	Wayne	Detroit TSC	100	356070000	2024-11-01T00:00:00	""	Reconstruction	Reconstruction	Road	31.773	32.735	1576405	N	Priority (POC & Poverty)	2025	2025,2026,2027	3	""	""	""	""	""	""	1548.19186567942
83	94	218427	68	CON	2024-11-01T00:00:00	2027-11-15T00:00:00	2025-03-14T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-94 E	I-94 E	I-94 east of X01 82024 (Conrail RR) to west of Burns Street  	Road Reconstruction 	Southeast Michigan Council of Governments [SEMCOG]	Wayne	Detroit TSC	100	356070000	2024-11-01T00:00:00	""	Reconstruction	Reconstruction	Road	0	0.218	1577910	N	Priority (POC & Poverty)	2025	2025,2026,2027	3	219B	""	""	""	""	""	350.83769839468
84	95	218427	68	CON	2024-11-01T00:00:00	2027-11-15T00:00:00	2025-03-14T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-94 E	I-94 E	I-94 east of X01 82024 (Conrail RR) to west of Burns Street  	Road Reconstruction 	Southeast Michigan Council of Governments [SEMCOG]	Wayne	Detroit TSC	100	356070000	2024-11-01T00:00:00	""	Reconstruction	Reconstruction	Road	0	0.148	1578002	N	Priority (POC & Poverty)	2025	2025,2026,2027	3	220A	""	""	""	""	""	237.460212939744
85	96	218427	68	CON	2024-11-01T00:00:00	2027-11-15T00:00:00	2025-03-14T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-94 E	I-94 E	I-94 east of X01 82024 (Conrail RR) to west of Burns Street  	Road Reconstruction 	Southeast Michigan Council of Governments [SEMCOG]	Wayne	Detroit TSC	100	356070000	2024-11-01T00:00:00	""	Reconstruction	Reconstruction	Road	0	0.171	1578004	N	Priority (POC & Poverty)	2025	2025,2026,2027	3	220B	""	""	""	""	""	274.691805690585
86	97	218427	68	CON	2024-11-01T00:00:00	2027-11-15T00:00:00	2025-03-14T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-94 E	I-94 E	I-94 east of X01 82024 (Conrail RR) to west of Burns Street  	Road Reconstruction 	Southeast Michigan Council of Governments [SEMCOG]	Wayne	Detroit TSC	100	356070000	2024-11-01T00:00:00	""	Reconstruction	Reconstruction	Road	0	0.193	1587905	N	Priority (POC & Poverty)	2025	2025,2026,2027	3	219D	""	""	""	""	""	310.128472172752
87	98	218427	68	CON	2024-11-01T00:00:00	2027-11-15T00:00:00	2025-03-14T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-94 E	I-94 E	I-94 east of X01 82024 (Conrail RR) to west of Burns Street  	Road Reconstruction 	Southeast Michigan Council of Governments [SEMCOG]	Wayne	Detroit TSC	100	356070000	2024-11-01T00:00:00	""	Reconstruction	Reconstruction	Road	31.154	31.742	1588802	N	Priority (POC & Poverty)	2025	2025,2026,2027	3	""	""	""	""	""	""	946.295907899794
88	99	218427	68	CON	2024-11-01T00:00:00	2027-11-15T00:00:00	2025-03-14T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-94 E	I-94 E	I-94 east of X01 82024 (Conrail RR) to west of Burns Street  	Road Reconstruction 	Southeast Michigan Council of Governments [SEMCOG]	Wayne	Detroit TSC	100	356070000	2024-11-01T00:00:00	""	Reconstruction	Reconstruction	Road	31.742	32.622	1588802	N	Priority (POC & Poverty)	2025	2025,2026,2027	3	""	""	""	""	""	""	1416.22540016726
89	100	218427	68	CON	2024-11-01T00:00:00	2027-11-15T00:00:00	2025-03-14T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-94 E	I-94 E	I-94 east of X01 82024 (Conrail RR) to west of Burns Street  	Road Reconstruction 	Southeast Michigan Council of Governments [SEMCOG]	Wayne	Detroit TSC	100	356070000	2024-11-01T00:00:00	""	Reconstruction	Reconstruction	Road	0	0.157	1589201	N	Priority (POC & Poverty)	2025	2025,2026,2027	3	220C	""	""	""	""	""	252.667560935809
90	101	218427	68	CON	2024-11-01T00:00:00	2027-11-15T00:00:00	2025-03-14T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-94 E	I-94 E	I-94 east of X01 82024 (Conrail RR) to west of Burns Street  	Road Reconstruction 	Southeast Michigan Council of Governments [SEMCOG]	Wayne	Detroit TSC	100	356070000	2024-11-01T00:00:00	""	Reconstruction	Reconstruction	Road	0.132	0.199	1589202	N	Priority (POC & Poverty)	2025	2025,2026,2027	3	220H	""	""	""	""	""	107.340743178155
91	102	211379	68	CON	2026-10-09T00:00:00	2028-11-30T00:00:00	2027-03-15T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	US-31	US-31	from Stronach Road to Mason Street and from Van Buren Street to M-55.	Asphalt Reconstruction	Rural	Manistee	Traverse City TSC	6	32374295	2026-12-04T00:00:00	""	Asphalt Reconstruction	Reconstruction	Road	5.359	7.205	1153803	Y	Not an EJ Priority Area	2027	2027,2028	3	""	""	""	""	""	""	2970.85433005565
92	103	218427	68	CON	2024-11-01T00:00:00	2027-11-15T00:00:00	2025-03-14T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-94 E	I-94 E	I-94 east of X01 82024 (Conrail RR) to west of Burns Street  	Road Reconstruction 	Southeast Michigan Council of Governments [SEMCOG]	Wayne	Detroit TSC	100	356070000	2024-11-01T00:00:00	""	Reconstruction	Reconstruction	Road	0	0.204	4710000	N	Priority (POC & Poverty)	2025	2025,2026,2027	3	219C	""	""	""	""	""	328.306656756396
93	104	218427	68	CON	2024-11-01T00:00:00	2027-11-15T00:00:00	2025-03-14T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-94 E	I-94 E	I-94 east of X01 82024 (Conrail RR) to west of Burns Street  	Road Reconstruction 	Southeast Michigan Council of Governments [SEMCOG]	Wayne	Detroit TSC	100	356070000	2024-11-01T00:00:00	""	Reconstruction	Reconstruction	Road	0	0.161	4710282	N	Priority (POC & Poverty)	2025	2025,2026,2027	3	219A	""	""	""	""	""	259.053103851214
94	105	218427	68	CON	2024-11-01T00:00:00	2027-11-15T00:00:00	2025-03-14T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-94 E	I-94 E	I-94 east of X01 82024 (Conrail RR) to west of Burns Street  	Road Reconstruction 	Southeast Michigan Council of Governments [SEMCOG]	Wayne	Detroit TSC	100	356070000	2024-11-01T00:00:00	""	Reconstruction	Reconstruction	Road	4.648	5.134	4711788	N	Priority (POC & Poverty)	2025	2025,2026,2027	3	""	""	""	""	""	""	782.142613174365
95	106	211043	68	CON	2027-11-12T00:00:00	2030-10-31T00:00:00	2028-04-03T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	M-60	M-60	M-60, M-86, US-131BR in the City of Three Rivers	Reconstruction	Rural	St. Joseph	Marshall TSC	7	35000000	2028-01-07T00:00:00	""	Reconstruction	Reconstruction	Road	1.079	1.597	3750035	N	Not an EJ Priority Area	2028	2028,2029,2030	3	""	""	""	""	""	""	833.641791537112
96	107	217013	68	CON	2025-05-16T00:00:00	2026-11-19T00:00:00	2025-08-11T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	Regionwide	M-60	M-60, M-86, and M-99 in Calhoun and St. Joseph Counties	Milling and one course asphalt overlay	Rural	Calhoun	Marshall TSC	80	2330300	2025-07-11T00:00:00	""	Milling & One Course Asphalt Overlay	Road Capital Preventive Maintenance	Road	0.783	4.392	1295308	Y	Not an EJ Priority Area	2025	2025,2026	3	""	""	""	""	""	""	5808.13316959723
97	108	220988	68	CON	2026-01-09T00:00:00	2026-11-16T00:00:00	2026-04-15T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	US-12	US-12	Haggerty to Lotz and EB / 0.2 miles west of Pershing to Howe	Reconstruct	Southeast Michigan Council of Governments [SEMCOG]	Wayne	Taylor TSC	5	31500000	2026-03-06T00:00:00	""	Reconstruction	Reconstruction	Road	0.386	0.453	1599110	N	Priority (POC)	2026	2026	3	096D	""	""	""	""	""	107.550615949283
98	109	217013	68	CON	2025-05-16T00:00:00	2026-11-19T00:00:00	2025-08-11T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	Regionwide	M-60	M-60, M-86, and M-99 in Calhoun and St. Joseph Counties	Milling and one course asphalt overlay	Rural	Calhoun	Marshall TSC	80	2330300	2025-07-11T00:00:00	""	Milling & One Course Asphalt Overlay	Road Capital Preventive Maintenance	Road	0.001	0.063	3131054	N	Not an EJ Priority Area	2025	2025,2026	3	""	""	""	""	""	""	99.7795287289723
99	110	211043	68	CON	2027-11-12T00:00:00	2030-10-31T00:00:00	2028-04-03T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	M-60	M-60	M-60, M-86, US-131BR in the City of Three Rivers	Reconstruction	Rural	St. Joseph	Marshall TSC	7	35000000	2028-01-07T00:00:00	""	Reconstruction	Reconstruction	Road	0	0.018	231210	N	Not an EJ Priority Area	2028	2028,2029,2030	3	""	""	""	""	""	""	28.9682339842869
100	111	214047	68	CON	2025-07-11T00:00:00	2026-11-20T00:00:00	2026-03-02T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	US-24	US-24	at White Lake Road	Intersection Improvements	Southeast Michigan Council of Governments [SEMCOG]	Oakland	Oakland TSC	27	1059664	2025-09-05T00:00:00	""	Intersection Improvements	Traffic Safety	Traffic Safety	1.185	1.883	4412733	N	Not an EJ Priority Area	2025	2026	4	""	""	""	""	""	""	1123.32415507801
101	112	219773	68	CON	2026-08-07T00:00:00	2027-12-03T00:00:00	2027-06-14T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	M-43 E	M-43 E	M-43/I-69BL (Saginaw and Oakland) from Chesnut St to Pennsylvania Ave	"1.5"" milling and asphalt overlay with concrete pavement repairs"	Tri-County Regional Planning Commission [TCRPC]	Ingham	Lansing TSC	82	1985236	2026-10-02T00:00:00	""	Milling & One Course Asphalt Overlay	Road Capital Preventive Maintenance	Road	1.496	2.211	3330065	N	Priority (POC & Poverty)	2026	2027	3	""	""	""	""	""	""	1150.68320654215
102	113	219773	68	CON	2026-08-07T00:00:00	2027-12-03T00:00:00	2027-06-14T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	M-43 E	M-43 E	M-43/I-69BL (Saginaw and Oakland) from Chesnut St to Pennsylvania Ave	"1.5"" milling and asphalt overlay with concrete pavement repairs"	Tri-County Regional Planning Commission [TCRPC]	Ingham	Lansing TSC	82	1985236	2026-10-02T00:00:00	""	Milling & One Course Asphalt Overlay	Road Capital Preventive Maintenance	Road	2.211	2.557	3330065	N	Priority (POC & Poverty)	2026	2027	3	""	""	""	""	""	""	556.834061667975
103	114	216114	68	CON	2024-10-25T00:00:00	2025-12-01T00:00:00	2025-04-14T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	M-116	M-116	from Tinkham Avenue north to Ludington State Park Entrance	Milling & One Course Asphalt Overlay	Rural	Mason	Muskegon TSC	77	2871000	2024-12-06T00:00:00	""	Milling & One Course Asphalt Overlay	Road Capital Preventive Maintenance	Road	0.651	2.579	215810	N	Not an EJ Priority Area	2025	2025	3	""	""	""	""	""	""	3102.82092948855
104	115	217479	68	CON	2025-06-06T00:00:00	2026-12-04T00:00:00	2026-04-06T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	M-50	M-50	M-50 in Charlotte	Mill and single course asphalt overlay	Tri-County Regional Planning Commission [TCRPC]	Eaton	Lansing TSC	82	490050	2025-08-01T00:00:00	""	Milling & One Course Asphalt Overlay	Road Capital Preventive Maintenance	Road	18.207	19.223	567504	Y	Not an EJ Priority Area	2025	2026	3	""	""	""	""	""	""	1634.60427411345
105	116	210046	68	CON	2027-08-20T00:00:00	2028-12-01T00:00:00	2028-03-06T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	M-11	M-11	from Division Avenue east to Kalamazoo Avenue	Inlay	Grand Valley Metropolitan Council [GVMC]	Kent	Grand Rapids TSC	4	17000000	2027-10-01T00:00:00	""	Concrete Pavement Inlay	Road Rehabilitation	Road	11.81	13.658	409008	Y	Priority (POC),Priority (POC & Poverty)	2027	2028	3	""	""	""	""	""	""	2974.0730788681
106	117	208803	68	CON	2026-06-12T00:00:00	2028-06-09T00:00:00	2027-05-17T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	US-45	US-45	from the state line northerly to US-2	HMA base crushing and shaping, HMA overlay, agg. shoulders, and guardrail	Rural	Gogebic	Crystal Falls TSC	8	6562000	2026-08-07T00:00:00	""	Crush & Shape & Asphalt Resurfacing	Road Rehabilitation	Road	0	0.533	1475203	N	Not an EJ Priority Area	2026	2027	3	""	""	""	""	""	""	857.781988069163
107	118	201225	68	CON	2025-06-06T00:00:00	2030-12-30T00:00:00	2026-03-06T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-94 E	I-94 E	Pelham to Oakwood	Reconstruct, Conc Pavt Rprs, Conc Pavt Inlay, and misc work	Southeast Michigan Council of Governments [SEMCOG]	Wayne	Taylor TSC	5	60000000	2025-08-01T00:00:00	""	Concrete Reconstruction	Reconstruction	Road	0	0.105	1577003	N	No data	2025	2026,2027,2028	3	206C	""	""	""	""	""	168.981499692346
108	119	201225	68	CON	2025-06-06T00:00:00	2030-12-30T00:00:00	2026-03-06T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-94 E	I-94 E	Pelham to Oakwood	Reconstruct, Conc Pavt Rprs, Conc Pavt Inlay, and misc work	Southeast Michigan Council of Governments [SEMCOG]	Wayne	Taylor TSC	5	60000000	2025-08-01T00:00:00	""	Concrete Reconstruction	Reconstruction	Road	0	0.563	1576901	N	No data,Not an EJ Priority Area	2025	2026,2027,2028	3	204A	""	""	""	""	""	906.062449329388
109	120	201225	68	CON	2025-06-06T00:00:00	2030-12-30T00:00:00	2026-03-06T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-94 E	I-94 E	Pelham to Oakwood	Reconstruct, Conc Pavt Rprs, Conc Pavt Inlay, and misc work	Southeast Michigan Council of Governments [SEMCOG]	Wayne	Taylor TSC	5	60000000	2025-08-01T00:00:00	""	Concrete Reconstruction	Reconstruction	Road	0.576	0.951	1576901	N	Not an EJ Priority Area	2025	2026,2027,2028	3	204A	""	""	""	""	""	603.505055562731
110	121	201225	68	CON	2025-06-06T00:00:00	2030-12-30T00:00:00	2026-03-06T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-94 E	I-94 E	Pelham to Oakwood	Reconstruct, Conc Pavt Rprs, Conc Pavt Inlay, and misc work	Southeast Michigan Council of Governments [SEMCOG]	Wayne	Taylor TSC	5	60000000	2025-08-01T00:00:00	""	Concrete Reconstruction	Reconstruction	Road	0.388	0.478	1580309	N	Not an EJ Priority Area	2025	2026,2027,2028	3	204F	""	""	""	""	""	144.841122334276
111	122	201225	68	CON	2025-06-06T00:00:00	2030-12-30T00:00:00	2026-03-06T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-94 E	I-94 E	Pelham to Oakwood	Reconstruct, Conc Pavt Rprs, Conc Pavt Inlay, and misc work	Southeast Michigan Council of Governments [SEMCOG]	Wayne	Taylor TSC	5	60000000	2025-08-01T00:00:00	""	Concrete Reconstruction	Reconstruction	Road	17.235	18.369	1588802	N	Priority (POC & Poverty),Not an EJ Priority Area	2025	2026,2027,2028	3	""	""	""	""	""	""	1824.99926963655
112	123	201225	68	CON	2025-06-06T00:00:00	2030-12-30T00:00:00	2026-03-06T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-94 E	I-94 E	Pelham to Oakwood	Reconstruct, Conc Pavt Rprs, Conc Pavt Inlay, and misc work	Southeast Michigan Council of Governments [SEMCOG]	Wayne	Taylor TSC	5	60000000	2025-08-01T00:00:00	""	Concrete Reconstruction	Reconstruction	Road	10.265	10.356	1670203	N	Not an EJ Priority Area	2025	2026,2027,2028	3	""	""	""	""	""	""	146.450597775087
113	124	211793	68	CON	2023-07-03T00:00:00	2025-07-25T00:00:00	2024-06-03T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-94 E	I-94 E	Blue Water Bridge Plaza	BWB Plaza Expansion	Southeast Michigan Council of Governments [SEMCOG]	St. Clair	Huron TSC	33	46434010	2024-04-19T00:00:00	""	Concrete Reconstruction	Reconstruction	Road	0.587	1.077	4506262	N	""	2023	2024,2025	3	008B	""	""	""	""	""	788.420133563362
114	125	211793	68	CON	2023-07-03T00:00:00	2025-07-25T00:00:00	2024-06-03T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-94 E	I-94 E	Blue Water Bridge Plaza	BWB Plaza Expansion	Southeast Michigan Council of Governments [SEMCOG]	St. Clair	Huron TSC	33	46434010	2024-04-19T00:00:00	""	Concrete Reconstruction	Reconstruction	Road	0	0.291	4502649	N	""	2023	2024,2025	3	008A	""	""	""	""	""	468.319833935095
115	126	211793	68	CON	2023-07-03T00:00:00	2025-07-25T00:00:00	2024-06-03T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-94 E	I-94 E	Blue Water Bridge Plaza	BWB Plaza Expansion	Southeast Michigan Council of Governments [SEMCOG]	St. Clair	Huron TSC	33	46434010	2024-04-19T00:00:00	""	Concrete Reconstruction	Reconstruction	Road	0	0.255	964509	N	""	2023	2024,2025	3	""	""	""	""	""	""	410.383557874363
116	127	211793	68	CON	2023-07-03T00:00:00	2025-07-25T00:00:00	2024-06-03T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-94 E	I-94 E	Blue Water Bridge Plaza	BWB Plaza Expansion	Southeast Michigan Council of Governments [SEMCOG]	St. Clair	Huron TSC	33	46434010	2024-04-19T00:00:00	""	Concrete Reconstruction	Reconstruction	Road	0	0.113	965304	N	""	2023	2024,2025	3	007A	""	""	""	""	""	181.856218626759
117	128	210875	68	CON	2025-10-10T00:00:00	2027-06-25T00:00:00	2026-03-02T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	M-139	M-139	from 0.44 miles south of I-94 to I-94 BL	Reconstruction	Twin Cities Area Transportation Study [TwinCATS]	Berrien	Kalamazoo TSC	7	20803981	2025-12-05T00:00:00	""	Reconstruction	Reconstruction	Road	0.983	1.138	1367306	N	Priority (POC & Poverty)	2026	2026,2027	4	""	""	""	""	""	""	249.448780356973
118	129	211793	68	CON	2023-07-03T00:00:00	2025-07-25T00:00:00	2024-06-03T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-94 E	I-94 E	Blue Water Bridge Plaza	BWB Plaza Expansion	Southeast Michigan Council of Governments [SEMCOG]	St. Clair	Huron TSC	33	46434010	2024-04-19T00:00:00	""	Concrete Reconstruction	Reconstruction	Road	24.818	25.268	967804	N	""	2023	2024,2025	3	""	""	""	""	""	""	724.206210803418
119	130	208838	68	CON	2025-10-10T00:00:00	2027-04-30T00:00:00	2026-02-02T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	M-55	M-55	from Udell Hills Road to M-37	Asphalt Overlay	Rural	Manistee	Traverse City TSC	79	4103000	2025-12-05T00:00:00	""	One Course Asphalt Overlay	Road Capital Preventive Maintenance	Road	14	20.75	1154207	Y	Not an EJ Priority Area	2026	2026	3	""	""	""	""	""	""	10863.0919355844
120	131	208838	68	CON	2025-10-10T00:00:00	2027-04-30T00:00:00	2026-02-02T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	M-55	M-55	from Udell Hills Road to M-37	Asphalt Overlay	Rural	Manistee	Traverse City TSC	79	4103000	2025-12-05T00:00:00	""	One Course Asphalt Overlay	Road Capital Preventive Maintenance	Road	0	0.691	1126103	N	Not an EJ Priority Area	2026	2026	3	""	""	""	""	""	""	1112.058668192
121	132	208489	68	CON	2025-06-06T00:00:00	2026-12-23T00:00:00	2026-03-16T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	US10 BR/M-20	M-20 E	Jerome Street to Washington Street	Reconstruction	Midland Area Transportation Study [MATS]	Midland	Mt. Pleasant TSC	3	39400800	2025-08-01T00:00:00	""	Reconstruction	Reconstruction	Road	0.176	0.185	885605	N	Priority (Poverty)	2025	2026	3	""	""	""	""	""	""	14.4841453465697
122	133	219768	68	CON	2025-10-10T00:00:00	2026-12-04T00:00:00	2026-06-15T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-69 E	I-69 E	I-69 from I-69BL (Saginaw St) to Shiawassee County Line	Concrete pavement repairs	Tri-County Regional Planning Commission [TCRPC]	Clinton	Lansing TSC	249	4264742	2025-12-05T00:00:00	""	Concrete Pavement Repair	Road Rehabilitation	Road	15.472	18.333	369002	N	Not an EJ Priority Area	2026	2026	3	""	""	""	""	""	""	4603.5426913032
123	134	208489	68	CON	2025-06-06T00:00:00	2026-12-23T00:00:00	2026-03-16T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	US10 BR/M-20	M-20 E	Jerome Street to Washington Street	Reconstruction	Midland Area Transportation Study [MATS]	Midland	Mt. Pleasant TSC	3	39400800	2025-08-01T00:00:00	""	Reconstruction	Reconstruction	Road	0	0.013	884810	N	Not an EJ Priority Area	2025	2026	3	""	""	""	""	""	""	20.9214359538494
124	135	208489	68	CON	2025-06-06T00:00:00	2026-12-23T00:00:00	2026-03-16T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	US10 BR/M-20	M-20 E	Jerome Street to Washington Street	Reconstruction	Midland Area Transportation Study [MATS]	Midland	Mt. Pleasant TSC	3	39400800	2025-08-01T00:00:00	""	Reconstruction	Reconstruction	Road	18.143	18.355	885110	N	Not an EJ Priority Area,Priority (Poverty)	2025	2026	3	""	""	""	""	""	""	341.181480950389
125	136	214656	68	CON	2027-10-08T00:00:00	2029-06-29T00:00:00	2028-05-15T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	US-31	US-31	at the southerly M-37 intersection.	Lane reconfiguration and lane extension	Rural	Grand Traverse	Traverse City TSC	264	372004	2027-12-03T00:00:00	""	Additional Lane(s) less than 0.5 mile long	Minor Widening	Road	8.188	8.28	992204	N	Not an EJ Priority Area,Priority (Poverty)	2028	2028	4	""	""	""	""	""	""	148.059904089227
126	137	211043	68	CON	2027-11-12T00:00:00	2030-10-31T00:00:00	2028-04-03T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	M-60	M-60	M-60, M-86, US-131BR in the City of Three Rivers	Reconstruction	Rural	St. Joseph	Marshall TSC	7	35000000	2028-01-07T00:00:00	""	Reconstruction	Reconstruction	Road	0.125	0.824	229201	N	Not an EJ Priority Area	2028	2028,2029,2030	3	""	""	""	""	""	""	1124.93370999697
127	138	201225	68	CON	2025-06-06T00:00:00	2030-12-30T00:00:00	2026-03-06T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-94 E	I-94 E	Pelham to Oakwood	Reconstruct, Conc Pavt Rprs, Conc Pavt Inlay, and misc work	Southeast Michigan Council of Governments [SEMCOG]	Wayne	Taylor TSC	5	60000000	2025-08-01T00:00:00	""	Concrete Reconstruction	Reconstruction	Road	0.037	0.487	1576908	N	Priority (POC & Poverty)	2025	2026,2027,2028	3	204D	""	""	""	""	""	724.206142433431
128	139	220418	68	CON	2028-10-06T00:00:00	2029-11-13T00:00:00	2029-04-16T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	M-53	M-53	from Newark Road to Morrice Boulevard	Reconstruction and Boulevard	Rural	Lapeer	Davison TSC	25	3050000	2028-12-01T00:00:00	""	Reconstruction	Reconstruction	Road	8.702	9.12	755909	Y	Priority (POC & Poverty)	2029	2029	3	""	""	""	""	""	""	672.706994963583
129	140	201225	68	CON	2025-06-06T00:00:00	2030-12-30T00:00:00	2026-03-06T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-94 E	I-94 E	Pelham to Oakwood	Reconstruct, Conc Pavt Rprs, Conc Pavt Inlay, and misc work	Southeast Michigan Council of Governments [SEMCOG]	Wayne	Taylor TSC	5	60000000	2025-08-01T00:00:00	""	Concrete Reconstruction	Reconstruction	Road	0.312	0.661	1576907	N	Priority (POC & Poverty),Not an EJ Priority Area	2025	2026,2027,2028	3	204C	""	""	""	""	""	560.875947541289
130	141	201225	68	CON	2025-06-06T00:00:00	2030-12-30T00:00:00	2026-03-06T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-94 E	I-94 E	Pelham to Oakwood	Reconstruct, Conc Pavt Rprs, Conc Pavt Inlay, and misc work	Southeast Michigan Council of Governments [SEMCOG]	Wayne	Taylor TSC	5	60000000	2025-08-01T00:00:00	""	Concrete Reconstruction	Reconstruction	Road	0	0.12	1869508	N	No data,Not an EJ Priority Area	2025	2026,2027,2028	3	203B	""	""	""	""	""	193.121665566807
131	142	201225	68	CON	2025-06-06T00:00:00	2030-12-30T00:00:00	2026-03-06T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-94 E	I-94 E	Pelham to Oakwood	Reconstruct, Conc Pavt Rprs, Conc Pavt Inlay, and misc work	Southeast Michigan Council of Governments [SEMCOG]	Wayne	Taylor TSC	5	60000000	2025-08-01T00:00:00	""	Concrete Reconstruction	Reconstruction	Road	0	0.661	1869601	N	Priority (POC & Poverty),Not an EJ Priority Area	2025	2026,2027,2028	3	204J	""	""	""	""	""	1063.44260659851
132	143	213488	68	CON	2025-10-10T00:00:00	2028-07-31T00:00:00	2026-02-02T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	US-23	US-23 N	School Road to Ida Center Road	Road Reconstruction	Southeast Michigan Council of Governments [SEMCOG]	Monroe	Brighton TSC	9	69841408	2025-12-05T00:00:00	""	Concrete Reconstruction	Reconstruction	Road	0	0.153	1224003	N	Priority (Poverty)	2026	2026,2027,2028	3	008B	""	""	""	""	""	246.067187850295
133	144	201225	68	CON	2025-06-06T00:00:00	2030-12-30T00:00:00	2026-03-06T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-94 E	I-94 E	Pelham to Oakwood	Reconstruct, Conc Pavt Rprs, Conc Pavt Inlay, and misc work	Southeast Michigan Council of Governments [SEMCOG]	Wayne	Taylor TSC	5	60000000	2025-08-01T00:00:00	""	Concrete Reconstruction	Reconstruction	Road	0	0.257	1869507	N	No data	2025	2026,2027,2028	3	203A	""	""	""	""	""	412.823098907816
134	145	201225	68	CON	2025-06-06T00:00:00	2030-12-30T00:00:00	2026-03-06T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-94 E	I-94 E	Pelham to Oakwood	Reconstruct, Conc Pavt Rprs, Conc Pavt Inlay, and misc work	Southeast Michigan Council of Governments [SEMCOG]	Wayne	Taylor TSC	5	60000000	2025-08-01T00:00:00	""	Concrete Reconstruction	Reconstruction	Road	0	0.328	1869509	N	Not an EJ Priority Area	2025	2026,2027,2028	3	203D	""	""	""	""	""	527.86573263199
135	146	201225	68	CON	2025-06-06T00:00:00	2030-12-30T00:00:00	2026-03-06T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-94 E	I-94 E	Pelham to Oakwood	Reconstruct, Conc Pavt Rprs, Conc Pavt Inlay, and misc work	Southeast Michigan Council of Governments [SEMCOG]	Wayne	Taylor TSC	5	60000000	2025-08-01T00:00:00	""	Concrete Reconstruction	Reconstruction	Road	16.748	17.071	1576405	Y	Not an EJ Priority Area	2025	2026,2027,2028	3	""	""	""	""	""	""	519.818931542095
136	147	201225	68	CON	2025-06-06T00:00:00	2030-12-30T00:00:00	2026-03-06T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-94 E	I-94 E	Pelham to Oakwood	Reconstruct, Conc Pavt Rprs, Conc Pavt Inlay, and misc work	Southeast Michigan Council of Governments [SEMCOG]	Wayne	Taylor TSC	5	60000000	2025-08-01T00:00:00	""	Concrete Reconstruction	Reconstruction	Road	0	0.277	1576907	N	Not an EJ Priority Area	2025	2026,2027,2028	3	204C	""	""	""	""	""	445.789119556563
137	148	201225	68	CON	2025-06-06T00:00:00	2030-12-30T00:00:00	2026-03-06T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-94 E	I-94 E	Pelham to Oakwood	Reconstruct, Conc Pavt Rprs, Conc Pavt Inlay, and misc work	Southeast Michigan Council of Governments [SEMCOG]	Wayne	Taylor TSC	5	60000000	2025-08-01T00:00:00	""	Concrete Reconstruction	Reconstruction	Road	0.138	0.454	1869510	N	Not an EJ Priority Area	2025	2026,2027,2028	3	203C	""	""	""	""	""	508.553696033407
138	149	201225	68	CON	2025-06-06T00:00:00	2030-12-30T00:00:00	2026-03-06T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-94 E	I-94 E	Pelham to Oakwood	Reconstruct, Conc Pavt Rprs, Conc Pavt Inlay, and misc work	Southeast Michigan Council of Governments [SEMCOG]	Wayne	Taylor TSC	5	60000000	2025-08-01T00:00:00	""	Concrete Reconstruction	Reconstruction	Road	0.364	0.624	1580306	N	Not an EJ Priority Area	2025	2026,2027,2028	3	204G	""	""	""	""	""	418.045965407103
139	150	201225	68	CON	2025-06-06T00:00:00	2030-12-30T00:00:00	2026-03-06T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-94 E	I-94 E	Pelham to Oakwood	Reconstruct, Conc Pavt Rprs, Conc Pavt Inlay, and misc work	Southeast Michigan Council of Governments [SEMCOG]	Wayne	Taylor TSC	5	60000000	2025-08-01T00:00:00	""	Concrete Reconstruction	Reconstruction	Road	0.226	0.342	1589506	N	Not an EJ Priority Area	2025	2026,2027,2028	3	204I	""	""	""	""	""	186.684142974976
140	151	204314	68	CON	2026-06-22T00:00:00	2029-12-07T00:00:00	2026-09-14T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	M-150	M-150	Avon to Clinton River and Paint Creek to Tienken	Reconstruction	Southeast Michigan Council of Governments [SEMCOG]	Oakland	Oakland TSC	5	21800000	2026-08-07T00:00:00	""	Reconstruction	Reconstruction	Road	13.013	13.818	4413538	N	Not an EJ Priority Area	2026	2026,2027,2028,2029	3	""	""	""	""	""	""	1295.52435678616
141	152	204314	68	CON	2026-06-22T00:00:00	2029-12-07T00:00:00	2026-09-14T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	M-150	M-150	Avon to Clinton River and Paint Creek to Tienken	Reconstruction	Southeast Michigan Council of Governments [SEMCOG]	Oakland	Oakland TSC	5	21800000	2026-08-07T00:00:00	""	Reconstruction	Reconstruction	Road	11.79	12.449	4413538	Y	Not an EJ Priority Area,Priority (POC)	2026	2026,2027,2028,2029	3	""	""	""	""	""	""	1060.55956553478
142	153	208609	68	CON	2025-06-06T00:00:00	2028-12-15T00:00:00	2026-03-02T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-94	I-94 E	Wayne Road to Middlebelt Road	Reconstruct	Southeast Michigan Council of Governments [SEMCOG]	Wayne	Taylor TSC	5	170200000	2025-08-01T00:00:00	""	Reconstruction	Reconstruction	Road	0	0.127	1588902	N	Not an EJ Priority Area	2025	2026,2027,2028	3	196D	""	""	""	""	""	204.386943123262
143	154	208609	68	CON	2025-06-06T00:00:00	2028-12-15T00:00:00	2026-03-02T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-94	I-94 E	Wayne Road to Middlebelt Road	Reconstruct	Southeast Michigan Council of Governments [SEMCOG]	Wayne	Taylor TSC	5	170200000	2025-08-01T00:00:00	""	Reconstruction	Reconstruction	Road	0	0.33	4718585	N	Not an EJ Priority Area	2025	2026,2027,2028	3	198H	""	""	""	""	""	530.525215422404
144	155	208609	68	CON	2025-06-06T00:00:00	2028-12-15T00:00:00	2026-03-02T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-94	I-94 E	Wayne Road to Middlebelt Road	Reconstruct	Southeast Michigan Council of Governments [SEMCOG]	Wayne	Taylor TSC	5	170200000	2025-08-01T00:00:00	""	Reconstruction	Reconstruction	Road	0	0.213	4718583	N	Not an EJ Priority Area	2025	2026,2027,2028	3	197D	""	""	""	""	""	342.790920906242
145	156	208609	68	CON	2025-06-06T00:00:00	2028-12-15T00:00:00	2026-03-02T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-94	I-94 E	Wayne Road to Middlebelt Road	Reconstruct	Southeast Michigan Council of Governments [SEMCOG]	Wayne	Taylor TSC	5	170200000	2025-08-01T00:00:00	""	Reconstruction	Reconstruction	Road	0	0.241	4706255	N	Not an EJ Priority Area	2025	2026,2027,2028	3	197C	""	""	""	""	""	387.667919996246
146	157	200682	68	CON	2026-06-26T00:00:00	2027-12-01T00:00:00	2027-05-03T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	US-31	US-31	from Freeman Road north to Hoague Road	Milling and Two Course Asphalt Resurfacing	Rural	Mason	Muskegon TSC	4	5650000	2026-08-07T00:00:00	""	Milling and Two Course Asphalt Resurfacing	Road Rehabilitation	Road	9.813	13.914	217507	Y	Not an EJ Priority Area	2026	2027	3	""	""	""	""	""	""	6599.93175586256
147	158	208609	68	CON	2025-06-06T00:00:00	2028-12-15T00:00:00	2026-03-02T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-94	I-94 E	Wayne Road to Middlebelt Road	Reconstruct	Southeast Michigan Council of Governments [SEMCOG]	Wayne	Taylor TSC	5	170200000	2025-08-01T00:00:00	""	Reconstruction	Reconstruction	Road	0	0.338	4706257	N	Not an EJ Priority Area	2025	2026,2027,2028	3	197A	""	""	""	""	""	543.821595194642
148	159	208609	68	CON	2025-06-06T00:00:00	2028-12-15T00:00:00	2026-03-02T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-94	I-94 E	Wayne Road to Middlebelt Road	Reconstruct	Southeast Michigan Council of Governments [SEMCOG]	Wayne	Taylor TSC	5	170200000	2025-08-01T00:00:00	""	Reconstruction	Reconstruction	Road	0	0.634	4706256	N	Not an EJ Priority Area	2025	2026,2027,2028	3	197B	""	""	""	""	""	1020.32592855007
149	160	210086	68	CON	2025-06-06T00:00:00	2027-12-14T00:00:00	2025-10-20T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-475	I-475 N	Thread Creek to Flint River and 10 Structure Locations	Road Reconstruction and Structure Work	Genesee County Metropolitan Planning Commission [GCMPC]	Genesee	Davison TSC	3	150429885	2025-08-01T00:00:00	""	Reconstruction	Reconstruction	Road	0	0.099	1844702	N	""	2025	2026,2027	3	033D	""	""	""	""	""	159.325371419633
150	161	208609	68	CON	2025-06-06T00:00:00	2028-12-15T00:00:00	2026-03-02T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-94	I-94 E	Wayne Road to Middlebelt Road	Reconstruct	Southeast Michigan Council of Governments [SEMCOG]	Wayne	Taylor TSC	5	170200000	2025-08-01T00:00:00	""	Reconstruction	Reconstruction	Road	0	0.93	1576701	N	Not an EJ Priority Area	2025	2026,2027,2028	3	998I	""	""	""	""	""	1496.69269972865
151	162	208609	68	CON	2025-06-06T00:00:00	2028-12-15T00:00:00	2026-03-02T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-94	I-94 E	Wayne Road to Middlebelt Road	Reconstruct	Southeast Michigan Council of Governments [SEMCOG]	Wayne	Taylor TSC	5	170200000	2025-08-01T00:00:00	""	Reconstruction	Reconstruction	Road	0	0.326	1578404	N	Not an EJ Priority Area	2025	2026,2027,2028	3	198B	""	""	""	""	""	524.64701916933
152	163	208609	68	CON	2025-06-06T00:00:00	2028-12-15T00:00:00	2026-03-02T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-94	I-94 E	Wayne Road to Middlebelt Road	Reconstruct	Southeast Michigan Council of Governments [SEMCOG]	Wayne	Taylor TSC	5	170200000	2025-08-01T00:00:00	""	Reconstruction	Reconstruction	Road	0	0.247	1578406	N	Not an EJ Priority Area	2025	2026,2027,2028	3	198D	""	""	""	""	""	397.023914875207
153	164	208609	68	CON	2025-06-06T00:00:00	2028-12-15T00:00:00	2026-03-02T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-94	I-94 E	Wayne Road to Middlebelt Road	Reconstruct	Southeast Michigan Council of Governments [SEMCOG]	Wayne	Taylor TSC	5	170200000	2025-08-01T00:00:00	""	Reconstruction	Reconstruction	Road	0	0.169	1578405	N	Not an EJ Priority Area	2025	2026,2027,2028	3	198C	""	""	""	""	""	271.857135934914
154	165	211041	68	CON	2026-09-11T00:00:00	2027-12-01T00:00:00	2027-03-15T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	M-91	M-91	from Stanton Road north to Kendaville Road	Crush & Shape and Reconstruction	Rural	Montcalm	Cadillac TSC	4	7033000	2026-11-06T00:00:00	""	Crush & Shape & Asphalt Resurfacing	Road Rehabilitation	Road	13.342	14.85	1204902	N	Priority (Poverty)	2026	2027	3	""	""	""	""	""	""	2426.89521910821
155	166	211793	68	CON	2023-07-03T00:00:00	2025-07-25T00:00:00	2024-06-03T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-94 E	I-94 E	Blue Water Bridge Plaza	BWB Plaza Expansion	Southeast Michigan Council of Governments [SEMCOG]	St. Clair	Huron TSC	33	46434010	2024-04-19T00:00:00	""	Concrete Reconstruction	Reconstruction	Road	24.618	25.216	967606	Y	""	2023	2024,2025	3	""	""	""	""	""	""	962.389484318771
156	167	211041	68	CON	2026-09-11T00:00:00	2027-12-01T00:00:00	2027-03-15T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	M-91	M-91	from Stanton Road north to Kendaville Road	Crush & Shape and Reconstruction	Rural	Montcalm	Cadillac TSC	4	7033000	2026-11-06T00:00:00	""	Crush & Shape & Asphalt Resurfacing	Road Rehabilitation	Road	14.851	17.72	1204902	Y	Priority (Poverty)	2026	2027	3	""	""	""	""	""	""	4617.21637440063
157	168	215026	68	CON	2025-10-10T00:00:00	2027-11-05T00:00:00	2026-04-13T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-75 	I-75 N	at the M-32 Interchange.	Reconstruction	Rural	Otsego	Gaylord TSC	6	60000000	2025-12-05T00:00:00	""	Interchange Redesign & Upgrading	Major Widening	Road	0	0.3	1080209	N	Priority (Poverty)	2026	2026,2027	3	003A	""	""	""	""	""	482.642653859681
158	169	211043	68	CON	2027-11-12T00:00:00	2030-10-31T00:00:00	2028-04-03T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	M-60	M-60	M-60, M-86, US-131BR in the City of Three Rivers	Reconstruction	Rural	St. Joseph	Marshall TSC	7	35000000	2028-01-07T00:00:00	""	Reconstruction	Reconstruction	Road	0	1.966	228406	N	Not an EJ Priority Area	2028	2028,2029,2030	3	""	""	""	""	""	""	3163.9761342109
159	170	215026	68	CON	2025-10-10T00:00:00	2027-11-05T00:00:00	2026-04-13T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-75 	I-75 N	at the M-32 Interchange.	Reconstruction	Rural	Otsego	Gaylord TSC	6	60000000	2025-12-05T00:00:00	""	Interchange Redesign & Upgrading	Major Widening	Road	10.609	10.854	1079903	N	Priority (Poverty)	2026	2026,2027	3	""	""	""	""	""	""	394.290081101833
160	171	210875	68	CON	2025-10-10T00:00:00	2027-06-25T00:00:00	2026-03-02T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	M-139	M-139	from 0.44 miles south of I-94 to I-94 BL	Reconstruction	Twin Cities Area Transportation Study [TwinCATS]	Berrien	Kalamazoo TSC	7	20803981	2025-12-05T00:00:00	""	Reconstruction	Reconstruction	Road	3.019	4.21	1366708	Y	Priority (POC & Poverty)	2026	2026,2027	3	""	""	""	""	""	""	1916.73217830882
161	172	211694	68	CON	2026-06-12T00:00:00	2027-12-03T00:00:00	2027-03-01T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	US-131	I-296 N	From I-96 north to Post Drive	Active Traffic Management Systems	Grand Valley Metropolitan Council [GVMC]	Kent	Grand Rapids TSC	264	35884105	2026-08-07T00:00:00	""	Dynamic Shoulder Use	Active Traffic Management	System Operations	17.213	17.229	410203	Y	Not an EJ Priority Area	2026	2027	3	""	""	""	""	""	""	25.749457009174
162	173	210812	68	CON	2024-10-11T00:00:00	2025-12-30T00:00:00	2025-04-01T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-94 W/ US-131 N Ramp	W I 94/US-131 N Ramp	I-94 Westbound ramp to US-131 Northbound	Widening for additional ramp lane	Kalamazoo Area Transportation Study [KATS]	Kalamazoo	Kalamazoo TSC	264	14300000	2024-12-06T00:00:00	""	Additional Lane(s) less than 0.5 mile long	Minor Widening	Road	0	0.248	3392903	N	Priority (POC)	2025	2025	3	074C	""	""	""	""	""	398.950312114803
163	174	210812	68	CON	2024-10-11T00:00:00	2025-12-30T00:00:00	2025-04-01T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-94 W/ US-131 N Ramp	W I 94/US-131 N Ramp	I-94 Westbound ramp to US-131 Northbound	Widening for additional ramp lane	Kalamazoo Area Transportation Study [KATS]	Kalamazoo	Kalamazoo TSC	264	14300000	2024-12-06T00:00:00	""	Additional Lane(s) less than 0.5 mile long	Minor Widening	Road	6.752	7.442	26005	N	Priority (POC)	2025	2025	3	""	""	""	""	""	""	1110.4493525413
164	175	211939	68	CON	2027-11-12T00:00:00	2028-12-28T00:00:00	2028-03-03T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-96BL	I-96BL E	I-96/Cedar St/Pennsylvania Interchange	Construct indirect lefts	Tri-County Regional Planning Commission [TCRPC]	Ingham	Lansing TSC	264	6600000	2028-01-07T00:00:00	""	Intersection Improvements	Traffic Safety	Traffic Safety	0	0.592	1869707	N	Priority (POC & Poverty)	2028	2028	3	""	""	""	""	""	""	952.73348099842
165	176	211939	68	CON	2027-11-12T00:00:00	2028-12-28T00:00:00	2028-03-03T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-96BL	I-96BL E	I-96/Cedar St/Pennsylvania Interchange	Construct indirect lefts	Tri-County Regional Planning Commission [TCRPC]	Ingham	Lansing TSC	264	6600000	2028-01-07T00:00:00	""	Intersection Improvements	Traffic Safety	Traffic Safety	0	0.106	1867902	N	Priority (POC & Poverty)	2028	2028	3	017D	""	""	""	""	""	170.018303834109
166	177	211939	68	CON	2027-11-12T00:00:00	2028-12-28T00:00:00	2028-03-03T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-96BL	I-96BL E	I-96/Cedar St/Pennsylvania Interchange	Construct indirect lefts	Tri-County Regional Planning Commission [TCRPC]	Ingham	Lansing TSC	264	6600000	2028-01-07T00:00:00	""	Intersection Improvements	Traffic Safety	Traffic Safety	0	0.54	336103	Y	Priority (POC & Poverty)	2028	2028	3	""	""	""	""	""	""	869.047308713184
167	178	210813	68	CON	2024-10-11T00:00:00	2026-12-30T00:00:00	2025-01-13T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	M-43	M-43	from 10th Street to Drake Road 	Widening for turn lanes, intersection and interchange ramp improvements	Kalamazoo Area Transportation Study [KATS]	Kalamazoo	Kalamazoo TSC	264	9163673	2024-12-06T00:00:00	""	Additional Lane(s) less than 0.5 mile long	Minor Widening	Road	0	0.121	1792209	N	Not an EJ Priority Area	2025	2025,2026	4	""	""	""	""	""	""	194.730964738579
168	179	211155	68	CON	2026-10-09T00:00:00	2031-05-30T00:00:00	2027-01-04T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	US-23 N	US-23 N	M-14 to I-94	Road system and operational improvement as defined through EA process	Southeast Michigan Council of Governments [SEMCOG]	Washtenaw	Brighton TSC	9	229369618	2026-12-04T00:00:00	""	Reconstruction	Reconstruction	Road	0	0.24	1429609	N	Priority (POC),Priority (POC & Poverty)	2027	2027,2028,2029	3	019C	""	""	""	""	""	386.243249567923
169	180	211155	68	CON	2026-10-09T00:00:00	2031-05-30T00:00:00	2027-01-04T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	US-23 N	US-23 N	M-14 to I-94	Road system and operational improvement as defined through EA process	Southeast Michigan Council of Governments [SEMCOG]	Washtenaw	Brighton TSC	9	229369618	2026-12-04T00:00:00	""	Reconstruction	Reconstruction	Road	0	0.326	1429702	N	Priority (POC & Poverty)	2027	2027,2028,2029	3	019D	""	""	""	""	""	524.412635430892
170	181	211155	68	CON	2026-10-09T00:00:00	2031-05-30T00:00:00	2027-01-04T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	US-23 N	US-23 N	M-14 to I-94	Road system and operational improvement as defined through EA process	Southeast Michigan Council of Governments [SEMCOG]	Washtenaw	Brighton TSC	9	229369618	2026-12-04T00:00:00	""	Reconstruction	Reconstruction	Road	0	0.225	1427705	N	Priority (POC)	2027	2027,2028,2029	3	019E	""	""	""	""	""	362.103021671889
171	182	211155	68	CON	2026-10-09T00:00:00	2031-05-30T00:00:00	2027-01-04T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	US-23 N	US-23 N	M-14 to I-94	Road system and operational improvement as defined through EA process	Southeast Michigan Council of Governments [SEMCOG]	Washtenaw	Brighton TSC	9	229369618	2026-12-04T00:00:00	""	Reconstruction	Reconstruction	Road	0	0.232	1429607	N	Priority (POC),Not an EJ Priority Area	2027	2027,2028,2029	3	019F	""	""	""	""	""	372.71895544428
172	183	211155	68	CON	2026-10-09T00:00:00	2031-05-30T00:00:00	2027-01-04T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	US-23 N	US-23 N	M-14 to I-94	Road system and operational improvement as defined through EA process	Southeast Michigan Council of Governments [SEMCOG]	Washtenaw	Brighton TSC	9	229369618	2026-12-04T00:00:00	""	Reconstruction	Reconstruction	Road	0	0.217	1429608	N	Not an EJ Priority Area	2027	2027,2028,2029	3	019G	""	""	""	""	""	349.228225376515
173	184	201225	68	CON	2025-06-06T00:00:00	2030-12-30T00:00:00	2026-03-06T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-94 E	I-94 E	Pelham to Oakwood	Reconstruct, Conc Pavt Rprs, Conc Pavt Inlay, and misc work	Southeast Michigan Council of Governments [SEMCOG]	Wayne	Taylor TSC	5	60000000	2025-08-01T00:00:00	""	Concrete Reconstruction	Reconstruction	Road	0.515	0.658	1580309	N	Not an EJ Priority Area	2025	2026,2027,2028	3	204F	""	""	""	""	""	230.13662606511
174	185	211155	68	CON	2026-10-09T00:00:00	2031-05-30T00:00:00	2027-01-04T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	US-23 N	US-23 N	M-14 to I-94	Road system and operational improvement as defined through EA process	Southeast Michigan Council of Governments [SEMCOG]	Washtenaw	Brighton TSC	9	229369618	2026-12-04T00:00:00	""	Reconstruction	Reconstruction	Road	0	0.235	1431310	N	Priority (POC)	2027	2027,2028,2029	3	020A	""	""	""	""	""	378.115836428133
175	186	211155	68	CON	2026-10-09T00:00:00	2031-05-30T00:00:00	2027-01-04T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	US-23 N	US-23 N	M-14 to I-94	Road system and operational improvement as defined through EA process	Southeast Michigan Council of Governments [SEMCOG]	Washtenaw	Brighton TSC	9	229369618	2026-12-04T00:00:00	""	Reconstruction	Reconstruction	Road	0.045	0.315	1431402	N	Not an EJ Priority Area,Priority (POC)	2027	2027,2028,2029	3	020B	""	""	""	""	""	434.488428198769
176	187	210086	68	CON	2025-06-06T00:00:00	2027-12-14T00:00:00	2025-10-20T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-475	I-475 N	Thread Creek to Flint River and 10 Structure Locations	Road Reconstruction and Structure Work	Genesee County Metropolitan Planning Commission [GCMPC]	Genesee	Davison TSC	3	150429885	2025-08-01T00:00:00	""	Reconstruction	Reconstruction	Road	0	0.15	1844305	N	""	2025	2026,2027	3	034B	""	""	""	""	""	240.980168768539
177	188	211155	68	CON	2026-10-09T00:00:00	2031-05-30T00:00:00	2027-01-04T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	US-23 N	US-23 N	M-14 to I-94	Road system and operational improvement as defined through EA process	Southeast Michigan Council of Governments [SEMCOG]	Washtenaw	Brighton TSC	9	229369618	2026-12-04T00:00:00	""	Reconstruction	Reconstruction	Road	0	0.395	1431404	N	Priority (POC),Not an EJ Priority Area	2027	2027,2028,2029	3	021A	""	""	""	""	""	635.540418775378
178	189	211155	68	CON	2026-10-09T00:00:00	2031-05-30T00:00:00	2027-01-04T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	US-23 N	US-23 N	M-14 to I-94	Road system and operational improvement as defined through EA process	Southeast Michigan Council of Governments [SEMCOG]	Washtenaw	Brighton TSC	9	229369618	2026-12-04T00:00:00	""	Reconstruction	Reconstruction	Road	0	0.279	1431406	N	Priority (POC)	2027	2027,2028,2029	3	021B	""	""	""	""	""	448.23827474104
179	190	211155	68	CON	2026-10-09T00:00:00	2031-05-30T00:00:00	2027-01-04T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	US-23 N	US-23 N	M-14 to I-94	Road system and operational improvement as defined through EA process	Southeast Michigan Council of Governments [SEMCOG]	Washtenaw	Brighton TSC	9	229369618	2026-12-04T00:00:00	""	Reconstruction	Reconstruction	Road	10.239	11.907	1431202	N	Priority (POC),Priority (POC & Poverty),Not an EJ Priority Area	2027	2027,2028,2029	3	""	""	""	""	""	""	2684.39069439445
180	191	220988	68	CON	2026-01-09T00:00:00	2026-11-16T00:00:00	2026-04-15T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	US-12	US-12	Haggerty to Lotz and EB / 0.2 miles west of Pershing to Howe	Reconstruct	Southeast Michigan Council of Governments [SEMCOG]	Wayne	Taylor TSC	5	31500000	2026-03-06T00:00:00	""	Reconstruction	Reconstruction	Road	0	0.023	6702983	N	Priority (Poverty),Not an EJ Priority Area	2026	2026	3	""	""	""	""	""	""	36.4116929774515
181	192	220367	68	CON	2029-08-10T00:00:00	2030-12-06T00:00:00	2030-04-01T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	M-78	M-78	from the Barry County Line to Pease Road	Shoulder widening	Tri-County Regional Planning Commission [TCRPC]	Eaton	Lansing TSC	31	634000	2029-10-05T00:00:00	""	Shoulder Widening	Minor Widening	Road	0	2.367	565105	Y	Not an EJ Priority Area	2029	2030	3	""	""	""	""	""	""	3809.3241183151
182	193	211155	68	CON	2026-10-09T00:00:00	2031-05-30T00:00:00	2027-01-04T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	US-23 N	US-23 N	M-14 to I-94	Road system and operational improvement as defined through EA process	Southeast Michigan Council of Governments [SEMCOG]	Washtenaw	Brighton TSC	9	229369618	2026-12-04T00:00:00	""	Reconstruction	Reconstruction	Road	0	0.282	1431307	N	Priority (POC),Priority (POC & Poverty)	2027	2027,2028,2029	3	019A	""	""	""	""	""	453.83594313176
183	194	211155	68	CON	2026-10-09T00:00:00	2031-05-30T00:00:00	2027-01-04T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	US-23 N	US-23 N	M-14 to I-94	Road system and operational improvement as defined through EA process	Southeast Michigan Council of Governments [SEMCOG]	Washtenaw	Brighton TSC	9	229369618	2026-12-04T00:00:00	""	Reconstruction	Reconstruction	Road	0.8	1.016	1426905	N	Priority (POC)	2027	2027,2028,2029	3	911K	""	""	""	""	""	347.274924470871
184	195	211155	68	CON	2026-10-09T00:00:00	2031-05-30T00:00:00	2027-01-04T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	US-23 N	US-23 N	M-14 to I-94	Road system and operational improvement as defined through EA process	Southeast Michigan Council of Governments [SEMCOG]	Washtenaw	Brighton TSC	9	229369618	2026-12-04T00:00:00	""	Reconstruction	Reconstruction	Road	11.957	15.79	1431603	N	Priority (POC),Not an EJ Priority Area	2027	2027,2028,2029	3	""	""	""	""	""	""	6168.62684870917
185	196	211155	68	CON	2026-10-09T00:00:00	2031-05-30T00:00:00	2027-01-04T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	US-23 N	US-23 N	M-14 to I-94	Road system and operational improvement as defined through EA process	Southeast Michigan Council of Governments [SEMCOG]	Washtenaw	Brighton TSC	9	229369618	2026-12-04T00:00:00	""	Reconstruction	Reconstruction	Road	15.805	16.543	1431603	N	Priority (POC)	2027	2027,2028,2029	3	""	""	""	""	""	""	1187.6980263718
186	197	214656	68	CON	2027-10-08T00:00:00	2029-06-29T00:00:00	2028-05-15T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	US-31	US-31	at the southerly M-37 intersection.	Lane reconfiguration and lane extension	Rural	Grand Traverse	Traverse City TSC	264	372004	2027-12-03T00:00:00	""	Additional Lane(s) less than 0.5 mile long	Minor Widening	Road	7.783	8.188	992204	Y	Priority (Poverty)	2028	2028	3	""	""	""	""	""	""	651.785465249606
187	198	211155	68	CON	2026-10-09T00:00:00	2031-05-30T00:00:00	2027-01-04T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	US-23 N	US-23 N	M-14 to I-94	Road system and operational improvement as defined through EA process	Southeast Michigan Council of Governments [SEMCOG]	Washtenaw	Brighton TSC	9	229369618	2026-12-04T00:00:00	""	Reconstruction	Reconstruction	Road	16.543	17.122	1431603	N	Priority (POC)	2027	2027,2028,2029	3	022D	""	""	""	""	""	931.811836522291
188	199	210599	68	CON	2024-12-13T00:00:00	2028-12-01T00:00:00	2025-04-07T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-75BL (Woodward Ave Loop)	I-75BL S	I-75 BL (Woodward Ave Loop), M-59, and US-24 BR (N Cass Ave)	Reconstruction	Southeast Michigan Council of Governments [SEMCOG]	Oakland	Oakland TSC	5	41300000	2025-02-07T00:00:00	""	Concrete Reconstruction	Reconstruction	Road	0.918	1.211	641407	N	Priority (POC & Poverty)	2025	2025,2026	3	""	""	""	""	""	""	471.538589524314
189	200	211155	68	CON	2026-10-09T00:00:00	2031-05-30T00:00:00	2027-01-04T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	US-23 N	US-23 N	M-14 to I-94	Road system and operational improvement as defined through EA process	Southeast Michigan Council of Governments [SEMCOG]	Washtenaw	Brighton TSC	9	229369618	2026-12-04T00:00:00	""	Reconstruction	Reconstruction	Road	0	0.018	4606021	N	Not an EJ Priority Area	2027	2027,2028,2029	3	""	""	""	""	""	""	28.4509913837089
190	201	211155	68	CON	2026-10-09T00:00:00	2031-05-30T00:00:00	2027-01-04T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	US-23 N	US-23 N	M-14 to I-94	Road system and operational improvement as defined through EA process	Southeast Michigan Council of Governments [SEMCOG]	Washtenaw	Brighton TSC	9	229369618	2026-12-04T00:00:00	""	Reconstruction	Reconstruction	Road	0	0.224	2000004	N	Priority (POC),Not an EJ Priority Area	2027	2027,2028,2029	3	021F	""	""	""	""	""	359.767282712509
191	202	211155	68	CON	2026-10-09T00:00:00	2031-05-30T00:00:00	2027-01-04T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	US-23 N	US-23 N	M-14 to I-94	Road system and operational improvement as defined through EA process	Southeast Michigan Council of Governments [SEMCOG]	Washtenaw	Brighton TSC	9	229369618	2026-12-04T00:00:00	""	Reconstruction	Reconstruction	Road	0	0.573	4603872	N	Priority (POC)	2027	2027,2028,2029	3	011F	""	""	""	""	""	921.552223402091
192	203	211155	68	CON	2026-10-09T00:00:00	2031-05-30T00:00:00	2027-01-04T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	US-23 N	US-23 N	M-14 to I-94	Road system and operational improvement as defined through EA process	Southeast Michigan Council of Governments [SEMCOG]	Washtenaw	Brighton TSC	9	229369618	2026-12-04T00:00:00	""	Reconstruction	Reconstruction	Road	26.01	26.505	1426110	N	Priority (POC)	2027	2027,2028,2029	3	""	""	""	""	""	""	796.626930643936
193	204	211043	68	CON	2027-11-12T00:00:00	2030-10-31T00:00:00	2028-04-03T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	M-60	M-60	M-60, M-86, US-131BR in the City of Three Rivers	Reconstruction	Rural	St. Joseph	Marshall TSC	7	35000000	2028-01-07T00:00:00	""	Reconstruction	Reconstruction	Road	0.171	1.078	3750035	Y	Not an EJ Priority Area	2028	2028,2029,2030	3	""	""	""	""	""	""	1459.67755723912
194	205	211155	68	CON	2026-10-09T00:00:00	2031-05-30T00:00:00	2027-01-04T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	US-23 N	US-23 N	M-14 to I-94	Road system and operational improvement as defined through EA process	Southeast Michigan Council of Governments [SEMCOG]	Washtenaw	Brighton TSC	9	229369618	2026-12-04T00:00:00	""	Reconstruction	Reconstruction	Road	0.019	0.212	4606199	N	Not an EJ Priority Area	2027	2027,2028,2029	3	020E	""	""	""	""	""	310.604001980853
195	206	211155	68	CON	2026-10-09T00:00:00	2031-05-30T00:00:00	2027-01-04T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	US-23 N	US-23 N	M-14 to I-94	Road system and operational improvement as defined through EA process	Southeast Michigan Council of Governments [SEMCOG]	Washtenaw	Brighton TSC	9	229369618	2026-12-04T00:00:00	""	Reconstruction	Reconstruction	Road	0	0.019	4606022	N	Priority (POC)	2027	2027,2028,2029	3	""	""	""	""	""	""	30.5289670625503
196	207	209359	68	CON	2024-10-01T00:00:00	2026-04-30T00:00:00	2025-05-05T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	US-31	US-31	From Lake Ann Road to Sullivan Road	Construct continuous center left turn lane.	Rural	Grand Traverse	Traverse City TSC	28	2609799	2024-12-06T00:00:00	""	Left Turn Lane	Minor Widening	Road	22.327	23.589	1074106	N	Not an EJ Priority Area	2025	2025	3	""	""	""	""	""	""	2030.99587906805
197	208	214958	68	CON	2026-08-07T00:00:00	2029-06-29T00:00:00	2027-05-17T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	US-2	US-2	from North 30th Street to 9th Avenue in the city of Escanaba	HMA reconstruction including storm sewer, sanitary sewer, and water main.	Rural	Delta	Crystal Falls TSC	8	12735372	2026-10-02T00:00:00	""	Asphalt Reconstruction	Reconstruction	Road	11.897	12.404	1351805	N	Not an EJ Priority Area,Priority (Poverty)	2026	2027,2028	3	""	""	""	""	""	""	815.939068057819
198	209	211043	68	CON	2027-11-12T00:00:00	2030-10-31T00:00:00	2028-04-03T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	M-60	M-60	M-60, M-86, US-131BR in the City of Three Rivers	Reconstruction	Rural	St. Joseph	Marshall TSC	7	35000000	2028-01-07T00:00:00	""	Reconstruction	Reconstruction	Road	0	0.094	3750550	N	Not an EJ Priority Area	2028	2028,2029,2030	3	""	""	""	""	""	""	151.23295389791
199	210	214958	68	CON	2026-08-07T00:00:00	2029-06-29T00:00:00	2027-05-17T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	US-2	US-2	from North 30th Street to 9th Avenue in the city of Escanaba	HMA reconstruction including storm sewer, sanitary sewer, and water main.	Rural	Delta	Crystal Falls TSC	8	12735372	2026-10-02T00:00:00	""	Asphalt Reconstruction	Reconstruction	Road	17.654	18.472	1349006	Y	Priority (Poverty)	2026	2027,2028	3	""	""	""	""	""	""	1316.44599503461
200	211	201225	68	CON	2025-06-06T00:00:00	2030-12-30T00:00:00	2026-03-06T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-94 E	I-94 E	Pelham to Oakwood	Reconstruct, Conc Pavt Rprs, Conc Pavt Inlay, and misc work	Southeast Michigan Council of Governments [SEMCOG]	Wayne	Taylor TSC	5	60000000	2025-08-01T00:00:00	""	Concrete Reconstruction	Reconstruction	Road	16.826	17.031	1588802	N	Not an EJ Priority Area	2025	2026,2027,2028	3	""	""	""	""	""	""	329.916257326824
201	212	214876	68	CON	2028-10-06T00:00:00	2030-09-30T00:00:00	2029-05-01T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	M-66	M-66	from Indiana state line to Lafayette Street	Milling and two course asphalt overlay	Rural	St. Joseph	Marshall TSC	7	15000000	2028-12-01T00:00:00	""	Milling and Two Course Asphalt Resurfacing	Road Rehabilitation	Road	2.946	3.517	238204	N	Priority (POC & Poverty)	2029	2029,2030	3	""	""	""	""	""	""	918.937003362444
202	213	213485	68	CON	2024-10-11T00:00:00	2026-12-01T00:00:00	2025-04-01T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	US-12	US-12	Carpenter Road to I-94	Mill and asphalt overlay with concrete patches	Southeast Michigan Council of Governments [SEMCOG]	Washtenaw	Brighton TSC	82	1648000	2024-12-06T00:00:00	""	Milling & One Course Asphalt Overlay	Road Capital Preventive Maintenance	Road	0	0.757	1427708	N	Priority (POC),Not an EJ Priority Area	2025	2025	3	""	""	""	""	""	""	1218.27552073883
203	214	208609	68	CON	2025-06-06T00:00:00	2028-12-15T00:00:00	2026-03-02T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-94	I-94 E	Wayne Road to Middlebelt Road	Reconstruct	Southeast Michigan Council of Governments [SEMCOG]	Wayne	Taylor TSC	5	170200000	2025-08-01T00:00:00	""	Reconstruction	Reconstruction	Road	0.925	1.619	1588904	N	Not an EJ Priority Area	2025	2026,2027,2028	3	999G	""	""	""	""	""	1116.88687047606
204	215	213485	68	CON	2024-10-11T00:00:00	2026-12-01T00:00:00	2025-04-01T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	US-12	US-12	Carpenter Road to I-94	Mill and asphalt overlay with concrete patches	Southeast Michigan Council of Governments [SEMCOG]	Washtenaw	Brighton TSC	82	1648000	2024-12-06T00:00:00	""	Milling & One Course Asphalt Overlay	Road Capital Preventive Maintenance	Road	0	0.73	1427707	N	Priority (POC),Not an EJ Priority Area	2025	2025	3	""	""	""	""	""	""	1174.82326463441
205	216	217675	68	CON	2025-06-06T00:00:00	2026-11-13T00:00:00	2026-03-09T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	M-25	M-25	from Sanilac/Huron County Line to Helena Road	Milling and One Course HMA Overlay	Rural	Huron	Huron TSC	76	3408182	2025-08-01T00:00:00	""	Milling & One Course Asphalt Overlay	Road Capital Preventive Maintenance	Road	0	6.006	1033107	Y	Not an EJ Priority Area	2025	2026	3	""	""	""	""	""	""	9665.73770816232
206	217	208489	68	CON	2025-06-06T00:00:00	2026-12-23T00:00:00	2026-03-16T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	US10 BR/M-20	M-20 E	Jerome Street to Washington Street	Reconstruction	Midland Area Transportation Study [MATS]	Midland	Mt. Pleasant TSC	3	39400800	2025-08-01T00:00:00	""	Reconstruction	Reconstruction	Road	0.753	0.953	885605	N	Priority (Poverty)	2025	2026	3	""	""	""	""	""	""	321.869463660117
207	218	213485	68	CON	2024-10-11T00:00:00	2026-12-01T00:00:00	2025-04-01T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	US-12	US-12	Carpenter Road to I-94	Mill and asphalt overlay with concrete patches	Southeast Michigan Council of Governments [SEMCOG]	Washtenaw	Brighton TSC	82	1648000	2024-12-06T00:00:00	""	Milling & One Course Asphalt Overlay	Road Capital Preventive Maintenance	Road	17.128	18.471	1427301	Y	Priority (POC),Not an EJ Priority Area	2025	2025	3	""	""	""	""	""	""	2161.08486621346
208	219	210812	68	CON	2024-10-11T00:00:00	2025-12-30T00:00:00	2025-04-01T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-94 W/ US-131 N Ramp	W I 94/US-131 N Ramp	I-94 Westbound ramp to US-131 Northbound	Widening for additional ramp lane	Kalamazoo Area Transportation Study [KATS]	Kalamazoo	Kalamazoo TSC	264	14300000	2024-12-06T00:00:00	""	Additional Lane(s) less than 0.5 mile long	Minor Widening	Road	8.68	9.28	3390106	N	Not an EJ Priority Area	2025	2025	3	""	""	""	""	""	""	965.608207112052
209	220	209416	68	CON	2025-07-11T00:00:00	2026-10-30T00:00:00	2026-02-01T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	Lansing Road	Old 27 N	at Millett Highway	Construction of directional crossovers with turning loons	Tri-County Regional Planning Commission [TCRPC]	Eaton	Lansing TSC	31	1092300	2025-09-05T00:00:00	""	Intersection Improvements	Traffic Safety	Traffic Safety	3.29	4.086	3231104	N	Priority (POC & Poverty)	2025	2026	3	""	""	""	""	""	""	1281.04012066122
210	221	219773	68	CON	2026-08-07T00:00:00	2027-12-03T00:00:00	2027-06-14T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	M-43 E	M-43 E	M-43/I-69BL (Saginaw and Oakland) from Chesnut St to Pennsylvania Ave	"1.5"" milling and asphalt overlay with concrete pavement repairs"	Tri-County Regional Planning Commission [TCRPC]	Ingham	Lansing TSC	82	1985236	2026-10-02T00:00:00	""	Milling & One Course Asphalt Overlay	Road Capital Preventive Maintenance	Road	2.977	3.326	341208	N	Priority (POC & Poverty)	2026	2027	3	""	""	""	""	""	""	561.662109589428
211	222	209416	68	CON	2025-07-11T00:00:00	2026-10-30T00:00:00	2026-02-01T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	Lansing Road	Old 27 N	at Millett Highway	Construction of directional crossovers with turning loons	Tri-County Regional Planning Commission [TCRPC]	Eaton	Lansing TSC	31	1092300	2025-09-05T00:00:00	""	Intersection Improvements	Traffic Safety	Traffic Safety	13.802	14.601	566006	Y	Priority (POC & Poverty)	2025	2026	3	""	""	""	""	""	""	1285.8682959847
212	223	220458	68	CON	2029-07-27T00:00:00	2030-12-27T00:00:00	2030-05-06T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	M-28	M-28	from Kitchie Road to the Baraga County Line	Widen Paved Shoulders	Rural	Houghton	Ishpeming TSC	30	1339592	2029-09-07T00:00:00	""	Shoulder Widening	Minor Widening	Road	9.568	15.256	1174510	Y	Not an EJ Priority Area	2029	2030	3	""	""	""	""	""	""	9153.39846152131
213	224	214107	68	CON	2028-10-06T00:00:00	2029-12-28T00:00:00	2029-04-09T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	US-223	US-223	Ogden Highway to High Street	Shoulder widening and paving	Rural	Lenawee	Jackson TSC	31	456751	2028-12-01T00:00:00	""	Shoulder Widening	Minor Widening	Road	23.44	29.807	946402	Y	Not an EJ Priority Area,Priority (POC)	2029	2029	3	""	""	""	""	""	""	10246.5624187227
214	225	214107	68	CON	2028-10-06T00:00:00	2029-12-28T00:00:00	2029-04-09T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	US-223	US-223	Ogden Highway to High Street	Shoulder widening and paving	Rural	Lenawee	Jackson TSC	31	456751	2028-12-01T00:00:00	""	Shoulder Widening	Minor Widening	Road	0	0.302	947102	N	Not an EJ Priority Area	2029	2029	3	""	""	""	""	""	""	486.022758883619
215	226	220988	68	CON	2026-01-09T00:00:00	2026-11-16T00:00:00	2026-04-15T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	US-12	US-12	Haggerty to Lotz and EB / 0.2 miles west of Pershing to Howe	Reconstruct	Southeast Michigan Council of Governments [SEMCOG]	Wayne	Taylor TSC	5	31500000	2026-03-06T00:00:00	""	Reconstruction	Reconstruction	Road	0	0.03	4708363	Y	Priority (POC)	2026	2026	3	""	""	""	""	""	""	48.2802898175563
216	227	220402	68	CON	2029-09-04T00:00:00	2030-12-06T00:00:00	2030-04-15T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	US-131 Southbound	US-131 S/84th Ramp	exit ramp to 84th Street	Ramp widening for a right-turn lane	Grand Valley Metropolitan Council [GVMC]	Kent	Grand Rapids TSC	264	540848	2029-11-02T00:00:00	""	Right Turn Lane	Minor Widening	Road	0	0.172	411007	Y	Not an EJ Priority Area	2029	2030	3	002C	""	""	""	""	""	276.807709913789
217	228	220397	68	CON	2028-10-06T00:00:00	2029-11-16T00:00:00	2029-04-16T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	M-57	M-57	at Northland Drive	Roundabout Construction	Grand Valley Metropolitan Council [GVMC]	Kent	Grand Rapids TSC	264	4378004	2028-12-01T00:00:00	""	Intersection Improvements	Traffic Safety	Traffic Safety	4.929	5.233	410710	Y	Not an EJ Priority Area	2029	2029	3	""	""	""	""	""	""	489.241519933433
218	229	220394	68	CON	2026-09-04T00:00:00	2028-06-09T00:00:00	2027-05-17T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	M-35	M-35	from Old Mill Lane 20.75 Road to the Bark River.	Hot mixed asphalt shoulder widening.	Rural	Delta	Crystal Falls TSC	30	1310000	2026-11-06T00:00:00	""	Shoulder Widening	Minor Widening	Road	23.912	25.5	1322610	N	Not an EJ Priority Area	2026	2027	3	""	""	""	""	""	""	2555.64293869099
219	230	220231	68	CON	2028-10-06T00:00:00	2029-12-28T00:00:00	2029-04-16T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	M-57	M-57	M-57 from 417' East of Northland Drive to Tefft Avenue	Shoulder Widening and rumble strips	Grand Valley Metropolitan Council [GVMC]	Kent	Grand Rapids TSC	26	1206911	2028-12-01T00:00:00	""	Shoulder Widening	Minor Widening	Road	5.085	6.658	410710	Y	Not an EJ Priority Area	2029	2029	3	""	""	""	""	""	""	2531.50270821291
220	231	208838	68	CON	2025-10-10T00:00:00	2027-04-30T00:00:00	2026-02-02T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	M-55	M-55	from Udell Hills Road to M-37	Asphalt Overlay	Rural	Manistee	Traverse City TSC	79	4103000	2025-12-05T00:00:00	""	One Course Asphalt Overlay	Road Capital Preventive Maintenance	Road	20.976	25.055	1154207	N	Not an EJ Priority Area	2026	2026	3	""	""	""	""	""	""	6564.47226207686
221	232	220411	68	CON	2027-10-08T00:00:00	2029-06-15T00:00:00	2028-05-15T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	M-72	M-72	from west of Bates Road to west of Arnold Road.	Widening to construct a center left turn lane.	Rural	Grand Traverse	Traverse City TSC	28	1131377	2027-12-03T00:00:00	""	Additional lane(s) over 0.5 mile long	Major Widening	Road	2.806	3.266	994307	Y	Not an EJ Priority Area	2028	2028	3	""	""	""	""	""	""	740.299583195736
222	233	220355	68	CON	2025-08-08T00:00:00	2026-12-04T00:00:00	2026-04-06T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	M-100	M-100	M-100 from Doane Hwy to Strange Hwy	Shoulder Widening	Tri-County Regional Planning Commission [TCRPC]	Eaton	Lansing TSC	31	348000	2025-10-03T00:00:00	""	Shoulder Widening	Minor Widening	Road	3.859	5.446	566510	Y	Not an EJ Priority Area	2025	2026	3	""	""	""	""	""	""	2554.03356807513
223	234	220364	68	CON	2029-08-10T00:00:00	2030-12-06T00:00:00	2030-04-01T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	M-78	M-78	M-78 from Bellevue to I-69	Shoulder widening	Tri-County Regional Planning Commission [TCRPC]	Eaton	Lansing TSC	31	870000	2029-10-05T00:00:00	""	Shoulder Widening	Minor Widening	Road	3.466	6.857	565105	Y	Not an EJ Priority Area	2029	2030	3	""	""	""	""	""	""	5457.29554181081
224	235	211047	68	CON	2026-08-07T00:00:00	2027-11-19T00:00:00	2027-05-17T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	M-134	M-134	from southbound I-75 ramps to east of northbound I-75 ramps	HMA Crush and Shape and HMA Resurfacing	Rural	Mackinac	Newberry TSC	8	860000	2026-10-02T00:00:00	""	Crush & Shape & Asphalt Resurfacing	Road Rehabilitation	Road	0.238	0.646	1143604	Y	Not an EJ Priority Area	2026	2027	3	""	""	""	""	""	""	656.613468512896
225	236	211155	68	CON	2026-10-09T00:00:00	2031-05-30T00:00:00	2027-01-04T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	US-23 N	US-23 N	M-14 to I-94	Road system and operational improvement as defined through EA process	Southeast Michigan Council of Governments [SEMCOG]	Washtenaw	Brighton TSC	9	229369618	2026-12-04T00:00:00	""	Reconstruction	Reconstruction	Road	0	0.334	1426907	N	Not an EJ Priority Area	2027	2027,2028,2029	3	021D	""	""	""	""	""	537.521809439687
226	237	219523	68	CON	2028-07-07T00:00:00	2030-06-07T00:00:00	2029-05-07T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	US-2	US-2	from north of County Road 424 southerly to County Airport Road.	HMA reconstruction and HMA base crushing and shaping and resurfacing.	Rural	Iron	Crystal Falls TSC	8	11161450	2028-09-01T00:00:00	""	Asphalt Reconstruction	Reconstruction	Road	2.849	6.476	3360044	Y	Not an EJ Priority Area	2028	2029	3	""	""	""	""	""	""	5837.10144929364
227	238	211939	68	CON	2027-11-12T00:00:00	2028-12-28T00:00:00	2028-03-03T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-96BL	I-96BL E	I-96/Cedar St/Pennsylvania Interchange	Construct indirect lefts	Tri-County Regional Planning Commission [TCRPC]	Ingham	Lansing TSC	264	6600000	2028-01-07T00:00:00	""	Intersection Improvements	Traffic Safety	Traffic Safety	6.511	6.538	359606	N	Priority (POC & Poverty)	2028	2028	3	""	""	""	""	""	""	43.4522849300676
228	239	217178	68	CON	2028-08-11T00:00:00	2029-10-26T00:00:00	2029-05-29T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	US-2	US-2	from Worth Road to Wildwood Road	Cold Milling with two course HMA resurfacing.	Rural	Mackinac	Newberry TSC	8	8307000	2028-10-06T00:00:00	""	Milling and Two Course Asphalt Resurfacing	Road Rehabilitation	Road	39.609	44.052	1142108	Y	Priority (POC & Poverty),Not an EJ Priority Area	2028	2029	3	""	""	""	""	""	""	7150.32866387296
229	240	217409	68	CON	2027-08-20T00:00:00	2028-12-28T00:00:00	2028-05-01T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	M-95	M-95	from County Road FH to County Road 601	Aggregate Grade Lift with HMA Surfacing	Rural	Marquette	Ishpeming TSC	8	1446928	2027-10-01T00:00:00	""	Aggregate Grade Lift & Asphalt Overlay	Road Rehabilitation	Road	18.456	19.035	1560510	Y	Not an EJ Priority Area	2027	2028	3	""	""	""	""	""	""	931.811875581426
230	241	214876	68	CON	2028-10-06T00:00:00	2030-09-30T00:00:00	2029-05-01T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	M-66	M-66	from Indiana state line to Lafayette Street	Milling and two course asphalt overlay	Rural	St. Joseph	Marshall TSC	7	15000000	2028-12-01T00:00:00	""	Milling and Two Course Asphalt Resurfacing	Road Rehabilitation	Road	0	2.659	238008	Y	Priority (Poverty),Not an EJ Priority Area	2029	2029,2030	3	""	""	""	""	""	""	4279.25361265003
231	242	211694	68	CON	2026-06-12T00:00:00	2027-12-03T00:00:00	2027-03-01T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	US-131	I-296 N	From I-96 north to Post Drive	Active Traffic Management Systems	Grand Valley Metropolitan Council [GVMC]	Kent	Grand Rapids TSC	264	35884105	2026-08-07T00:00:00	""	Dynamic Shoulder Use	Active Traffic Management	System Operations	17.878	23.477	410907	N	Not an EJ Priority Area	2026	2027	3	""	""	""	""	""	""	9010.73363650472
232	243	219521	68	CON	2026-06-12T00:00:00	2027-11-19T00:00:00	2027-05-10T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	M-94	M-94	from Dodge Lake Road to Alger County line	HMA overlay	Rural	Schoolcraft	Newberry TSC	81	6155000	2026-08-07T00:00:00	""	One Course Asphalt Overlay	Road Capital Preventive Maintenance	Road	0	21.743	1200603	Y	Not an EJ Priority Area	2026	2027	3	""	""	""	""	""	""	34992.0311678562
233	244	219538	68	CON	2026-08-21T00:00:00	2027-12-29T00:00:00	2027-05-17T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	M-64	M-64	from Bergland to Silver City	Single Course HMA Overlay	Rural	Ontonagon	Ishpeming TSC	81	6486000	2026-10-02T00:00:00	""	One Course Asphalt Overlay	Road Capital Preventive Maintenance	Road	0.152	17.677	1271205	Y	Not an EJ Priority Area	2026	2027	3	""	""	""	""	""	""	28203.8058916576
234	245	211155	68	CON	2026-10-09T00:00:00	2031-05-30T00:00:00	2027-01-04T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	US-23 N	US-23 N	M-14 to I-94	Road system and operational improvement as defined through EA process	Southeast Michigan Council of Governments [SEMCOG]	Washtenaw	Brighton TSC	9	229369618	2026-12-04T00:00:00	""	Reconstruction	Reconstruction	Road	0	0.315	1430309	N	Not an EJ Priority Area	2027	2027,2028,2029	3	020C	""	""	""	""	""	506.94426408368
235	246	213407	68	CON	2025-06-06T00:00:00	2026-11-20T00:00:00	2026-05-11T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	M-123	M-123	from Curley Lewis Memorial Highway to Paradise	Micro mill and one course overlay	Rural	Chippewa	Newberry TSC	81	4024500	2025-08-01T00:00:00	""	Milling & One Course Asphalt Overlay	Road Capital Preventive Maintenance	Road	22.522	36.535	3170009	Y	Not an EJ Priority Area	2025	2026	3	""	""	""	""	""	""	22551.7791532128
236	247	211155	68	CON	2026-10-09T00:00:00	2031-05-30T00:00:00	2027-01-04T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	US-23 N	US-23 N	M-14 to I-94	Road system and operational improvement as defined through EA process	Southeast Michigan Council of Governments [SEMCOG]	Washtenaw	Brighton TSC	9	229369618	2026-12-04T00:00:00	""	Reconstruction	Reconstruction	Road	0	0.646	1431409	N	Priority (POC)	2027	2027,2028,2029	3	022B	""	""	""	""	""	1039.6381833333
237	248	211155	68	CON	2026-10-09T00:00:00	2031-05-30T00:00:00	2027-01-04T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	US-23 N	US-23 N	M-14 to I-94	Road system and operational improvement as defined through EA process	Southeast Michigan Council of Governments [SEMCOG]	Washtenaw	Brighton TSC	9	229369618	2026-12-04T00:00:00	""	Reconstruction	Reconstruction	Road	0	0.206	1429610	N	Priority (POC),Not an EJ Priority Area	2027	2027,2028,2029	3	019B	""	""	""	""	""	331.012821461836
238	249	201225	68	CON	2025-06-06T00:00:00	2030-12-30T00:00:00	2026-03-06T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-94 E	I-94 E	Pelham to Oakwood	Reconstruct, Conc Pavt Rprs, Conc Pavt Inlay, and misc work	Southeast Michigan Council of Governments [SEMCOG]	Wayne	Taylor TSC	5	60000000	2025-08-01T00:00:00	""	Concrete Reconstruction	Reconstruction	Road	10.403	10.506	1670203	N	Not an EJ Priority Area	2025	2026,2027,2028	3	""	""	""	""	""	""	165.76263017254
239	250	215026	68	CON	2025-10-10T00:00:00	2027-11-05T00:00:00	2026-04-13T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-75 	I-75 N	at the M-32 Interchange.	Reconstruction	Rural	Otsego	Gaylord TSC	6	60000000	2025-12-05T00:00:00	""	Interchange Redesign & Upgrading	Major Widening	Road	12.649	13	1080910	N	Priority (Poverty)	2026	2026,2027	3	""	""	""	""	""	""	564.880796517376
240	251	220874	68	CON	2026-11-13T00:00:00	2027-12-29T00:00:00	2027-03-01T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	US-12	US-12 W	County Line to Denton Rd	Concrete Inlay	Southeast Michigan Council of Governments [SEMCOG]	Wayne	Taylor TSC	5	21900000	2027-01-08T00:00:00	""	Concrete Pavement Inlay	Road Rehabilitation	Road	0	0.02	6703034	N	Not an EJ Priority Area	2027	2027	3	""	""	""	""	""	""	32.1869511589327
241	252	215817	68	CON	2029-07-27T00:00:00	2030-12-30T00:00:00	2030-05-06T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	M-28	M-28	from Kitchie Road to the Baraga County Line	HMA Base Crushing and Shaping with HMA Resurfacing	Rural	Houghton	Ishpeming TSC	8	7187918	2029-09-07T00:00:00	""	Crush & Shape & Asphalt Resurfacing	Road Rehabilitation	Road	9.568	15.256	1174510	Y	Not an EJ Priority Area	2029	2030	3	""	""	""	""	""	""	9153.39846152131
242	253	211694	68	CON	2026-06-12T00:00:00	2027-12-03T00:00:00	2027-03-01T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	US-131	I-296 N	From I-96 north to Post Drive	Active Traffic Management Systems	Grand Valley Metropolitan Council [GVMC]	Kent	Grand Rapids TSC	264	35884105	2026-08-07T00:00:00	""	Dynamic Shoulder Use	Active Traffic Management	System Operations	17.418	17.867	410907	N	Not an EJ Priority Area	2026	2027	3	""	""	""	""	""	""	722.5968589527
243	254	208927	68	CON	2024-10-25T00:00:00	2025-12-05T00:00:00	2025-05-05T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	M-44 CONN	Conn 44	from I-96 north to Airway Street	Milling and Two Course Asphalt Resurfacing	Grand Valley Metropolitan Council [GVMC]	Kent	Grand Rapids TSC	4	7323000	2024-12-06T00:00:00	""	Milling and Two Course Asphalt Resurfacing	Road Rehabilitation	Road	3.028	3.229	405307	N	Not an EJ Priority Area	2025	2025	3	""	""	""	""	""	""	323.478678488756
244	255	208421	68	CON	2025-06-20T00:00:00	2026-12-30T00:00:00	2026-03-16T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	M-35	M-35	from County Road 480 to US-41	Crush and Shape with 2 course HMA resurfacing	Rural	Marquette	Ishpeming TSC	8	6448769	2025-08-01T00:00:00	""	Crush & Shape & Asphalt Resurfacing	Road Rehabilitation	Road	38.393	39.662	1560808	Y	Not an EJ Priority Area	2025	2026	3	""	""	""	""	""	""	2042.26144163476
245	256	213211	68	CON	2024-10-11T00:00:00	2026-12-30T00:00:00	2025-03-17T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-96 	I-96 E	M-37/M-44 (East Beltline) over I-96 from GRE Railroad to Bradford Street	Bridge Replacement of S10-41025 & Road Reconstruction of bridge approaches	Grand Valley Metropolitan Council [GVMC]	Kent	Grand Rapids TSC	284	19215000	2024-12-06T00:00:00	""	Bridge Replacement	Bridge Replacement	Bridge	12.228	12.42	407204	N	Not an EJ Priority Area	2025	2025,2026	3	""	""	""	""	""	""	308.994569111562
246	257	213168	68	CON	2026-10-09T00:00:00	2029-11-30T00:00:00	2027-02-01T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	M-63	M-63	from Central Avenue to the Blossomland and Bicentennial Bridges	Reconstruction	Twin Cities Area Transportation Study [TwinCATS]	Berrien	Kalamazoo TSC	7	22800146	2026-12-04T00:00:00	""	Reconstruction	Reconstruction	Road	5.92	6.228	1360705	Y	Not an EJ Priority Area	2027	2027,2028,2029	3	""	""	""	""	""	""	495.678829317623
247	258	213168	68	CON	2026-10-09T00:00:00	2029-11-30T00:00:00	2027-02-01T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	M-63	M-63	from Central Avenue to the Blossomland and Bicentennial Bridges	Reconstruction	Twin Cities Area Transportation Study [TwinCATS]	Berrien	Kalamazoo TSC	7	22800146	2026-12-04T00:00:00	""	Reconstruction	Reconstruction	Road	5.44	5.546	1360705	N	Not an EJ Priority Area	2027	2027,2028,2029	3	""	""	""	""	""	""	170.590787146317
248	259	213168	68	CON	2026-10-09T00:00:00	2029-11-30T00:00:00	2027-02-01T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	M-63	M-63	from Central Avenue to the Blossomland and Bicentennial Bridges	Reconstruction	Twin Cities Area Transportation Study [TwinCATS]	Berrien	Kalamazoo TSC	7	22800146	2026-12-04T00:00:00	""	Reconstruction	Reconstruction	Road	0.137	0.637	1363303	N	Not an EJ Priority Area	2027	2027,2028,2029	3	""	""	""	""	""	""	804.673418338023
249	260	113501	68	CON	2026-09-04T00:00:00	2028-12-04T00:00:00	2027-01-01T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	US-23 BR	US-23 BR	I-94 BL to M-14	Reconstruct possible ASCRL in sections	Southeast Michigan Council of Governments [SEMCOG]	Washtenaw	Brighton TSC	9	24840000	2026-11-06T00:00:00	""	Reconstruction	Reconstruction	Road	0	0.078	1430808	N	Not an EJ Priority Area	2026	2027	3	""	""	""	""	""	""	125.529052152797
250	261	210812	68	CON	2024-10-11T00:00:00	2025-12-30T00:00:00	2025-04-01T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-94 W/ US-131 N Ramp	W I 94/US-131 N Ramp	I-94 Westbound ramp to US-131 Northbound	Widening for additional ramp lane	Kalamazoo Area Transportation Study [KATS]	Kalamazoo	Kalamazoo TSC	264	14300000	2024-12-06T00:00:00	""	Additional Lane(s) less than 0.5 mile long	Minor Widening	Road	11.323	11.666	15007	N	Priority (POC)	2025	2025	3	""	""	""	""	""	""	552.005952780496
251	262	113501	68	CON	2026-09-04T00:00:00	2028-12-04T00:00:00	2027-01-01T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	US-23 BR	US-23 BR	I-94 BL to M-14	Reconstruct possible ASCRL in sections	Southeast Michigan Council of Governments [SEMCOG]	Washtenaw	Brighton TSC	9	24840000	2026-11-06T00:00:00	""	Reconstruction	Reconstruction	Road	1.694	2.858	4603186	Y	Not an EJ Priority Area,Priority (Poverty)	2026	2027	3	""	""	""	""	""	""	1873.27988825782
252	263	204085	68	CON	2024-10-11T00:00:00	2029-12-07T00:00:00	2025-02-03T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-75 	I-75 S	Otter Creek to LaPlaisance Road	Reconstruct, culvert replacement	Southeast Michigan Council of Governments [SEMCOG]	Monroe	Brighton TSC	9	88800000	2024-12-06T00:00:00	""	Concrete Reconstruction	Reconstruction	Road	0	0.014	4302951	N	Not an EJ Priority Area	2025	2025,2026	3	""	""	""	""	""	""	22.5308142388683
253	264	204085	68	CON	2024-10-11T00:00:00	2029-12-07T00:00:00	2025-02-03T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-75 	I-75 S	Otter Creek to LaPlaisance Road	Reconstruct, culvert replacement	Southeast Michigan Council of Governments [SEMCOG]	Monroe	Brighton TSC	9	88800000	2024-12-06T00:00:00	""	Concrete Reconstruction	Reconstruction	Road	0	0.185	4302520	N	Not an EJ Priority Area	2025	2025,2026	3	""	""	""	""	""	""	297.729201395086
254	265	214089	68	CON	2026-10-09T00:00:00	2028-04-07T00:00:00	2027-05-17T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-94BL E	I-94BL E	at Ravenswood Road	Installation of left turn lanes	Southeast Michigan Council of Governments [SEMCOG]	St. Clair	Huron TSC	25	363000	2026-12-04T00:00:00	""	Intersection Improvements	Traffic Safety	Traffic Safety	0.81	0.894	963402	N	Not an EJ Priority Area,Priority (POC & Poverty)	2027	2027	3	""	""	""	""	""	""	135.185125189531
255	266	204085	68	CON	2024-10-11T00:00:00	2029-12-07T00:00:00	2025-02-03T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-75 	I-75 S	Otter Creek to LaPlaisance Road	Reconstruct, culvert replacement	Southeast Michigan Council of Governments [SEMCOG]	Monroe	Brighton TSC	9	88800000	2024-12-06T00:00:00	""	Concrete Reconstruction	Reconstruction	Road	0	0.395	1228206	N	Not an EJ Priority Area	2025	2025,2026	3	019E	""	""	""	""	""	350.560108961404
256	267	204085	68	CON	2024-10-11T00:00:00	2029-12-07T00:00:00	2025-02-03T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-75 	I-75 S	Otter Creek to LaPlaisance Road	Reconstruct, culvert replacement	Southeast Michigan Council of Governments [SEMCOG]	Monroe	Brighton TSC	9	88800000	2024-12-06T00:00:00	""	Concrete Reconstruction	Reconstruction	Road	0	0.326	1227903	N	Not an EJ Priority Area	2025	2025,2026	3	019A	""	""	""	""	""	524.647092721983
257	268	217013	68	CON	2025-05-16T00:00:00	2026-11-19T00:00:00	2025-08-11T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	Regionwide	M-60	M-60, M-86, and M-99 in Calhoun and St. Joseph Counties	Milling and one course asphalt overlay	Rural	Calhoun	Marshall TSC	80	2330300	2025-07-11T00:00:00	""	Milling & One Course Asphalt Overlay	Road Capital Preventive Maintenance	Road	8.427	9.469	3750007	N	Not an EJ Priority Area	2025	2025,2026	3	""	""	""	""	""	""	1676.93948642238
258	269	204085	68	CON	2024-10-11T00:00:00	2029-12-07T00:00:00	2025-02-03T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-75 	I-75 S	Otter Creek to LaPlaisance Road	Reconstruct, culvert replacement	Southeast Michigan Council of Governments [SEMCOG]	Monroe	Brighton TSC	9	88800000	2024-12-06T00:00:00	""	Concrete Reconstruction	Reconstruction	Road	0.185	0.384	1227901	N	Not an EJ Priority Area	2025	2025,2026	3	""	""	""	""	""	""	320.25999296145
259	270	204085	68	CON	2024-10-11T00:00:00	2029-12-07T00:00:00	2025-02-03T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-75 	I-75 S	Otter Creek to LaPlaisance Road	Reconstruct, culvert replacement	Southeast Michigan Council of Governments [SEMCOG]	Monroe	Brighton TSC	9	88800000	2024-12-06T00:00:00	""	Concrete Reconstruction	Reconstruction	Road	0	0.153	1227901	N	Not an EJ Priority Area	2025	2025,2026	3	RA3A	""	""	""	""	""	246.230161439649
260	271	204085	68	CON	2024-10-11T00:00:00	2029-12-07T00:00:00	2025-02-03T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-75 	I-75 S	Otter Creek to LaPlaisance Road	Reconstruct, culvert replacement	Southeast Michigan Council of Governments [SEMCOG]	Monroe	Brighton TSC	9	88800000	2024-12-06T00:00:00	""	Concrete Reconstruction	Reconstruction	Road	8.692	11.926	1226910	N	Not an EJ Priority Area	2025	2025,2026	3	""	""	""	""	""	""	5204.62810466721
261	272	201225	68	CON	2025-06-06T00:00:00	2030-12-30T00:00:00	2026-03-06T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-94 E	I-94 E	Pelham to Oakwood	Reconstruct, Conc Pavt Rprs, Conc Pavt Inlay, and misc work	Southeast Michigan Council of Governments [SEMCOG]	Wayne	Taylor TSC	5	60000000	2025-08-01T00:00:00	""	Concrete Reconstruction	Reconstruction	Road	0	0.316	1580309	N	Not an EJ Priority Area	2025	2026,2027,2028	3	204F	""	""	""	""	""	508.55369157774
262	273	208435	68	CON	2024-10-25T00:00:00	2025-12-19T00:00:00	2025-03-03T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-194	I-194 N	under M-96 (Columbia Avenue)	Full Depth Deck Patching, Concrete Deep Overlay, zone Paint, Beam Repairs	Battle Creek Area Transportation Study [BCATS]	Calhoun	Marshall TSC	286	3564700	2024-12-06T00:00:00	""	Overlay - Deep	Bridge Rehabilitation	Bridge	4.989	5.161	1297109	N	Priority (POC & Poverty),Not an EJ Priority Area	2025	2025	3	""	""	""	""	""	""	276.80763824302
263	274	204085	68	CON	2024-10-11T00:00:00	2029-12-07T00:00:00	2025-02-03T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-75 	I-75 S	Otter Creek to LaPlaisance Road	Reconstruct, culvert replacement	Southeast Michigan Council of Governments [SEMCOG]	Monroe	Brighton TSC	9	88800000	2024-12-06T00:00:00	""	Concrete Reconstruction	Reconstruction	Road	8.96	12.05	1226909	Y	Not an EJ Priority Area	2025	2025,2026	3	""	""	""	""	""	""	4972.8821920217
264	275	208282	68	CON	2028-10-06T00:00:00	2031-05-30T00:00:00	2029-04-16T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	US-223	US-223	Ogden Highway to High Street in Blissfield, Lenawee County	HMA cold milling and two course overlay with drainage improvements	Rural	Lenawee	Jackson TSC	9	17910310	2028-12-01T00:00:00	""	Milling and Two Course Asphalt Resurfacing	Road Rehabilitation	Road	0	0.302	947102	N	Not an EJ Priority Area	2029	2029	3	""	""	""	""	""	""	486.022758883619
265	276	208282	68	CON	2028-10-06T00:00:00	2031-05-30T00:00:00	2029-04-16T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	US-223	US-223	Ogden Highway to High Street in Blissfield, Lenawee County	HMA cold milling and two course overlay with drainage improvements	Rural	Lenawee	Jackson TSC	9	17910310	2028-12-01T00:00:00	""	Milling and Two Course Asphalt Resurfacing	Road Rehabilitation	Road	23.44	29.807	946402	Y	Not an EJ Priority Area,Priority (POC)	2029	2029	3	""	""	""	""	""	""	10246.5624187227
266	277	211426	68	CON	2025-06-06T00:00:00	2030-12-30T00:00:00	2026-03-06T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-94	I-94 E	Middlebelt Rd to Beech Daly Rd 	Reconstruct 	Southeast Michigan Council of Governments [SEMCOG]	Wayne	Taylor TSC	5	128600000	2025-08-01T00:00:00	""	Reconstruction	Reconstruction	Road	0	0.298	1576709	N	Not an EJ Priority Area	2025	2026,2027,2028	3	200A	""	""	""	""	""	479.585379518881
267	278	204075	68	CON	2024-11-15T00:00:00	2025-12-30T00:00:00	2025-03-03T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	M-153	M-153 E	from M-14 to Frains Lake Road	Single Course Mill & Resurface	Southeast Michigan Council of Governments [SEMCOG]	Washtenaw	Brighton TSC	82	757000	2025-01-10T00:00:00	""	Milling & One Course Asphalt Overlay	Road Capital Preventive Maintenance	Road	0	0.678	1431510	N	Priority (POC)	2025	2025	3	031A	""	""	""	""	""	1091.13719925026
268	279	219818	68	CON	2026-06-12T00:00:00	2027-10-15T00:00:00	2027-03-08T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	M-71	M-71	from Gould Street to Legion Road	Milling and One Course Asphalt Overlay	Rural	Shiawassee	Davison TSC	76	1452000	2026-08-07T00:00:00	""	Milling & One Course Asphalt Overlay	Road Capital Preventive Maintenance	Road	1.052	2.283	3780087	Y	Not an EJ Priority Area	2026	2027	3	""	""	""	""	""	""	1981.10609596803
269	280	212691	68	CON	2026-07-10T00:00:00	2027-09-03T00:00:00	2027-05-17T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	M-142	M-142	from Ruth Road to Harbor Beach West Village Limits	Milling and One Course Asphalt Overlay	Rural	Huron	Huron TSC	76	2235520	2026-09-04T00:00:00	""	Milling & One Course Asphalt Overlay	Road Capital Preventive Maintenance	Road	25.219	29.3	1033809	Y	Not an EJ Priority Area	2026	2027	3	""	""	""	""	""	""	6567.7449738028
270	281	212745	68	CON	2024-10-11T00:00:00	2026-12-01T00:00:00	2025-01-21T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	US-131 	US-131 N	At US-131BS in Oshtemo Township, Kalamazoo County.	Construct interchange ramps on US-131 at US-131BR.	Kalamazoo Area Transportation Study [KATS]	Kalamazoo	Kalamazoo TSC	7	26750000	2024-12-06T00:00:00	""	Interchange Redesign & Upgrading	Major Widening	Road	3.059	4.69	26101	N	Not an EJ Priority Area,Priority (Poverty)	2025	2025,2026	3	""	""	""	""	""	""	2624.84478899547
271	282	212745	68	CON	2024-10-11T00:00:00	2026-12-01T00:00:00	2025-01-21T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	US-131 	US-131 N	At US-131BS in Oshtemo Township, Kalamazoo County.	Construct interchange ramps on US-131 at US-131BR.	Kalamazoo Area Transportation Study [KATS]	Kalamazoo	Kalamazoo TSC	7	26750000	2024-12-06T00:00:00	""	Interchange Redesign & Upgrading	Major Widening	Road	13.048	14.951	3390106	N	Not an EJ Priority Area	2025	2025,2026	3	""	""	""	""	""	""	3062.58731156121
272	283	219816	68	CON	2025-10-24T00:00:00	2026-11-13T00:00:00	2026-04-20T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-75 N	I-75 N	I-75 from US-23 to Court St.	Milling and Asphalt Overlay (1 1/2 Inches)	Genesee County Metropolitan Planning Commission [GCMPC]	Genesee	Davison TSC	249	5280000	2025-11-07T00:00:00	""	Milling & One Course Asphalt Overlay	Road Capital Preventive Maintenance	Road	8.787	11.318	1503107	N	Not an EJ Priority Area,Priority (Poverty),No data	2026	2026	3	""	""	""	""	""	""	4073.25710004873
273	284	219486	68	CON	2026-06-12T00:00:00	2027-12-17T00:00:00	2027-05-03T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-96	I-96 W	from Sunfield Highway east to the Grand River	Full Depth Concrete Pavement Repairs	Rural	Ionia	Grand Rapids TSC	249	5041000	2026-08-07T00:00:00	""	Full Depth Concrete Pavement Repair	Road Capital Preventive Maintenance	Road	16.198	20.365	505206	Y	Not an EJ Priority Area,Priority (POC & Poverty)	2026	2027	3	""	""	""	""	""	""	6706.14881971874
274	285	211181	68	CON	2026-10-09T00:00:00	2027-12-29T00:00:00	2027-02-01T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	M-10	M-10 W	Meyers to I-75	Concrete Pavement Repair	Southeast Michigan Council of Governments [SEMCOG]	Wayne	Detroit TSC	5	12000000	2026-12-04T00:00:00	""	Concrete Pavement Repair	Road Rehabilitation	Road	0	0.193	1585206	N	Priority (POC & Poverty)	2027	2027	3	108C	""	""	""	""	""	310.290636902782
275	286	208609	68	CON	2025-06-06T00:00:00	2028-12-15T00:00:00	2026-03-02T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-94	I-94 E	Wayne Road to Middlebelt Road	Reconstruct	Southeast Michigan Council of Governments [SEMCOG]	Wayne	Taylor TSC	5	170200000	2025-08-01T00:00:00	""	Reconstruction	Reconstruction	Road	0	0.284	1589403	N	Not an EJ Priority Area	2025	2026,2027,2028	3	198F	""	""	""	""	""	457.05450296884
276	287	217333	68	CON	2025-06-06T00:00:00	2026-11-06T00:00:00	2026-05-04T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	US-131 SB	US-131 S	one mile north of M-222	Shoulder Rehabilitation and Slope Stabilization	Rural	Allegan	Grand Rapids TSC	4	1148000	2025-08-01T00:00:00	""	Shoulder Rehabilitation	Road Rehabilitation	Road	9.1	9.2	788505	Y	Priority (Poverty)	2025	2026	3	""	""	""	""	""	""	160.934633272986
277	288	201305	68	CON	2024-10-11T00:00:00	2025-12-26T00:00:00	2025-01-01T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-96	I-96 E	Fruit Ridge Road Over I-96	Bridge Replacement	Grand Valley Metropolitan Council [GVMC]	Kent	Grand Rapids TSC	284	26752447	2024-12-06T00:00:00	""	Bridge Replacement	Bridge Replacement	Bridge	0	0.248	406005	N	Not an EJ Priority Area	2025	2025	3	026D	""	""	""	""	""	399.118007617062
278	289	211181	68	CON	2026-10-09T00:00:00	2027-12-29T00:00:00	2027-02-01T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	M-10	M-10 W	Meyers to I-75	Concrete Pavement Repair	Southeast Michigan Council of Governments [SEMCOG]	Wayne	Detroit TSC	5	12000000	2026-12-04T00:00:00	""	Concrete Pavement Repair	Road Rehabilitation	Road	0	0.15	1585304	N	Priority (POC)	2027	2027	3	112C	""	""	""	""	""	240.907905544327
279	290	213488	68	CON	2025-10-10T00:00:00	2028-07-31T00:00:00	2026-02-02T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	US-23	US-23 N	School Road to Ida Center Road	Road Reconstruction	Southeast Michigan Council of Governments [SEMCOG]	Monroe	Brighton TSC	9	69841408	2025-12-05T00:00:00	""	Concrete Reconstruction	Reconstruction	Road	0	0.207	1223910	N	Priority (Poverty)	2026	2026,2027,2028	3	RA2A	""	""	""	""	""	333.134727432201
280	291	215026	68	CON	2025-10-10T00:00:00	2027-11-05T00:00:00	2026-04-13T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-75 	I-75 N	at the M-32 Interchange.	Reconstruction	Rural	Otsego	Gaylord TSC	6	60000000	2025-12-05T00:00:00	""	Interchange Redesign & Upgrading	Major Widening	Road	0	0.313	1080203	N	Priority (Poverty)	2026	2026,2027	3	003C	""	""	""	""	""	503.725564600569
281	292	211181	68	CON	2026-10-09T00:00:00	2027-12-29T00:00:00	2027-02-01T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	M-10	M-10 W	Meyers to I-75	Concrete Pavement Repair	Southeast Michigan Council of Governments [SEMCOG]	Wayne	Detroit TSC	5	12000000	2026-12-04T00:00:00	""	Concrete Pavement Repair	Road Rehabilitation	Road	0	0.179	1585308	N	Priority (POC & Poverty)	2027	2027	3	117A	""	""	""	""	""	288.073240908989
282	293	213346	68	CON	2026-07-10T00:00:00	2028-05-26T00:00:00	2027-05-17T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	M-46	M-46	From Miles Road east to M-66 (East Junction)	Micro-Cold Milling, One Course Asphalt Overlay	Rural	Montcalm	Cadillac TSC	77	2364000	2026-09-04T00:00:00	""	Milling & One Course Asphalt Overlay	Road Capital Preventive Maintenance	Road	16.681	20.32	1205603	Y	Not an EJ Priority Area	2026	2027,2028	3	""	""	""	""	""	""	5856.41348727556
283	294	217013	68	CON	2025-05-16T00:00:00	2026-11-19T00:00:00	2025-08-11T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	Regionwide	M-60	M-60, M-86, and M-99 in Calhoun and St. Joseph Counties	Milling and one course asphalt overlay	Rural	Calhoun	Marshall TSC	80	2330300	2025-07-11T00:00:00	""	Milling & One Course Asphalt Overlay	Road Capital Preventive Maintenance	Road	4.634	5.4	1301707	N	Not an EJ Priority Area	2025	2025,2026	3	""	""	""	""	""	""	1232.75985777051
284	295	216909	68	CON	2025-11-10T00:00:00	2026-11-20T00:00:00	2026-05-04T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	US-12	US-12	from M-62 to Union	Milling & One Course Asphalt Overlay	Niles-Buchanan-Cass Area Transportation Study [NATS]	Cass	Kalamazoo TSC	80	4607350	2026-01-09T00:00:00	""	Milling & One Course Asphalt Overlay	Road Capital Preventive Maintenance	Road	9.39	15.877	594006	Y	Priority (Poverty),Not an EJ Priority Area	2026	2026	3	""	""	""	""	""	""	10439.8335580042
285	296	211181	68	CON	2026-10-09T00:00:00	2027-12-29T00:00:00	2027-02-01T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	M-10	M-10 W	Meyers to I-75	Concrete Pavement Repair	Southeast Michigan Council of Governments [SEMCOG]	Wayne	Detroit TSC	5	12000000	2026-12-04T00:00:00	""	Concrete Pavement Repair	Road Rehabilitation	Road	0	0.099	1585306	N	Priority (POC & Poverty)	2027	2027	3	114B	""	""	""	""	""	159.325362789411
286	297	211181	68	CON	2026-10-09T00:00:00	2027-12-29T00:00:00	2027-02-01T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	M-10	M-10 W	Meyers to I-75	Concrete Pavement Repair	Southeast Michigan Council of Governments [SEMCOG]	Wayne	Detroit TSC	5	12000000	2026-12-04T00:00:00	""	Concrete Pavement Repair	Road Rehabilitation	Road	0	0.148	1585402	N	Priority (POC & Poverty),Not an EJ Priority Area	2027	2027	3	120B	""	""	""	""	""	238.183391907172
287	298	211181	68	CON	2026-10-09T00:00:00	2027-12-29T00:00:00	2027-02-01T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	M-10	M-10 W	Meyers to I-75	Concrete Pavement Repair	Southeast Michigan Council of Governments [SEMCOG]	Wayne	Detroit TSC	5	12000000	2026-12-04T00:00:00	""	Concrete Pavement Repair	Road Rehabilitation	Road	0	0.136	1585310	N	Priority (POC & Poverty)	2027	2027	3	119D	""	""	""	""	""	218.418349681012
288	299	208435	68	CON	2024-10-25T00:00:00	2025-12-19T00:00:00	2025-03-03T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-194	I-194 N	under M-96 (Columbia Avenue)	Full Depth Deck Patching, Concrete Deep Overlay, zone Paint, Beam Repairs	Battle Creek Area Transportation Study [BCATS]	Calhoun	Marshall TSC	286	3564700	2024-12-06T00:00:00	""	Overlay - Deep	Bridge Rehabilitation	Bridge	0.251	0.286	1297208	N	Not an EJ Priority Area	2025	2025	3	002C	""	""	""	""	""	55.5472376747977
289	300	211181	68	CON	2026-10-09T00:00:00	2027-12-29T00:00:00	2027-02-01T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	M-10	M-10 W	Meyers to I-75	Concrete Pavement Repair	Southeast Michigan Council of Governments [SEMCOG]	Wayne	Detroit TSC	5	12000000	2026-12-04T00:00:00	""	Concrete Pavement Repair	Road Rehabilitation	Road	0	0.159	1584808	N	Not an EJ Priority Area	2027	2027	3	113B	""	""	""	""	""	255.09604793493
290	301	211181	68	CON	2026-10-09T00:00:00	2027-12-29T00:00:00	2027-02-01T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	M-10	M-10 W	Meyers to I-75	Concrete Pavement Repair	Southeast Michigan Council of Governments [SEMCOG]	Wayne	Detroit TSC	5	12000000	2026-12-04T00:00:00	""	Concrete Pavement Repair	Road Rehabilitation	Road	0	0.154	1584902	N	Priority (POC & Poverty)	2027	2027	3	116A	""	""	""	""	""	247.839506789976
291	302	220408	68	CON	2028-10-06T00:00:00	2029-12-21T00:00:00	2029-04-16T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	US-12	US-12	US-12 at Gumwood Road	Install a roundabout	Niles-Buchanan-Cass Area Transportation Study [NATS]	Cass	Kalamazoo TSC	264	3263258	2028-12-01T00:00:00	""	Intersection Improvements	Traffic Safety	Traffic Safety	0.742	1.201	594108	N	Not an EJ Priority Area	2029	2029	4	""	""	""	""	""	""	738.690219381338
292	303	211181	68	CON	2026-10-09T00:00:00	2027-12-29T00:00:00	2027-02-01T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	M-10	M-10 W	Meyers to I-75	Concrete Pavement Repair	Southeast Michigan Council of Governments [SEMCOG]	Wayne	Detroit TSC	5	12000000	2026-12-04T00:00:00	""	Concrete Pavement Repair	Road Rehabilitation	Road	0	0.102	1585001	N	Not an EJ Priority Area	2027	2027	3	120A	""	""	""	""	""	164.153489112893
293	304	211181	68	CON	2026-10-09T00:00:00	2027-12-29T00:00:00	2027-02-01T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	M-10	M-10 W	Meyers to I-75	Concrete Pavement Repair	Southeast Michigan Council of Governments [SEMCOG]	Wayne	Detroit TSC	5	12000000	2026-12-04T00:00:00	""	Concrete Pavement Repair	Road Rehabilitation	Road	0	0.206	1585204	N	Priority (POC & Poverty)	2027	2027	3	107C	""	""	""	""	""	331.525459978424
294	305	208927	68	CON	2024-10-25T00:00:00	2025-12-05T00:00:00	2025-05-05T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	M-44 CONN	Conn 44	from I-96 north to Airway Street	Milling and Two Course Asphalt Resurfacing	Grand Valley Metropolitan Council [GVMC]	Kent	Grand Rapids TSC	4	7323000	2024-12-06T00:00:00	""	Milling and Two Course Asphalt Resurfacing	Road Rehabilitation	Road	3.23	5.694	405307	Y	Priority (Poverty),Not an EJ Priority Area	2025	2025	3	""	""	""	""	""	""	3965.43082862567
295	306	208609	68	CON	2025-06-06T00:00:00	2028-12-15T00:00:00	2026-03-02T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-94	I-94 E	Wayne Road to Middlebelt Road	Reconstruct	Southeast Michigan Council of Governments [SEMCOG]	Wayne	Taylor TSC	5	170200000	2025-08-01T00:00:00	""	Reconstruction	Reconstruction	Road	0.143	0.184	4705434	N	Not an EJ Priority Area	2025	2026,2027,2028	3	196C	""	""	""	""	""	65.9417169817898
296	307	211181	68	CON	2026-10-09T00:00:00	2027-12-29T00:00:00	2027-02-01T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	M-10	M-10 W	Meyers to I-75	Concrete Pavement Repair	Southeast Michigan Council of Governments [SEMCOG]	Wayne	Detroit TSC	5	12000000	2026-12-04T00:00:00	""	Concrete Pavement Repair	Road Rehabilitation	Road	0	0.105	1585109	N	Priority (POC & Poverty),Priority (POC)	2027	2027	3	105E	""	""	""	""	""	168.981445611204
297	308	211181	68	CON	2026-10-09T00:00:00	2027-12-29T00:00:00	2027-02-01T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	M-10	M-10 W	Meyers to I-75	Concrete Pavement Repair	Southeast Michigan Council of Governments [SEMCOG]	Wayne	Detroit TSC	5	12000000	2026-12-04T00:00:00	""	Concrete Pavement Repair	Road Rehabilitation	Road	0	0.161	1584406	N	Priority (POC & Poverty)	2027	2027	3	215H	""	""	""	""	""	259.10486311219
298	309	211939	68	CON	2027-11-12T00:00:00	2028-12-28T00:00:00	2028-03-03T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-96BL	I-96BL E	I-96/Cedar St/Pennsylvania Interchange	Construct indirect lefts	Tri-County Regional Planning Commission [TCRPC]	Ingham	Lansing TSC	264	6600000	2028-01-07T00:00:00	""	Intersection Improvements	Traffic Safety	Traffic Safety	0	0.145	336101	N	Priority (POC & Poverty)	2028	2028	3	017A	""	""	""	""	""	232.837688074006
299	310	211181	68	CON	2026-10-09T00:00:00	2027-12-29T00:00:00	2027-02-01T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	M-10	M-10 W	Meyers to I-75	Concrete Pavement Repair	Southeast Michigan Council of Governments [SEMCOG]	Wayne	Detroit TSC	5	12000000	2026-12-04T00:00:00	""	Concrete Pavement Repair	Road Rehabilitation	Road	0	0.215	1584601	N	Priority (POC)	2027	2027	3	105C	""	""	""	""	""	345.434262524028
300	311	211181	68	CON	2026-10-09T00:00:00	2027-12-29T00:00:00	2027-02-01T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	M-10	M-10 W	Meyers to I-75	Concrete Pavement Repair	Southeast Michigan Council of Governments [SEMCOG]	Wayne	Detroit TSC	5	12000000	2026-12-04T00:00:00	""	Concrete Pavement Repair	Road Rehabilitation	Road	0	0.19	4711346	N	Priority (POC)	2027	2027	3	107D	""	""	""	""	""	305.775981271483
301	312	214047	68	CON	2025-07-11T00:00:00	2026-11-20T00:00:00	2026-03-02T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	US-24	US-24	at White Lake Road	Intersection Improvements	Southeast Michigan Council of Governments [SEMCOG]	Oakland	Oakland TSC	27	1059664	2025-09-05T00:00:00	""	Intersection Improvements	Traffic Safety	Traffic Safety	1.702	1.996	689103	Y	Not an EJ Priority Area	2025	2026	3	""	""	""	""	""	""	473.147949358833
302	313	214876	68	CON	2028-10-06T00:00:00	2030-09-30T00:00:00	2029-05-01T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	M-66	M-66	from Indiana state line to Lafayette Street	Milling and two course asphalt overlay	Rural	St. Joseph	Marshall TSC	7	15000000	2028-12-01T00:00:00	""	Milling and Two Course Asphalt Resurfacing	Road Rehabilitation	Road	2.74	2.945	238204	N	Priority (POC & Poverty),Priority (Poverty)	2029	2029,2030	3	""	""	""	""	""	""	329.916097831843
303	314	211767	68	CON	2025-06-20T00:00:00	2026-12-30T00:00:00	2026-03-16T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	M-35	M-35	from County Road 480 to US-41	HMA shoulder widening and slope flattening	Rural	Marquette	Ishpeming TSC	30	1435500	2025-08-01T00:00:00	""	Shoulder Widening	Minor Widening	Road	39.965	42.039	1560808	N	Not an EJ Priority Area	2025	2026	3	""	""	""	""	""	""	3337.78568804414
304	315	208609	68	CON	2025-06-06T00:00:00	2028-12-15T00:00:00	2026-03-02T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-94	I-94 E	Wayne Road to Middlebelt Road	Reconstruct	Southeast Michigan Council of Governments [SEMCOG]	Wayne	Taylor TSC	5	170200000	2025-08-01T00:00:00	""	Reconstruction	Reconstruction	Road	0	0.392	4705459	N	Not an EJ Priority Area	2025	2026,2027,2028	3	199C	""	""	""	""	""	630.160562558323
305	316	211181	68	CON	2026-10-09T00:00:00	2027-12-29T00:00:00	2027-02-01T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	M-10	M-10 W	Meyers to I-75	Concrete Pavement Repair	Southeast Michigan Council of Governments [SEMCOG]	Wayne	Detroit TSC	5	12000000	2026-12-04T00:00:00	""	Concrete Pavement Repair	Road Rehabilitation	Road	0.022	0.29	1577507	N	Priority (POC & Poverty)	2027	2027	3	215A	""	""	""	""	""	431.304994677848
306	317	211181	68	CON	2026-10-09T00:00:00	2027-12-29T00:00:00	2027-02-01T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	M-10	M-10 W	Meyers to I-75	Concrete Pavement Repair	Southeast Michigan Council of Governments [SEMCOG]	Wayne	Detroit TSC	5	12000000	2026-12-04T00:00:00	""	Concrete Pavement Repair	Road Rehabilitation	Road	0	0.157	1585307	N	Priority (POC & Poverty)	2027	2027	3	116B	""	""	""	""	""	252.667442563696
307	318	211155	68	CON	2026-10-09T00:00:00	2031-05-30T00:00:00	2027-01-04T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	US-23 N	US-23 N	M-14 to I-94	Road system and operational improvement as defined through EA process	Southeast Michigan Council of Governments [SEMCOG]	Washtenaw	Brighton TSC	9	229369618	2026-12-04T00:00:00	""	Reconstruction	Reconstruction	Road	11.949	16.678	1431202	Y	Priority (POC),Not an EJ Priority Area,Priority (POC & Poverty)	2027	2027,2028,2029	3	""	""	""	""	""	""	7610.60161656176
308	319	208609	68	CON	2025-06-06T00:00:00	2028-12-15T00:00:00	2026-03-02T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-94	I-94 E	Wayne Road to Middlebelt Road	Reconstruct	Southeast Michigan Council of Governments [SEMCOG]	Wayne	Taylor TSC	5	170200000	2025-08-01T00:00:00	""	Reconstruction	Reconstruction	Road	0	0.165	4706189	N	Not an EJ Priority Area	2025	2026,2027,2028	3	199E	""	""	""	""	""	265.542288336186
309	320	211181	68	CON	2026-10-09T00:00:00	2027-12-29T00:00:00	2027-02-01T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	M-10	M-10 W	Meyers to I-75	Concrete Pavement Repair	Southeast Michigan Council of Governments [SEMCOG]	Wayne	Detroit TSC	5	12000000	2026-12-04T00:00:00	""	Concrete Pavement Repair	Road Rehabilitation	Road	0	0.11	1584907	N	Priority (POC & Poverty)	2027	2027	3	119A	""	""	""	""	""	176.393957008839
310	321	211181	68	CON	2026-10-09T00:00:00	2027-12-29T00:00:00	2027-02-01T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	M-10	M-10 W	Meyers to I-75	Concrete Pavement Repair	Southeast Michigan Council of Governments [SEMCOG]	Wayne	Detroit TSC	5	12000000	2026-12-04T00:00:00	""	Concrete Pavement Repair	Road Rehabilitation	Road	0	0.143	1585305	N	Priority (POC & Poverty)	2027	2027	3	113A	""	""	""	""	""	229.877652242271
311	322	208489	68	CON	2025-06-06T00:00:00	2026-12-23T00:00:00	2026-03-16T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	US10 BR/M-20	M-20 E	Jerome Street to Washington Street	Reconstruction	Midland Area Transportation Study [MATS]	Midland	Mt. Pleasant TSC	3	39400800	2025-08-01T00:00:00	""	Reconstruction	Reconstruction	Road	0	0.019	886303	N	Not an EJ Priority Area	2025	2026	3	008A	""	""	""	""	""	30.5775921414898
312	323	113501	68	CON	2026-09-04T00:00:00	2028-12-04T00:00:00	2027-01-01T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	US-23 BR	US-23 BR	I-94 BL to M-14	Reconstruct possible ASCRL in sections	Southeast Michigan Council of Governments [SEMCOG]	Washtenaw	Brighton TSC	9	24840000	2026-11-06T00:00:00	""	Reconstruction	Reconstruction	Road	0	0.075	1430809	N	Not an EJ Priority Area	2026	2027	3	""	""	""	""	""	""	120.700943599616
313	324	213211	68	CON	2024-10-11T00:00:00	2026-12-30T00:00:00	2025-03-17T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-96 	I-96 E	M-37/M-44 (East Beltline) over I-96 from GRE Railroad to Bradford Street	Bridge Replacement of S10-41025 & Road Reconstruction of bridge approaches	Grand Valley Metropolitan Council [GVMC]	Kent	Grand Rapids TSC	284	19215000	2024-12-06T00:00:00	""	Bridge Replacement	Bridge Replacement	Bridge	12.442	12.585	407204	N	Not an EJ Priority Area	2025	2025,2026	3	""	""	""	""	""	""	230.136658925389
314	325	208427	68	CON	2025-06-06T00:00:00	2026-09-18T00:00:00	2026-06-01T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	M-123	M-123	from Paradise south 0.46 miles	HMA reconstruction with 11 ft lanes and 8 ft shoulder	Rural	Chippewa	Newberry TSC	8	3230149	2025-08-01T00:00:00	""	Asphalt Reconstruction	Reconstruction	Road	36.535	36.99	3170009	Y	Not an EJ Priority Area	2025	2026	3	""	""	""	""	""	""	732.252862940533
315	326	211181	68	CON	2026-10-09T00:00:00	2027-12-29T00:00:00	2027-02-01T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	M-10	M-10 W	Meyers to I-75	Concrete Pavement Repair	Southeast Michigan Council of Governments [SEMCOG]	Wayne	Detroit TSC	5	12000000	2026-12-04T00:00:00	""	Concrete Pavement Repair	Road Rehabilitation	Road	0	0.098	1585401	N	Priority (POC & Poverty)	2027	2027	3	119C	""	""	""	""	""	157.716008650057
316	327	218427	68	CON	2024-11-01T00:00:00	2027-11-15T00:00:00	2025-03-14T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-94 E	I-94 E	I-94 east of X01 82024 (Conrail RR) to west of Burns Street  	Road Reconstruction 	Southeast Michigan Council of Governments [SEMCOG]	Wayne	Detroit TSC	100	356070000	2024-11-01T00:00:00	""	Reconstruction	Reconstruction	Road	31.195	31.773	1576405	Y	Priority (POC & Poverty)	2025	2025,2026,2027	3	""	""	""	""	""	""	930.202444582229
317	328	211181	68	CON	2026-10-09T00:00:00	2027-12-29T00:00:00	2027-02-01T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	M-10	M-10 W	Meyers to I-75	Concrete Pavement Repair	Southeast Michigan Council of Governments [SEMCOG]	Wayne	Detroit TSC	5	12000000	2026-12-04T00:00:00	""	Concrete Pavement Repair	Road Rehabilitation	Road	0	0.125	1584904	N	Not an EJ Priority Area	2027	2027	3	117B	""	""	""	""	""	200.393674039509
318	329	211181	68	CON	2026-10-09T00:00:00	2027-12-29T00:00:00	2027-02-01T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	M-10	M-10 W	Meyers to I-75	Concrete Pavement Repair	Southeast Michigan Council of Governments [SEMCOG]	Wayne	Detroit TSC	5	12000000	2026-12-04T00:00:00	""	Concrete Pavement Repair	Road Rehabilitation	Road	0.163	0.402	1584906	N	Priority (POC & Poverty)	2027	2027	3	215D	""	""	""	""	""	384.430206447642
319	330	217336	68	CON	2025-06-06T00:00:00	2030-12-30T00:00:00	2026-03-06T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-94	I-94 E	Beech Daly Rd to Pelham Rd	Concrete Pavement Repair 	Southeast Michigan Council of Governments [SEMCOG]	Wayne	Taylor TSC	249	6000000	2025-08-01T00:00:00	""	Concrete Pavement Repair	Road Rehabilitation	Road	0	0.035	4718569	N	Priority (Poverty)	2025	2026,2027,2028	3	""	""	""	""	""	""	56.3271885673857
320	331	211181	68	CON	2026-10-09T00:00:00	2027-12-29T00:00:00	2027-02-01T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	M-10	M-10 W	Meyers to I-75	Concrete Pavement Repair	Southeast Michigan Council of Governments [SEMCOG]	Wayne	Detroit TSC	5	12000000	2026-12-04T00:00:00	""	Concrete Pavement Repair	Road Rehabilitation	Road	0	0.13	1584810	N	Priority (POC & Poverty)	2027	2027	3	115A	""	""	""	""	""	209.215036500568
321	332	212745	68	CON	2024-10-11T00:00:00	2026-12-01T00:00:00	2025-01-21T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	US-131 	US-131 N	At US-131BS in Oshtemo Township, Kalamazoo County.	Construct interchange ramps on US-131 at US-131BR.	Kalamazoo Area Transportation Study [KATS]	Kalamazoo	Kalamazoo TSC	7	26750000	2024-12-06T00:00:00	""	Interchange Redesign & Upgrading	Major Widening	Road	16.58	18.48	15007	Y	Not an EJ Priority Area	2025	2025,2026	3	""	""	""	""	""	""	3057.75916225091
322	333	208609	68	CON	2025-06-06T00:00:00	2028-12-15T00:00:00	2026-03-02T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-94	I-94 E	Wayne Road to Middlebelt Road	Reconstruct	Southeast Michigan Council of Governments [SEMCOG]	Wayne	Taylor TSC	5	170200000	2025-08-01T00:00:00	""	Reconstruction	Reconstruction	Road	0.175	0.231	1588901	N	Not an EJ Priority Area	2025	2026,2027,2028	3	196E	""	""	""	""	""	89.6626069448262
323	334	211179	68	CON	2025-12-12T00:00:00	2028-11-15T00:00:00	2026-04-15T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	M-3 NB	M-3 N	Church St to Canfield Dr	Reconstruction & Sewer Separation	Southeast Michigan Council of Governments [SEMCOG]	Macomb	Macomb TSC	5	14200000	2026-02-06T00:00:00	""	Reconstruction	Reconstruction	Road	0	0.771	832010	N	Priority (POC & Poverty)	2026	2026,2027,2028	3	""	""	""	""	""	""	1240.8065385614
324	335	214094	68	CON	2024-10-11T00:00:00	2026-11-02T00:00:00	2025-04-07T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	US-131	US-131 N	From Wealthy Street north to Pearl Street	Remove and Replace Existing Freeway Lighting	Grand Valley Metropolitan Council [GVMC]	Kent	Grand Rapids TSC	4	7236000	2024-12-06T00:00:00	""	Construct Roadway Lighting	Operation Improvements	System Operations	13.221	14.132	410203	Y	Priority (POC & Poverty),Priority (Poverty)	2025	2025,2026	3	""	""	""	""	""	""	1466.1150217477
325	336	211793	68	CON	2023-07-03T00:00:00	2025-07-25T00:00:00	2024-06-03T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-94 E	I-94 E	Blue Water Bridge Plaza	BWB Plaza Expansion	Southeast Michigan Council of Governments [SEMCOG]	St. Clair	Huron TSC	33	46434010	2024-04-19T00:00:00	""	Concrete Reconstruction	Reconstruction	Road	0	0.083	5492975	N	""	2023	2024,2025	4	""	""	""	""	""	""	133.57579011814
326	337	211181	68	CON	2026-10-09T00:00:00	2027-12-29T00:00:00	2027-02-01T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	M-10	M-10 W	Meyers to I-75	Concrete Pavement Repair	Southeast Michigan Council of Governments [SEMCOG]	Wayne	Detroit TSC	5	12000000	2026-12-04T00:00:00	""	Concrete Pavement Repair	Road Rehabilitation	Road	0	0.111	1584909	N	Priority (POC & Poverty)	2027	2027	3	119B	""	""	""	""	""	178.220834864553
327	338	211181	68	CON	2026-10-09T00:00:00	2027-12-29T00:00:00	2027-02-01T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	M-10	M-10 W	Meyers to I-75	Concrete Pavement Repair	Southeast Michigan Council of Governments [SEMCOG]	Wayne	Detroit TSC	5	12000000	2026-12-04T00:00:00	""	Concrete Pavement Repair	Road Rehabilitation	Road	0	0.151	1585110	N	Priority (POC)	2027	2027	3	105D	""	""	""	""	""	243.01148958307
328	339	220874	68	CON	2026-11-13T00:00:00	2027-12-29T00:00:00	2027-03-01T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	US-12	US-12 W	County Line to Denton Rd	Concrete Inlay	Southeast Michigan Council of Governments [SEMCOG]	Wayne	Taylor TSC	5	21900000	2027-01-08T00:00:00	""	Concrete Pavement Inlay	Road Rehabilitation	Road	1.18	1.388	4705565	N	Not an EJ Priority Area	2027	2027	3	""	""	""	""	""	""	334.744095256438
329	340	217336	68	CON	2025-06-06T00:00:00	2030-12-30T00:00:00	2026-03-06T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-94	I-94 E	Beech Daly Rd to Pelham Rd	Concrete Pavement Repair 	Southeast Michigan Council of Governments [SEMCOG]	Wayne	Taylor TSC	249	6000000	2025-08-01T00:00:00	""	Concrete Pavement Repair	Road Rehabilitation	Road	0	0.093	4712153	N	Priority (Poverty)	2025	2026,2027,2028	3	202H	""	""	""	""	""	149.453123317028
330	341	211181	68	CON	2026-10-09T00:00:00	2027-12-29T00:00:00	2027-02-01T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	M-10	M-10 W	Meyers to I-75	Concrete Pavement Repair	Southeast Michigan Council of Governments [SEMCOG]	Wayne	Detroit TSC	5	12000000	2026-12-04T00:00:00	""	Concrete Pavement Repair	Road Rehabilitation	Road	0	0.156	1584507	N	Priority (POC & Poverty)	2027	2027	3	104A	""	""	""	""	""	250.499529590005
331	342	217336	68	CON	2025-06-06T00:00:00	2030-12-30T00:00:00	2026-03-06T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-94	I-94 E	Beech Daly Rd to Pelham Rd	Concrete Pavement Repair 	Southeast Michigan Council of Governments [SEMCOG]	Wayne	Taylor TSC	249	6000000	2025-08-01T00:00:00	""	Concrete Pavement Repair	Road Rehabilitation	Road	0	0.521	1578710	N	Priority (Poverty)	2025	2026,2027,2028	3	202G	""	""	""	""	""	838.469901394306
332	343	211181	68	CON	2026-10-09T00:00:00	2027-12-29T00:00:00	2027-02-01T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	M-10	M-10 W	Meyers to I-75	Concrete Pavement Repair	Southeast Michigan Council of Governments [SEMCOG]	Wayne	Detroit TSC	5	12000000	2026-12-04T00:00:00	""	Concrete Pavement Repair	Road Rehabilitation	Road	0	0.238	1584510	N	Priority (POC & Poverty),Priority (POC)	2027	2027	3	105B	""	""	""	""	""	383.024601854706
333	344	217609	68	CON	2024-12-13T00:00:00	2025-12-30T00:00:00	2025-04-14T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	M-52	M-52	Valley Road to M-50 in Lenawee County	HMA cold milling with single course HMA overlay	Rural	Lenawee	Jackson TSC	82	1901788	2025-02-07T00:00:00	""	Milling & One Course Asphalt Overlay	Road Capital Preventive Maintenance	Road	3.616	8.469	948504	Y	Not an EJ Priority Area	2025	2025	3	""	""	""	""	""	""	7810.16069145279
334	345	211181	68	CON	2026-10-09T00:00:00	2027-12-29T00:00:00	2027-02-01T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	M-10	M-10 W	Meyers to I-75	Concrete Pavement Repair	Southeast Michigan Council of Governments [SEMCOG]	Wayne	Detroit TSC	5	12000000	2026-12-04T00:00:00	""	Concrete Pavement Repair	Road Rehabilitation	Road	0	0.16	1577603	N	Not an EJ Priority Area,Priority (POC & Poverty)	2027	2027	3	215F	""	""	""	""	""	257.4954633499
335	346	211181	68	CON	2026-10-09T00:00:00	2027-12-29T00:00:00	2027-02-01T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	M-10	M-10 W	Meyers to I-75	Concrete Pavement Repair	Southeast Michigan Council of Governments [SEMCOG]	Wayne	Detroit TSC	5	12000000	2026-12-04T00:00:00	""	Concrete Pavement Repair	Road Rehabilitation	Road	0	0.128	1584801	N	Not an EJ Priority Area	2027	2027	3	111B	""	""	""	""	""	205.207636573879
336	347	220874	68	CON	2026-11-13T00:00:00	2027-12-29T00:00:00	2027-03-01T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	US-12	US-12 W	County Line to Denton Rd	Concrete Inlay	Southeast Michigan Council of Governments [SEMCOG]	Wayne	Taylor TSC	5	21900000	2027-01-08T00:00:00	""	Concrete Pavement Inlay	Road Rehabilitation	Road	0	0.019	6703028	N	Not an EJ Priority Area	2027	2027	3	""	""	""	""	""	""	30.5774947577755
337	348	211181	68	CON	2026-10-09T00:00:00	2027-12-29T00:00:00	2027-02-01T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	M-10	M-10 W	Meyers to I-75	Concrete Pavement Repair	Southeast Michigan Council of Governments [SEMCOG]	Wayne	Detroit TSC	5	12000000	2026-12-04T00:00:00	""	Concrete Pavement Repair	Road Rehabilitation	Road	0	0.181	1584604	N	Priority (POC)	2027	2027	3	107A	""	""	""	""	""	290.97931801841
338	349	215026	68	CON	2025-10-10T00:00:00	2027-11-05T00:00:00	2026-04-13T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-75 	I-75 N	at the M-32 Interchange.	Reconstruction	Rural	Otsego	Gaylord TSC	6	60000000	2025-12-05T00:00:00	""	Interchange Redesign & Upgrading	Major Widening	Road	12.232	12.649	1080910	N	Priority (Poverty)	2026	2026,2027	3	""	""	""	""	""	""	671.097761585568
339	350	219291	68	CON	2025-10-10T00:00:00	2026-11-20T00:00:00	2026-04-13T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-196 S	I-196 S	Berrien County Line to closed Covert Rest Area	Milling with one and two course asphalt overlay	Rural	Van Buren	Kalamazoo TSC	249	4727521	2025-12-05T00:00:00	""	Milling & One Course Asphalt Overlay	Road Capital Preventive Maintenance	Road	4.175	6.32	580802	N	Priority (POC & Poverty)	2026	2026	3	""	""	""	""	""	""	3452.04913272548
340	351	211181	68	CON	2026-10-09T00:00:00	2027-12-29T00:00:00	2027-02-01T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	M-10	M-10 W	Meyers to I-75	Concrete Pavement Repair	Southeast Michigan Council of Governments [SEMCOG]	Wayne	Detroit TSC	5	12000000	2026-12-04T00:00:00	""	Concrete Pavement Repair	Road Rehabilitation	Road	0	0.182	1584608	N	Priority (POC & Poverty)	2027	2027	3	108A	""	""	""	""	""	292.676823634305
341	352	219773	68	CON	2026-08-07T00:00:00	2027-12-03T00:00:00	2027-06-14T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	M-43 E	M-43 E	M-43/I-69BL (Saginaw and Oakland) from Chesnut St to Pennsylvania Ave	"1.5"" milling and asphalt overlay with concrete pavement repairs"	Tri-County Regional Planning Commission [TCRPC]	Ingham	Lansing TSC	82	1985236	2026-10-02T00:00:00	""	Milling & One Course Asphalt Overlay	Road Capital Preventive Maintenance	Road	2.267	2.977	341208	Y	Not an EJ Priority Area,Priority (POC & Poverty)	2026	2027	3	""	""	""	""	""	""	1142.63626490047
342	353	208609	68	CON	2025-06-06T00:00:00	2028-12-15T00:00:00	2026-03-02T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-94	I-94 E	Wayne Road to Middlebelt Road	Reconstruct	Southeast Michigan Council of Governments [SEMCOG]	Wayne	Taylor TSC	5	170200000	2025-08-01T00:00:00	""	Reconstruction	Reconstruction	Road	0	0.47	1589404	N	Not an EJ Priority Area	2025	2026,2027,2028	3	198E	""	""	""	""	""	756.244932039263
343	354	211164	68	CON	2028-10-06T00:00:00	2029-12-28T00:00:00	2029-03-26T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	M-21	M-21	Morton Street to Scott Road	Reconstruction	Tri-County Regional Planning Commission [TCRPC]	Clinton	Lansing TSC	9	15576600	2028-12-01T00:00:00	""	Asphalt Reconstruction	Reconstruction	Road	14.505	15.02	208909	N	Not an EJ Priority Area,Priority (Poverty)	2029	2029	3	""	""	""	""	""	""	828.813544776872
344	355	211181	68	CON	2026-10-09T00:00:00	2027-12-29T00:00:00	2027-02-01T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	M-10	M-10 W	Meyers to I-75	Concrete Pavement Repair	Southeast Michigan Council of Governments [SEMCOG]	Wayne	Detroit TSC	5	12000000	2026-12-04T00:00:00	""	Concrete Pavement Repair	Road Rehabilitation	Road	0	0.269	1590906	N	Priority (POC),Priority (POC & Poverty)	2027	2027	3	109F	""	""	""	""	""	432.233337901046
345	356	211181	68	CON	2026-10-09T00:00:00	2027-12-29T00:00:00	2027-02-01T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	M-10	M-10 W	Meyers to I-75	Concrete Pavement Repair	Southeast Michigan Council of Governments [SEMCOG]	Wayne	Detroit TSC	5	12000000	2026-12-04T00:00:00	""	Concrete Pavement Repair	Road Rehabilitation	Road	0	0.302	4710290	N	Not an EJ Priority Area,Priority (POC),Priority (POC & Poverty)	2027	2027	3	109A	""	""	""	""	""	486.022729242985
346	357	208489	68	CON	2025-06-06T00:00:00	2026-12-23T00:00:00	2026-03-16T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	US10 BR/M-20	M-20 E	Jerome Street to Washington Street	Reconstruction	Midland Area Transportation Study [MATS]	Midland	Mt. Pleasant TSC	3	39400800	2025-08-01T00:00:00	""	Reconstruction	Reconstruction	Road	0	0.926	884809	N	Priority (Poverty),Not an EJ Priority Area	2025	2026	3	""	""	""	""	""	""	1490.25528457336
347	358	211181	68	CON	2026-10-09T00:00:00	2027-12-29T00:00:00	2027-02-01T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	M-10	M-10 W	Meyers to I-75	Concrete Pavement Repair	Southeast Michigan Council of Governments [SEMCOG]	Wayne	Detroit TSC	5	12000000	2026-12-04T00:00:00	""	Concrete Pavement Repair	Road Rehabilitation	Road	9.749	11.28	1577509	N	Not an EJ Priority Area,Priority (POC & Poverty)	2027	2027	3	""	""	""	""	""	""	2463.91008322494
348	359	204075	68	CON	2024-11-15T00:00:00	2025-12-30T00:00:00	2025-03-03T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	M-153	M-153 E	from M-14 to Frains Lake Road	Single Course Mill & Resurface	Southeast Michigan Council of Governments [SEMCOG]	Washtenaw	Brighton TSC	82	757000	2025-01-10T00:00:00	""	Milling & One Course Asphalt Overlay	Road Capital Preventive Maintenance	Road	0	0.036	6702871	N	Priority (POC)	2025	2025	3	""	""	""	""	""	""	57.9365136091596
349	360	215026	68	CON	2025-10-10T00:00:00	2027-11-05T00:00:00	2026-04-13T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-75 	I-75 N	at the M-32 Interchange.	Reconstruction	Rural	Otsego	Gaylord TSC	6	60000000	2025-12-05T00:00:00	""	Interchange Redesign & Upgrading	Major Widening	Road	9.818	10.609	1079903	N	Priority (Poverty)	2026	2026,2027	3	""	""	""	""	""	""	1272.9934188108
350	361	219198	68	CON	2029-08-10T00:00:00	2031-06-06T00:00:00	2030-05-13T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	US-2 E	US-2 E	at M-35 in the city of Gladstone.	Construct roundabout.	Rural	Delta	Crystal Falls TSC	264	1450000	2029-10-05T00:00:00	""	Intersection Improvements	Traffic Safety	Traffic Safety	25.703	26.075	1349006	N	Priority (Poverty)	2029	2030	3	""	""	""	""	""	""	598.677119242572
351	362	208692	68	CON	2025-10-10T00:00:00	2026-11-13T00:00:00	2026-04-13T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-94BL	I-94BL	I-94 to M-29	Concrete pavement repairs	Southeast Michigan Council of Governments [SEMCOG]	St. Clair	Huron TSC	3	2268636	2025-12-05T00:00:00	""	Concrete Pavement Repair	Road Rehabilitation	Road	13.92	16.573	963509	Y	Not an EJ Priority Area,Priority (Poverty)	2026	2026	3	""	""	""	""	""	""	4269.59729480976
352	363	210081	68	CON	2026-06-22T00:00:00	2029-12-07T00:00:00	2026-09-14T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	M-150	M-150	M-59 to Avon Road	Milling and Two Course Asphalt Resurfacing	Southeast Michigan Council of Governments [SEMCOG]	Oakland	Oakland TSC	5	17730000	2026-08-07T00:00:00	""	Milling and Two Course Asphalt Resurfacing	Road Rehabilitation	Road	9.009	9.708	4413538	N	Not an EJ Priority Area,Priority (POC)	2026	2026,2027,2028,2029	3	""	""	""	""	""	""	1124.93354534826
353	364	211181	68	CON	2026-10-09T00:00:00	2027-12-29T00:00:00	2027-02-01T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	M-10	M-10 W	Meyers to I-75	Concrete Pavement Repair	Southeast Michigan Council of Governments [SEMCOG]	Wayne	Detroit TSC	5	12000000	2026-12-04T00:00:00	""	Concrete Pavement Repair	Road Rehabilitation	Road	0.126	0.361	4702011	N	Priority (POC),Priority (POC & Poverty)	2027	2027	3	""	""	""	""	""	""	378.196470013997
354	365	213442	68	CON	2027-10-08T00:00:00	2030-05-31T00:00:00	2028-04-10T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-94BL	I-94BL	Dwight Street to Bender Street	Road reconstruction, watermain, storm sewer, signals, and pavt markings	Jackson Area Comprehensive Transportation Study [JACTS]	Jackson	Jackson TSC	9	29754034	2027-12-03T00:00:00	""	Asphalt Reconstruction	Reconstruction	Road	0	0.117	3381751	N	Priority (Poverty)	2028	2028	3	""	""	""	""	""	""	188.293552279811
355	366	208435	68	CON	2024-10-25T00:00:00	2025-12-19T00:00:00	2025-03-03T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-194	I-194 N	under M-96 (Columbia Avenue)	Full Depth Deck Patching, Concrete Deep Overlay, zone Paint, Beam Repairs	Battle Creek Area Transportation Study [BCATS]	Calhoun	Marshall TSC	286	3564700	2024-12-06T00:00:00	""	Overlay - Deep	Bridge Rehabilitation	Bridge	5.183	5.243	1297109	N	Not an EJ Priority Area,Priority (POC & Poverty)	2025	2025	3	""	""	""	""	""	""	96.5608134271336
356	367	213791	68	CON	2027-10-08T00:00:00	2028-12-08T00:00:00	2028-03-15T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-75	I-75 N	Court Street to North Junction I-475	Mill and Two Course HMA Overlay	Genesee County Metropolitan Planning Commission [GCMPC]	Genesee	Davison TSC	3	37026769	2027-12-03T00:00:00	""	Milling and Two Course Asphalt Resurfacing	Road Rehabilitation	Road	0	0.295	1498103	N	""	2028	2028	3	022C	""	""	""	""	""	474.27745937334
357	368	217614	68	CON	2025-08-08T00:00:00	2026-12-30T00:00:00	2026-04-13T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	M-106	M-106	Michigan Avenue to Ganson Street in the City of Jackson	HMA cold milling with single course HMA overlay w/ ADA ramp upgrades	Jackson Area Comprehensive Transportation Study [JACTS]	Jackson	Jackson TSC	82	454220	2025-10-03T00:00:00	""	Milling & One Course Asphalt Overlay	Road Capital Preventive Maintenance	Road	0	0.46	901504	Y	Not an EJ Priority Area,Priority (Poverty)	2025	2026	3	""	""	""	""	""	""	740.299538786544
358	369	210774	68	CON	2025-05-16T00:00:00	2027-04-30T00:00:00	2026-04-20T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	US-31	US-31	at the Three Mile Road Intersection	Construct second left-turn lane onto Three Mile Road	Rural	Grand Traverse	Traverse City TSC	264	1745369	2025-07-11T00:00:00	""	Left Turn Lane	Minor Widening	Road	1.715	1.998	994002	Y	Not an EJ Priority Area	2025	2026	3	""	""	""	""	""	""	455.445277576236
359	370	204355	68	CON	2028-10-06T00:00:00	2029-12-14T00:00:00	2029-03-12T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	M-53	M-53	 Newark Road to Capac Road	Milling and Two Course HMA Overlay	Rural	Lapeer	Davison TSC	3	5719121	2028-12-01T00:00:00	""	Milling and Two Course Asphalt Resurfacing	Road Rehabilitation	Road	10.096	10.251	755909	N	Priority (POC & Poverty),Not an EJ Priority Area	2029	2029	3	""	""	""	""	""	""	249.448714938425
360	371	204355	68	CON	2028-10-06T00:00:00	2029-12-14T00:00:00	2029-03-12T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	M-53	M-53	 Newark Road to Capac Road	Milling and Two Course HMA Overlay	Rural	Lapeer	Davison TSC	3	5719121	2028-12-01T00:00:00	""	Milling and Two Course Asphalt Resurfacing	Road Rehabilitation	Road	8.35	10.096	755909	Y	Priority (POC & Poverty)	2029	2029	3	""	""	""	""	""	""	2809.91965345318
361	372	210956	68	CON	2026-10-09T00:00:00	2027-11-30T00:00:00	2027-04-01T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	US-23	US-23	from the Tawas River Bridge to Tawas Beach Road.	Hot Mix Asphalt Reconstruction	Rural	Iosco	Alpena TSC	6	21768910	2026-12-04T00:00:00	""	Asphalt Reconstruction	Reconstruction	Road	8.602	10.441	1251607	Y	Not an EJ Priority Area	2027	2027	3	""	""	""	""	""	""	2959.5891504739
362	373	201305	68	CON	2024-10-11T00:00:00	2025-12-26T00:00:00	2025-01-01T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-96	I-96 E	Fruit Ridge Road Over I-96	Bridge Replacement	Grand Valley Metropolitan Council [GVMC]	Kent	Grand Rapids TSC	284	26752447	2024-12-06T00:00:00	""	Bridge Replacement	Bridge Replacement	Bridge	0	0.264	405409	N	Not an EJ Priority Area	2025	2025	3	026A	""	""	""	""	""	424.73353587471
363	374	211777	68	CON	2026-11-13T00:00:00	2027-12-29T00:00:00	2027-04-12T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	US-127	US-127	US-127 at Harper/Lewis 	Add Center Left Turn Lane	Rural	Hillsdale	Jackson TSC	31	1185310	2027-01-08T00:00:00	""	Intersection Improvements	Traffic Safety	Traffic Safety	7.016	7.071	946208	N	Not an EJ Priority Area	2027	2027	3	""	""	""	""	""	""	88.2863213843391
364	375	219531	68	CON	2027-08-06T00:00:00	2029-06-15T00:00:00	2028-05-08T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	US-2	US-2	from 9th Avenue northerly to Danforth Road in Escanaba.	HMA reconstruction and replacement of railroad overpass.	Rural	Delta	Crystal Falls TSC	8	20135750	2027-10-01T00:00:00	""	Asphalt Reconstruction	Reconstruction	Road	18.472	19.397	1349006	Y	Not an EJ Priority Area,Priority (Poverty)	2027	2028	3	""	""	""	""	""	""	1488.64596578318
365	376	201225	68	CON	2025-06-06T00:00:00	2030-12-30T00:00:00	2026-03-06T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-94 E	I-94 E	Pelham to Oakwood	Reconstruct, Conc Pavt Rprs, Conc Pavt Inlay, and misc work	Southeast Michigan Council of Governments [SEMCOG]	Wayne	Taylor TSC	5	60000000	2025-08-01T00:00:00	""	Concrete Reconstruction	Reconstruction	Road	0.324	0.593	1576902	N	Priority (POC & Poverty)	2025	2026,2027,2028	3	204B	""	""	""	""	""	432.914398183482
366	377	213791	68	CON	2027-10-08T00:00:00	2028-12-08T00:00:00	2028-03-15T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-75	I-75 N	Court Street to North Junction I-475	Mill and Two Course HMA Overlay	Genesee County Metropolitan Planning Commission [GCMPC]	Genesee	Davison TSC	3	37026769	2027-12-03T00:00:00	""	Milling and Two Course Asphalt Resurfacing	Road Rehabilitation	Road	0	0.367	1503206	N	""	2028	2028	3	022F	""	""	""	""	""	590.630382511419
367	378	209211	68	CON	2026-06-12T00:00:00	2027-12-17T00:00:00	2027-04-12T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-69BL EB	I-69BL E	32nd Street to I-94 Business Loop	Concrete pavement repair	Southeast Michigan Council of Governments [SEMCOG]	St. Clair	Huron TSC	3	4284766	2026-08-07T00:00:00	""	Concrete Pavement Repair	Road Rehabilitation	Road	27.776	29.736	962706	Y	Priority (POC & Poverty)	2026	2027	3	""	""	""	""	""	""	3154.32003794665
368	379	212692	68	CON	2027-10-08T00:00:00	2028-11-17T00:00:00	2028-05-04T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	M-29	M-29	Belle River to Marine City North City Limits	Milling and two course asphalt resurfacing	Southeast Michigan Council of Governments [SEMCOG]	St. Clair	Huron TSC	3	2113095	2027-12-03T00:00:00	""	Milling and Two Course Asphalt Resurfacing	Road Rehabilitation	Road	0.46	1.11	4502782	N	""	2028	2028	3	""	""	""	""	""	""	1046.07553966495
369	380	204075	68	CON	2024-11-15T00:00:00	2025-12-30T00:00:00	2025-03-03T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	M-153	M-153 E	from M-14 to Frains Lake Road	Single Course Mill & Resurface	Southeast Michigan Council of Governments [SEMCOG]	Washtenaw	Brighton TSC	82	757000	2025-01-10T00:00:00	""	Milling & One Course Asphalt Overlay	Road Capital Preventive Maintenance	Road	0.678	1.553	1431510	Y	Priority (POC)	2025	2025	3	""	""	""	""	""	""	1407.76704919507
370	381	217482	68	CON	2025-08-08T00:00:00	2026-12-04T00:00:00	2026-04-06T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	M-100	M-100	from Doane Hwy to Strange Hwy	Mill and single course asphalt overlay	Tri-County Regional Planning Commission [TCRPC]	Eaton	Lansing TSC	82	582900	2025-10-03T00:00:00	""	Milling & One Course Asphalt Overlay	Road Capital Preventive Maintenance	Road	3.859	5.446	566510	Y	Not an EJ Priority Area	2025	2026	3	""	""	""	""	""	""	2554.03356807513
371	382	210599	68	CON	2024-12-13T00:00:00	2028-12-01T00:00:00	2025-04-07T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-75BL (Woodward Ave Loop)	I-75BL S	I-75 BL (Woodward Ave Loop), M-59, and US-24 BR (N Cass Ave)	Reconstruction	Southeast Michigan Council of Governments [SEMCOG]	Oakland	Oakland TSC	5	41300000	2025-02-07T00:00:00	""	Concrete Reconstruction	Reconstruction	Road	0.807	0.852	4400013	N	Priority (POC & Poverty)	2025	2025,2026	3	""	""	""	""	""	""	72.4205627602386
372	383	212692	68	CON	2027-10-08T00:00:00	2028-11-17T00:00:00	2028-05-04T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	M-29	M-29	Belle River to Marine City North City Limits	Milling and two course asphalt resurfacing	Southeast Michigan Council of Governments [SEMCOG]	St. Clair	Huron TSC	3	2113095	2027-12-03T00:00:00	""	Milling and Two Course Asphalt Resurfacing	Road Rehabilitation	Road	0.273	0.52	966604	Y	""	2028	2028	3	""	""	""	""	""	""	397.508749478348
373	384	211181	68	CON	2026-10-09T00:00:00	2027-12-29T00:00:00	2027-02-01T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	M-10	M-10 W	Meyers to I-75	Concrete Pavement Repair	Southeast Michigan Council of Governments [SEMCOG]	Wayne	Detroit TSC	5	12000000	2026-12-04T00:00:00	""	Concrete Pavement Repair	Road Rehabilitation	Road	0	0.149	4705639	N	Priority (POC)	2027	2027	3	112B	""	""	""	""	""	239.627272114634
374	385	220874	68	CON	2026-11-13T00:00:00	2027-12-29T00:00:00	2027-03-01T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	US-12	US-12 W	County Line to Denton Rd	Concrete Inlay	Southeast Michigan Council of Governments [SEMCOG]	Wayne	Taylor TSC	5	21900000	2027-01-08T00:00:00	""	Concrete Pavement Inlay	Road Rehabilitation	Road	0	0.836	1600206	N	Not an EJ Priority Area,No data,Priority (POC & Poverty)	2027	2027	3	""	""	""	""	""	""	1345.41405005377
375	386	211181	68	CON	2026-10-09T00:00:00	2027-12-29T00:00:00	2027-02-01T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	M-10	M-10 W	Meyers to I-75	Concrete Pavement Repair	Southeast Michigan Council of Governments [SEMCOG]	Wayne	Detroit TSC	5	12000000	2026-12-04T00:00:00	""	Concrete Pavement Repair	Road Rehabilitation	Road	2.655	2.801	4702009	N	Not an EJ Priority Area,Priority (POC),Priority (POC & Poverty)	2027	2027	3	""	""	""	""	""	""	234.964781329787
376	387	214094	68	CON	2024-10-11T00:00:00	2026-11-02T00:00:00	2025-04-07T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	US-131	US-131 N	From Wealthy Street north to Pearl Street	Remove and Replace Existing Freeway Lighting	Grand Valley Metropolitan Council [GVMC]	Kent	Grand Rapids TSC	4	7236000	2024-12-06T00:00:00	""	Construct Roadway Lighting	Operation Improvements	System Operations	13.218	14.124	410907	N	Priority (POC & Poverty),Priority (Poverty)	2025	2025,2026	3	""	""	""	""	""	""	1458.06831899034
377	388	210168	68	CON	2027-10-08T00:00:00	2028-12-08T00:00:00	2028-02-01T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	M-20	M-20	US-127 to Summerton Road	Milling and Two Course Asphalt Overlay	Rural	Isabella	Mt. Pleasant TSC	3	3500000	2027-12-03T00:00:00	""	Milling and Two Course Asphalt Resurfacing	Road Rehabilitation	Road	15.389	16.045	242308	Y	""	2028	2028	3	""	""	""	""	""	""	1055.73160380101
378	389	212745	68	CON	2024-10-11T00:00:00	2026-12-01T00:00:00	2025-01-21T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	US-131 	US-131 N	At US-131BS in Oshtemo Township, Kalamazoo County.	Construct interchange ramps on US-131 at US-131BR.	Kalamazoo Area Transportation Study [KATS]	Kalamazoo	Kalamazoo TSC	7	26750000	2024-12-06T00:00:00	""	Interchange Redesign & Upgrading	Major Widening	Road	4.325	5.886	9308	N	Not an EJ Priority Area,Priority (Poverty)	2025	2025,2026	3	""	""	""	""	""	""	2512.19059252103
379	390	213791	68	CON	2027-10-08T00:00:00	2028-12-08T00:00:00	2028-03-15T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-75	I-75 N	Court Street to North Junction I-475	Mill and Two Course HMA Overlay	Genesee County Metropolitan Planning Commission [GCMPC]	Genesee	Davison TSC	3	37026769	2027-12-03T00:00:00	""	Milling and Two Course Asphalt Resurfacing	Road Rehabilitation	Road	0	0.354	1498010	N	""	2028	2028	3	022A	""	""	""	""	""	569.708820273205
380	391	210599	68	CON	2024-12-13T00:00:00	2028-12-01T00:00:00	2025-04-07T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-75BL (Woodward Ave Loop)	I-75BL S	I-75 BL (Woodward Ave Loop), M-59, and US-24 BR (N Cass Ave)	Reconstruction	Southeast Michigan Council of Governments [SEMCOG]	Oakland	Oakland TSC	5	41300000	2025-02-07T00:00:00	""	Concrete Reconstruction	Reconstruction	Road	0	0.677	641407	Y	Priority (POC & Poverty)	2025	2025,2026	3	""	""	""	""	""	""	1089.52804211679
381	392	214148	68	CON	2026-10-09T00:00:00	2027-12-15T00:00:00	2027-03-15T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-75 Ramps	I-75 S/Grange Hall Ramp	at Grange Hall Road	Construct roundabouts	Southeast Michigan Council of Governments [SEMCOG]	Oakland	Oakland TSC	27	4869662	2026-12-04T00:00:00	""	Intersection Improvements	Traffic Safety	Traffic Safety	0	0.14	646205	N	""	2027	2027	3	037B	""	""	""	""	""	225.308417118533
382	393	211181	68	CON	2026-10-09T00:00:00	2027-12-29T00:00:00	2027-02-01T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	M-10	M-10 W	Meyers to I-75	Concrete Pavement Repair	Southeast Michigan Council of Governments [SEMCOG]	Wayne	Detroit TSC	5	12000000	2026-12-04T00:00:00	""	Concrete Pavement Repair	Road Rehabilitation	Road	0	0.144	1584803	N	Priority (POC)	2027	2027	3	112A	""	""	""	""	""	230.998440065972
383	394	218702	68	CON	2027-12-10T00:00:00	2029-05-31T00:00:00	2028-04-10T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	M-50	M-50	M-50 at Matthews Highway in Lenawee County	Install Passing Flare	Rural	Lenawee	Jackson TSC	31	1135670	2028-02-04T00:00:00	""	Intersection Improvements	Traffic Safety	Traffic Safety	14.27	14.33	947405	Y	Not an EJ Priority Area	2028	2028	3	""	""	""	""	""	""	96.5607881909303
384	395	214148	68	CON	2026-10-09T00:00:00	2027-12-15T00:00:00	2027-03-15T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-75 Ramps	I-75 S/Grange Hall Ramp	at Grange Hall Road	Construct roundabouts	Southeast Michigan Council of Governments [SEMCOG]	Oakland	Oakland TSC	27	4869662	2026-12-04T00:00:00	""	Intersection Improvements	Traffic Safety	Traffic Safety	0	0.297	651603	Y	""	2027	2027	3	037C	""	""	""	""	""	477.392030276066
385	396	211694	68	CON	2026-06-12T00:00:00	2027-12-03T00:00:00	2027-03-01T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	US-131	I-296 N	From I-96 north to Post Drive	Active Traffic Management Systems	Grand Valley Metropolitan Council [GVMC]	Kent	Grand Rapids TSC	264	35884105	2026-08-07T00:00:00	""	Dynamic Shoulder Use	Active Traffic Management	System Operations	17.229	23.398	410203	N	Not an EJ Priority Area	2026	2027	3	""	""	""	""	""	""	9928.06131157384
386	397	211155	68	CON	2026-10-09T00:00:00	2031-05-30T00:00:00	2027-01-04T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	US-23 N	US-23 N	M-14 to I-94	Road system and operational improvement as defined through EA process	Southeast Michigan Council of Governments [SEMCOG]	Washtenaw	Brighton TSC	9	229369618	2026-12-04T00:00:00	""	Reconstruction	Reconstruction	Road	0	0.481	1431407	N	Priority (POC)	2027	2027,2028,2029	3	022A	""	""	""	""	""	773.543215620599
387	398	214148	68	CON	2026-10-09T00:00:00	2027-12-15T00:00:00	2027-03-15T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-75 Ramps	I-75 S/Grange Hall Ramp	at Grange Hall Road	Construct roundabouts	Southeast Michigan Council of Governments [SEMCOG]	Oakland	Oakland TSC	27	4869662	2026-12-04T00:00:00	""	Intersection Improvements	Traffic Safety	Traffic Safety	5.981	6.585	649504	N	""	2027	2027	4	""	""	""	""	""	""	972.045609901822
388	399	209082	68	CON	2026-10-09T00:00:00	2028-12-01T00:00:00	2027-03-31T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	US-127	US-127 N	Long Lake Road to the Clare/Roscommon County Line	Milling and Two Course Asphalt Resurfacing	Rural	Clare	Mt. Pleasant TSC	3	14947949	2026-12-04T00:00:00	""	Milling and Two Course Asphalt Resurfacing	Road Rehabilitation	Road	21.037	25.026	1040803	Y	""	2027	2027,2028	3	""	""	""	""	""	""	6418.99967200196
389	400	211181	68	CON	2026-10-09T00:00:00	2027-12-29T00:00:00	2027-02-01T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	M-10	M-10 W	Meyers to I-75	Concrete Pavement Repair	Southeast Michigan Council of Governments [SEMCOG]	Wayne	Detroit TSC	5	12000000	2026-12-04T00:00:00	""	Concrete Pavement Repair	Road Rehabilitation	Road	0	0.203	1585004	N	Not an EJ Priority Area,Priority (POC & Poverty)	2027	2027	3	122B	""	""	""	""	""	326.697430139156
390	401	208831	68	CON	2026-10-09T00:00:00	2027-12-10T00:00:00	2027-03-08T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-69	I-69 E	Lake George Road to Newark Road	Reconstruction	Rural	Lapeer	Davison TSC	3	27744286	2026-12-04T00:00:00	""	Reconstruction	Reconstruction	Road	0	0.476	1846706	N	""	2027	2027	3	005A	""	""	""	""	""	766.049083013385
391	402	211181	68	CON	2026-10-09T00:00:00	2027-12-29T00:00:00	2027-02-01T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	M-10	M-10 W	Meyers to I-75	Concrete Pavement Repair	Southeast Michigan Council of Governments [SEMCOG]	Wayne	Detroit TSC	5	12000000	2026-12-04T00:00:00	""	Concrete Pavement Repair	Road Rehabilitation	Road	0.274	0.319	1585006	N	Priority (POC & Poverty),Not an EJ Priority Area	2027	2027	3	122E	""	""	""	""	""	71.916340659046
392	403	208831	68	CON	2026-10-09T00:00:00	2027-12-10T00:00:00	2027-03-08T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-69	I-69 E	Lake George Road to Newark Road	Reconstruction	Rural	Lapeer	Davison TSC	3	27744286	2026-12-04T00:00:00	""	Reconstruction	Reconstruction	Road	14.445	16.332	756510	N	""	2027	2027	3	""	""	""	""	""	""	3036.83760408993
393	404	85540	68	CON	2025-10-10T00:00:00	2027-03-31T00:00:00	2026-04-13T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	M-59	M-59	Elizabeth Lake Road to US-24	Concrete Pavement Repair 	Southeast Michigan Council of Governments [SEMCOG]	Oakland	Oakland TSC	5	6000000	2025-12-05T00:00:00	""	Concrete Pavement Repair	Road Rehabilitation	Road	17.801	19.25	648906	Y	Priority (Poverty),Priority (POC)	2026	2026,2027	3	""	""	""	""	""	""	2331.94367953687
394	405	207946	68	CON	2027-07-09T00:00:00	2028-12-01T00:00:00	2028-03-01T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	M-37	M-37	From M-82 (North Junction) to the White River	Pavement Inlay	Rural	Newaygo	Cadillac TSC	4	33720000	2027-09-03T00:00:00	""	Concrete Pavement Inlay	Road Rehabilitation	Road	0	8.759	711907	Y	""	2027	2028	3	""	""	""	""	""	""	14096.2698899098
395	406	212745	68	CON	2024-10-11T00:00:00	2026-12-01T00:00:00	2025-01-21T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	US-131 	US-131 N	At US-131BS in Oshtemo Township, Kalamazoo County.	Construct interchange ramps on US-131 at US-131BR.	Kalamazoo Area Transportation Study [KATS]	Kalamazoo	Kalamazoo TSC	7	26750000	2024-12-06T00:00:00	""	Interchange Redesign & Upgrading	Major Widening	Road	0	0.037	3392529	N	Not an EJ Priority Area	2025	2025,2026	3	""	""	""	""	""	""	59.2409220644993
396	407	207946	68	CON	2027-07-09T00:00:00	2028-12-01T00:00:00	2028-03-01T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	M-37	M-37	From M-82 (North Junction) to the White River	Pavement Inlay	Rural	Newaygo	Cadillac TSC	4	33720000	2027-09-03T00:00:00	""	Concrete Pavement Inlay	Road Rehabilitation	Road	9.536	9.554	711701	N	""	2027	2028	3	""	""	""	""	""	""	28.9682456785147
397	408	219813	68	CON	2026-07-10T00:00:00	2027-11-12T00:00:00	2027-04-01T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	US-127BR	US-127BR	from High Street to Corporate Drive	Milling and One Course Asphalt Overlay	Rural	Isabella	Mt. Pleasant TSC	76	1700000	2026-09-04T00:00:00	""	Milling & One Course Asphalt Overlay	Road Capital Preventive Maintenance	Road	3.578	4.861	246704	Y	Priority (POC & Poverty),Priority (Poverty)	2026	2027	3	""	""	""	""	""	""	2064.79211402684
398	409	213157	68	CON	2027-09-10T00:00:00	2028-12-01T00:00:00	2028-04-03T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	US-31 NB	US-31 N	From Ransom Street north to Port Sheldon Street	Milling and Two Course Asphalt Resurfacing	Macatawa Area Coordinating Council [MACC]	Ottawa	Muskegon TSC	4	3310000	2027-11-05T00:00:00	""	Milling and Two Course Asphalt Resurfacing	Road Rehabilitation	Road	6.085	8.71	742605	Y	""	2027	2028	3	""	""	""	""	""	""	4224.53566225028
399	410	214083	68	CON	2026-08-07T00:00:00	2028-05-31T00:00:00	2027-04-12T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	M-60	M-60	M-60 at Cross Road	Install Passing Flare	Jackson Area Comprehensive Transportation Study [JACTS]	Jackson	Jackson TSC	31	612157	2026-10-02T00:00:00	""	Intersection Improvements	Traffic Safety	Traffic Safety	7.335	7.485	899407	Y	Not an EJ Priority Area	2026	2027	3	""	""	""	""	""	""	241.402049892292
400	411	211181	68	CON	2026-10-09T00:00:00	2027-12-29T00:00:00	2027-02-01T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	M-10	M-10 W	Meyers to I-75	Concrete Pavement Repair	Southeast Michigan Council of Governments [SEMCOG]	Wayne	Detroit TSC	5	12000000	2026-12-04T00:00:00	""	Concrete Pavement Repair	Road Rehabilitation	Road	0	0.14	1584606	N	Priority (POC & Poverty)	2027	2027	3	107B	""	""	""	""	""	224.599505831782
401	412	213616	68	CON	2028-06-09T00:00:00	2029-11-09T00:00:00	2029-04-02T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	US-31	US-31 N	at Jackson Street	Realign US-31 SB, add turn lanes	West Michigan Metropolitan Transportation Planning Program [WestPlan]	Ottawa	Muskegon TSC	264	2026629	2028-08-04T00:00:00	""	Intersection Improvements	Traffic Safety	Traffic Safety	22.083	22.37	742605	Y	""	2028	2029	3	""	""	""	""	""	""	461.882633272671
402	413	214339	68	CON	2026-07-10T00:00:00	2027-12-03T00:00:00	2027-02-01T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	M-66	M-66	From Tuttle Road north to Wells Street	Reconstruction	Rural	Ionia	Grand Rapids TSC	4	28200000	2026-09-04T00:00:00	""	Reconstruction	Reconstruction	Road	12.4	14.5	504502	Y	""	2026	2027	3	""	""	""	""	""	""	3379.62859134857
403	414	211173	68	CON	2028-08-11T00:00:00	2029-11-02T00:00:00	2029-04-16T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-96	I-96 E	from Airline Road east to Apple Drive	Milling and Two Course Asphalt Resurfacing	West Michigan Metropolitan Transportation Planning Program [WestPlan]	Ottawa	Muskegon TSC	4	12887000	2028-10-06T00:00:00	""	Milling and Two Course Asphalt Resurfacing	Road Rehabilitation	Road	0	0.22	858110	N	""	2028	2029	3	004C	""	""	""	""	""	354.056366015568
404	415	208609	68	CON	2025-06-06T00:00:00	2028-12-15T00:00:00	2026-03-02T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-94	I-94 E	Wayne Road to Middlebelt Road	Reconstruct	Southeast Michigan Council of Governments [SEMCOG]	Wayne	Taylor TSC	5	170200000	2025-08-01T00:00:00	""	Reconstruction	Reconstruction	Road	0	0.35	1578403	N	Not an EJ Priority Area	2025	2026,2027,2028	3	198A	""	""	""	""	""	563.271372398935
405	416	219486	68	CON	2026-06-12T00:00:00	2027-12-17T00:00:00	2027-05-03T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-96	I-96 W	from Sunfield Highway east to the Grand River	Full Depth Concrete Pavement Repairs	Rural	Ionia	Grand Rapids TSC	249	5041000	2026-08-07T00:00:00	""	Full Depth Concrete Pavement Repair	Road Capital Preventive Maintenance	Road	16.199	20.355	504910	N	Not an EJ Priority Area,Priority (POC & Poverty)	2026	2027	3	""	""	""	""	""	""	6688.44601200511
406	417	210063	68	CON	2025-06-20T00:00:00	2026-12-11T00:00:00	2026-03-02T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	M-37	M-37	from 92nd Street north to 76th Street	Reconstruction and Widening for a Boulevard	Grand Valley Metropolitan Council [GVMC]	Kent	Grand Rapids TSC	4	41400000	2025-08-01T00:00:00	""	Additional lane(s) over 0.5 mile long	Major Widening	Road	0	0.524	3410033	N	Not an EJ Priority Area	2025	2026	3	""	""	""	""	""	""	843.297799226031
407	418	211173	68	CON	2028-08-11T00:00:00	2029-11-02T00:00:00	2029-04-16T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-96	I-96 E	from Airline Road east to Apple Drive	Milling and Two Course Asphalt Resurfacing	West Michigan Metropolitan Transportation Planning Program [WestPlan]	Ottawa	Muskegon TSC	4	12887000	2028-10-06T00:00:00	""	Milling and Two Course Asphalt Resurfacing	Road Rehabilitation	Road	0	0.25	858201	N	""	2028	2029	3	005B	""	""	""	""	""	402.336783245938
408	419	219291	68	CON	2025-10-10T00:00:00	2026-11-20T00:00:00	2026-04-13T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-196 S	I-196 S	Berrien County Line to closed Covert Rest Area	Milling with one and two course asphalt overlay	Rural	Van Buren	Kalamazoo TSC	249	4727521	2025-12-05T00:00:00	""	Milling & One Course Asphalt Overlay	Road Capital Preventive Maintenance	Road	0	4.174	580802	Y	Priority (POC & Poverty)	2026	2026	3	""	""	""	""	""	""	6717.41416578038
409	420	211181	68	CON	2026-10-09T00:00:00	2027-12-29T00:00:00	2027-02-01T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	M-10	M-10 W	Meyers to I-75	Concrete Pavement Repair	Southeast Michigan Council of Governments [SEMCOG]	Wayne	Detroit TSC	5	12000000	2026-12-04T00:00:00	""	Concrete Pavement Repair	Road Rehabilitation	Road	0.136	0.316	1590902	N	Not an EJ Priority Area,Priority (POC & Poverty)	2027	2027	3	109C	""	""	""	""	""	288.963760393285
410	421	213791	68	CON	2027-10-08T00:00:00	2028-12-08T00:00:00	2028-03-15T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-75	I-75 N	Court Street to North Junction I-475	Mill and Two Course HMA Overlay	Genesee County Metropolitan Planning Commission [GCMPC]	Genesee	Davison TSC	3	37026769	2027-12-03T00:00:00	""	Milling and Two Course Asphalt Resurfacing	Road Rehabilitation	Road	0	0.187	1502207	N	""	2028	2028	3	022E	""	""	""	""	""	300.948011258994
411	422	217334	68	CON	2025-06-06T00:00:00	2027-06-04T00:00:00	2026-05-18T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	US-2	US-2	from west of the Dickinson/Menominee county line easterly to 43.75 Road.	HMA base crushing and shaping and HMA overlay.	Rural	Menominee	Crystal Falls TSC	8	1890500	2025-08-01T00:00:00	""	Crush & Shape & Asphalt Resurfacing	Road Rehabilitation	Road	0	1.404	1324107	Y	Not an EJ Priority Area	2025	2026	3	""	""	""	""	""	""	2259.52312081716
412	423	211173	68	CON	2028-08-11T00:00:00	2029-11-02T00:00:00	2029-04-16T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-96	I-96 E	from Airline Road east to Apple Drive	Milling and Two Course Asphalt Resurfacing	West Michigan Metropolitan Transportation Planning Program [WestPlan]	Ottawa	Muskegon TSC	4	12887000	2028-10-06T00:00:00	""	Milling and Two Course Asphalt Resurfacing	Road Rehabilitation	Road	3.49	5.472	857608	N	""	2028	2029	3	""	""	""	""	""	""	3189.72573320805
413	424	211173	68	CON	2028-08-11T00:00:00	2029-11-02T00:00:00	2029-04-16T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-96	I-96 E	from Airline Road east to Apple Drive	Milling and Two Course Asphalt Resurfacing	West Michigan Metropolitan Transportation Planning Program [WestPlan]	Ottawa	Muskegon TSC	4	12887000	2028-10-06T00:00:00	""	Milling and Two Course Asphalt Resurfacing	Road Rehabilitation	Road	0	0.167	858105	N	""	2028	2029	3	004B	""	""	""	""	""	268.760890849871
414	425	211181	68	CON	2026-10-09T00:00:00	2027-12-29T00:00:00	2027-02-01T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	M-10	M-10 W	Meyers to I-75	Concrete Pavement Repair	Southeast Michigan Council of Governments [SEMCOG]	Wayne	Detroit TSC	5	12000000	2026-12-04T00:00:00	""	Concrete Pavement Repair	Road Rehabilitation	Road	0	0.287	1577602	N	Priority (POC & Poverty)	2027	2027	3	215C	""	""	""	""	""	461.882487290573
415	426	220394	68	CON	2026-09-04T00:00:00	2028-06-09T00:00:00	2027-05-17T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	M-35	M-35	from Old Mill Lane 20.75 Road to the Bark River.	Hot mixed asphalt shoulder widening.	Rural	Delta	Crystal Falls TSC	30	1310000	2026-11-06T00:00:00	""	Shoulder Widening	Minor Widening	Road	0.141	2.263	1349006	Y	Not an EJ Priority Area	2026	2027	3	""	""	""	""	""	""	3415.03433422131
416	427	211939	68	CON	2027-11-12T00:00:00	2028-12-28T00:00:00	2028-03-03T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-96BL	I-96BL E	I-96/Cedar St/Pennsylvania Interchange	Construct indirect lefts	Tri-County Regional Planning Commission [TCRPC]	Ingham	Lansing TSC	264	6600000	2028-01-07T00:00:00	""	Intersection Improvements	Traffic Safety	Traffic Safety	0	0.09	352906	N	Priority (POC & Poverty)	2028	2028	3	017C	""	""	""	""	""	144.448229170531
417	428	211173	68	CON	2028-08-11T00:00:00	2029-11-02T00:00:00	2029-04-16T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-96	I-96 E	from Airline Road east to Apple Drive	Milling and Two Course Asphalt Resurfacing	West Michigan Metropolitan Transportation Planning Program [WestPlan]	Ottawa	Muskegon TSC	4	12887000	2028-10-06T00:00:00	""	Milling and Two Course Asphalt Resurfacing	Road Rehabilitation	Road	0	0.383	858107	N	""	2028	2029	3	005A	""	""	""	""	""	615.717351277067
418	429	211173	68	CON	2028-08-11T00:00:00	2029-11-02T00:00:00	2029-04-16T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-96	I-96 E	from Airline Road east to Apple Drive	Milling and Two Course Asphalt Resurfacing	West Michigan Metropolitan Transportation Planning Program [WestPlan]	Ottawa	Muskegon TSC	4	12887000	2028-10-06T00:00:00	""	Milling and Two Course Asphalt Resurfacing	Road Rehabilitation	Road	0	0.18	858109	N	""	2028	2029	3	004D	""	""	""	""	""	289.682393525436
419	430	211181	68	CON	2026-10-09T00:00:00	2027-12-29T00:00:00	2027-02-01T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	M-10	M-10 W	Meyers to I-75	Concrete Pavement Repair	Southeast Michigan Council of Governments [SEMCOG]	Wayne	Detroit TSC	5	12000000	2026-12-04T00:00:00	""	Concrete Pavement Repair	Road Rehabilitation	Road	0	0.11	1584709	N	Not an EJ Priority Area	2027	2027	3	111A	""	""	""	""	""	176.413271603188
420	431	211163	68	CON	2025-10-10T00:00:00	2027-12-29T00:00:00	2026-03-09T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	M-78	M-78	550' south of Sharkey Street to the Battle Creek River	Roadway Reconstruction	Tri-County Regional Planning Commission [TCRPC]	Eaton	Lansing TSC	9	14560000	2025-12-05T00:00:00	""	Reconstruction	Reconstruction	Road	2.42	3.64	565105	Y	""	2026	2026,2027	3	""	""	""	""	""	""	1963.40335039673
421	432	210081	68	CON	2026-06-22T00:00:00	2029-12-07T00:00:00	2026-09-14T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	M-150	M-150	M-59 to Avon Road	Milling and Two Course Asphalt Resurfacing	Southeast Michigan Council of Governments [SEMCOG]	Oakland	Oakland TSC	5	17730000	2026-08-07T00:00:00	""	Milling and Two Course Asphalt Resurfacing	Road Rehabilitation	Road	9.708	11.79	4413538	Y	Not an EJ Priority Area,Priority (POC)	2026	2026,2027,2028,2029	3	""	""	""	""	""	""	3350.66038722107
422	433	208489	68	CON	2025-06-06T00:00:00	2026-12-23T00:00:00	2026-03-16T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	US10 BR/M-20	M-20 E	Jerome Street to Washington Street	Reconstruction	Midland Area Transportation Study [MATS]	Midland	Mt. Pleasant TSC	3	39400800	2025-08-01T00:00:00	""	Reconstruction	Reconstruction	Road	0.235	0.918	3560073	N	Priority (Poverty),Not an EJ Priority Area	2025	2026	3	""	""	""	""	""	""	1099.1838433208
423	434	208831	68	CON	2026-10-09T00:00:00	2027-12-10T00:00:00	2027-03-08T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-69	I-69 E	Lake George Road to Newark Road	Reconstruction	Rural	Lapeer	Davison TSC	3	27744286	2026-12-04T00:00:00	""	Reconstruction	Reconstruction	Road	0	0.022	3441616	N	""	2027	2027	3	""	""	""	""	""	""	35.0631660141189
424	435	210812	68	CON	2024-10-11T00:00:00	2025-12-30T00:00:00	2025-04-01T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-94 W/ US-131 N Ramp	W I 94/US-131 N Ramp	I-94 Westbound ramp to US-131 Northbound	Widening for additional ramp lane	Kalamazoo Area Transportation Study [KATS]	Kalamazoo	Kalamazoo TSC	264	14300000	2024-12-06T00:00:00	""	Additional Lane(s) less than 0.5 mile long	Minor Widening	Road	0	0.223	14505	N	Priority (POC)	2025	2025	3	074F	""	""	""	""	""	358.884305062221
425	436	211118	68	CON	2025-10-10T00:00:00	2026-12-30T00:00:00	2026-04-13T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-675 W/Veterans Memorial Ramp	I-675 W/Veterans Memorial Ramp	I-675 at Veterans Memorial Parkway	Interchange Reconstruction	Saginaw Area Transportation Agency [SATA]	Saginaw	Bay City TSC	3	8901081	2025-12-05T00:00:00	""	Reconstruction	Reconstruction	Road	0	0.202	464802	N	""	2026	2026	3	009E	""	""	""	""	""	325.088129965553
426	437	211777	68	CON	2026-11-13T00:00:00	2027-12-29T00:00:00	2027-04-12T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	US-127	US-127	US-127 at Harper/Lewis 	Add Center Left Turn Lane	Rural	Hillsdale	Jackson TSC	31	1185310	2027-01-08T00:00:00	""	Intersection Improvements	Traffic Safety	Traffic Safety	0	0.252	521302	Y	Not an EJ Priority Area	2027	2027	3	""	""	""	""	""	""	405.555429297944
427	438	211118	68	CON	2025-10-10T00:00:00	2026-12-30T00:00:00	2026-04-13T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-675 W/Veterans Memorial Ramp	I-675 W/Veterans Memorial Ramp	I-675 at Veterans Memorial Parkway	Interchange Reconstruction	Saginaw Area Transportation Agency [SATA]	Saginaw	Bay City TSC	3	8901081	2025-12-05T00:00:00	""	Reconstruction	Reconstruction	Road	0	0.342	464804	Y	""	2026	2026	3	009A	""	""	""	""	""	550.15800514166
428	439	211118	68	CON	2025-10-10T00:00:00	2026-12-30T00:00:00	2026-04-13T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-675 W/Veterans Memorial Ramp	I-675 W/Veterans Memorial Ramp	I-675 at Veterans Memorial Parkway	Interchange Reconstruction	Saginaw Area Transportation Agency [SATA]	Saginaw	Bay City TSC	3	8901081	2025-12-05T00:00:00	""	Reconstruction	Reconstruction	Road	0.997	1.017	463306	N	""	2026	2026	4	""	""	""	""	""	""	32.1869242185397
429	440	217336	68	CON	2025-06-06T00:00:00	2030-12-30T00:00:00	2026-03-06T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-94	I-94 E	Beech Daly Rd to Pelham Rd	Concrete Pavement Repair 	Southeast Michigan Council of Governments [SEMCOG]	Wayne	Taylor TSC	249	6000000	2025-08-01T00:00:00	""	Concrete Pavement Repair	Road Rehabilitation	Road	0	0.108	4712152	N	Not an EJ Priority Area,Priority (Poverty)	2025	2026,2027,2028	3	202F	""	""	""	""	""	173.413856468289
430	441	210655	68	CON	2026-10-09T00:00:00	2028-11-15T00:00:00	2027-02-10T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	M-59	M-59	M-59 at Latson Road	Roundabout	Southeast Michigan Council of Governments [SEMCOG]	Livingston	Brighton TSC	264	4156350	2026-12-04T00:00:00	""	Additional Lane(s) less than 0.5 mile long	Minor Widening	Road	6	6.45	933209	Y	""	2027	2027,2028	3	""	""	""	""	""	""	724.206316136275
431	442	211118	68	CON	2025-10-10T00:00:00	2026-12-30T00:00:00	2026-04-13T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-675 W/Veterans Memorial Ramp	I-675 W/Veterans Memorial Ramp	I-675 at Veterans Memorial Parkway	Interchange Reconstruction	Saginaw Area Transportation Agency [SATA]	Saginaw	Bay City TSC	3	8901081	2025-12-05T00:00:00	""	Reconstruction	Reconstruction	Road	0	0.248	464801	N	""	2026	2026	3	009D	""	""	""	""	""	399.118132546596
432	443	211118	68	CON	2025-10-10T00:00:00	2026-12-30T00:00:00	2026-04-13T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-675 W/Veterans Memorial Ramp	I-675 W/Veterans Memorial Ramp	I-675 at Veterans Memorial Parkway	Interchange Reconstruction	Saginaw Area Transportation Agency [SATA]	Saginaw	Bay City TSC	3	8901081	2025-12-05T00:00:00	""	Reconstruction	Reconstruction	Road	1.083	1.251	469901	N	""	2026	2026	3	""	""	""	""	""	""	270.370231264932
433	444	211155	68	CON	2026-10-09T00:00:00	2031-05-30T00:00:00	2027-01-04T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	US-23 N	US-23 N	M-14 to I-94	Road system and operational improvement as defined through EA process	Southeast Michigan Council of Governments [SEMCOG]	Washtenaw	Brighton TSC	9	229369618	2026-12-04T00:00:00	""	Reconstruction	Reconstruction	Road	10.242	11.913	1431603	N	Not an EJ Priority Area,Priority (POC)	2027	2027,2028,2029	3	""	""	""	""	""	""	2689.21877042301
434	445	208891	68	CON	2026-09-04T00:00:00	2027-11-19T00:00:00	2027-05-10T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	US-41	US-41	from the Delta/Alger county line to the Alger/Marquette county line	Cold Milling and two Course HMA resurfacing	Rural	Alger	Newberry TSC	8	8032000	2026-11-06T00:00:00	""	Milling and Two Course Asphalt Resurfacing	Road Rehabilitation	Road	8.204	11.104	1138003	N	""	2026	2027	3	""	""	""	""	""	""	4667.10630529502
435	446	208891	68	CON	2026-09-04T00:00:00	2027-11-19T00:00:00	2027-05-10T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	US-41	US-41	from the Delta/Alger county line to the Alger/Marquette county line	Cold Milling and two Course HMA resurfacing	Rural	Alger	Newberry TSC	8	8032000	2026-11-06T00:00:00	""	Milling and Two Course Asphalt Resurfacing	Road Rehabilitation	Road	0	8.131	1138003	Y	""	2026	2027	3	""	""	""	""	""	""	13085.600186925
436	447	211181	68	CON	2026-10-09T00:00:00	2027-12-29T00:00:00	2027-02-01T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	M-10	M-10 W	Meyers to I-75	Concrete Pavement Repair	Southeast Michigan Council of Governments [SEMCOG]	Wayne	Detroit TSC	5	12000000	2026-12-04T00:00:00	""	Concrete Pavement Repair	Road Rehabilitation	Road	0	0.141	1585210	N	Not an EJ Priority Area,Priority (POC & Poverty)	2027	2027	3	110A	""	""	""	""	""	226.8999129082
437	448	220404	68	CON	2029-09-04T00:00:00	2030-12-06T00:00:00	2030-04-15T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	US-131 Southbound	US-131 S/142nd Ramp	exit ramp to 142nd Avenue	Ramp widening for a right-turn lane	Rural	Allegan	Grand Rapids TSC	264	335563	2029-11-02T00:00:00	""	Right Turn Lane	Minor Widening	Road	0	0.136	797606	Y	Not an EJ Priority Area	2029	2030	3	011C	""	""	""	""	""	218.871183913137
438	449	208609	68	CON	2025-06-06T00:00:00	2028-12-15T00:00:00	2026-03-02T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-94	I-94 E	Wayne Road to Middlebelt Road	Reconstruct	Southeast Michigan Council of Governments [SEMCOG]	Wayne	Taylor TSC	5	170200000	2025-08-01T00:00:00	""	Reconstruction	Reconstruction	Road	0.93	1.536	1576701	N	Not an EJ Priority Area	2025	2026,2027,2028	3	999F	""	""	""	""	""	975.264160268001
439	450	217673	68	CON	2025-06-06T00:00:00	2026-11-13T00:00:00	2026-03-09T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	M-29	M-29	Palms Road to Algonac WVL	One Course HMA Overlay	Southeast Michigan Council of Governments [SEMCOG]	St. Clair	Huron TSC	76	2640000	2025-08-01T00:00:00	""	One Course Asphalt Overlay	Road Capital Preventive Maintenance	Road	4.487	10.98	4502633	Y	Not an EJ Priority Area	2025	2026	3	""	""	""	""	""	""	10449.489738518
440	451	201143	68	CON	2027-10-08T00:00:00	2028-11-17T00:00:00	2028-05-15T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	US-131 SB	US-131 S	From US-10 to 14 Mile Road, Ashton & Luther/Leroy Carpool Parking Lots	Milling and Two Course Asphalt Overlay (One Course for Carpool Lots)	Rural	Osceola	Cadillac TSC	4	6703000	2027-12-03T00:00:00	""	Milling and Two Course Asphalt Resurfacing	Road Rehabilitation	Road	0	0.57	1872305	N	""	2028	2028	3	002C	""	""	""	""	""	917.147611686197
441	452	211181	68	CON	2026-10-09T00:00:00	2027-12-29T00:00:00	2027-02-01T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	M-10	M-10 W	Meyers to I-75	Concrete Pavement Repair	Southeast Michigan Council of Governments [SEMCOG]	Wayne	Detroit TSC	5	12000000	2026-12-04T00:00:00	""	Concrete Pavement Repair	Road Rehabilitation	Road	9.779	11.288	1577510	N	Priority (POC & Poverty),Not an EJ Priority Area	2027	2027	3	""	""	""	""	""	""	2428.50446703351
442	453	215026	68	CON	2025-10-10T00:00:00	2027-11-05T00:00:00	2026-04-13T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-75 	I-75 N	at the M-32 Interchange.	Reconstruction	Rural	Otsego	Gaylord TSC	6	60000000	2025-12-05T00:00:00	""	Interchange Redesign & Upgrading	Major Widening	Road	0	0.351	1080204	N	Priority (Poverty)	2026	2026,2027	3	003F	""	""	""	""	""	564.880905956954
443	454	201143	68	CON	2027-10-08T00:00:00	2028-11-17T00:00:00	2028-05-15T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	US-131 SB	US-131 S	From US-10 to 14 Mile Road, Ashton & Luther/Leroy Carpool Parking Lots	Milling and Two Course Asphalt Overlay (One Course for Carpool Lots)	Rural	Osceola	Cadillac TSC	4	6703000	2027-12-03T00:00:00	""	Milling and Two Course Asphalt Resurfacing	Road Rehabilitation	Road	0	0.52	1872302	N	""	2028	2028	3	002D	""	""	""	""	""	836.860374087931
444	455	214148	68	CON	2026-10-09T00:00:00	2027-12-15T00:00:00	2027-03-15T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-75 Ramps	I-75 S/Grange Hall Ramp	at Grange Hall Road	Construct roundabouts	Southeast Michigan Council of Governments [SEMCOG]	Oakland	Oakland TSC	27	4869662	2026-12-04T00:00:00	""	Intersection Improvements	Traffic Safety	Traffic Safety	0	0.319	651605	N	""	2027	2027	3	037A	""	""	""	""	""	512.589229867851
445	456	210324	68	CON	2024-10-11T00:00:00	2026-12-30T00:00:00	2025-03-03T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	US-12	US-12	I-96 to Cass Ave	Reconstruct and other misc. work 	Southeast Michigan Council of Governments [SEMCOG]	Wayne	Detroit TSC	5	70026032	2024-12-06T00:00:00	""	Reconstruction	Reconstruction	Road	5.61	7.231	1577103	Y	Not an EJ Priority Area,Priority (POC & Poverty)	2025	2025,2026	3	""	""	""	""	""	""	2608.75142864537
446	457	211173	68	CON	2028-08-11T00:00:00	2029-11-02T00:00:00	2029-04-16T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-96	I-96 E	from Airline Road east to Apple Drive	Milling and Two Course Asphalt Resurfacing	West Michigan Metropolitan Transportation Planning Program [WestPlan]	Ottawa	Muskegon TSC	4	12887000	2028-10-06T00:00:00	""	Milling and Two Course Asphalt Resurfacing	Road Rehabilitation	Road	0	3.266	742410	Y	""	2028	2029	3	""	""	""	""	""	""	5256.12706076956
447	458	201225	68	CON	2025-06-06T00:00:00	2030-12-30T00:00:00	2026-03-06T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-94 E	I-94 E	Pelham to Oakwood	Reconstruct, Conc Pavt Rprs, Conc Pavt Inlay, and misc work	Southeast Michigan Council of Governments [SEMCOG]	Wayne	Taylor TSC	5	60000000	2025-08-01T00:00:00	""	Concrete Reconstruction	Reconstruction	Road	16.728	16.805	1588802	N	Not an EJ Priority Area	2025	2026,2027,2028	3	""	""	""	""	""	""	123.919632887217
448	459	210875	68	CON	2025-10-10T00:00:00	2027-06-25T00:00:00	2026-03-02T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	M-139	M-139	from 0.44 miles south of I-94 to I-94 BL	Reconstruction	Twin Cities Area Transportation Study [TwinCATS]	Berrien	Kalamazoo TSC	7	20803981	2025-12-05T00:00:00	""	Reconstruction	Reconstruction	Road	0	1.008	1364007	N	Priority (POC & Poverty)	2026	2026,2027	3	""	""	""	""	""	""	1622.22175229166
449	460	220874	68	CON	2026-11-13T00:00:00	2027-12-29T00:00:00	2027-03-01T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	US-12	US-12 W	County Line to Denton Rd	Concrete Inlay	Southeast Michigan Council of Governments [SEMCOG]	Wayne	Taylor TSC	5	21900000	2027-01-08T00:00:00	""	Concrete Pavement Inlay	Road Rehabilitation	Road	0	1.18	4705565	Y	Not an EJ Priority Area,No data,Priority (POC & Poverty)	2027	2027	3	""	""	""	""	""	""	1899.02940761372
450	461	76899	68	CON	2027-06-11T00:00:00	2028-08-04T00:00:00	2027-09-20T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	US-24	US-24	Carter to Pennsylvania	Reconstruction	Southeast Michigan Council of Governments [SEMCOG]	Wayne	Taylor TSC	5	32800000	2027-08-06T00:00:00	""	Reconstruction	Reconstruction	Road	3.873	6.506	4700038	Y	Priority (POC & Poverty),Not an EJ Priority Area,Priority (POC),Priority (Poverty)	2027	2027,2028	3	""	""	""	""	""	""	4237.41042050195
451	462	208697	68	CON	2026-10-09T00:00:00	2027-12-03T00:00:00	2027-04-12T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	M-29	M-29	Church Road to Palms Road	Milling and Two Course Asphalt Resurfacing	Southeast Michigan Council of Governments [SEMCOG]	St. Clair	Huron TSC	3	21621600	2026-12-04T00:00:00	""	Milling and Two Course Asphalt Resurfacing	Road Rehabilitation	Road	0.86	4.487	4502633	Y	""	2027	2027	3	""	""	""	""	""	""	5837.10133458829
452	463	201143	68	CON	2027-10-08T00:00:00	2028-11-17T00:00:00	2028-05-15T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	US-131 SB	US-131 S	From US-10 to 14 Mile Road, Ashton & Luther/Leroy Carpool Parking Lots	Milling and Two Course Asphalt Overlay (One Course for Carpool Lots)	Rural	Osceola	Cadillac TSC	4	6703000	2027-12-03T00:00:00	""	Milling and Two Course Asphalt Resurfacing	Road Rehabilitation	Road	5.734	13.448	1845009	Y	""	2028	2028	3	""	""	""	""	""	""	12414.5023499175
453	464	217888	68	CON	2025-06-06T00:00:00	2026-11-13T00:00:00	2026-03-09T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	M-46	M-46	Croswell Road to Merrill WVL	Mill and One Course HMA Overlay	Rural	Gratiot	Mt. Pleasant TSC	76	5146090	2025-08-01T00:00:00	""	Milling & One Course Asphalt Overlay	Road Capital Preventive Maintenance	Road	12.952	23.918	497604	Y	""	2025	2026	3	""	""	""	""	""	""	17648.0985648094
454	465	217611	68	CON	2024-12-13T00:00:00	2025-12-30T00:00:00	2025-04-14T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	M-52	M-52	M-50 to US-12 in Lenawee County	HMA cold milling with single course HMA overlay	Rural	Lenawee	Jackson TSC	82	1692304	2025-02-07T00:00:00	""	Milling & One Course Asphalt Overlay	Road Capital Preventive Maintenance	Road	8.534	12.793	948504	Y	""	2025	2025	3	""	""	""	""	""	""	6854.20870598439
455	466	213791	68	CON	2027-10-08T00:00:00	2028-12-08T00:00:00	2028-03-15T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-75	I-75 N	Court Street to North Junction I-475	Mill and Two Course HMA Overlay	Genesee County Metropolitan Planning Commission [GCMPC]	Genesee	Davison TSC	3	37026769	2027-12-03T00:00:00	""	Milling and Two Course Asphalt Resurfacing	Road Rehabilitation	Road	12.748	19.177	1503107	N	""	2028	2028	3	""	""	""	""	""	""	10346.4913260364
456	467	217491	68	CON	2024-11-15T00:00:00	2026-12-30T00:00:00	2025-03-01T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	US-24	US-24	Hurd Rd to M-125	Mill and Single Course Overlay	Southeast Michigan Council of Governments [SEMCOG]	Monroe	Brighton TSC	82	686500	2025-01-10T00:00:00	""	Milling & One Course Asphalt Overlay	Road Capital Preventive Maintenance	Road	18.512	19.794	4300001	Y	""	2025	2025	3	""	""	""	""	""	""	2063.18277410271
457	468	217483	68	CON	2024-11-15T00:00:00	2026-12-30T00:00:00	2025-03-01T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	US-24	US-24	US-24 Yargerville Rd to Southpointe Parkway	Mill and single course overlay	Southeast Michigan Council of Governments [SEMCOG]	Monroe	Brighton TSC	82	997500	2025-01-10T00:00:00	""	Milling & One Course Asphalt Overlay	Road Capital Preventive Maintenance	Road	10.762	13.35	4300001	Y	""	2025	2025	3	""	""	""	""	""	""	4164.98984427585
458	469	211379	68	CON	2026-10-09T00:00:00	2028-11-30T00:00:00	2027-03-15T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	US-31	US-31	from Stronach Road to Mason Street and from Van Buren Street to M-55.	Asphalt Reconstruction	Rural	Manistee	Traverse City TSC	6	32374295	2026-12-04T00:00:00	""	Asphalt Reconstruction	Reconstruction	Road	2.428	5.284	1153803	N	Not an EJ Priority Area	2027	2027,2028	3	""	""	""	""	""	""	4596.29494455213
459	470	210655	68	CON	2026-10-09T00:00:00	2028-11-15T00:00:00	2027-02-10T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	M-59	M-59	M-59 at Latson Road	Roundabout	Southeast Michigan Council of Governments [SEMCOG]	Livingston	Brighton TSC	264	4156350	2026-12-04T00:00:00	""	Additional Lane(s) less than 0.5 mile long	Minor Widening	Road	3.4	3.6	5490669	N	""	2027	2027,2028	4	""	""	""	""	""	""	321.869299275677
460	471	211181	68	CON	2026-10-09T00:00:00	2027-12-29T00:00:00	2027-02-01T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	M-10	M-10 W	Meyers to I-75	Concrete Pavement Repair	Southeast Michigan Council of Governments [SEMCOG]	Wayne	Detroit TSC	5	12000000	2026-12-04T00:00:00	""	Concrete Pavement Repair	Road Rehabilitation	Road	0	0.244	1585209	N	Not an EJ Priority Area,Priority (POC & Poverty)	2027	2027	3	109D	""	""	""	""	""	392.641550871681
461	472	219406	68	CON	2025-09-05T00:00:00	2026-09-30T00:00:00	2026-04-01T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-94BL	I-94BL	from Dickman Road to Amtrak railroad crossing	Milling & One Course Asphalt Overlay	Battle Creek Area Transportation Study [BCATS]	Calhoun	Marshall TSC	80	1710000	2025-11-07T00:00:00	""	Milling & One Course Asphalt Overlay	Road Capital Preventive Maintenance	Road	0.094	1.113	3130975	Y	Priority (POC & Poverty)	2025	2026	3	""	""	""	""	""	""	1639.92446559175
462	473	217341	68	CON	2025-07-11T00:00:00	2026-12-30T00:00:00	2026-03-01T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-96	I-96 W	US-23 to Kent Lake Rd	Milling and One Course Asphalt Overlay	Southeast Michigan Council of Governments [SEMCOG]	Livingston	Brighton TSC	249	6733000	2025-09-05T00:00:00	""	Milling & One Course Asphalt Overlay	Road Capital Preventive Maintenance	Road	0	0.854	657304	N	""	2025	2026	3	""	""	""	""	""	""	1374.3822149736
463	474	217341	68	CON	2025-07-11T00:00:00	2026-12-30T00:00:00	2026-03-01T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-96	I-96 W	US-23 to Kent Lake Rd	Milling and One Course Asphalt Overlay	Southeast Michigan Council of Governments [SEMCOG]	Livingston	Brighton TSC	249	6733000	2025-09-05T00:00:00	""	Milling & One Course Asphalt Overlay	Road Capital Preventive Maintenance	Road	0	0.24	935204	N	""	2025	2026	3	008A	""	""	""	""	""	386.243223791656
464	475	204085	68	CON	2024-10-11T00:00:00	2029-12-07T00:00:00	2025-02-03T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-75 	I-75 S	Otter Creek to LaPlaisance Road	Reconstruct, culvert replacement	Southeast Michigan Council of Governments [SEMCOG]	Monroe	Brighton TSC	9	88800000	2024-12-06T00:00:00	""	Concrete Reconstruction	Reconstruction	Road	0	0.252	1843903	N	Not an EJ Priority Area	2025	2025,2026	3	019C	""	""	""	""	""	405.555442012302
465	476	219768	68	CON	2025-10-10T00:00:00	2026-12-04T00:00:00	2026-06-15T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-69 E	I-69 E	I-69 from I-69BL (Saginaw St) to Shiawassee County Line	Concrete pavement repairs	Tri-County Regional Planning Commission [TCRPC]	Clinton	Lansing TSC	249	4264742	2025-12-05T00:00:00	""	Concrete Pavement Repair	Road Rehabilitation	Road	15.056	17.92	369105	Y	Not an EJ Priority Area	2026	2026	3	""	""	""	""	""	""	4608.45021737688
466	477	214141	68	CON	2025-10-10T00:00:00	2026-07-31T00:00:00	2026-03-02T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	US-12	US-12	at Beebe Road and Adamsville Road intersection in Cass County	Addition of Left turn lane and Passing Flare	Niles-Buchanan-Cass Area Transportation Study [NATS]	Cass	Kalamazoo TSC	29	1370380	2025-12-05T00:00:00	""	Passing Relief Lane(s)	Minor Widening	Road	12.97	13.15	594006	Y	Not an EJ Priority Area	2026	2026	3	""	""	""	""	""	""	289.682467263643
467	478	217341	68	CON	2025-07-11T00:00:00	2026-12-30T00:00:00	2026-03-01T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-96	I-96 W	US-23 to Kent Lake Rd	Milling and One Course Asphalt Overlay	Southeast Michigan Council of Governments [SEMCOG]	Livingston	Brighton TSC	249	6733000	2025-09-05T00:00:00	""	Milling & One Course Asphalt Overlay	Road Capital Preventive Maintenance	Road	23.826	27.463	935105	N	""	2025	2026	3	""	""	""	""	""	""	5853.19459926947
468	479	217341	68	CON	2025-07-11T00:00:00	2026-12-30T00:00:00	2026-03-01T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-96	I-96 W	US-23 to Kent Lake Rd	Milling and One Course Asphalt Overlay	Southeast Michigan Council of Governments [SEMCOG]	Livingston	Brighton TSC	249	6733000	2025-09-05T00:00:00	""	Milling & One Course Asphalt Overlay	Road Capital Preventive Maintenance	Road	0	0.21	935206	N	""	2025	2026	3	009B	""	""	""	""	""	337.728391572604
469	480	217888	68	CON	2025-06-06T00:00:00	2026-11-13T00:00:00	2026-03-09T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	M-46	M-46	Croswell Road to Merrill WVL	Mill and One Course HMA Overlay	Rural	Gratiot	Mt. Pleasant TSC	76	5146090	2025-08-01T00:00:00	""	Milling & One Course Asphalt Overlay	Road Capital Preventive Maintenance	Road	0	1.588	466004	N	""	2025	2026	3	""	""	""	""	""	""	2555.64300242813
470	481	203897	68	CON	2026-07-10T00:00:00	2028-06-09T00:00:00	2027-05-10T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	US-2	US-2	from the state line northerly to County Airport Road	HMA reconstruction, HMA base crush and shape, HMA overlay	Rural	Iron	Crystal Falls TSC	8	11875850	2026-09-04T00:00:00	""	Reconstruction	Reconstruction	Road	6.476	10.241	3360044	Y	Not an EJ Priority Area	2026	2027	3	""	""	""	""	""	""	6059.19130001505
471	482	210813	68	CON	2024-10-11T00:00:00	2026-12-30T00:00:00	2025-01-13T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	M-43	M-43	from 10th Street to Drake Road 	Widening for turn lanes, intersection and interchange ramp improvements	Kalamazoo Area Transportation Study [KATS]	Kalamazoo	Kalamazoo TSC	264	9163673	2024-12-06T00:00:00	""	Additional Lane(s) less than 0.5 mile long	Minor Widening	Road	0	0.073	22309	N	Priority (Poverty)	2025	2025,2026	3	003G	""	""	""	""	""	117.482354614201
472	483	204075	68	CON	2024-11-15T00:00:00	2025-12-30T00:00:00	2025-03-03T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	M-153	M-153 E	from M-14 to Frains Lake Road	Single Course Mill & Resurface	Southeast Michigan Council of Governments [SEMCOG]	Washtenaw	Brighton TSC	82	757000	2025-01-10T00:00:00	""	Milling & One Course Asphalt Overlay	Road Capital Preventive Maintenance	Road	0.649	0.869	1431602	N	Priority (POC)	2025	2025	3	031D	""	""	""	""	""	354.056296516937
473	484	210812	68	CON	2024-10-11T00:00:00	2025-12-30T00:00:00	2025-04-01T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-94 W/ US-131 N Ramp	W I 94/US-131 N Ramp	I-94 Westbound ramp to US-131 Northbound	Widening for additional ramp lane	Kalamazoo Area Transportation Study [KATS]	Kalamazoo	Kalamazoo TSC	264	14300000	2024-12-06T00:00:00	""	Additional Lane(s) less than 0.5 mile long	Minor Widening	Road	0	0.491	14504	Y	Priority (POC)	2025	2025	3	074E	""	""	""	""	""	790.189406002339
474	485	217341	68	CON	2025-07-11T00:00:00	2026-12-30T00:00:00	2026-03-01T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-96	I-96 W	US-23 to Kent Lake Rd	Milling and One Course Asphalt Overlay	Southeast Michigan Council of Governments [SEMCOG]	Livingston	Brighton TSC	249	6733000	2025-09-05T00:00:00	""	Milling & One Course Asphalt Overlay	Road Capital Preventive Maintenance	Road	0	0.219	935205	N	""	2025	2026	3	009A	""	""	""	""	""	352.446981396785
475	486	213168	68	CON	2026-10-09T00:00:00	2029-11-30T00:00:00	2027-02-01T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	M-63	M-63	from Central Avenue to the Blossomland and Bicentennial Bridges	Reconstruction	Twin Cities Area Transportation Study [TwinCATS]	Berrien	Kalamazoo TSC	7	22800146	2026-12-04T00:00:00	""	Reconstruction	Reconstruction	Road	0.136	0.588	3110096	N	Not an EJ Priority Area	2027	2027,2028,2029	3	""	""	""	""	""	""	727.42485562798
476	487	204085	68	CON	2024-10-11T00:00:00	2029-12-07T00:00:00	2025-02-03T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-75 	I-75 S	Otter Creek to LaPlaisance Road	Reconstruct, culvert replacement	Southeast Michigan Council of Governments [SEMCOG]	Monroe	Brighton TSC	9	88800000	2024-12-06T00:00:00	""	Concrete Reconstruction	Reconstruction	Road	0.185	0.338	4302520	N	Not an EJ Priority Area	2025	2025,2026	3	RA3B	""	""	""	""	""	246.230037350949
477	488	210812	68	CON	2024-10-11T00:00:00	2025-12-30T00:00:00	2025-04-01T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-94 W/ US-131 N Ramp	W I 94/US-131 N Ramp	I-94 Westbound ramp to US-131 Northbound	Widening for additional ramp lane	Kalamazoo Area Transportation Study [KATS]	Kalamazoo	Kalamazoo TSC	264	14300000	2024-12-06T00:00:00	""	Additional Lane(s) less than 0.5 mile long	Minor Widening	Road	11.666	13.105	15007	N	Priority (POC),Not an EJ Priority Area	2025	2025	3	""	""	""	""	""	""	2315.85024094096
478	489	211118	68	CON	2025-10-10T00:00:00	2026-12-30T00:00:00	2026-04-13T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-675 W/Veterans Memorial Ramp	I-675 W/Veterans Memorial Ramp	I-675 at Veterans Memorial Parkway	Interchange Reconstruction	Saginaw Area Transportation Agency [SATA]	Saginaw	Bay City TSC	3	8901081	2025-12-05T00:00:00	""	Reconstruction	Reconstruction	Road	0	0.334	3730504	N	""	2026	2026	4	""	""	""	""	""	""	537.521831675024
479	490	219521	68	CON	2026-06-12T00:00:00	2027-11-19T00:00:00	2027-05-10T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	M-94	M-94	from Dodge Lake Road to Alger County line	HMA overlay	Rural	Schoolcraft	Newberry TSC	81	6155000	2026-08-07T00:00:00	""	One Course Asphalt Overlay	Road Capital Preventive Maintenance	Road	21.743	22.21	1200603	N	Not an EJ Priority Area	2026	2027	3	""	""	""	""	""	""	751.565022159475
480	491	208609	68	CON	2025-06-06T00:00:00	2028-12-15T00:00:00	2026-03-02T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-94	I-94 E	Wayne Road to Middlebelt Road	Reconstruct	Southeast Michigan Council of Governments [SEMCOG]	Wayne	Taylor TSC	5	170200000	2025-08-01T00:00:00	""	Reconstruction	Reconstruction	Road	0	0.198	4705456	N	Not an EJ Priority Area	2025	2026,2027,2028	3	199A	""	""	""	""	""	318.650686917734
481	492	201225	68	CON	2025-06-06T00:00:00	2030-12-30T00:00:00	2026-03-06T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-94 E	I-94 E	Pelham to Oakwood	Reconstruct, Conc Pavt Rprs, Conc Pavt Inlay, and misc work	Southeast Michigan Council of Governments [SEMCOG]	Wayne	Taylor TSC	5	60000000	2025-08-01T00:00:00	""	Concrete Reconstruction	Reconstruction	Road	0	0.032	4708481	N	No data	2025	2026,2027,2028	3	""	""	""	""	""	""	51.1205313021022
482	493	217341	68	CON	2025-07-11T00:00:00	2026-12-30T00:00:00	2026-03-01T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-96	I-96 W	US-23 to Kent Lake Rd	Milling and One Course Asphalt Overlay	Southeast Michigan Council of Governments [SEMCOG]	Livingston	Brighton TSC	249	6733000	2025-09-05T00:00:00	""	Milling & One Course Asphalt Overlay	Road Capital Preventive Maintenance	Road	0	0.289	935302	N	""	2025	2026	3	008B	""	""	""	""	""	464.543654641189
483	494	214148	68	CON	2026-10-09T00:00:00	2027-12-15T00:00:00	2027-03-15T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-75 Ramps	I-75 S/Grange Hall Ramp	at Grange Hall Road	Construct roundabouts	Southeast Michigan Council of Governments [SEMCOG]	Oakland	Oakland TSC	27	4869662	2026-12-04T00:00:00	""	Intersection Improvements	Traffic Safety	Traffic Safety	0	0.187	651604	N	""	2027	2027	3	037D	""	""	""	""	""	300.947790441701
484	495	217336	68	CON	2025-06-06T00:00:00	2030-12-30T00:00:00	2026-03-06T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-94	I-94 E	Beech Daly Rd to Pelham Rd	Concrete Pavement Repair 	Southeast Michigan Council of Governments [SEMCOG]	Wayne	Taylor TSC	249	6000000	2025-08-01T00:00:00	""	Concrete Pavement Repair	Road Rehabilitation	Road	0	0.373	1576808	N	Not an EJ Priority Area	2025	2026,2027,2028	3	202C	""	""	""	""	""	600.286456222776
485	496	217332	68	CON	2025-06-06T00:00:00	2027-06-04T00:00:00	2026-05-18T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	US-2	US-2	from 43.75 Road easterly to Powers	HMA Overlay 	Rural	Menominee	Crystal Falls TSC	81	4203025	2025-08-01T00:00:00	""	One Course Asphalt Overlay	Road Capital Preventive Maintenance	Road	1.404	10.141	1324107	Y	""	2025	2026	3	""	""	""	""	""	""	14060.8644515048
486	497	208827	68	CON	2027-10-08T00:00:00	2029-12-07T00:00:00	2028-04-03T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	M-25 E	M-25 S	M-25 Freeway End to Walnut Street	Reconstruction	Bay City Area Transportation Study [BCATS]	Bay	Bay City TSC	3	12795053	2027-12-03T00:00:00	""	Reconstruction	Reconstruction	Road	1.293	2.504	768604	Y	""	2028	2028,2029	3	""	""	""	""	""	""	1948.91904194703
487	498	208609	68	CON	2025-06-06T00:00:00	2028-12-15T00:00:00	2026-03-02T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-94	I-94 E	Wayne Road to Middlebelt Road	Reconstruct	Southeast Michigan Council of Governments [SEMCOG]	Wayne	Taylor TSC	5	170200000	2025-08-01T00:00:00	""	Reconstruction	Reconstruction	Road	0	0.332	4718582	N	Not an EJ Priority Area	2025	2026,2027,2028	3	197E	""	""	""	""	""	534.303128184564
488	499	214896	68	CON	2025-07-11T00:00:00	2026-12-01T00:00:00	2026-03-02T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	M-46	M-46	from Muskegon Avenue east to Home Street	Concrete Pavement Inlay	West Michigan Metropolitan Transportation Planning Program [WestPlan]	Muskegon	Muskegon TSC	4	26976000	2025-09-05T00:00:00	""	Concrete Pavement Inlay	Road Rehabilitation	Road	0	0.092	3611741	N	""	2025	2026	3	""	""	""	""	""	""	148.059856373263
489	500	214896	68	CON	2025-07-11T00:00:00	2026-12-01T00:00:00	2026-03-02T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	M-46	M-46	from Muskegon Avenue east to Home Street	Concrete Pavement Inlay	West Michigan Metropolitan Transportation Planning Program [WestPlan]	Muskegon	Muskegon TSC	4	26976000	2025-09-05T00:00:00	""	Concrete Pavement Inlay	Road Rehabilitation	Road	0	2.083	857803	Y	""	2025	2026	3	""	""	""	""	""	""	3352.26963000085
490	501	208831	68	CON	2026-10-09T00:00:00	2027-12-10T00:00:00	2027-03-08T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-69	I-69 E	Lake George Road to Newark Road	Reconstruction	Rural	Lapeer	Davison TSC	3	27744286	2026-12-04T00:00:00	""	Reconstruction	Reconstruction	Road	14.452	16.301	756502	Y	""	2027	2027	3	""	""	""	""	""	""	2975.68251851984
491	502	214892	68	CON	2025-06-06T00:00:00	2026-12-01T00:00:00	2026-03-02T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	US-10	US-10	from west of 95th Avenue east to the Muskegon River	Pavement Inlay	Rural	Osceola	Cadillac TSC	4	15000000	2025-08-01T00:00:00	""	Concrete Pavement Inlay	Road Rehabilitation	Road	14.7	16	1290603	Y	""	2025	2026	3	""	""	""	""	""	""	2092.15109638172
492	503	200626	68	CON	2026-06-12T00:00:00	2027-12-03T00:00:00	2027-06-14T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	M-222	M-222	from the Kalamazoo River east to Grand Ravine Drive	Milling & One Course Asphalt Overlay	Rural	Allegan	Grand Rapids TSC	77	785000	2026-08-07T00:00:00	""	Milling & One Course Asphalt Overlay	Road Capital Preventive Maintenance	Road	0.556	1.359	787604	Y	Priority (Poverty)	2026	2027	3	""	""	""	""	""	""	1292.30565951143
493	504	208609	68	CON	2025-06-06T00:00:00	2028-12-15T00:00:00	2026-03-02T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-94	I-94 E	Wayne Road to Middlebelt Road	Reconstruct	Southeast Michigan Council of Governments [SEMCOG]	Wayne	Taylor TSC	5	170200000	2025-08-01T00:00:00	""	Reconstruction	Reconstruction	Road	0	0.3	4705460	N	Not an EJ Priority Area	2025	2026,2027,2028	3	199D	""	""	""	""	""	482.591719892963
494	505	214595	68	CON	2028-08-11T00:00:00	2030-06-14T00:00:00	2029-06-04T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	US-2	US-2	at North 30th Street in Escanaba.	construct multi-lane roundabout.	Rural	Delta	Crystal Falls TSC	264	2600000	2028-10-06T00:00:00	""	Intersection Improvements	Traffic Safety	Traffic Safety	11.81	11.94	1351805	Y	""	2028	2029	3	""	""	""	""	""	""	209.215213472795
495	506	211179	68	CON	2025-12-12T00:00:00	2028-11-15T00:00:00	2026-04-15T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	M-3 NB	M-3 N	Church St to Canfield Dr	Reconstruction & Sewer Separation	Southeast Michigan Council of Governments [SEMCOG]	Macomb	Macomb TSC	5	14200000	2026-02-06T00:00:00	""	Reconstruction	Reconstruction	Road	1.327	2.034	833209	Y	Not an EJ Priority Area,Priority (POC & Poverty)	2026	2026,2027,2028	3	""	""	""	""	""	""	1137.37129482382
496	507	214565	68	CON	2027-10-08T00:00:00	2028-11-15T00:00:00	2028-03-01T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-94 W	I-94 W	I-94 Between M-59 and 21 Mile Road	Auxiliary Lane Construction between M-59 and 21 Mile Road	Southeast Michigan Council of Governments [SEMCOG]	Macomb	Macomb TSC	264	4313476	2027-12-03T00:00:00	""	Additional Lane(s) less than 0.5 mile long	Minor Widening	Road	0.077	0.432	4210058	N	""	2028	2028	3	011B	""	""	""	""	""	571.25083358667
497	508	210063	68	CON	2025-06-20T00:00:00	2026-12-11T00:00:00	2026-03-02T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	M-37	M-37	from 92nd Street north to 76th Street	Reconstruction and Widening for a Boulevard	Grand Valley Metropolitan Council [GVMC]	Kent	Grand Rapids TSC	4	41400000	2025-08-01T00:00:00	""	Additional lane(s) over 0.5 mile long	Major Widening	Road	1.542	2.73	407106	N	Not an EJ Priority Area	2025	2026	3	""	""	""	""	""	""	1911.90410154939
498	509	208831	68	CON	2026-10-09T00:00:00	2027-12-10T00:00:00	2027-03-08T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-69	I-69 E	Lake George Road to Newark Road	Reconstruction	Rural	Lapeer	Davison TSC	3	27744286	2026-12-04T00:00:00	""	Reconstruction	Reconstruction	Road	0	0.409	1846707	N	""	2027	2027	3	005B	""	""	""	""	""	658.222924632298
499	510	215026	68	CON	2025-10-10T00:00:00	2027-11-05T00:00:00	2026-04-13T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-75 	I-75 N	at the M-32 Interchange.	Reconstruction	Rural	Otsego	Gaylord TSC	6	60000000	2025-12-05T00:00:00	""	Interchange Redesign & Upgrading	Major Widening	Road	12.615	12.976	1080805	Y	Priority (Poverty)	2026	2026,2027	3	""	""	""	""	""	""	580.974395232686
500	511	214565	68	CON	2027-10-08T00:00:00	2028-11-15T00:00:00	2028-03-01T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-94 W	I-94 W	I-94 Between M-59 and 21 Mile Road	Auxiliary Lane Construction between M-59 and 21 Mile Road	Southeast Michigan Council of Governments [SEMCOG]	Macomb	Macomb TSC	264	4313476	2027-12-03T00:00:00	""	Additional Lane(s) less than 0.5 mile long	Minor Widening	Road	14.792	15.153	798501	N	""	2028	2028	3	""	""	""	""	""	""	580.974172500515
501	512	216909	68	CON	2025-11-10T00:00:00	2026-11-20T00:00:00	2026-05-04T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	US-12	US-12	from M-62 to Union	Milling & One Course Asphalt Overlay	Niles-Buchanan-Cass Area Transportation Study [NATS]	Cass	Kalamazoo TSC	80	4607350	2026-01-09T00:00:00	""	Milling & One Course Asphalt Overlay	Road Capital Preventive Maintenance	Road	16.01	20.716	594006	N	Priority (Poverty),Not an EJ Priority Area	2026	2026	3	""	""	""	""	""	""	7573.58657134965
502	513	208831	68	CON	2026-10-09T00:00:00	2027-12-10T00:00:00	2027-03-08T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-69	I-69 E	Lake George Road to Newark Road	Reconstruction	Rural	Lapeer	Davison TSC	3	27744286	2026-12-04T00:00:00	""	Reconstruction	Reconstruction	Road	0	0.37	1846708	N	""	2027	2027	3	005D	""	""	""	""	""	595.231692236242
503	514	214148	68	CON	2026-10-09T00:00:00	2027-12-15T00:00:00	2027-03-15T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-75 Ramps	I-75 S/Grange Hall Ramp	at Grange Hall Road	Construct roundabouts	Southeast Michigan Council of Governments [SEMCOG]	Oakland	Oakland TSC	27	4869662	2026-12-04T00:00:00	""	Intersection Improvements	Traffic Safety	Traffic Safety	1.331	1.434	651602	N	""	2027	2027	4	""	""	""	""	""	""	165.14594159113
504	515	211155	68	CON	2026-10-09T00:00:00	2031-05-30T00:00:00	2027-01-04T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	US-23 N	US-23 N	M-14 to I-94	Road system and operational improvement as defined through EA process	Southeast Michigan Council of Governments [SEMCOG]	Washtenaw	Brighton TSC	9	229369618	2026-12-04T00:00:00	""	Reconstruction	Reconstruction	Road	0	0.017	4606020	N	Not an EJ Priority Area,Priority (POC)	2027	2027,2028,2029	3	""	""	""	""	""	""	27.3588836206956
505	516	211173	68	CON	2028-08-11T00:00:00	2029-11-02T00:00:00	2029-04-16T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-96	I-96 E	from Airline Road east to Apple Drive	Milling and Two Course Asphalt Resurfacing	West Michigan Metropolitan Transportation Planning Program [WestPlan]	Ottawa	Muskegon TSC	4	12887000	2028-10-06T00:00:00	""	Milling and Two Course Asphalt Resurfacing	Road Rehabilitation	Road	3.518	5.432	857607	N	""	2028	2029	3	""	""	""	""	""	""	3080.21365926721
506	517	201225	68	CON	2025-06-06T00:00:00	2030-12-30T00:00:00	2026-03-06T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-94 E	I-94 E	Pelham to Oakwood	Reconstruct, Conc Pavt Rprs, Conc Pavt Inlay, and misc work	Southeast Michigan Council of Governments [SEMCOG]	Wayne	Taylor TSC	5	60000000	2025-08-01T00:00:00	""	Concrete Reconstruction	Reconstruction	Road	0.058	0.126	1869510	N	Not an EJ Priority Area	2025	2026,2027,2028	3	203C	""	""	""	""	""	109.435636447618
507	518	211155	68	CON	2026-10-09T00:00:00	2031-05-30T00:00:00	2027-01-04T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	US-23 N	US-23 N	M-14 to I-94	Road system and operational improvement as defined through EA process	Southeast Michigan Council of Governments [SEMCOG]	Washtenaw	Brighton TSC	9	229369618	2026-12-04T00:00:00	""	Reconstruction	Reconstruction	Road	0	0.211	2000005	N	Priority (POC)	2027	2027,2028,2029	3	021E	""	""	""	""	""	339.572136471891
508	519	214522	68	CON	2027-10-08T00:00:00	2028-12-01T00:00:00	2028-04-01T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	M-153 E	M-153 E	M-153 at Plymouth Rd	Indirect left turn lanes	Southeast Michigan Council of Governments [SEMCOG]	Washtenaw	Brighton TSC	264	1561940	2027-12-03T00:00:00	""	Left Turn Lane	Minor Widening	Road	0.869	1.3	1431602	N	""	2028	2028	3	""	""	""	""	""	""	693.628525650758
509	520	214943	68	CON	2026-06-12T00:00:00	2027-12-17T00:00:00	2027-01-11T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	M-21	M-21	Swartz Creek to I-475	Reconstruction	Genesee County Metropolitan Planning Commission [GCMPC]	Genesee	Davison TSC	3	18720000	2026-08-07T00:00:00	""	Reconstruction	Reconstruction	Road	6.415	6.712	1498006	N	Priority (POC & Poverty)	2026	2027	3	""	""	""	""	""	""	477.975982507889
510	521	215485	68	CON	2025-06-06T00:00:00	2027-12-29T00:00:00	2026-04-06T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-475 N	I-475 N	Bristol Road to Thread Creek and 17 Structures	Road Reconstruction, Bridge Rehabilitation	Genesee County Metropolitan Planning Commission [GCMPC]	Genesee	Davison TSC	3	119611694	2025-08-01T00:00:00	""	Reconstruction	Reconstruction	Road	3.68	6.121	1497904	N	""	2025	2026,2027	3	""	""	""	""	""	""	3928.41571342688
511	522	210086	68	CON	2025-06-06T00:00:00	2027-12-14T00:00:00	2025-10-20T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-475	I-475 N	Thread Creek to Flint River and 10 Structure Locations	Road Reconstruction and Structure Work	Genesee County Metropolitan Planning Commission [GCMPC]	Genesee	Davison TSC	3	150429885	2025-08-01T00:00:00	""	Reconstruction	Reconstruction	Road	0	0.196	1844205	N	""	2025	2026,2027	3	032C	""	""	""	""	""	315.199151545928
512	523	215485	68	CON	2025-06-06T00:00:00	2027-12-29T00:00:00	2026-04-06T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-475 N	I-475 N	Bristol Road to Thread Creek and 17 Structures	Road Reconstruction, Bridge Rehabilitation	Genesee County Metropolitan Planning Commission [GCMPC]	Genesee	Davison TSC	3	119611694	2025-08-01T00:00:00	""	Reconstruction	Reconstruction	Road	0	0.179	1495001	N	""	2025	2026,2027	3	028A	""	""	""	""	""	288.073169613473
513	524	211155	68	CON	2026-10-09T00:00:00	2031-05-30T00:00:00	2027-01-04T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	US-23 N	US-23 N	M-14 to I-94	Road system and operational improvement as defined through EA process	Southeast Michigan Council of Governments [SEMCOG]	Washtenaw	Brighton TSC	9	229369618	2026-12-04T00:00:00	""	Reconstruction	Reconstruction	Road	0.211	0.416	1429606	N	Not an EJ Priority Area	2027	2027,2028,2029	3	019H	""	""	""	""	""	329.916161388794
514	525	215485	68	CON	2025-06-06T00:00:00	2027-12-29T00:00:00	2026-04-06T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-475 N	I-475 N	Bristol Road to Thread Creek and 17 Structures	Road Reconstruction, Bridge Rehabilitation	Genesee County Metropolitan Planning Commission [GCMPC]	Genesee	Davison TSC	3	119611694	2025-08-01T00:00:00	""	Reconstruction	Reconstruction	Road	0	0.212	1502610	N	""	2025	2026,2027	3	028B	""	""	""	""	""	340.949171747046
515	526	217341	68	CON	2025-07-11T00:00:00	2026-12-30T00:00:00	2026-03-01T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-96	I-96 W	US-23 to Kent Lake Rd	Milling and One Course Asphalt Overlay	Southeast Michigan Council of Governments [SEMCOG]	Livingston	Brighton TSC	249	6733000	2025-09-05T00:00:00	""	Milling & One Course Asphalt Overlay	Road Capital Preventive Maintenance	Road	0	0.846	657303	N	""	2025	2026	3	""	""	""	""	""	""	1361.50754126754
516	527	211181	68	CON	2026-10-09T00:00:00	2027-12-29T00:00:00	2027-02-01T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	M-10	M-10 W	Meyers to I-75	Concrete Pavement Repair	Southeast Michigan Council of Governments [SEMCOG]	Wayne	Detroit TSC	5	12000000	2026-12-04T00:00:00	""	Concrete Pavement Repair	Road Rehabilitation	Road	0	0.198	1584706	N	Not an EJ Priority Area	2027	2027	3	109B	""	""	""	""	""	318.650732130304
517	528	215485	68	CON	2025-06-06T00:00:00	2027-12-29T00:00:00	2026-04-06T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-475 N	I-475 N	Bristol Road to Thread Creek and 17 Structures	Road Reconstruction, Bridge Rehabilitation	Genesee County Metropolitan Planning Commission [GCMPC]	Genesee	Davison TSC	3	119611694	2025-08-01T00:00:00	""	Reconstruction	Reconstruction	Road	0	0.28	1502401	N	""	2025	2026,2027	3	027D	""	""	""	""	""	450.193635605131
518	529	208489	68	CON	2025-06-06T00:00:00	2026-12-23T00:00:00	2026-03-16T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	US10 BR/M-20	M-20 E	Jerome Street to Washington Street	Reconstruction	Midland Area Transportation Study [MATS]	Midland	Mt. Pleasant TSC	3	39400800	2025-08-01T00:00:00	""	Reconstruction	Reconstruction	Road	0.185	0.752	885605	N	Priority (Poverty)	2025	2026	3	""	""	""	""	""	""	912.499658522489
519	530	217244	68	CON	2025-10-10T00:00:00	2026-06-26T00:00:00	2026-04-13T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	M-75	M-75	from US-131 to Air Industrial Park	Single course hot mix asphalt overlay	Rural	Charlevoix	Gaylord TSC	79	1350370	2025-12-05T00:00:00	""	One Course Asphalt Overlay	Road Capital Preventive Maintenance	Road	0.215	4.205	1242004	Y	Not an EJ Priority Area	2026	2026	3	""	""	""	""	""	""	6421.29450197967
520	531	213791	68	CON	2027-10-08T00:00:00	2028-12-08T00:00:00	2028-03-15T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-75	I-75 N	Court Street to North Junction I-475	Mill and Two Course HMA Overlay	Genesee County Metropolitan Planning Commission [GCMPC]	Genesee	Davison TSC	3	37026769	2027-12-03T00:00:00	""	Milling and Two Course Asphalt Resurfacing	Road Rehabilitation	Road	0	0.33	1494709	N	""	2028	2028	3	022D	""	""	""	""	""	531.084565255566
521	532	211118	68	CON	2025-10-10T00:00:00	2026-12-30T00:00:00	2026-04-13T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-675 W/Veterans Memorial Ramp	I-675 W/Veterans Memorial Ramp	I-675 at Veterans Memorial Parkway	Interchange Reconstruction	Saginaw Area Transportation Agency [SATA]	Saginaw	Bay City TSC	3	8901081	2025-12-05T00:00:00	""	Reconstruction	Reconstruction	Road	0	0.203	3730026	N	""	2026	2026	3	009F	""	""	""	""	""	326.697468013213
522	533	220988	68	CON	2026-01-09T00:00:00	2026-11-16T00:00:00	2026-04-15T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	US-12	US-12	Haggerty to Lotz and EB / 0.2 miles west of Pershing to Howe	Reconstruct	Southeast Michigan Council of Governments [SEMCOG]	Wayne	Taylor TSC	5	31500000	2026-03-06T00:00:00	""	Reconstruction	Reconstruction	Road	8.094	9.391	1600206	N	Priority (Poverty),Not an EJ Priority Area	2026	2026	3	""	""	""	""	""	""	2087.32294241468
523	534	201225	68	CON	2025-06-06T00:00:00	2030-12-30T00:00:00	2026-03-06T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-94 E	I-94 E	Pelham to Oakwood	Reconstruct, Conc Pavt Rprs, Conc Pavt Inlay, and misc work	Southeast Michigan Council of Governments [SEMCOG]	Wayne	Taylor TSC	5	60000000	2025-08-01T00:00:00	""	Concrete Reconstruction	Reconstruction	Road	0	0.062	1589405	N	No data	2025	2026,2027,2028	3	""	""	""	""	""	""	99.5940551723724
524	535	215485	68	CON	2025-06-06T00:00:00	2027-12-29T00:00:00	2026-04-06T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-475 N	I-475 N	Bristol Road to Thread Creek and 17 Structures	Road Reconstruction, Bridge Rehabilitation	Genesee County Metropolitan Planning Commission [GCMPC]	Genesee	Davison TSC	3	119611694	2025-08-01T00:00:00	""	Reconstruction	Reconstruction	Road	0	0.322	1502405	N	""	2025	2026,2027	3	027A	""	""	""	""	""	518.209730423309
525	536	211937	68	CON	2028-01-07T00:00:00	2033-03-01T00:00:00	2028-04-03T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	Kensington/I-96 W Ramp	Kensington/I-96 W Ramp	Kensington Rd from Larkins Rd to Grand River Ave	Install roundabouts at the I-96 and Kensington Rd ramp terminals	Southeast Michigan Council of Governments [SEMCOG]	Livingston	Brighton TSC	264	4080645	2028-03-03T00:00:00	""	Additional Lane(s) less than 0.5 mile long	Minor Widening	Road	1.621	1.749	942603	N	""	2028	2028,2029	4	""	""	""	""	""	""	205.996429432712
526	537	211181	68	CON	2026-10-09T00:00:00	2027-12-29T00:00:00	2027-02-01T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	M-10	M-10 W	Meyers to I-75	Concrete Pavement Repair	Southeast Michigan Council of Governments [SEMCOG]	Wayne	Detroit TSC	5	12000000	2026-12-04T00:00:00	""	Concrete Pavement Repair	Road Rehabilitation	Road	0.125	0.308	1577508	N	Not an EJ Priority Area,Priority (POC & Poverty)	2027	2027	3	215B	""	""	""	""	""	294.510511993386
527	538	211173	68	CON	2028-08-11T00:00:00	2029-11-02T00:00:00	2029-04-16T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-96	I-96 E	from Airline Road east to Apple Drive	Milling and Two Course Asphalt Resurfacing	West Michigan Metropolitan Transportation Planning Program [WestPlan]	Ottawa	Muskegon TSC	4	12887000	2028-10-06T00:00:00	""	Milling and Two Course Asphalt Resurfacing	Road Rehabilitation	Road	0	3.014	742501	N	""	2028	2029	3	""	""	""	""	""	""	4850.57174150223
528	539	211155	68	CON	2026-10-09T00:00:00	2031-05-30T00:00:00	2027-01-04T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	US-23 N	US-23 N	M-14 to I-94	Road system and operational improvement as defined through EA process	Southeast Michigan Council of Governments [SEMCOG]	Washtenaw	Brighton TSC	9	229369618	2026-12-04T00:00:00	""	Reconstruction	Reconstruction	Road	16.678	17.368	1431202	N	Priority (POC)	2027	2027,2028,2029	3	022C	""	""	""	""	""	1110.19903905269
529	540	214169	68	CON	2026-08-07T00:00:00	2027-11-05T00:00:00	2027-04-12T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	US-31 BR	US-31BR	From the White River north to Stanton Boulevard	Milling and Two Course Asphalt Resurfacing	West Michigan Metropolitan Transportation Planning Program [WestPlan]	Muskegon	Muskegon TSC	4	1817000	2026-10-02T00:00:00	""	Milling and Two Course Asphalt Resurfacing	Road Rehabilitation	Road	0.078	0.53	860702	N	""	2026	2027	3	""	""	""	""	""	""	727.424748211456
530	541	213346	68	CON	2026-07-10T00:00:00	2028-05-26T00:00:00	2027-05-17T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	M-46	M-46	From Miles Road east to M-66 (East Junction)	Micro-Cold Milling, One Course Asphalt Overlay	Rural	Montcalm	Cadillac TSC	77	2364000	2026-09-04T00:00:00	""	Milling & One Course Asphalt Overlay	Road Capital Preventive Maintenance	Road	15.777	16.681	1205603	N	Not an EJ Priority Area	2026	2027,2028	3	""	""	""	""	""	""	1454.84966303529
531	542	211937	68	CON	2028-01-07T00:00:00	2033-03-01T00:00:00	2028-04-03T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	Kensington/I-96 W Ramp	Kensington/I-96 W Ramp	Kensington Rd from Larkins Rd to Grand River Ave	Install roundabouts at the I-96 and Kensington Rd ramp terminals	Southeast Michigan Council of Governments [SEMCOG]	Livingston	Brighton TSC	264	4080645	2028-03-03T00:00:00	""	Additional Lane(s) less than 0.5 mile long	Minor Widening	Road	0	0.043	4104044	N	""	2028	2028,2029	3	""	""	""	""	""	""	69.2018585261538
532	543	201225	68	CON	2025-06-06T00:00:00	2030-12-30T00:00:00	2026-03-06T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-94 E	I-94 E	Pelham to Oakwood	Reconstruct, Conc Pavt Rprs, Conc Pavt Inlay, and misc work	Southeast Michigan Council of Governments [SEMCOG]	Wayne	Taylor TSC	5	60000000	2025-08-01T00:00:00	""	Concrete Reconstruction	Reconstruction	Road	0	0.182	1589506	N	Not an EJ Priority Area	2025	2026,2027,2028	3	204I	""	""	""	""	""	292.901094496285
533	544	217336	68	CON	2025-06-06T00:00:00	2030-12-30T00:00:00	2026-03-06T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-94	I-94 E	Beech Daly Rd to Pelham Rd	Concrete Pavement Repair 	Southeast Michigan Council of Governments [SEMCOG]	Wayne	Taylor TSC	249	6000000	2025-08-01T00:00:00	""	Concrete Pavement Repair	Road Rehabilitation	Road	0	0.031	4718571	N	Not an EJ Priority Area,No data	2025	2026,2027,2028	3	""	""	""	""	""	""	49.8353645988082
534	545	215485	68	CON	2025-06-06T00:00:00	2027-12-29T00:00:00	2026-04-06T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-475 N	I-475 N	Bristol Road to Thread Creek and 17 Structures	Road Reconstruction, Bridge Rehabilitation	Genesee County Metropolitan Planning Commission [GCMPC]	Genesee	Davison TSC	3	119611694	2025-08-01T00:00:00	""	Reconstruction	Reconstruction	Road	0	0.218	1501402	N	""	2025	2026,2027	3	027C	""	""	""	""	""	350.837103522168
535	546	215026	68	CON	2025-10-10T00:00:00	2027-11-05T00:00:00	2026-04-13T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-75 	I-75 N	at the M-32 Interchange.	Reconstruction	Rural	Otsego	Gaylord TSC	6	60000000	2025-12-05T00:00:00	""	Interchange Redesign & Upgrading	Major Widening	Road	0	0.191	3690782	N	Priority (Poverty)	2026	2026,2027	3	003D	""	""	""	""	""	307.000774542806
536	547	215485	68	CON	2025-06-06T00:00:00	2027-12-29T00:00:00	2026-04-06T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-475 N	I-475 N	Bristol Road to Thread Creek and 17 Structures	Road Reconstruction, Bridge Rehabilitation	Genesee County Metropolitan Planning Commission [GCMPC]	Genesee	Davison TSC	3	119611694	2025-08-01T00:00:00	""	Reconstruction	Reconstruction	Road	3.495	5.974	1497903	Y	""	2025	2026,2027	3	""	""	""	""	""	""	3989.5709771174
537	548	219508	68	CON	2025-12-12T00:00:00	2026-12-30T00:00:00	2026-04-13T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	M-106	M-106	3RD STREET NORTH TO CHANTER ROAD IN JACKSON COUNTY	HMA cold milling with single course HMA overlay	Jackson Area Comprehensive Transportation Study [JACTS]	Jackson	Jackson TSC	82	330441	2026-02-06T00:00:00	""	Milling & One Course Asphalt Overlay	Road Capital Preventive Maintenance	Road	1.913	2.522	901504	Y	Not an EJ Priority Area	2026	2026	3	""	""	""	""	""	""	980.092177329837
538	549	211937	68	CON	2028-01-07T00:00:00	2033-03-01T00:00:00	2028-04-03T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	Kensington/I-96 W Ramp	Kensington/I-96 W Ramp	Kensington Rd from Larkins Rd to Grand River Ave	Install roundabouts at the I-96 and Kensington Rd ramp terminals	Southeast Michigan Council of Governments [SEMCOG]	Livingston	Brighton TSC	264	4080645	2028-03-03T00:00:00	""	Additional Lane(s) less than 0.5 mile long	Minor Widening	Road	0	0.186	4103167	N	""	2028	2028,2029	4	""	""	""	""	""	""	299.338562188135
539	550	208609	68	CON	2025-06-06T00:00:00	2028-12-15T00:00:00	2026-03-02T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-94	I-94 E	Wayne Road to Middlebelt Road	Reconstruct	Southeast Michigan Council of Governments [SEMCOG]	Wayne	Taylor TSC	5	170200000	2025-08-01T00:00:00	""	Reconstruction	Reconstruction	Road	8.191	12.029	1588802	N	Not an EJ Priority Area	2025	2026,2027,2028	3	""	""	""	""	""	""	6176.67359918458
540	551	211118	68	CON	2025-10-10T00:00:00	2026-12-30T00:00:00	2026-04-13T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-675 W/Veterans Memorial Ramp	I-675 W/Veterans Memorial Ramp	I-675 at Veterans Memorial Parkway	Interchange Reconstruction	Saginaw Area Transportation Agency [SATA]	Saginaw	Bay City TSC	3	8901081	2025-12-05T00:00:00	""	Reconstruction	Reconstruction	Road	0	0.166	464805	N	""	2026	2026	3	009C	""	""	""	""	""	267.151514785034
541	552	218826	68	CON	2028-08-11T00:00:00	2029-12-28T00:00:00	2029-05-07T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	M-28	M-28	from Houghton County Line to Johnson Rd	Widen Paved Shoulders	Rural	Baraga	Ishpeming TSC	30	1263419	2028-10-06T00:00:00	""	Shoulder Widening	Minor Widening	Road	0	6.19	1189709	Y	Not an EJ Priority Area,Priority (POC)	2028	2029	3	""	""	""	""	""	""	9961.85772597003
542	553	211147	68	CON	2025-10-10T00:00:00	2027-05-28T00:00:00	2026-04-13T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	M-99	M-99	South Street north and east to Gibbs Road	Multi-course HMA mill & resurface, concrete pavement repairs, drainage impr	Jackson Area Comprehensive Transportation Study [JACTS]	Jackson	Jackson TSC	9	5888491	2025-12-05T00:00:00	""	Milling and Two Course Asphalt Resurfacing	Road Rehabilitation	Road	7.871	9.26	897108	Y	Priority (Poverty)	2026	2026	3	""	""	""	""	""	""	2235.38291503107
543	554	219817	68	CON	2025-10-10T00:00:00	2026-11-13T00:00:00	2026-05-04T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	M-57	M-57	from Linden Road to Clio West Village Limits	Milling and One Course Asphalt Overlay	Genesee County Metropolitan Planning Commission [GCMPC]	Genesee	Davison TSC	76	2100000	2025-12-05T00:00:00	""	Milling & One Course Asphalt Overlay	Road Capital Preventive Maintenance	Road	7.906	9.395	1494503	Y	Not an EJ Priority Area	2026	2026	3	""	""	""	""	""	""	2396.31762254505
544	555	217341	68	CON	2025-07-11T00:00:00	2026-12-30T00:00:00	2026-03-01T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-96	I-96 W	US-23 to Kent Lake Rd	Milling and One Course Asphalt Overlay	Southeast Michigan Council of Governments [SEMCOG]	Livingston	Brighton TSC	249	6733000	2025-09-05T00:00:00	""	Milling & One Course Asphalt Overlay	Road Capital Preventive Maintenance	Road	23.842	27.48	935207	Y	""	2025	2026	3	""	""	""	""	""	""	5854.7679855329
545	556	212745	68	CON	2024-10-11T00:00:00	2026-12-01T00:00:00	2025-01-21T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	US-131 	US-131 N	At US-131BS in Oshtemo Township, Kalamazoo County.	Construct interchange ramps on US-131 at US-131BR.	Kalamazoo Area Transportation Study [KATS]	Kalamazoo	Kalamazoo TSC	7	26750000	2024-12-06T00:00:00	""	Interchange Redesign & Upgrading	Major Widening	Road	0	0.018	3392526	N	Not an EJ Priority Area	2025	2025,2026	3	""	""	""	""	""	""	28.2533345736205
546	557	211181	68	CON	2026-10-09T00:00:00	2027-12-29T00:00:00	2027-02-01T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	M-10	M-10 W	Meyers to I-75	Concrete Pavement Repair	Southeast Michigan Council of Governments [SEMCOG]	Wayne	Detroit TSC	5	12000000	2026-12-04T00:00:00	""	Concrete Pavement Repair	Road Rehabilitation	Road	0	0.183	1585205	N	Priority (POC & Poverty)	2027	2027	3	108D	""	""	""	""	""	294.51040282849
547	558	211937	68	CON	2028-01-07T00:00:00	2033-03-01T00:00:00	2028-04-03T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	Kensington/I-96 W Ramp	Kensington/I-96 W Ramp	Kensington Rd from Larkins Rd to Grand River Ave	Install roundabouts at the I-96 and Kensington Rd ramp terminals	Southeast Michigan Council of Governments [SEMCOG]	Livingston	Brighton TSC	264	4080645	2028-03-03T00:00:00	""	Additional Lane(s) less than 0.5 mile long	Minor Widening	Road	0	0.072	4102895	N	""	2028	2028,2029	4	""	""	""	""	""	""	115.873093208045
548	559	208803	68	CON	2026-06-12T00:00:00	2028-06-09T00:00:00	2027-05-17T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	US-45	US-45	from the state line northerly to US-2	HMA base crushing and shaping, HMA overlay, agg. shoulders, and guardrail	Rural	Gogebic	Crystal Falls TSC	8	6562000	2026-08-07T00:00:00	""	Crush & Shape & Asphalt Resurfacing	Road Rehabilitation	Road	0.615	7.505	1475203	Y	Not an EJ Priority Area	2026	2027	3	""	""	""	""	""	""	11088.4007178365
549	560	211118	68	CON	2025-10-10T00:00:00	2026-12-30T00:00:00	2026-04-13T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-675 W/Veterans Memorial Ramp	I-675 W/Veterans Memorial Ramp	I-675 at Veterans Memorial Parkway	Interchange Reconstruction	Saginaw Area Transportation Agency [SATA]	Saginaw	Bay City TSC	3	8901081	2025-12-05T00:00:00	""	Reconstruction	Reconstruction	Road	0.07	0.09	463401	N	""	2026	2026	4	""	""	""	""	""	""	32.1868491443106
550	561	211181	68	CON	2026-10-09T00:00:00	2027-12-29T00:00:00	2027-02-01T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	M-10	M-10 W	Meyers to I-75	Concrete Pavement Repair	Southeast Michigan Council of Governments [SEMCOG]	Wayne	Detroit TSC	5	12000000	2026-12-04T00:00:00	""	Concrete Pavement Repair	Road Rehabilitation	Road	0	0.122	1585301	N	Priority (POC),Priority (POC & Poverty)	2027	2027	3	111D	""	""	""	""	""	196.287617761509
551	562	214028	68	CON	2026-10-09T00:00:00	2027-10-29T00:00:00	2027-06-07T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	M-28	M-28	at Autrain Forest Lake Road intersection	installing a new left turn bypass lane 	Rural	Alger	Newberry TSC	30	854616	2026-12-04T00:00:00	""	Intersection Improvements	Traffic Safety	Traffic Safety	15.27	15.53	1138809	Y	""	2027	2027	3	""	""	""	""	""	""	418.430047606055
552	563	211181	68	CON	2026-10-09T00:00:00	2027-12-29T00:00:00	2027-02-01T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	M-10	M-10 W	Meyers to I-75	Concrete Pavement Repair	Southeast Michigan Council of Governments [SEMCOG]	Wayne	Detroit TSC	5	12000000	2026-12-04T00:00:00	""	Concrete Pavement Repair	Road Rehabilitation	Road	0	0.194	1585108	N	Priority (POC & Poverty),Priority (POC)	2027	2027	3	104B	""	""	""	""	""	312.213361207509
553	564	210956	68	CON	2026-10-09T00:00:00	2027-11-30T00:00:00	2027-04-01T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	US-23	US-23	from the Tawas River Bridge to Tawas Beach Road.	Hot Mix Asphalt Reconstruction	Rural	Iosco	Alpena TSC	6	21768910	2026-12-04T00:00:00	""	Asphalt Reconstruction	Reconstruction	Road	7.287	8.602	1251607	N	Not an EJ Priority Area	2027	2027	3	""	""	""	""	""	""	2116.29112794531
554	565	211937	68	CON	2028-01-07T00:00:00	2033-03-01T00:00:00	2028-04-03T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	Kensington/I-96 W Ramp	Kensington/I-96 W Ramp	Kensington Rd from Larkins Rd to Grand River Ave	Install roundabouts at the I-96 and Kensington Rd ramp terminals	Southeast Michigan Council of Governments [SEMCOG]	Livingston	Brighton TSC	264	4080645	2028-03-03T00:00:00	""	Additional Lane(s) less than 0.5 mile long	Minor Widening	Road	0	0.187	1821407	N	""	2028	2028,2029	4	""	""	""	""	""	""	300.947862547288
555	566	211067	68	CON	2029-08-10T00:00:00	2031-06-06T00:00:00	2030-05-06T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	M-35	M-35	from US-2 to 13th Street in the city of Gladstone	HMA reconstruction, curb and gutter, storm sewer.	Rural	Delta	Crystal Falls TSC	8	1552830	2029-10-05T00:00:00	""	Asphalt Reconstruction	Reconstruction	Road	0.037	0.194	5502004	Y	""	2029	2030	3	""	""	""	""	""	""	252.667428441137
556	567	213198	68	CON	2026-10-09T00:00:00	2028-05-31T00:00:00	2027-04-01T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	M-72	M-72	from Fourteenth Street to M-33.	Asphalt Reconstruction and Hot Mix Asphalt Crush and Shape	Rural	Oscoda	Alpena TSC	6	5782000	2026-12-04T00:00:00	""	Asphalt Reconstruction	Reconstruction	Road	11.912	13.444	1335208	Y	""	2027	2027	3	""	""	""	""	""	""	2465.51938643642
557	568	214169	68	CON	2026-08-07T00:00:00	2027-11-05T00:00:00	2027-04-12T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	US-31 BR	US-31BR	From the White River north to Stanton Boulevard	Milling and Two Course Asphalt Resurfacing	West Michigan Metropolitan Transportation Planning Program [WestPlan]	Muskegon	Muskegon TSC	4	1817000	2026-10-02T00:00:00	""	Milling and Two Course Asphalt Resurfacing	Road Rehabilitation	Road	0.318	0.536	859301	Y	""	2026	2027	3	""	""	""	""	""	""	350.837562931328
558	569	213189	68	CON	2024-10-11T00:00:00	2025-11-26T00:00:00	2025-05-01T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	M-65	M-65	from Grand Lake Highway north to US-23	Hot Mix Asphalt Mill and Resurface	Rural	Presque Isle	Alpena TSC	79	1490000	2024-12-06T00:00:00	""	Milling & One Course Asphalt Overlay	Road Capital Preventive Maintenance	Road	4.94	9.275	1262504	Y	""	2025	2025	3	""	""	""	""	""	""	6976.51914404261
559	570	211941	68	CON	2027-12-10T00:00:00	2029-07-05T00:00:00	2028-04-03T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	M-43	M-43	Broadbent to I-96	Construct median boulevard and indirect crossovers	Tri-County Regional Planning Commission [TCRPC]	Eaton	Lansing TSC	264	13600000	2028-02-04T00:00:00	""	Traffic Flow Improvement	Traffic Safety	Traffic Safety	0	0.045	3231541	N	""	2028	2028,2029	3	""	""	""	""	""	""	71.6641968987426
560	571	211941	68	CON	2027-12-10T00:00:00	2029-07-05T00:00:00	2028-04-03T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	M-43	M-43	Broadbent to I-96	Construct median boulevard and indirect crossovers	Tri-County Regional Planning Commission [TCRPC]	Eaton	Lansing TSC	264	13600000	2028-02-04T00:00:00	""	Traffic Flow Improvement	Traffic Safety	Traffic Safety	18.613	19.787	567503	Y	""	2028	2028,2029	3	""	""	""	""	""	""	1889.37332122716
561	572	211181	68	CON	2026-10-09T00:00:00	2027-12-29T00:00:00	2027-02-01T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	M-10	M-10 W	Meyers to I-75	Concrete Pavement Repair	Southeast Michigan Council of Governments [SEMCOG]	Wayne	Detroit TSC	5	12000000	2026-12-04T00:00:00	""	Concrete Pavement Repair	Road Rehabilitation	Road	0	0.229	4710004	N	Priority (POC & Poverty)	2027	2027	3	108B	""	""	""	""	""	368.540448683529
562	573	217341	68	CON	2025-07-11T00:00:00	2026-12-30T00:00:00	2026-03-01T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-96	I-96 W	US-23 to Kent Lake Rd	Milling and One Course Asphalt Overlay	Southeast Michigan Council of Governments [SEMCOG]	Livingston	Brighton TSC	249	6733000	2025-09-05T00:00:00	""	Milling & One Course Asphalt Overlay	Road Capital Preventive Maintenance	Road	0	0.043	4104044	N	""	2025	2026	3	""	""	""	""	""	""	69.2018585261538
563	574	204085	68	CON	2024-10-11T00:00:00	2029-12-07T00:00:00	2025-02-03T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-75 	I-75 S	Otter Creek to LaPlaisance Road	Reconstruct, culvert replacement	Southeast Michigan Council of Governments [SEMCOG]	Monroe	Brighton TSC	9	88800000	2024-12-06T00:00:00	""	Concrete Reconstruction	Reconstruction	Road	0	0.452	1228207	N	Not an EJ Priority Area	2025	2025,2026	3	019D	""	""	""	""	""	609.827934433308
564	575	211939	68	CON	2027-11-12T00:00:00	2028-12-28T00:00:00	2028-03-03T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-96BL	I-96BL E	I-96/Cedar St/Pennsylvania Interchange	Construct indirect lefts	Tri-County Regional Planning Commission [TCRPC]	Ingham	Lansing TSC	264	6600000	2028-01-07T00:00:00	""	Intersection Improvements	Traffic Safety	Traffic Safety	0	0.148	336102	N	Priority (POC & Poverty)	2028	2028	3	017B	""	""	""	""	""	237.439716005589
565	576	211937	68	CON	2028-01-07T00:00:00	2033-03-01T00:00:00	2028-04-03T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	Kensington/I-96 W Ramp	Kensington/I-96 W Ramp	Kensington Rd from Larkins Rd to Grand River Ave	Install roundabouts at the I-96 and Kensington Rd ramp terminals	Southeast Michigan Council of Governments [SEMCOG]	Livingston	Brighton TSC	264	4080645	2028-03-03T00:00:00	""	Additional Lane(s) less than 0.5 mile long	Minor Widening	Road	0	0.219	935205	N	""	2028	2028,2029	3	009A	""	""	""	""	""	352.446981396785
566	577	208489	68	CON	2025-06-06T00:00:00	2026-12-23T00:00:00	2026-03-16T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	US10 BR/M-20	M-20 E	Jerome Street to Washington Street	Reconstruction	Midland Area Transportation Study [MATS]	Midland	Mt. Pleasant TSC	3	39400800	2025-08-01T00:00:00	""	Reconstruction	Reconstruction	Road	0.205	0.235	3560073	N	Priority (Poverty)	2025	2026	3	""	""	""	""	""	""	48.2803845255904
567	578	213442	68	CON	2027-10-08T00:00:00	2030-05-31T00:00:00	2028-04-10T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-94BL	I-94BL	Dwight Street to Bender Street	Road reconstruction, watermain, storm sewer, signals, and pavt markings	Jackson Area Comprehensive Transportation Study [JACTS]	Jackson	Jackson TSC	9	29754034	2027-12-03T00:00:00	""	Asphalt Reconstruction	Reconstruction	Road	1.187	2.328	3381123	Y	Not an EJ Priority Area,Priority (Poverty)	2028	2028	3	""	""	""	""	""	""	1836.26484585908
568	579	211941	68	CON	2027-12-10T00:00:00	2029-07-05T00:00:00	2028-04-03T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	M-43	M-43	Broadbent to I-96	Construct median boulevard and indirect crossovers	Tri-County Regional Planning Commission [TCRPC]	Eaton	Lansing TSC	264	13600000	2028-02-04T00:00:00	""	Traffic Flow Improvement	Traffic Safety	Traffic Safety	0	0.479	567901	N	""	2028	2028,2029	3	006A	""	""	""	""	""	770.673609808645
569	580	211155	68	CON	2026-10-09T00:00:00	2031-05-30T00:00:00	2027-01-04T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	US-23 N	US-23 N	M-14 to I-94	Road system and operational improvement as defined through EA process	Southeast Michigan Council of Governments [SEMCOG]	Washtenaw	Brighton TSC	9	229369618	2026-12-04T00:00:00	""	Reconstruction	Reconstruction	Road	0.692	0.999	1426908	N	Priority (POC & Poverty),Priority (POC)	2027	2027,2028,2029	3	911J	""	""	""	""	""	494.069498992021
570	581	211937	68	CON	2028-01-07T00:00:00	2033-03-01T00:00:00	2028-04-03T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	Kensington/I-96 W Ramp	Kensington/I-96 W Ramp	Kensington Rd from Larkins Rd to Grand River Ave	Install roundabouts at the I-96 and Kensington Rd ramp terminals	Southeast Michigan Council of Governments [SEMCOG]	Livingston	Brighton TSC	264	4080645	2028-03-03T00:00:00	""	Additional Lane(s) less than 0.5 mile long	Minor Widening	Road	0	0.21	935206	N	""	2028	2028,2029	3	009B	""	""	""	""	""	337.728391572604
571	582	208609	68	CON	2025-06-06T00:00:00	2028-12-15T00:00:00	2026-03-02T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-94	I-94 E	Wayne Road to Middlebelt Road	Reconstruct	Southeast Michigan Council of Governments [SEMCOG]	Wayne	Taylor TSC	5	170200000	2025-08-01T00:00:00	""	Reconstruction	Reconstruction	Road	0	0.925	1588904	N	Not an EJ Priority Area	2025	2026,2027,2028	3	998J	""	""	""	""	""	1488.6457727114
572	583	211937	68	CON	2028-01-07T00:00:00	2033-03-01T00:00:00	2028-04-03T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	Kensington/I-96 W Ramp	Kensington/I-96 W Ramp	Kensington Rd from Larkins Rd to Grand River Ave	Install roundabouts at the I-96 and Kensington Rd ramp terminals	Southeast Michigan Council of Governments [SEMCOG]	Livingston	Brighton TSC	264	4080645	2028-03-03T00:00:00	""	Additional Lane(s) less than 0.5 mile long	Minor Widening	Road	0	0.214	935303	Y	""	2028	2028,2029	3	009D	""	""	""	""	""	343.958225148586
573	584	211181	68	CON	2026-10-09T00:00:00	2027-12-29T00:00:00	2027-02-01T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	M-10	M-10 W	Meyers to I-75	Concrete Pavement Repair	Southeast Michigan Council of Governments [SEMCOG]	Wayne	Detroit TSC	5	12000000	2026-12-04T00:00:00	""	Concrete Pavement Repair	Road Rehabilitation	Road	0.097	0.306	1585309	N	Priority (POC & Poverty)	2027	2027	3	215E	""	""	""	""	""	336.353489870935
574	585	211426	68	CON	2025-06-06T00:00:00	2030-12-30T00:00:00	2026-03-06T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-94	I-94 E	Middlebelt Rd to Beech Daly Rd 	Reconstruct 	Southeast Michigan Council of Governments [SEMCOG]	Wayne	Taylor TSC	5	128600000	2025-08-01T00:00:00	""	Reconstruction	Reconstruction	Road	0	0.351	1588908	N	No data	2025	2026,2027,2028	3	200C	""	""	""	""	""	564.8806752829
575	586	213616	68	CON	2028-06-09T00:00:00	2029-11-09T00:00:00	2029-04-02T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	US-31	US-31 N	at Jackson Street	Realign US-31 SB, add turn lanes	West Michigan Metropolitan Transportation Planning Program [WestPlan]	Ottawa	Muskegon TSC	264	2026629	2028-08-04T00:00:00	""	Intersection Improvements	Traffic Safety	Traffic Safety	22.112	22.374	740406	N	""	2028	2029	3	""	""	""	""	""	""	421.648898986234
576	587	209359	68	CON	2024-10-01T00:00:00	2026-04-30T00:00:00	2025-05-05T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	US-31	US-31	From Lake Ann Road to Sullivan Road	Construct continuous center left turn lane.	Rural	Grand Traverse	Traverse City TSC	28	2609799	2024-12-06T00:00:00	""	Left Turn Lane	Minor Widening	Road	0	5.65	992204	Y	Not an EJ Priority Area,Priority (Poverty)	2025	2025	3	""	""	""	""	""	""	9092.81031484286
577	588	209397	68	CON	2024-10-11T00:00:00	2025-12-26T00:00:00	2025-04-14T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	M-24	M-24	At Brocker Road	Add Center Left Turn Lane	Rural	Lapeer	Davison TSC	25	665945	2024-12-06T00:00:00	""	Intersection Improvements	Traffic Safety	Traffic Safety	1.9	2.2	754110	Y	""	2025	2025	3	""	""	""	""	""	""	482.803920545846
578	589	211937	68	CON	2028-01-07T00:00:00	2033-03-01T00:00:00	2028-04-03T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	Kensington/I-96 W Ramp	Kensington/I-96 W Ramp	Kensington Rd from Larkins Rd to Grand River Ave	Install roundabouts at the I-96 and Kensington Rd ramp terminals	Southeast Michigan Council of Governments [SEMCOG]	Livingston	Brighton TSC	264	4080645	2028-03-03T00:00:00	""	Additional Lane(s) less than 0.5 mile long	Minor Widening	Road	0	0.204	935304	N	""	2028	2028,2029	3	009C	""	""	""	""	""	328.187145470805
579	590	211941	68	CON	2027-12-10T00:00:00	2029-07-05T00:00:00	2028-04-03T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	M-43	M-43	Broadbent to I-96	Construct median boulevard and indirect crossovers	Tri-County Regional Planning Commission [TCRPC]	Eaton	Lansing TSC	264	13600000	2028-02-04T00:00:00	""	Traffic Flow Improvement	Traffic Safety	Traffic Safety	0	0.443	567902	N	""	2028	2028,2029	3	006D	""	""	""	""	""	712.634612849456
580	591	209212	68	CON	2027-10-08T00:00:00	2028-11-17T00:00:00	2028-04-10T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	M-29	M-29	River Road to I-94 Business Loop	Concrete pavement repair	Southeast Michigan Council of Governments [SEMCOG]	St. Clair	Huron TSC	3	5568534	2027-12-03T00:00:00	""	Concrete Pavement Repair	Road Rehabilitation	Road	0	0.108	963402	N	""	2028	2028	3	""	""	""	""	""	""	173.809532218155
581	592	216114	68	CON	2024-10-25T00:00:00	2025-12-01T00:00:00	2025-04-14T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	M-116	M-116	from Tinkham Avenue north to Ludington State Park Entrance	Milling & One Course Asphalt Overlay	Rural	Mason	Muskegon TSC	77	2871000	2024-12-06T00:00:00	""	Milling & One Course Asphalt Overlay	Road Capital Preventive Maintenance	Road	0	4.027	223306	Y	Not an EJ Priority Area	2025	2025	3	""	""	""	""	""	""	6480.84024850327
582	593	200175	68	CON	2024-10-18T00:00:00	2025-12-30T00:00:00	2025-03-01T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	M-43	M-43	from Sheffield Road north to Bush Street 	Milling and One Course Asphalt Overlay	Rural	Barry	Grand Rapids TSC	77	1951000	2024-12-06T00:00:00	""	Milling & One Course Asphalt Overlay	Road Capital Preventive Maintenance	Road	1.043	5.976	984708	Y	""	2025	2025	3	""	""	""	""	""	""	7938.90840123029
583	594	211181	68	CON	2026-10-09T00:00:00	2027-12-29T00:00:00	2027-02-01T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	M-10	M-10 W	Meyers to I-75	Concrete Pavement Repair	Southeast Michigan Council of Governments [SEMCOG]	Wayne	Detroit TSC	5	12000000	2026-12-04T00:00:00	""	Concrete Pavement Repair	Road Rehabilitation	Road	0	0.089	1591108	N	Not an EJ Priority Area	2027	2027	3	122A	""	""	""	""	""	143.231912455694
584	595	201225	68	CON	2025-06-06T00:00:00	2030-12-30T00:00:00	2026-03-06T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-94 E	I-94 E	Pelham to Oakwood	Reconstruct, Conc Pavt Rprs, Conc Pavt Inlay, and misc work	Southeast Michigan Council of Governments [SEMCOG]	Wayne	Taylor TSC	5	60000000	2025-08-01T00:00:00	""	Concrete Reconstruction	Reconstruction	Road	0	0.384	1588909	N	No data	2025	2026,2027,2028	3	206F	""	""	""	""	""	617.346186319277
585	596	211173	68	CON	2028-08-11T00:00:00	2029-11-02T00:00:00	2029-04-16T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-96	I-96 E	from Airline Road east to Apple Drive	Milling and Two Course Asphalt Resurfacing	West Michigan Metropolitan Transportation Planning Program [WestPlan]	Ottawa	Muskegon TSC	4	12887000	2028-10-06T00:00:00	""	Milling and Two Course Asphalt Resurfacing	Road Rehabilitation	Road	0	0.023	3611744	N	""	2028	2029	3	""	""	""	""	""	""	36.5200910152897
586	597	215026	68	CON	2025-10-10T00:00:00	2027-11-05T00:00:00	2026-04-13T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-75 	I-75 N	at the M-32 Interchange.	Reconstruction	Rural	Otsego	Gaylord TSC	6	60000000	2025-12-05T00:00:00	""	Interchange Redesign & Upgrading	Major Widening	Road	0	0.274	1080208	N	Priority (Poverty)	2026	2026,2027	3	003B	""	""	""	""	""	440.411383251855
587	598	211181	68	CON	2026-10-09T00:00:00	2027-12-29T00:00:00	2027-02-01T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	M-10	M-10 W	Meyers to I-75	Concrete Pavement Repair	Southeast Michigan Council of Governments [SEMCOG]	Wayne	Detroit TSC	5	12000000	2026-12-04T00:00:00	""	Concrete Pavement Repair	Road Rehabilitation	Road	2.744	9.749	1577509	N	Not an EJ Priority Area,Priority (POC),Priority (POC & Poverty)	2027	2027	3	""	""	""	""	""	""	11273.4752306597
588	599	213791	68	CON	2027-10-08T00:00:00	2028-12-08T00:00:00	2028-03-15T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-75	I-75 N	Court Street to North Junction I-475	Mill and Two Course HMA Overlay	Genesee County Metropolitan Planning Commission [GCMPC]	Genesee	Davison TSC	3	37026769	2027-12-03T00:00:00	""	Milling and Two Course Asphalt Resurfacing	Road Rehabilitation	Road	12.867	19.284	1497804	Y	""	2028	2028	3	""	""	""	""	""	""	10327.179297069
589	600	214565	68	CON	2027-10-08T00:00:00	2028-11-15T00:00:00	2028-03-01T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-94 W	I-94 W	I-94 Between M-59 and 21 Mile Road	Auxiliary Lane Construction between M-59 and 21 Mile Road	Southeast Michigan Council of Governments [SEMCOG]	Macomb	Macomb TSC	264	4313476	2027-12-03T00:00:00	""	Additional Lane(s) less than 0.5 mile long	Minor Widening	Road	0	0.204	4210056	N	""	2028	2028	3	011F	""	""	""	""	""	327.78595611205
590	601	128907	68	CON	2024-10-11T00:00:00	2026-06-30T00:00:00	2025-02-03T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-94 W	I-94 W	from I-196 to 0.7 miles west of M-140	Repair Existing & Multiple Course HMA Overlay	Twin Cities Area Transportation Study [TwinCATS]	Berrien	Kalamazoo TSC	7	39897117	2024-12-06T00:00:00	""	Three Course Asphalt Resurfacing	Road Rehabilitation	Road	1.501	2.228	1362306	N	""	2025	2025,2026	3	""	""	""	""	""	""	1169.99520853414
591	602	214277	68	CON	2026-10-09T00:00:00	2027-12-29T00:00:00	2027-04-26T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	M-30	M-30	at East/West Olson Road, Midland County	Installation of a center left turn lane	Midland Area Transportation Study [MATS]	Midland	Mt. Pleasant TSC	25	1274750	2026-12-04T00:00:00	""	Left Turn Lane	Minor Widening	Road	10.889	11.295	889906	Y	Priority (Poverty)	2027	2027	3	""	""	""	""	""	""	653.394967324372
592	603	211737	68	CON	2027-10-08T00:00:00	2028-12-28T00:00:00	2028-03-06T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	M-20	M-20	at Summerton Road	Median boulevard installation	Rural	Isabella	Mt. Pleasant TSC	25	1520339	2027-12-03T00:00:00	""	Intersection Improvements	Traffic Safety	Traffic Safety	15.892	16.142	242308	Y	""	2028	2028	3	""	""	""	""	""	""	402.336685616733
593	604	211767	68	CON	2025-06-20T00:00:00	2026-12-30T00:00:00	2026-03-16T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	M-35	M-35	from County Road 480 to US-41	HMA shoulder widening and slope flattening	Rural	Marquette	Ishpeming TSC	30	1435500	2025-08-01T00:00:00	""	Shoulder Widening	Minor Widening	Road	38.431	39.662	1560808	Y	Not an EJ Priority Area	2025	2026	3	""	""	""	""	""	""	1981.1062104647
594	605	217159	68	CON	2024-11-15T00:00:00	2026-06-30T00:00:00	2025-04-01T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	M-22	M-22	from 8 Mile to Norman Road	Mill and One Course Asphalt Overlay	Rural	Manistee	Traverse City TSC	79	5335000	2025-01-10T00:00:00	""	Milling & One Course Asphalt Overlay	Road Capital Preventive Maintenance	Road	6.854	18.735	1154306	Y	Not an EJ Priority Area	2025	2025	3	""	""	""	""	""	""	19120.6511577145
595	606	214021	68	CON	2026-08-07T00:00:00	2027-11-19T00:00:00	2027-05-03T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	M-46	M-46	at Federal Road, Montcalm County	Construct New Roundabout	Rural	Montcalm	Cadillac TSC	26	2164800	2026-10-02T00:00:00	""	Intersection Improvements	Traffic Safety	Traffic Safety	0.88	1.02	1205603	Y	Not an EJ Priority Area	2026	2027	3	""	""	""	""	""	""	225.308629534495
596	607	208435	68	CON	2024-10-25T00:00:00	2025-12-19T00:00:00	2025-03-03T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-194	I-194 N	under M-96 (Columbia Avenue)	Full Depth Deck Patching, Concrete Deep Overlay, zone Paint, Beam Repairs	Battle Creek Area Transportation Study [BCATS]	Calhoun	Marshall TSC	286	3564700	2024-12-06T00:00:00	""	Overlay - Deep	Bridge Rehabilitation	Bridge	0.363	0.398	1301701	N	Priority (POC & Poverty),Not an EJ Priority Area	2025	2025	3	002A	""	""	""	""	""	56.3271498833945
597	608	214565	68	CON	2027-10-08T00:00:00	2028-11-15T00:00:00	2028-03-01T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-94 W	I-94 W	I-94 Between M-59 and 21 Mile Road	Auxiliary Lane Construction between M-59 and 21 Mile Road	Southeast Michigan Council of Governments [SEMCOG]	Macomb	Macomb TSC	264	4313476	2027-12-03T00:00:00	""	Additional Lane(s) less than 0.5 mile long	Minor Widening	Road	0	0.416	801303	N	""	2028	2028	3	012A	""	""	""	""	""	669.289015200123
598	609	208609	68	CON	2025-06-06T00:00:00	2028-12-15T00:00:00	2026-03-02T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-94	I-94 E	Wayne Road to Middlebelt Road	Reconstruct	Southeast Michigan Council of Governments [SEMCOG]	Wayne	Taylor TSC	5	170200000	2025-08-01T00:00:00	""	Reconstruction	Reconstruction	Road	0	0.18	4718584	N	Not an EJ Priority Area	2025	2026,2027,2028	3	198G	""	""	""	""	""	289.682393805771
599	610	208831	68	CON	2026-10-09T00:00:00	2027-12-10T00:00:00	2027-03-08T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-69	I-69 E	Lake George Road to Newark Road	Reconstruction	Rural	Lapeer	Davison TSC	3	27744286	2026-12-04T00:00:00	""	Reconstruction	Reconstruction	Road	0	0.44	1846709	N	""	2027	2027	3	005C	""	""	""	""	""	707.543021952272
600	611	214965	68	CON	2025-06-06T00:00:00	2027-04-15T00:00:00	2026-04-13T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-94BL	I-94BL	Black River to Glenwood Avenue	Reconstruction	Southeast Michigan Council of Governments [SEMCOG]	St. Clair	Huron TSC	3	12396522	2025-08-01T00:00:00	""	Asphalt Reconstruction	Reconstruction	Road	20.641	21.077	963509	Y	Not an EJ Priority Area	2025	2026	3	""	""	""	""	""	""	701.675217543468
601	612	210875	68	CON	2025-10-10T00:00:00	2027-06-25T00:00:00	2026-03-02T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	M-139	M-139	from 0.44 miles south of I-94 to I-94 BL	Reconstruction	Twin Cities Area Transportation Study [TwinCATS]	Berrien	Kalamazoo TSC	7	20803981	2025-12-05T00:00:00	""	Reconstruction	Reconstruction	Road	2.386	2.826	1367002	N	Priority (POC & Poverty)	2026	2026,2027	4	""	""	""	""	""	""	708.112621739895
602	613	220988	68	CON	2026-01-09T00:00:00	2026-11-16T00:00:00	2026-04-15T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	US-12	US-12	Haggerty to Lotz and EB / 0.2 miles west of Pershing to Howe	Reconstruct	Southeast Michigan Council of Governments [SEMCOG]	Wayne	Taylor TSC	5	31500000	2026-03-06T00:00:00	""	Reconstruction	Reconstruction	Road	7.897	8.09	1600206	N	Priority (Poverty)	2026	2026	3	""	""	""	""	""	""	310.603948378625
603	614	128907	68	CON	2024-10-11T00:00:00	2026-06-30T00:00:00	2025-02-03T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-94 W	I-94 W	from I-196 to 0.7 miles west of M-140	Repair Existing & Multiple Course HMA Overlay	Twin Cities Area Transportation Study [TwinCATS]	Berrien	Kalamazoo TSC	7	39897117	2024-12-06T00:00:00	""	Three Course Asphalt Resurfacing	Road Rehabilitation	Road	1.225	1.5	1362306	N	""	2025	2025,2026	3	""	""	""	""	""	""	442.570402499687
604	615	219816	68	CON	2025-10-24T00:00:00	2026-11-13T00:00:00	2026-04-20T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-75 N	I-75 N	I-75 from US-23 to Court St.	Milling and Asphalt Overlay (1 1/2 Inches)	Genesee County Metropolitan Planning Commission [GCMPC]	Genesee	Davison TSC	249	5280000	2025-11-07T00:00:00	""	Milling & One Course Asphalt Overlay	Road Capital Preventive Maintenance	Road	8.798	11.443	1497804	Y	Not an EJ Priority Area,Priority (Poverty),Priority (POC & Poverty),No data	2026	2026	3	""	""	""	""	""	""	4256.72258868612
605	616	211167	68	CON	2025-07-11T00:00:00	2027-09-30T00:00:00	2026-06-01T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	US-10/US-31	US-31	From Brye Road east to US-31 (East Junction)	Milling and Two Course Asphalt Resurfacing	Rural	Mason	Muskegon TSC	4	8088000	2025-09-05T00:00:00	""	Milling and Two Course Asphalt Resurfacing	Road Rehabilitation	Road	3.625	7.989	216003	Y	""	2025	2026	3	""	""	""	""	""	""	7023.1900179407
606	617	209212	68	CON	2027-10-08T00:00:00	2028-11-17T00:00:00	2028-04-10T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	M-29	M-29	River Road to I-94 Business Loop	Concrete pavement repair	Southeast Michigan Council of Governments [SEMCOG]	St. Clair	Huron TSC	3	5568534	2027-12-03T00:00:00	""	Concrete Pavement Repair	Road Rehabilitation	Road	4.827	9.426	967105	Y	""	2028	2028	3	""	""	""	""	""	""	7401.38661307059
607	618	201225	68	CON	2025-06-06T00:00:00	2030-12-30T00:00:00	2026-03-06T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-94 E	I-94 E	Pelham to Oakwood	Reconstruct, Conc Pavt Rprs, Conc Pavt Inlay, and misc work	Southeast Michigan Council of Governments [SEMCOG]	Wayne	Taylor TSC	5	60000000	2025-08-01T00:00:00	""	Concrete Reconstruction	Reconstruction	Road	18.396	19.595	1588802	N	No data	2025	2026,2027,2028	3	""	""	""	""	""	""	1929.60692826481
608	619	123138	68	CON	2027-10-08T00:00:00	2029-12-03T00:00:00	2028-03-01T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	M-153	M-153	W. of Sheldon Rd. to W. of Lotz Rd.	Reconstruction and widening of M-153 to a boulevard 	Southeast Michigan Council of Governments [SEMCOG]	Wayne	Taylor TSC	5	56710000	2027-12-03T00:00:00	""	Concrete Reconstruction	Reconstruction	Road	3.275	5.687	1595510	Y	Not an EJ Priority Area	2028	2028,2029	3	""	""	""	""	""	""	3881.74486247801
609	620	201225	68	CON	2025-06-06T00:00:00	2030-12-30T00:00:00	2026-03-06T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-94 E	I-94 E	Pelham to Oakwood	Reconstruct, Conc Pavt Rprs, Conc Pavt Inlay, and misc work	Southeast Michigan Council of Governments [SEMCOG]	Wayne	Taylor TSC	5	60000000	2025-08-01T00:00:00	""	Concrete Reconstruction	Reconstruction	Road	0	0.21	1576910	N	No data	2025	2026,2027,2028	3	206A	""	""	""	""	""	337.962784356278
610	621	214565	68	CON	2027-10-08T00:00:00	2028-11-15T00:00:00	2028-03-01T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-94 W	I-94 W	I-94 Between M-59 and 21 Mile Road	Auxiliary Lane Construction between M-59 and 21 Mile Road	Southeast Michigan Council of Governments [SEMCOG]	Macomb	Macomb TSC	264	4313476	2027-12-03T00:00:00	""	Additional Lane(s) less than 0.5 mile long	Minor Widening	Road	0.069	0.233	801608	N	""	2028	2028	3	012D	""	""	""	""	""	263.688880662274
611	622	211937	68	CON	2028-01-07T00:00:00	2033-03-01T00:00:00	2028-04-03T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	Kensington/I-96 W Ramp	Kensington/I-96 W Ramp	Kensington Rd from Larkins Rd to Grand River Ave	Install roundabouts at the I-96 and Kensington Rd ramp terminals	Southeast Michigan Council of Governments [SEMCOG]	Livingston	Brighton TSC	264	4080645	2028-03-03T00:00:00	""	Additional Lane(s) less than 0.5 mile long	Minor Widening	Road	1.892	1.964	942603	N	""	2028	2028,2029	4	""	""	""	""	""	""	115.872970679361
612	623	211181	68	CON	2026-10-09T00:00:00	2027-12-29T00:00:00	2027-02-01T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	M-10	M-10 W	Meyers to I-75	Concrete Pavement Repair	Southeast Michigan Council of Governments [SEMCOG]	Wayne	Detroit TSC	5	12000000	2026-12-04T00:00:00	""	Concrete Pavement Repair	Road Rehabilitation	Road	0	0.324	1584905	N	Not an EJ Priority Area	2027	2027	3	215G	""	""	""	""	""	521.428396942444
613	624	128907	68	CON	2024-10-11T00:00:00	2026-06-30T00:00:00	2025-02-03T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-94 W	I-94 W	from I-196 to 0.7 miles west of M-140	Repair Existing & Multiple Course HMA Overlay	Twin Cities Area Transportation Study [TwinCATS]	Berrien	Kalamazoo TSC	7	39897117	2024-12-06T00:00:00	""	Three Course Asphalt Resurfacing	Road Rehabilitation	Road	34.996	35.51	1360802	N	""	2025	2025,2026	3	""	""	""	""	""	""	827.204406855136
614	625	208609	68	CON	2025-06-06T00:00:00	2028-12-15T00:00:00	2026-03-02T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-94	I-94 E	Wayne Road to Middlebelt Road	Reconstruct	Southeast Michigan Council of Governments [SEMCOG]	Wayne	Taylor TSC	5	170200000	2025-08-01T00:00:00	""	Reconstruction	Reconstruction	Road	8.19	12.037	1576405	Y	Priority (POC),Not an EJ Priority Area	2025	2026,2027,2028	3	""	""	""	""	""	""	6191.15769731957
615	626	213791	68	CON	2027-10-08T00:00:00	2028-12-08T00:00:00	2028-03-15T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-75	I-75 N	Court Street to North Junction I-475	Mill and Two Course HMA Overlay	Genesee County Metropolitan Planning Commission [GCMPC]	Genesee	Davison TSC	3	37026769	2027-12-03T00:00:00	""	Milling and Two Course Asphalt Resurfacing	Road Rehabilitation	Road	0	0.19	1498101	N	""	2028	2028	3	022B	""	""	""	""	""	305.775906438451
616	627	200196	68	CON	2028-08-11T00:00:00	2029-12-03T00:00:00	2029-05-29T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	M-21	M-21	From Bennett Street east to Valley Vista Drive	Two Course Asphalt Resurfacing	Grand Valley Metropolitan Council [GVMC]	Kent	Grand Rapids TSC	4	6480000	2028-10-06T00:00:00	""	Milling and Two Course Asphalt Resurfacing	Road Rehabilitation	Road	12.516	18.595	409005	Y	""	2028	2029	3	""	""	""	""	""	""	9783.21994232752
617	628	217336	68	CON	2025-06-06T00:00:00	2030-12-30T00:00:00	2026-03-06T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-94	I-94 E	Beech Daly Rd to Pelham Rd	Concrete Pavement Repair 	Southeast Michigan Council of Governments [SEMCOG]	Wayne	Taylor TSC	249	6000000	2025-08-01T00:00:00	""	Concrete Pavement Repair	Road Rehabilitation	Road	13.745	16.748	1576405	Y	Not an EJ Priority Area,Priority (Poverty),No data	2025	2026,2027,2028	3	""	""	""	""	""	""	4832.86894814175
618	629	211181	68	CON	2026-10-09T00:00:00	2027-12-29T00:00:00	2027-02-01T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	M-10	M-10 W	Meyers to I-75	Concrete Pavement Repair	Southeast Michigan Council of Governments [SEMCOG]	Wayne	Detroit TSC	5	12000000	2026-12-04T00:00:00	""	Concrete Pavement Repair	Road Rehabilitation	Road	0	0.122	1584708	N	Not an EJ Priority Area	2027	2027	3	110B	""	""	""	""	""	196.340245052852
619	630	211937	68	CON	2028-01-07T00:00:00	2033-03-01T00:00:00	2028-04-03T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	Kensington/I-96 W Ramp	Kensington/I-96 W Ramp	Kensington Rd from Larkins Rd to Grand River Ave	Install roundabouts at the I-96 and Kensington Rd ramp terminals	Southeast Michigan Council of Governments [SEMCOG]	Livingston	Brighton TSC	264	4080645	2028-03-03T00:00:00	""	Additional Lane(s) less than 0.5 mile long	Minor Widening	Road	1.766	1.888	942603	N	""	2028	2028,2029	4	""	""	""	""	""	""	196.340412511994
620	631	208609	68	CON	2025-06-06T00:00:00	2028-12-15T00:00:00	2026-03-02T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-94	I-94 E	Wayne Road to Middlebelt Road	Reconstruct	Southeast Michigan Council of Governments [SEMCOG]	Wayne	Taylor TSC	5	170200000	2025-08-01T00:00:00	""	Reconstruction	Reconstruction	Road	0	0.198	1576707	N	Not an EJ Priority Area	2025	2026,2027,2028	3	199B	""	""	""	""	""	318.308909200673
621	632	201225	68	CON	2025-06-06T00:00:00	2030-12-30T00:00:00	2026-03-06T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-94 E	I-94 E	Pelham to Oakwood	Reconstruct, Conc Pavt Rprs, Conc Pavt Inlay, and misc work	Southeast Michigan Council of Governments [SEMCOG]	Wayne	Taylor TSC	5	60000000	2025-08-01T00:00:00	""	Concrete Reconstruction	Reconstruction	Road	0	0.125	1589504	N	Not an EJ Priority Area	2025	2026,2027,2028	3	204H	""	""	""	""	""	201.168423798764
622	633	208489	68	CON	2025-06-06T00:00:00	2026-12-23T00:00:00	2026-03-16T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	US10 BR/M-20	M-20 E	Jerome Street to Washington Street	Reconstruction	Midland Area Transportation Study [MATS]	Midland	Mt. Pleasant TSC	3	39400800	2025-08-01T00:00:00	""	Reconstruction	Reconstruction	Road	0	1.074	3560054	Y	Priority (Poverty),Not an EJ Priority Area	2025	2026	3	""	""	""	""	""	""	1728.43869812887
623	634	215485	68	CON	2025-06-06T00:00:00	2027-12-29T00:00:00	2026-04-06T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-475 N	I-475 N	Bristol Road to Thread Creek and 17 Structures	Road Reconstruction, Bridge Rehabilitation	Genesee County Metropolitan Planning Commission [GCMPC]	Genesee	Davison TSC	3	119611694	2025-08-01T00:00:00	""	Reconstruction	Reconstruction	Road	0	0.136	1501310	N	""	2025	2026,2027	3	027B	""	""	""	""	""	218.871231462994
624	635	211118	68	CON	2025-10-10T00:00:00	2026-12-30T00:00:00	2026-04-13T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-675 W/Veterans Memorial Ramp	I-675 W/Veterans Memorial Ramp	I-675 at Veterans Memorial Parkway	Interchange Reconstruction	Saginaw Area Transportation Agency [SATA]	Saginaw	Bay City TSC	3	8901081	2025-12-05T00:00:00	""	Reconstruction	Reconstruction	Road	0	0.226	3730027	N	""	2026	2026	3	009B	""	""	""	""	""	363.340196328723
625	636	210063	68	CON	2025-06-20T00:00:00	2026-12-11T00:00:00	2026-03-02T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	M-37	M-37	from 92nd Street north to 76th Street	Reconstruction and Widening for a Boulevard	Grand Valley Metropolitan Council [GVMC]	Kent	Grand Rapids TSC	4	41400000	2025-08-01T00:00:00	""	Additional lane(s) over 0.5 mile long	Major Widening	Road	0	2.136	407204	Y	Not an EJ Priority Area	2025	2026	3	""	""	""	""	""	""	3437.56505268704
626	637	128907	68	CON	2024-10-11T00:00:00	2026-06-30T00:00:00	2025-02-03T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-94 W	I-94 W	from I-196 to 0.7 miles west of M-140	Repair Existing & Multiple Course HMA Overlay	Twin Cities Area Transportation Study [TwinCATS]	Berrien	Kalamazoo TSC	7	39897117	2024-12-06T00:00:00	""	Three Course Asphalt Resurfacing	Road Rehabilitation	Road	0	0.192	1364509	N	""	2025	2025,2026	3	039C	""	""	""	""	""	308.994546358245
627	638	128907	68	CON	2024-10-11T00:00:00	2026-06-30T00:00:00	2025-02-03T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-94 W	I-94 W	from I-196 to 0.7 miles west of M-140	Repair Existing & Multiple Course HMA Overlay	Twin Cities Area Transportation Study [TwinCATS]	Berrien	Kalamazoo TSC	7	39897117	2024-12-06T00:00:00	""	Three Course Asphalt Resurfacing	Road Rehabilitation	Road	0	0.302	1364410	N	""	2025	2025,2026	3	039B	""	""	""	""	""	485.941976590061
628	639	209212	68	CON	2027-10-08T00:00:00	2028-11-17T00:00:00	2028-04-10T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	M-29	M-29	River Road to I-94 Business Loop	Concrete pavement repair	Southeast Michigan Council of Governments [SEMCOG]	St. Clair	Huron TSC	3	5568534	2027-12-03T00:00:00	""	Concrete Pavement Repair	Road Rehabilitation	Road	16.574	16.623	963509	N	""	2028	2028	3	""	""	""	""	""	""	78.8579573342815
629	640	210819	68	CON	2026-09-11T00:00:00	2028-09-29T00:00:00	2027-05-03T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	M-66	M-66	from M-50 north to Barry/Ionia County Line	Concrete joint repairs, diamond grinding and shoulder resurfacing	Rural	Barry	Grand Rapids TSC	4	1142000	2026-11-06T00:00:00	""	Concrete Pavement Repair	Road Rehabilitation	Road	0.999	2.027	3080054	Y	""	2026	2027	3	""	""	""	""	""	""	1654.40871071557
630	641	204075	68	CON	2024-11-15T00:00:00	2025-12-30T00:00:00	2025-03-03T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	M-153	M-153 E	from M-14 to Frains Lake Road	Single Course Mill & Resurface	Southeast Michigan Council of Governments [SEMCOG]	Washtenaw	Brighton TSC	82	757000	2025-01-10T00:00:00	""	Milling & One Course Asphalt Overlay	Road Capital Preventive Maintenance	Road	0.869	1.708	1431602	N	Priority (POC)	2025	2025	3	""	""	""	""	""	""	1349.54990715848
631	642	211181	68	CON	2026-10-09T00:00:00	2027-12-29T00:00:00	2027-02-01T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	M-10	M-10 W	Meyers to I-75	Concrete Pavement Repair	Southeast Michigan Council of Governments [SEMCOG]	Wayne	Detroit TSC	5	12000000	2026-12-04T00:00:00	""	Concrete Pavement Repair	Road Rehabilitation	Road	2.722	9.779	1577510	Y	Not an EJ Priority Area,Priority (POC),Priority (POC & Poverty)	2027	2027	3	""	""	""	""	""	""	11357.161268884
632	643	217336	68	CON	2025-06-06T00:00:00	2030-12-30T00:00:00	2026-03-06T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-94	I-94 E	Beech Daly Rd to Pelham Rd	Concrete Pavement Repair 	Southeast Michigan Council of Governments [SEMCOG]	Wayne	Taylor TSC	249	6000000	2025-08-01T00:00:00	""	Concrete Pavement Repair	Road Rehabilitation	Road	0	0.098	4712151	N	Not an EJ Priority Area,Priority (Poverty)	2025	2026,2027,2028	3	202D	""	""	""	""	""	157.715955526495
633	644	128907	68	CON	2024-10-11T00:00:00	2026-06-30T00:00:00	2025-02-03T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-94 W	I-94 W	from I-196 to 0.7 miles west of M-140	Repair Existing & Multiple Course HMA Overlay	Twin Cities Area Transportation Study [TwinCATS]	Berrien	Kalamazoo TSC	7	39897117	2024-12-06T00:00:00	""	Three Course Asphalt Resurfacing	Road Rehabilitation	Road	0	0.132	1362305	N	""	2025	2025,2026	3	039D	""	""	""	""	""	212.433759440574
634	645	211793	68	CON	2023-07-03T00:00:00	2025-07-25T00:00:00	2024-06-03T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-94 E	I-94 E	Blue Water Bridge Plaza	BWB Plaza Expansion	Southeast Michigan Council of Governments [SEMCOG]	St. Clair	Huron TSC	33	46434010	2024-04-19T00:00:00	""	Concrete Reconstruction	Reconstruction	Road	1.254	1.314	964203	N	""	2023	2024,2025	3	""	""	""	""	""	""	96.5609015334778
635	646	214522	68	CON	2027-10-08T00:00:00	2028-12-01T00:00:00	2028-04-01T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	M-153 E	M-153 E	M-153 at Plymouth Rd	Indirect left turn lanes	Southeast Michigan Council of Governments [SEMCOG]	Washtenaw	Brighton TSC	264	1561940	2027-12-03T00:00:00	""	Left Turn Lane	Minor Widening	Road	0.678	1.13	1431510	Y	""	2028	2028	3	""	""	""	""	""	""	727.424796818404
636	647	211155	68	CON	2026-10-09T00:00:00	2031-05-30T00:00:00	2027-01-04T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	US-23 N	US-23 N	M-14 to I-94	Road system and operational improvement as defined through EA process	Southeast Michigan Council of Governments [SEMCOG]	Washtenaw	Brighton TSC	9	229369618	2026-12-04T00:00:00	""	Reconstruction	Reconstruction	Road	0	0.395	1431608	N	Priority (POC),Not an EJ Priority Area	2027	2027,2028,2029	3	021C	""	""	""	""	""	635.691995027922
637	648	211043	68	CON	2027-11-12T00:00:00	2030-10-31T00:00:00	2028-04-03T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	M-60	M-60	M-60, M-86, US-131BR in the City of Three Rivers	Reconstruction	Rural	St. Joseph	Marshall TSC	7	35000000	2028-01-07T00:00:00	""	Reconstruction	Reconstruction	Road	0	1.355	228509	N	Not an EJ Priority Area	2028	2028,2029,2030	3	""	""	""	""	""	""	2180.27797309907
638	649	211181	68	CON	2026-10-09T00:00:00	2027-12-29T00:00:00	2027-02-01T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	M-10	M-10 W	Meyers to I-75	Concrete Pavement Repair	Southeast Michigan Council of Governments [SEMCOG]	Wayne	Detroit TSC	5	12000000	2026-12-04T00:00:00	""	Concrete Pavement Repair	Road Rehabilitation	Road	0	0.211	4710289	N	Priority (POC)	2027	2027	3	109E	""	""	""	""	""	339.572291840763
639	650	128907	68	CON	2024-10-11T00:00:00	2026-06-30T00:00:00	2025-02-03T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-94 W	I-94 W	from I-196 to 0.7 miles west of M-140	Repair Existing & Multiple Course HMA Overlay	Twin Cities Area Transportation Study [TwinCATS]	Berrien	Kalamazoo TSC	7	39897117	2024-12-06T00:00:00	""	Three Course Asphalt Resurfacing	Road Rehabilitation	Road	0	0.271	1364409	N	""	2025	2025,2026	3	039A	""	""	""	""	""	435.85366365184
640	651	217341	68	CON	2025-07-11T00:00:00	2026-12-30T00:00:00	2026-03-01T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-96	I-96 W	US-23 to Kent Lake Rd	Milling and One Course Asphalt Overlay	Southeast Michigan Council of Governments [SEMCOG]	Livingston	Brighton TSC	249	6733000	2025-09-05T00:00:00	""	Milling & One Course Asphalt Overlay	Road Capital Preventive Maintenance	Road	0	0.204	935304	N	""	2025	2026	3	009C	""	""	""	""	""	328.187145470805
641	652	210086	68	CON	2025-06-06T00:00:00	2027-12-14T00:00:00	2025-10-20T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-475	I-475 N	Thread Creek to Flint River and 10 Structure Locations	Road Reconstruction and Structure Work	Genesee County Metropolitan Planning Commission [GCMPC]	Genesee	Davison TSC	3	150429885	2025-08-01T00:00:00	""	Reconstruction	Reconstruction	Road	0	0.131	1844301	N	""	2025	2026,2027	3	033A	""	""	""	""	""	210.539016979685
642	653	217334	68	CON	2025-06-06T00:00:00	2027-06-04T00:00:00	2026-05-18T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	US-2	US-2	from west of the Dickinson/Menominee county line easterly to 43.75 Road.	HMA base crushing and shaping and HMA overlay.	Rural	Menominee	Crystal Falls TSC	8	1890500	2025-08-01T00:00:00	""	Crush & Shape & Asphalt Resurfacing	Road Rehabilitation	Road	23.273	23.539	1551710	N	Not an EJ Priority Area	2025	2026	3	""	""	""	""	""	""	427.719004121035
643	654	210086	68	CON	2025-06-06T00:00:00	2027-12-14T00:00:00	2025-10-20T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-475	I-475 N	Thread Creek to Flint River and 10 Structure Locations	Road Reconstruction and Structure Work	Genesee County Metropolitan Planning Commission [GCMPC]	Genesee	Davison TSC	3	150429885	2025-08-01T00:00:00	""	Reconstruction	Reconstruction	Road	0	0.232	1844304	N	""	2025	2026,2027	3	034A	""	""	""	""	""	372.629303672778
644	655	214565	68	CON	2027-10-08T00:00:00	2028-11-15T00:00:00	2028-03-01T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-94 W	I-94 W	I-94 Between M-59 and 21 Mile Road	Auxiliary Lane Construction between M-59 and 21 Mile Road	Southeast Michigan Council of Governments [SEMCOG]	Macomb	Macomb TSC	264	4313476	2027-12-03T00:00:00	""	Additional Lane(s) less than 0.5 mile long	Minor Widening	Road	13.696	15.578	798502	Y	""	2028	2028	3	""	""	""	""	""	""	3028.79107655488
645	656	128907	68	CON	2024-10-11T00:00:00	2026-06-30T00:00:00	2025-02-03T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-94 W	I-94 W	from I-196 to 0.7 miles west of M-140	Repair Existing & Multiple Course HMA Overlay	Twin Cities Area Transportation Study [TwinCATS]	Berrien	Kalamazoo TSC	7	39897117	2024-12-06T00:00:00	""	Three Course Asphalt Resurfacing	Road Rehabilitation	Road	34.996	37.63	1360804	N	""	2025	2025,2026	3	""	""	""	""	""	""	4239.0199043253
646	657	217341	68	CON	2025-07-11T00:00:00	2026-12-30T00:00:00	2026-03-01T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-96	I-96 W	US-23 to Kent Lake Rd	Milling and One Course Asphalt Overlay	Southeast Michigan Council of Governments [SEMCOG]	Livingston	Brighton TSC	249	6733000	2025-09-05T00:00:00	""	Milling & One Course Asphalt Overlay	Road Capital Preventive Maintenance	Road	0	0.214	935303	N	""	2025	2026	3	009D	""	""	""	""	""	343.958225148586
647	658	210599	68	CON	2024-12-13T00:00:00	2028-12-01T00:00:00	2025-04-07T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-75BL (Woodward Ave Loop)	I-75BL S	I-75 BL (Woodward Ave Loop), M-59, and US-24 BR (N Cass Ave)	Reconstruction	Southeast Michigan Council of Governments [SEMCOG]	Oakland	Oakland TSC	5	41300000	2025-02-07T00:00:00	""	Concrete Reconstruction	Reconstruction	Road	0.815	0.854	674904	N	Priority (POC & Poverty)	2025	2025,2026	3	""	""	""	""	""	""	62.2975864067058
648	659	214555	68	CON	2027-10-08T00:00:00	2029-12-03T00:00:00	2028-04-03T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	Highland/I-96 E Ramp	Highland/I-96 E Ramp	I-96 at M-59	Roundabout	Southeast Michigan Council of Governments [SEMCOG]	Livingston	Brighton TSC	264	4571318	2027-12-03T00:00:00	""	Intersection Improvements	Traffic Safety	Traffic Safety	0	0.462	934107	Y	""	2028	2028,2029	3	002B	""	""	""	""	""	743.51828290095
649	660	211181	68	CON	2026-10-09T00:00:00	2027-12-29T00:00:00	2027-02-01T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	M-10	M-10 W	Meyers to I-75	Concrete Pavement Repair	Southeast Michigan Council of Governments [SEMCOG]	Wayne	Detroit TSC	5	12000000	2026-12-04T00:00:00	""	Concrete Pavement Repair	Road Rehabilitation	Road	0	0.13	1585302	N	Not an EJ Priority Area,Priority (POC)	2027	2027	3	111C	""	""	""	""	""	209.215214185469
650	661	208823	68	CON	2027-10-08T00:00:00	2029-12-07T00:00:00	2028-04-03T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	M-25 W	M-25 N	M-25 Freeway End to Walnut Street	Reconstruction	Bay City Area Transportation Study [BCATS]	Bay	Bay City TSC	3	13537240	2027-12-03T00:00:00	""	Reconstruction	Reconstruction	Road	0	1.262	768706	Y	""	2028	2028,2029	3	""	""	""	""	""	""	2030.99580699555
651	662	212745	68	CON	2024-10-11T00:00:00	2026-12-01T00:00:00	2025-01-21T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	US-131 	US-131 N	At US-131BS in Oshtemo Township, Kalamazoo County.	Construct interchange ramps on US-131 at US-131BR.	Kalamazoo Area Transportation Study [KATS]	Kalamazoo	Kalamazoo TSC	7	26750000	2024-12-06T00:00:00	""	Interchange Redesign & Upgrading	Major Widening	Road	0	0.029	3392528	N	Not an EJ Priority Area	2025	2025,2026	3	""	""	""	""	""	""	46.6710966270089
652	663	215328	68	CON	2026-06-12T00:00:00	2027-12-17T00:00:00	2027-01-18T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	M-15	M-15	South Street to Rising Street	Culvert Replacement	Genesee County Metropolitan Planning Commission [GCMPC]	Genesee	Davison TSC	3	3520000	2026-08-07T00:00:00	""	Reconstruction	Reconstruction	Road	11.115	11.244	1501502	Y	""	2026	2027	3	""	""	""	""	""	""	207.605789972192
653	664	211181	68	CON	2026-10-09T00:00:00	2027-12-29T00:00:00	2027-02-01T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	M-10	M-10 W	Meyers to I-75	Concrete Pavement Repair	Southeast Michigan Council of Governments [SEMCOG]	Wayne	Detroit TSC	5	12000000	2026-12-04T00:00:00	""	Concrete Pavement Repair	Road Rehabilitation	Road	0	0.1	1584509	N	Priority (POC & Poverty)	2027	2027	3	105A	""	""	""	""	""	160.281454718134
654	665	128907	68	CON	2024-10-11T00:00:00	2026-06-30T00:00:00	2025-02-03T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-94 W	I-94 W	from I-196 to 0.7 miles west of M-140	Repair Existing & Multiple Course HMA Overlay	Twin Cities Area Transportation Study [TwinCATS]	Berrien	Kalamazoo TSC	7	39897117	2024-12-06T00:00:00	""	Three Course Asphalt Resurfacing	Road Rehabilitation	Road	35.511	38.558	1360802	Y	""	2025	2025,2026	3	""	""	""	""	""	""	4903.68020514644
655	666	128907	68	CON	2024-10-11T00:00:00	2026-06-30T00:00:00	2025-02-03T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-94 W	I-94 W	from I-196 to 0.7 miles west of M-140	Repair Existing & Multiple Course HMA Overlay	Twin Cities Area Transportation Study [TwinCATS]	Berrien	Kalamazoo TSC	7	39897117	2024-12-06T00:00:00	""	Three Course Asphalt Resurfacing	Road Rehabilitation	Road	1.23	2.234	1362105	N	""	2025	2025,2026	3	""	""	""	""	""	""	1615.78426486285
656	667	215026	68	CON	2025-10-10T00:00:00	2027-11-05T00:00:00	2026-04-13T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-75 	I-75 N	at the M-32 Interchange.	Reconstruction	Rural	Otsego	Gaylord TSC	6	60000000	2025-12-05T00:00:00	""	Interchange Redesign & Upgrading	Major Widening	Road	12.2	12.615	1080805	N	Priority (Poverty)	2026	2026,2027	3	""	""	""	""	""	""	667.878984553679
657	668	209082	68	CON	2026-10-09T00:00:00	2028-12-01T00:00:00	2027-03-31T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	US-127	US-127 N	Long Lake Road to the Clare/Roscommon County Line	Milling and Two Course Asphalt Resurfacing	Rural	Clare	Mt. Pleasant TSC	3	14947949	2026-12-04T00:00:00	""	Milling and Two Course Asphalt Resurfacing	Road Rehabilitation	Road	21.056	25.028	1041008	N	""	2027	2027,2028	3	""	""	""	""	""	""	6391.64411065226
658	669	201225	68	CON	2025-06-06T00:00:00	2030-12-30T00:00:00	2026-03-06T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-94 E	I-94 E	Pelham to Oakwood	Reconstruct, Conc Pavt Rprs, Conc Pavt Inlay, and misc work	Southeast Michigan Council of Governments [SEMCOG]	Wayne	Taylor TSC	5	60000000	2025-08-01T00:00:00	""	Concrete Reconstruction	Reconstruction	Road	0.087	0.354	4710283	N	Priority (POC & Poverty),Not an EJ Priority Area	2025	2026,2027,2028	3	204E	""	""	""	""	""	429.423337087
659	670	211421	68	CON	2026-07-10T00:00:00	2028-12-15T00:00:00	2027-04-12T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	M-142	M-142	West village limits of Harbor Beach to M-25	Milling and two course asphalt resurfacing	Rural	Huron	Huron TSC	3	1614711	2026-09-04T00:00:00	""	Milling and Two Course Asphalt Resurfacing	Road Rehabilitation	Road	29.3	30.025	1033809	Y	Not an EJ Priority Area	2026	2027	3	""	""	""	""	""	""	1166.77642271934
660	671	211181	68	CON	2026-10-09T00:00:00	2027-12-29T00:00:00	2027-02-01T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	M-10	M-10 W	Meyers to I-75	Concrete Pavement Repair	Southeast Michigan Council of Governments [SEMCOG]	Wayne	Detroit TSC	5	12000000	2026-12-04T00:00:00	""	Concrete Pavement Repair	Road Rehabilitation	Road	0.145	0.343	1585403	N	Priority (POC & Poverty)	2027	2027	3	122L	""	""	""	""	""	318.650675777216
661	672	220988	68	CON	2026-01-09T00:00:00	2026-11-16T00:00:00	2026-04-15T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	US-12	US-12	Haggerty to Lotz and EB / 0.2 miles west of Pershing to Howe	Reconstruct	Southeast Michigan Council of Governments [SEMCOG]	Wayne	Taylor TSC	5	31500000	2026-03-06T00:00:00	""	Reconstruction	Reconstruction	Road	0.4	0.436	1600306	N	Priority (POC)	2026	2026	3	096A	""	""	""	""	""	57.6817354979767
662	673	128907	68	CON	2024-10-11T00:00:00	2026-06-30T00:00:00	2025-02-03T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-94 W	I-94 W	from I-196 to 0.7 miles west of M-140	Repair Existing & Multiple Course HMA Overlay	Twin Cities Area Transportation Study [TwinCATS]	Berrien	Kalamazoo TSC	7	39897117	2024-12-06T00:00:00	""	Three Course Asphalt Resurfacing	Road Rehabilitation	Road	0	1.224	1362306	N	""	2025	2025,2026	3	""	""	""	""	""	""	1969.84060800535
663	674	120048	68	CON	2025-10-10T00:00:00	2026-12-30T00:00:00	2026-03-02T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	M-85	M-85	Rosa Parks Blvd to Griswold	Milling and Two Course Asphalt Resurfacing 	Southeast Michigan Council of Governments [SEMCOG]	Wayne	Detroit TSC	5	10465000	2025-12-05T00:00:00	""	Milling and Two Course Asphalt Resurfacing	Road Rehabilitation	Road	4.532	5.652	1585010	Y	Not an EJ Priority Area	2026	2026	3	""	""	""	""	""	""	1802.46861702013
664	675	214555	68	CON	2027-10-08T00:00:00	2029-12-03T00:00:00	2028-04-03T00:00:00	Pending	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	Highland/I-96 E Ramp	Highland/I-96 E Ramp	I-96 at M-59	Roundabout	Southeast Michigan Council of Governments [SEMCOG]	Livingston	Brighton TSC	264	4571318	2027-12-03T00:00:00	""	Intersection Improvements	Traffic Safety	Traffic Safety	0	0.34	934108	N	""	2028	2028,2029	3	002A	""	""	""	""	""	547.178033089811
665	676	219406	68	CON	2025-09-05T00:00:00	2026-09-30T00:00:00	2026-04-01T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	I-94BL	I-94BL	from Dickman Road to Amtrak railroad crossing	Milling & One Course Asphalt Overlay	Battle Creek Area Transportation Study [BCATS]	Calhoun	Marshall TSC	80	1710000	2025-11-07T00:00:00	""	Milling & One Course Asphalt Overlay	Road Capital Preventive Maintenance	Road	7.567	7.886	1319407	N	Priority (POC & Poverty)	2025	2026	3	""	""	""	""	""	""	513.381649987623
666	677	217329	68	CON	2025-09-05T00:00:00	2027-06-04T00:00:00	2026-05-18T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	M-69	M-69	from Felch to east of Oakes Road	HMA overlay, guardrail, and shoulder agg	Rural	Dickinson	Crystal Falls TSC	81	2827247	2025-11-07T00:00:00	""	One Course Asphalt Overlay	Road Capital Preventive Maintenance	Road	11.518	20.525	1556601	Y	""	2025	2026	3	""	""	""	""	""	""	14495.3883942927
667	678	113717	68	CON	2018-06-15T00:00:00	2024-12-30T00:00:00	2018-06-02T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	Gordie Howe International Bridge	Gordie Howe International Bridge	Gordie Howe Int'l Bridge-Interchange Area	Interchange work	Southeast Michigan Council of Governments [SEMCOG]	Wayne	Detroit TSC	34	68400000		""	New Road	New Roads	Road	0	0.659	2000026	N	""	2018	2018,2019,2020,2021,2022,2023,2024	4	""	""	""	""	""	""	1061.28535294526
668	679	113717	68	CON	2018-06-15T00:00:00	2024-12-30T00:00:00	2018-06-02T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	Gordie Howe International Bridge	Gordie Howe International Bridge	Gordie Howe Int'l Bridge-Interchange Area	Interchange work	Southeast Michigan Council of Governments [SEMCOG]	Wayne	Detroit TSC	34	68400000		""	New Road	New Roads	Road	0	0.391	2000025	N	""	2018	2018,2019,2020,2021,2022,2023,2024	4	""	""	""	""	""	""	628.988036744798
669	680	113717	68	CON	2018-06-15T00:00:00	2024-12-30T00:00:00	2018-06-02T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	Gordie Howe International Bridge	Gordie Howe International Bridge	Gordie Howe Int'l Bridge-Interchange Area	Interchange work	Southeast Michigan Council of Governments [SEMCOG]	Wayne	Detroit TSC	34	68400000		""	New Road	New Roads	Road	0	0.606	2000029	N	""	2018	2018,2019,2020,2021,2022,2023,2024	4	""	""	""	""	""	""	974.955023531894
670	681	205923	68	CON	2019-05-01T00:00:00	2024-12-30T00:00:00	2022-01-03T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	Gordie Howe International Bridge	Gordie Howe Rail	Gordie Howe Int'l Bridge - Rail West of Plaza Area	Construction and related activities for a new rail connection.	Southeast Michigan Council of Governments [SEMCOG]	Wayne	Detroit TSC	34	1684000		""	Rail	Rail	Rail	0	0.213	6100000	Y	""	2019	2022,2023,2024	35	""	""	""	""	""	""	343.685417371102
671	682	127063	68	CON	2018-06-15T00:00:00	2024-12-30T00:00:00	2018-06-02T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	Gordie Howe International Bridge	Gordie Howe International Bridge	Gordie Howe International Bridge-Bridge Area	Bridge work	Southeast Michigan Council of Governments [SEMCOG]	Wayne	Detroit TSC	34	150000000		""	New Road	New Roads	Road	1.37	1.948	2000022	Y	""	2018	2018,2019,2020,2021,2022,2023,2024	4	""	""	""	""	""	""	930.423551809164
672	683	113717	68	CON	2018-06-15T00:00:00	2024-12-30T00:00:00	2018-06-02T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	Gordie Howe International Bridge	Gordie Howe International Bridge	Gordie Howe Int'l Bridge-Interchange Area	Interchange work	Southeast Michigan Council of Governments [SEMCOG]	Wayne	Detroit TSC	34	68400000		""	New Road	New Roads	Road	0	0.556	2000022	Y	""	2018	2018,2019,2020,2021,2022,2023,2024	4	""	""	""	""	""	""	895.056115763611
673	684	113693	68	CON	2018-06-15T00:00:00	2024-12-30T00:00:00	2018-06-02T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	Gordie Howe International Bridge Plaza	Gordie Howe International Bridge Plaza	Gordie Howe International Bridge-Plaza Area	Plaza work	Southeast Michigan Council of Governments [SEMCOG]	Wayne	Detroit TSC	34	53500000		""	New Road	New Roads	Road	0	0.77	2000032	Y	""	2018	2018,2019,2020,2021,2022,2023,2024	4	""	""	""	""	""	""	1237.84103918089
674	685	113693	68	CON	2018-06-15T00:00:00	2024-12-30T00:00:00	2018-06-02T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	Gordie Howe International Bridge Plaza	Gordie Howe International Bridge Plaza	Gordie Howe International Bridge-Plaza Area	Plaza work	Southeast Michigan Council of Governments [SEMCOG]	Wayne	Detroit TSC	34	53500000		""	New Road	New Roads	Road	0.609	1.571	2000029	N	""	2018	2018,2019,2020,2021,2022,2023,2024	4	""	""	""	""	""	""	1548.16052249737
675	686	113693	68	CON	2018-06-15T00:00:00	2024-12-30T00:00:00	2018-06-02T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	Gordie Howe International Bridge Plaza	Gordie Howe International Bridge Plaza	Gordie Howe International Bridge-Plaza Area	Plaza work	Southeast Michigan Council of Governments [SEMCOG]	Wayne	Detroit TSC	34	53500000		""	New Road	New Roads	Road	0.555	1.37	2000022	N	""	2018	2018,2019,2020,2021,2022,2023,2024	4	""	""	""	""	""	""	1311.76658223145
676	687	113716	68	CON	2018-06-15T00:00:00	2024-12-30T00:00:00	2018-06-15T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	Gordie Howe International Bridge	Gordie Howe International Bridge	At the Gordie Howe International Bridge	Expenditure tracking	Southeast Michigan Council of Governments [SEMCOG]	Wayne	Detroit TSC	34	9250000		""	Project Management Contract	Contracts	Planning, Research & Design	0	0.77	2000032	N	""	2018	2018,2019,2020,2021,2022,2023,2024	4	""	""	""	""	""	""	1237.84103918089
677	688	113716	68	CON	2018-06-15T00:00:00	2024-12-30T00:00:00	2018-06-15T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	Gordie Howe International Bridge	Gordie Howe International Bridge	At the Gordie Howe International Bridge	Expenditure tracking	Southeast Michigan Council of Governments [SEMCOG]	Wayne	Detroit TSC	34	9250000		""	Project Management Contract	Contracts	Planning, Research & Design	0	1.625	2000029	N	""	2018	2018,2019,2020,2021,2022,2023,2024	4	""	""	""	""	""	""	2614.25798008468
678	689	113716	68	CON	2018-06-15T00:00:00	2024-12-30T00:00:00	2018-06-15T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	Gordie Howe International Bridge	Gordie Howe International Bridge	At the Gordie Howe International Bridge	Expenditure tracking	Southeast Michigan Council of Governments [SEMCOG]	Wayne	Detroit TSC	34	9250000		""	Project Management Contract	Contracts	Planning, Research & Design	0	1.948	2000022	Y	""	2018	2018,2019,2020,2021,2022,2023,2024	4	""	""	""	""	""	""	3135.59187964331
679	690	113716	68	CON	2018-06-15T00:00:00	2024-12-30T00:00:00	2018-06-15T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	Gordie Howe International Bridge	Gordie Howe International Bridge	At the Gordie Howe International Bridge	Expenditure tracking	Southeast Michigan Council of Governments [SEMCOG]	Wayne	Detroit TSC	34	9250000		""	Project Management Contract	Contracts	Planning, Research & Design	0	0.659	2000026	N	""	2018	2018,2019,2020,2021,2022,2023,2024	4	""	""	""	""	""	""	1061.28535294526
680	691	113716	68	CON	2018-06-15T00:00:00	2024-12-30T00:00:00	2018-06-15T00:00:00	Approved	2529	Fiscal Year 2025 - Fiscal Year 2029	Fiscal Year 2025 - Fiscal Year 2029	T	Trunkline	Gordie Howe International Bridge	Gordie Howe International Bridge	At the Gordie Howe International Bridge	Expenditure tracking	Southeast Michigan Council of Governments [SEMCOG]	Wayne	Detroit TSC	34	9250000		""	Project Management Contract	Contracts	Planning, Research & Design	0	0.391	2000025	N	""	2018	2018,2019,2020,2021,2022,2023,2024	4	""	""	""	""	""	""	628.988036744798